Fredericksburg DistrictBy the numbers
Commuters
37 percent in Fredericksburg area
53 percent in Middle Peninsula
Bridges
800+ bridges
2 movable structuresEltham Bridge
Gwynn’s Island Bridge
Ferry Service
2 ferriesMerry Point Ferry
Sunnybank Ferry
Employees
534 people
People
500,000 residents(approximately)
Virginia Department of Transportation
Interstate 95 ProjectsFredericksburg Area
Major I-95
construction is underway!
Interstate 95 ProjectsFredericksburg Area
More than $1 billion invested
to unlock I-95 gridlock
I-95 Express Lanes Fredericksburg Extension
($565 million)
I-95 Exit 140 Diverging Diamond Interchange and
Widening
($195 million)
I-95 Rappahannock River Crossing – NB and SB
($132 million + $132 million)
I-95 Exit 126 Southbound Ramp Improvement
($14.5 million)
6
I-95 Fredericksburg Area Improvements Timeline
2019 2020 2021 2022 2023 2024
Exit 140 – Diverging
Diamond Interchange
I-95 Express Lanes Fredericksburg Extension
“Fred Ex”
I-95 Southbound Rappahannock River Crossing
I-95 Northbound Rappahannock River
Crossing
All
new
lanes
open
to
traffic
We are here
I-95 Northbound Rappahannock River Crossing
Exit 126 Ramp Improvements
7
Virginia Department of Transportation
Beyond I-95 highway expansion …. • Passenger rail service
• Operational upgrades
• Clearing incidents faster
• Adds new lanes between Route 3 and Route 17 interchanges to separate local and through traffic
• Interfaces with 95 Express Lanes extension at Route 17 interchange area
• Requires new northbound bridge over Rappahannock River
Coming Soon: I-95 Northbound Rappahannock River Crossing
Construction begins: Late 2020 to Early 2021
Construction complete: Summer 2024
Construction cost: $132 million
Contractor: Under procurement
9
10
Agenda: Fredericksburg District
Project Development
Michelle Shropshire, P.E.
Assistant District Administrator for Project Development
Maintenance
Robbie Prezioso, P.E.
Assistant District Administrator for Maintenance
Structure & Bridge
Annette Adams, P.E.
District Structure and Bridge Engineer
Construction
Michael T. Coffey, P.E.
Assistant District Administrator for Construction
Questions and Discussion
VTCA DISTRICT DIALOGUE 2020MICHELLE A. SHROPSHIRE, P.E., DBIAADE - PROJECT DEVELOPMENT
Virginia Department of Transportation
2020 UPCOMING ADVERTISEMENTS…
Route 17 – I-95 Bridge to Hospital Boulevard
• Advertisement – 8/11/2020
• CN Budget – $20,804,170
Virginia Department of Transportation
Route 2092 – Secondary Access North of Route 606
• Advertisement – 9/8/2020
• CN Budget – $10,894,030
• Advertisement – 9/8/2020
• CN Budget – $3,590,000
Route 606 West - Mudd Tavern Road
2020 UPCOMING ADVERTISEMENTS…
Virginia Department of Transportation
2020 UPCOMING ADVERTISEMENTS…
Commuter Parking Lot Route 1 at Commonwealth Drive
• Advertisement – 8/11/2020
• CN Budget – $11,192,233
Virginia Department of Transportation
2020 UPCOMING ADVERTISEMENTS…
Route 3 Passing Lanes Potomac Mills/Flat Iron Road
• Advertisement – 9/8/2020
• CN Budget – $9,750,000
Virginia Department of Transportation
2020 UPCOMING ADVERTISEMENTS…
Saluda Residency
ProjectAdvertisement
DateCN Budget
Route 17B/14/3 Intersection Improvements 8/11/2020 $ 1,220,500
Route 17 Corridor Improvements 8/10/2021* $ 675,000
*Anticipated advancement to late 2020
Virginia Department of Transportation
2020 UPCOMING ADVERTISEMENTS…
Locally Administered Projects (LAPs)
ProjectAdvertisement
DateCN Budget
Virginia Central Railway (VCR) Trail Bridge Spring 2020 $ 305,000
King George Middle School Turn Lanes Feb 21, 2020 (re-advertised) $ 316,000
Virginia Department of Transportation
UPCOMING ADVERTISEMENTS…
Route 1 / 630 Area Corridor Road Improvements
• Locally Administered Project
• Advertisement – 9/1/2020
• CN Budget – $7,955,000
19
• I-95/630 Commuter Parking Lot Expand
• Rappahannock River Crossing SB
• Rte. 301/Dahlgren Turn Lanes
• Rappahannock Comm. College
Access Improvements
• Rte. 1/Potomac Creek Turn Lane
• King & Queen Telework Center
• Rte. 1 at Woodstock Lane/Telegraph Rd
• Rte. 17 Corridor Improvements (Tappahannock)
• Rte. 30/360 Intersection Improvements 1/14/20
• Rte.17 Ped. SB Improvements 2/11/20
• Rte. 17/17B Pedestrian Improvements 2/11/20
• VCR Trail Bridge
FREDERICKSBURG DISTRICT
ROUND 1 SMART SCALE PROJECTS
AdvertisedPH /
Design ApprovalAuthorize Right of Way
• Rte. 639 Widening – Ladysmith
• Rte. 606 West Mudd Tavern
• Rte. 17/I-95 Bridge to Hospital Blvd.
