Draft as of 3/30/20 DRAFT October 14,2020
VIRTUAL PUBLIC MEETINGOctober 21, 2020Materials Available Online October 14 – 30
![Page 2: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/2.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
MEETING FOCUS & FORMAT
• Team Presentation – 40 Minutes
• Moderated Q & A – 60 minutes
• Closing & Next Steps – 10 minutes
MEETING FORMAT
• Mics muted unless speaking
• Raise your hand for questions
• Chat: type questions here
• Meeting & chat are being recorded
![Page 3: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/3.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
ZOOM GROUND RULES• Everyone is encouraged to participate.
The Facilitator will go down the list of questions.
• No one or two individuals should dominate a discussion. If you have already voiced your ideas, let others have an opportunity. When you speak, be brief and to the point.
• Listen to and respect other points of view.
• This is a public discussion, not a debate. The purpose is not to win an argument, but to hear many points of view.
![Page 4: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/4.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
TODAY’S PROJECT UPDATE
• Phase 1 Design o Design Modifications North of
Junction Hollow – Boundary St. Realignment
o Design Modifications in Junction Hollow
• Park Features and Landscape Architecture Considerations
• Phase 2 Design o Swinburne Elevated Walkway
& Wall Options
o Sylvan Avenue Options
• Operations Updateo Permit/Conditions of Service
o Shuttle Operations
![Page 5: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/5.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
Phase 1: Junction Hollow & 4 Mile Run
Phase 2: “Chute” Bypass + Lake Connector
![Page 6: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/6.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
CITYWIDE MOBILITY GOALS & OBJECTIVES• No one dies or is seriously injured traveling on city streets
• Every household can access fresh fruits and vegetables within 20 minutes travel of home, without needing a private automobile
• No household must spend more than 45% of income on basic housing + essential transportation
• Walking, rolling, or biking is the most enjoyable choice for short distance trips
• Streets and public rights of way reflect the values of our City and community.
![Page 7: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/7.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PROJECT GOALS & OBJECTIVES
PWSA: Address stormwater and sewer overflow issues
DOMI: Address mobility gaps and increase connectivity and access to jobs and opportunity
Respect the park environment
Preserve and enhance local neighborhood health, safety and quality of life
Advance sustainability by increasing travel by transit, bicycle, walking and other low-emission modes
Support economic development and regeneration, and specifically Hazelwood Green
![Page 8: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/8.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 DESIGN – Features• ADA-compliant access to Panther Hollow parklet, fixing potholes on
Boundary Street• Pedestrian connection from Joncaire Street intersection to Filmore Street• Maintain 3 Rivers Heritage Trail (3RHT) during
construction/reconstruct trail• Reconstruct 3RHT with asphalt paving and lighting, 3RHT not used
for motor vehicles• New mobility trail in Junction Hollow to separate faster-moving
modes of travel such as e-bikes, scooters, and small electric shuttles from walkers, runners, and leisurely cyclists
• Improve bike/ped connections between Oakland and Junction Hollow
FEATURES INCLUDE
![Page 9: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/9.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 DESIGN – Boundary Street
• Realign within City Right-of-way
• Three Rivers Heritage Trail will run beside realigned street near CMU parking/maintenance facilities
![Page 10: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/10.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 DESIGN – Boundary StreetTypical Section A
![Page 11: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/11.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 DESIGN – Junction Hollow
![Page 12: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/12.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 DESIGN – Junction Hollow South Typical Section
>>
![Page 13: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/13.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 DESIGN – Junction Hollow North Typical Section
![Page 14: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/14.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 – LANDSCAPE ARCHITECTURE
EXISTING SITE PHOTOGRAPHS
![Page 15: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/15.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PRECEDENT IMAGERY: FIELDS, TRAILS & SITE FURNISHINGS
PHASE 1 – LANDSCAPE ARCHITECTURE
![Page 16: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/16.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 – LANDSCAPE ARCHITECTURE
PRECEDENT IMAGERY: GATEWAYS/SIGNAGE/ART & PROGRAMMING
![Page 17: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/17.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 – LANDSCAPE ARCHITECTURE
PRECEDENT LANDSCAPE IMAGERY: MEADOWS & RAIN GARDENS
