vis/nir early operations - nasa · vis/nir early operations airs science team meeting solvang,...
TRANSCRIPT
![Page 1: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/1.jpg)
Hofstadter 1
Vis/NIR Early Operations
AIRS Science Team Meeting
Solvang, California
2 May 2002
Mark Hofstadter, JPL
![Page 2: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/2.jpg)
Hofstadter 2
Summary• Vis data expected to start around launch +15 days. Variabilityindex, radiance maps, and NDVI maps available immediately.
• At launch, radiances are not calibrated. First calibratedradiances will start around 1 month after first-light.
• Co-registration of the 4 Vis channels and rough Vis to IR co-registration approximately 1 month after first light.
• Cloud detection over ocean expected to be working twomonths after first light.
• Improved vicarious calibration, cloud detection over land, andimproved co-registration ~4 months after first light.
Vis/NIR Early Operations
![Page 3: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/3.jpg)
Hofstadter 3
At Launch ProductsVis expected to start around launch +15. Variability indices,radiance maps, and NDVI maps available immediately.
Vis/NIR Early Operations
Daily NDVI (“VegMap”) Product.
![Page 4: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/4.jpg)
Hofstadter 4
At Launch Products (Continued)
Vis/NIR Early Operations
Multi-Day NDVI (“VegMap10X”) Product.
![Page 5: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/5.jpg)
Hofstadter 5
At Launch Products (Continued)
Vis/NIR Early Operations
Variability Index Radiance maps (Channel 1 shown)
![Page 6: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/6.jpg)
Hofstadter 6
Radiance CalibrationAt launch, radiances are not calibrated. First calibratedradiances will start around 1 month after first-light.
• Initial vicarious calibration can use model-predictedsurface and cloud reflectivities.
• In addition, a MISR-Terra field campaign expects to be inRailroad Valley Playa, Nevada, from late May to Mid-July.They have agreed to support AIRS-Aqua overflights.
Vis/NIR Early Operations
![Page 7: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/7.jpg)
Hofstadter 7
Radiance Calibration (Continued)
Vis/NIR Early Operations
Lunar Lake Playa, Nevada, as seen by AirMISR
![Page 8: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/8.jpg)
Hofstadter 8
Radiance Calibration (Continued)
Vis/NIR Early Operations
![Page 9: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/9.jpg)
Hofstadter 9
![Page 10: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/10.jpg)
Hofstadter 10
Initial Co-Registration/GeolocationCo-registration of the 4 Vis channels and rough Vis to IRcoregistration approximately 1 month after first light.
• Co-registration initially done “by hand”, using Vendavaltools allowing images to be overlaid and translated withrespect to each other.
• Absolute geolocation information from MISR data.
• Expect accuracy ~ 0.5 pixel (1 km) among Vis channels.
Vis/NIR Early Operations
![Page 11: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/11.jpg)
Hofstadter 11
Early Cloud DetectionCloud detection over ocean expected to be working two monthsafter first light.
• Detailed presentation given by UCSB at last scienceteam meeting.
Vis/NIR Early Operations
True vs. Vis retrieved cloud fraction. Vis vs. IR retrieved cloud fraction.
![Page 12: Vis/NIR Early Operations - NASA · Vis/NIR Early Operations AIRS Science Team Meeting Solvang, California 2 May 2002 ... • Absolute geolocation information from MISR data. • Expect](https://reader033.vdocuments.mx/reader033/viewer/2022053010/5f0d83c77e708231d43abd2c/html5/thumbnails/12.jpg)
Hofstadter 12
Mid-Term ProductsImproved vicarious calibration, cloud detection over land, andimproved co-registration ~4 months after first light.
• Additional vicarious calibration activities.
• Better radiances and development of surface NDVI mapsimprove cloud detection.
• Minimization of image differences used to co-register/geolocate images to a fraction of a pixel.
Vis/NIR Early Operations