• Rte. 17B/14/3 Intersection Improvements
• Rte. 1 Commonwealth Dr. Commuter Pkg. Lot
• Rte. 3 Passing Lanes (Potomac Mills-Flat Iron)
• Rte. 1 Courthouse Area Corridor Improvements
Virginia Department of Transportation
Under
ConstructionCN Complete
20
• Rte. 208 and Hood Drive Intersection Improvement
• Sharon Rd Park & Ride Improvements
• Loretto Park & Ride Improvements
• Twin Lake-Kensington Bike/Pedestrian Connector
• Rte. 738/639 Intersection Improvements
• Lafayette Blvd./Harrison Road Turn Lane
• I-95 Exit 126/Rte. 1 Improvements
• Dahlgren Rte. 301 SB Turn Lane Extension 1/7/20
FREDERICKSBURG DISTRICT
ROUND 2 SMART SCALE PROJECTS
PE Starting Scoping AdvertisedPH /
Design Approval
Authorize
Right of Way
Virginia Department of Transportation
March/April 2020
• Improve Brooke VRE Station
• Leeland Road VRE Parking Expansion
July 2020
• Improve Leeland VRE Station
July 2021
• VRE Crossroads Maintenance and Storage Facility
21
• Rte. 1/Fall Hill Ave. Intersection Improvements
• Rte. 206/218 Right Turn Lane
• Rte. 360/619 Intersection Improvements
• Harrison Rd. & Salem Church
FREDERICKSBURG DISTRICT
ROUND 3 SMART SCALE PROJECTS
Virginia Department of Transportation
• Rte. 624 – Expanded Turn Lane for Flat Iron Rd.
2021
• Rte. 1/Enon Rd. Intersection & Roadway Imp
2022
• Rte. 301/University Dr./Market Ctr. Double R-Cut
• Rte. 301/Rte. 3 Median U-Turn Intersection
2023
• Dixon St./Lansdowne Road Intersection Improvements
• Bike/Ped Improvements on Rte. 17B/Main St.
• Intersection Improvements at Stefangia/Mountain View
• Rte. 3 STARS Study & I-95 Off-Ramp Improvements
• Kilmarnock Right Turn Lane
2024
• Lafayette Blvd/Kenmore Ave/Charles St. Roundabouts
• Fred Transit – Shelters and Benches
cPE Starting Scoping AdvertisedPH /
Design Approval
Authorize
Right of Way
Virginia Department of Transportation
• Guiding localities through the process
• Understanding the funding source
• Developing realistic schedules
• Developing estimates that capture all
aspects of a project
• Comprehending processes/procedures
• Consensus on technical requirements
Locally Administered Projects
A Pathway for Success…
Virginia Department of Transportation
24
VTCA DISTRICT DIALOGUE 2020ROBBIE PREZIOSO, P.E.ADE - MAINTENANCE
Virginia Department of Transportation
FREDERICKSBURG DISTRICT
MAINTENANCE – Resurfacing Program
• Fredericksburg District:
• Comprised of Fourteen Counties, Spanning 11,925 Lane Miles
• Divided Between Three Residencies
• Fredericksburg Residency – 39.27% of primary and secondary LM’s
• Saluda Residency – 32.37% of primary and secondary LM’s
• Northern Neck Residency – 28.35% of primary and secondary LM’s
• Total District Lane Miles 11,925
• Interstate System Lane Miles – 281
• Primary System Lane Miles – 2,190
• Secondary System Lane Miles – 9,454
Virginia Department of Transportation
FREDERICKSBURG DISTRICT - MAINTENANCE
27
FREDERICKSBURG DISTRICT - MAINTENANCE
Fredericksburg District’s Distribution Of Lane Miles
28
FREDERICKSBURG DISTRICT - MAINTENANCE
Resurfacing Funding Trend
Virginia Department of Transportation
FREDERICKSBURG DISTRICT - MAINTENANCE
• 2019 Pavement Conditions
• Interstate System, 281 lane miles
• Target 82% Sufficient; Currently 99% Sufficient
Virginia Department of Transportation
FREDERICKSBURG DISTRICT - MAINTENANCE
• 2019 Pavement Conditions
• Primary System, 2,190 lane miles
• Target 82% Sufficient; Currently 85% Sufficient
Virginia Department of Transportation
FREDERICKSBURG DISTRICT - MAINTENANCE
• 2019 Pavement Conditions
• Secondary System, 9,454 lane miles
• Target 65% Sufficient; Currently 52% Sufficient
32
FREDERICKSBURG DISTRICT - MAINTENANCE
Fredericksburg District’s Pavement Conditions
Sufficient Pavement By System
System Target 2019 2018 2017 2016 2015
Interstate 82% 99% 99.3% 100% 100% 100%
Primary 82% 85% 85.4% 83.9% 84.6% 79.6%
Secondary 65% 52% 57.3% 58.5% 60.2% 64.1%
• Chart below represent five year historical conditions
• Graph represents the new metrics known as the “Tiered
Approach” pavement conditions.