![Page 18: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/18.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 – LANDSCAPE ARCHITECTUREPRECEDENT LANDSCAPE IMAGERY: TREES & SHRUBS
![Page 19: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/19.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 – LANDSCAPE ARCHITECTUREPRECEDENT LANDSCAPE IMAGERY: TREES & SHRUBS
![Page 20: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/20.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 1 – LANDSCAPE ARCHITECTUREILLUSTRATIVE PLAN
![Page 21: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/21.jpg)
Draft as of 3/30/20 DRAFT October 14,2020
PHASE 2 DESIGN -Sylvan Avenue
FEATURES INCLUDE
• Create Sylvan Avenue Bike/Ped Corridor
• Connect Three Rivers Heritage Trail to Panther Hollow Lake
• Swinburne Connection
![Page 22: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/22.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 2 DESIGN – Swinburne Connection• Trails travel below
Swinburne Street from lower athletic field to curve above railroad
• Connection to the Swinburne Street Bridge from that curve via Swinburne Street
• Mobility Trail connects to Second Avenue at intersection with Swinburne
DR
AFT
![Page 23: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/23.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 2 DESIGN – Swinburne Elevated Walkway Option
![Page 24: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/24.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 2 DESIGN – Swinburne Wall Option
![Page 25: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/25.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 2 DESIGN – Sylvan Avenue
![Page 26: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/26.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
PHASE 2 DESIGN – Sylvan AvenueTYPICAL SECTION – MOBILITY TRAIL BOARDWALK OPTION
![Page 27: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/27.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
TYPICAL SECTION – MOBILITY TRAIL REPURPOSING EXISTING PAVEMENT
PHASE 2 DESIGN – Sylvan Avenue
![Page 28: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/28.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
TYPICAL SECTION - MOBILITY TRAIL PROPOSED SECTION IN HISTORIC LANDSLIDE AREA
PHASE 2 DESIGN – Sylvan Avenue
![Page 29: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/29.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
• Publicly available service• Operated by a licensed driver
(natural person, in vehicle)• Conform with submitted and
approved Operating Plan• Public data reporting
• Real time speed and location via open API
• Monthly reporting of utilization, safety, maintenance, etc.)
• City reserves the right to revoke permit at any time
• Maximum vehicle dimensions: 7’ (W) x 20’ (L) x 9’6” (H)
• Fully loaded gross vehicle weight: 12,000 lbs.
• Electric propulsion only• Wheelchair accessible• Mobility trail use
• Maximum speed = 15 MPH• Maximum # of vehicles on trail = 1
![Page 30: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/30.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
•
![Page 31: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/31.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 32: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/32.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 33: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/33.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 34: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/34.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 35: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/35.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 36: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/36.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 37: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/37.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 38: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/38.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 39: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/39.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 40: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/40.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 41: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/41.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 42: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/42.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 43: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/43.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
![Page 44: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/44.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
NEXT STEPS
PHASE I -JUNCTION HOLLOW & THE RUN
SEGMENTS
PHASE II -SYLVAN
SEGMENT
Geotechnical Investigation
Preliminary Design
Final Design
Lidar Survey & Mapping Development
Preliminary Design
Geotechnical Investigation
Lidar Survey & Mapping Development
Final Bid Package
Final Bid Package
Final Design
2019 2020 2021
![Page 45: VIRTUAL PUBLIC MEETING - mon-oaklandmobility.com](https://reader033.vdocuments.mx/reader033/viewer/2022041903/6254e13ebbb9597f7e72754b/html5/thumbnails/45.jpg)
Draft as of 3/30/20 DRAFT October 14,2020DRAFT October 14,2020
NEXT STEPS
• Opportunities for public comment:
• On-line Meeting Materials: https://mon-oaklandmobility.com/virtual-meeting
• Questions about the shuttle: [email protected]
• Final design of Phase II: Sylvan segment