• Based on traffic volumes above and below AADT of 3,500
33
FREDERICKSBURG DISTRICT - MAINTENANCE
2020 Fredericksburg District
Resurfacing Planned Contracts
Treatment # of ContractsApproximate
Quantities
Approx. Contract
Value
Plant Mix 6 151,714 Tons $16.56M
Slurry Seal 1 319,578 SY $ 1.04M
Latex 1 2,114 Tons $850K
Surface Treatment 3 1,134,900 SY $2.6M
Total 7 $21.05M
• Success Stories
• Asphalt Content and Density Adjustments
• Contractors are achieving a high percentage of incentive adjustments
• Rideability Pay Adjustment Results
• Pleased with 2016 thru 2018 results,
however; for 2019, pay adjustments
have slipped
• 2016 - 17.00% of eligible incentive
• 2017 - 22.65% of eligible incentive
• 2018 - 39.48% of eligible incentive
• 2019 - 4.8% of eligible incentive
Virginia Department of Transportation
FREDERICKSBURG DISTRICT - MAINTENANCE
• Challenges
• Maintenance of Traffic
• Day work or night work. Disrupt daytime traffic and commerce flow or
the ability for folks to sleep at night……
• Resurfacing Material Performance
• Premature rutting
• End load segregation
Virginia Department of Transportation
FREDERICKSBURG DISTRICT - MAINTENANCE
36
VTCA DISTRICT DIALOGUE 2020ANNETTE ADAMS, P.E.DISTRICT BRIDGE ENGINEER
• 98.8% non-SD with no load postings
• 1 SD bridge – Rte. 95 SB over Rte. 17
• In CN with Rte. 95 SB CD
Rappahannock River Crossing
37
FREDERICKSBURG DISTRICT MAINTENANCE
CURRENT STATUS OF STRUCTURES
INTERSTATE
New Performance Measure Target – 97% non-Structurally Deficient
AND no Load Postings
• 92.3% non-SD
• 20 SD bridges and culverts
• 2 in CN
• 9 in SYP design
• 4 in MN design
• 4 are SGR candidates
• 1 currently not in plan
38
FREDERICKSBURG DISTRICT MAINTENANCE
CURRENT STATUS OF STRUCTURES
PRIMARY
New Performance Measure Target – 93% non-Structurally Deficient
207 WB Mattaponi River
17SB Dragon Run
• 95.5% non-SD
• 22 SD bridges and culverts
• 6 in CN
• 5 in SYP design
• 8 in MN design
• 2 are SGR candidates
• 1 to be abandoned
39
FREDERICKSBURG DISTRICT MAINTENANCE
CURRENT STATUS OF STRUCTURES
SECONDARY
New Performance Measure Target – 90% non-Structurally Deficient
617 Exol Swamp
King & Queen County620 Piscataway Creek
Essex County
751 Whitson’s Run
Stafford County
652 Rte. 95
Stafford County
619 Rickenaw Creek
King & Queen County
632 Harrison’s Creek
King William County
• Currently 6.3
• Average of all components
• Bridges – 3 components: Deck, Superstructure, Substructure
• Culvert – 1 component
40
FREDERICKSBURG DISTRICT MAINTENANCE
CURRENT STATUS OF STRUCTURES
GENERAL CONDITION RATING
New Performance Measure Target – Minimum 5.6
41
FREDERICKSBURG DISTRICT MAINTENANCE
WEST POINT BRIDGES
Post-Tensioning Update
Route Description
30 Eltham Bridge
Pamunkey River
33 Lord Delaware Bridge
Mattaponi River
PT Acoustic Emission
Monitoring
Currently being Installed
Concrete Superstructure
Repair
42
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES) -
FY20/21 Maintenance Program
Route Description Ad Date CN Estimate
3 – UPC 113839
17 – UPC 115729
Beam End Repairs over CSX RR
Re-Advertisement
March 2020 $4 million
Various
UPC 115153
District Wide Bridge Cleaning
Multi-Term
Spring 2020 $0.7 million
30 and 33
UPC 116636
Post-Tensioned Concrete Beam Repair
Eltham Bridge - Pamunkey River
Lord Delaware Bridge – Mattaponi River
Fall 2020 $5 million
223
UPC 116216
Center Bearing, Mechanical Rehabilitation
Gwynn Island Bridge
Mathews County
Winter 2020 $12 million
43
State of Good Repair Bridge Program
2020 Advertisements
UPC 102936
Bridge Replacement
AD January 2020
LET February 2020
$5 million
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES)
Route Description
1 Potomac Creek
Stafford County
44
State of Good Repair Bridge Program
2020 Advertisements
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES)UPC 113807 and UPC 116457
2 Culvert Replacements
AD April 2020
$2.5 million
Route Description
1470
(SGR)
Stream
Spotsylvania County
1621
(MN)
Black Meadow Creek
Spotsylvania County
45
State of Good Repair Bridge Program
2020 Advertisements
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES)
Route Description
743 South River
Caroline County
UPC 111392
Bridge Replacement
AD September 2020
$1.1 million
46
State of Good Repair Bridge Program
2020 Advertisements
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES)
Route Description
14 Poropotank Creek
King & Queen County
UPC 110097
Bridge Replacement
AD October 2020
$2.5 million
47
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES)
State of Good Repair Bridge Program
Chatham Bridge
Route Description
3 Rappahannock River
Stafford County
City of Fredericksburg
UPC 105535/110822
Superstructure Replacement
AD January 2020
LET March 2020
$20.4 million
48
State of Good Repair Bridge Program
Chatham Bridge
➢Old Stone Warehouse
Circa 1813
Virginia Landmarks Register
National Register of Historic Places
Stone Masonry exterior walls
Bracing during construction
Vibration monitoring
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES)
49
State of Good Repair Bridge Program 2021-2025 Advertisements
UPC Route Description CN Est
113853 652 Polecat Creek – Bridge Replacement
Caroline County, December 2022
$2.5 million
111406 1 Chopawamsic Creek – Bridge Replacement
Stafford County, August 2023
$8 million
111390 14 Northend Branch – Bridge Super Replacement
Mathews County, August 2024
$3.5 million
111391 3 Burke Mill Stream – Bridge Super Replacement
Mathews County, August 2024
$5.5 million
113851 644 Aquia Creek – Bridge Replacement
Stafford County, September 2024
$5 million
113850 607 Dragon Run – Bridge Replacement
Essex County, September 2024
$3 million
113852 638 South River – Bridge Replacement
Caroline County, September 2025
$4 million
FREDERICKSBURG DISTRICT MAINTENANCE
UPCOMING PROJECTS (BRIDGES)
50
FREDERICKSBURG DISTRICT MAINTENANCE
CONSULTANT SERVICES (BRIDGES)
➢ Statewide Bridge Professional Services (SB20180111)
HDR
AECOM
WRA
HNTB
Moffatt NicholTerm 1 (Term 2 begins July 2020)
➢ Statewide Movable Bridge Engineering Services (SB20170523)
HDR Engineering
Term 3 begins March 4, 2020
➢ Statewide Structure Load Rating (SB20171003)
AI Engineers
WSP
Term 2 began February 2020
➢ Statewide Underwater Structure Inspection (SB20170817)
Collins
Term 2 began February 2020
➢ Fredericksburg District Structure Inspection (SB20160609)
Michael Baker
Term 3, ends January 2021
Pennoni
Contract Complete
51
FREDERICKSBURG DISTRICT MAINTENANCE
CONSULTANT SERVICES (BRIDGES)
Construction
Michael T. Coffey, P.E.
Assistant District Administrator for
52
FREDERICKSBURG DISTRICT
Final Completion Date: July 31, 2020
Construction Award: $99,949,969.50 ($1,080,000 early completion bonus)
Contractor: Shirley Contracting Company
• Diverging Diamond Interchange
• Park and Ride Lot
• Widening Rte 630 from 2 lanes to 4 lanes divided from Rte 1 to Ramoth Church Rd.
53
FREDERICKSBURG DISTRICT
Interstate 95/Route 630 (Courthouse Road) Interchange
Relocation and Route 630 Widening (Stafford County)
54
FREDERICKSBURG DISTRICT
Interstate 95/Route 630 (Courthouse Road) Interchange
Relocation and Route 630 Widening (Stafford County)
55
Contractor: Wagman Heavy Civil
Completion Date: May 26, 2022
Construction Award: $101,608,779
Early Completion Incentives of up to $2,299,980
FREDERICKSBURG DISTRICT
I-95 Southbound CD Lanes and River Crossing
Spotsylvania County/City of Fredericksburg
• Adds new lanes between Route 3 and Route 17 interchanges to separate local and through traffic
• Interfaces with 95 Express Lanes extension at Route 17 interchange area
• Requires new northbound bridge over Rappahannock River
Coming Soon: I-95 Northbound Rappahannock River Crossing
Construction begins: Late 2020 to Early 2021
Construction complete: Summer 2024
Construction cost: $132 million
Contractor: Under procurement
56
Construction began: Summer 2019
Construction complete: Open to traffic late 2022, work complete in 2023
Project cost: $565 million
Contractor: Branch Civil and Flatiron Joint Venture and HNTB
Where: I-95 from approximately Exit 143 to Exit 133
Under Construction: 95 Express Lanes Fredericksburg Extension (FredEx)
57
58
Contractor: Henderson Construction
Completion Date: June 1, 2020
Construction Award: $2,646,937
Early Completion Incentives of up to $27,000
FREDERICKSBURG DISTRICT
Ferry Road Improvements – Stafford County
59
Contractor: Burleigh Construction
Completion Date: 11/20/2020
Construction Award: $1,087,092
FREDERICKSBURG DISTRICT
Route 620 over Piscataway Creek, Essex County
Saluda Residency
60
Contractor: Corman Kokosing Construction
Completion Date: 11/19/2021
Construction Award: $5,713,540
FREDERICKSBURG DISTRICT
Route 207 Bridge over Mattaponi River, Caroline County
Fredericksburg Residency
61
Contractor: Corman Kokosing Construction
Completion Date: 11/20/2020
Construction Award: $1,352,052
FREDERICKSBURG DISTRICT
Route 617 Bridge over Exol Swamp,
King & Queen County, Saluda Residency
62
Contractor: J. Saunders Construction Company
Completion Date: 08/15/2021
Construction Award: $2,769,687
FREDERICKSBURG DISTRICT
Route 17 Bridge over Dragon Run, Middlesex County
Saluda Residency
63
Contractor: Abernathy Construction
Completion Date: 09/29/2020
Construction Award: $1,067,062
FREDERICKSBURG DISTRICT
Route 632 over Harrison Creek, King William County,
Saluda Residency
64
FREDERICKSBURG DISTRICT
Consultant Services
District-wide CEI: 2020 Est.
Peak StaffingVDOT Consultant
Percentage
Outsourced
Inspectors
Trainees
included
14 20 59%
Construction
Managers/
Office Engineer
5 3 38%
Project
Controls3 2 40%
Total 21 25 54%
65
FREDERICKSBURG DISTRICT
Consultant Services
Fredericksburg District CEI Services
(FRED-20151201) $4,000,000 per term
A. Morton Thomas, Inc.Term 3
Expires 04/2020
Fredericksburg District CEI Services
(FRED-20180607) $3,000,000 per term
ATCS, PLCTerm 1
Expires 11/2022
66
FREDERICKSBURG DISTRICT
Construction
67
FY ’20 CQIP
91% Target
FREDERICKSBURG DISTRICT
Construction
68
FY ‘20 CQIP
Process vs Product
FREDERICKSBURG DISTRICT
Construction
69
FY ‘20 CQIP
District Compliance By Checklist Section
FREDERICKSBURG DISTRICT
Construction
▪ Design Build Quality Control and Quality Assurance
▪ Resolve issues at the appropriate level.
▪ Making common sense engineering and construction decisions.
▪ Paving Schedule – Maintenance of Traffic
▪ Working smart through technology (PlanGrid, OxBlue, UAVs)
70
FREDERICKSBURG DISTRICT
Construction – Focus for 2020
QUESTIONS?
71
FREDERICKSBURG DISTRICT