Page 1: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

7/8/2018

Virginia Beach Stormwater Master Plan Model

Model Content and Application Technical Guidance

Page 2: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Meeting Outline

Introduction Overview Source data and datum

Methodology Hydrology Hydraulics Boundary conditions Model validation

Master plan model application Master plan model application Master plan model limitations Examples

2

Page 3: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

City Watersheds and Model Status

3

Page 4: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

City Watersheds and Model Status

4

Page 5: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Model Software

5

Storm Water Management Model (SWMM)

Computational Hydraulics International

Page 6: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Model Resolution

Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater Management Facilities (SWMF) Overland flow paths 2-D modeling where applicable Based on Public Works Stormwater Infrastructure GIS Models continue downstream to MS4 outfall and/or tidal

boundary condition North American Vertical Datum of 1988 (NAVD 88)

Included conversions from NGVD 1929 and NGVD 1929 with 1972 adjustment

6

Page 7: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Methodology

Page 8: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydrology

Subbasin Geometry Boundaries (DEM/contour lines/sewer network) Flow width (Area weighted) Slope Area Outlet

Outlet

SubcatchmentBoundary

8

Page 9: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydrology

Lx: Flow path lengthSx: Flow path slopeWx: Flow path width

Flow Width (three-path approach)

9

Page 10: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydrology

Subbasin Runoff Parameters (Landuse) Impervious area Surface runoff roughness (Manning’s

Roughness Coefficient) Initial abstraction (Depression storage) Subarea routing (Impervious pervious OR

pervious impervious) Percent routed between subareas Flow routing method (Kinematic/Dynamic

Wave)

10

Page 11: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydrology (Rainfall Patterns and Inputs)

Historical rainfall (Rain gauge data) for model calibration

Design storm rainfall for master plan simulations NOAA Atlas 14 Type C One set of rainfall hyetographs for the entire City

Rainfall depth Based on values at the Centroid of the City (Watershed 6)

Temporal pattern Based on shape of 25-year rainfall hyetograph

11

Page 12: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydrology (Rainfall Patterns and Inputs)

0.000

0.200

0.400

0.600

0.800

1.000

1.200

1.400

1.600

660 670 680 690 700 710 720 730 740 750 760 770 780

Inte

nsity

(in/

hour

)

Time (min)

25 Year

Type CAveraged

Type II

NOAA Atlas 14 Type C Hyetograph

12

Page 13: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydrology (Rainfall Patterns and Inputs)

13

Page 14: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydrology

Infiltration (Soil) Modified Green-Ampt infiltration

Suction Head Conductivity Initial Deficit

(Rainfall depth)

(Depression storage)

INFILTRATION (MODIFIED GREEN-AMPT)

14

Page 15: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydraulics (View in PCSWMM)

15

Outfall

Subbasin load point (storage node)

Junction node

Overflow conduit

Irregular conduit (channel)

Conduit (pipe)

Subbasin

Page 16: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydraulics (2-D Area)

16

2D Grid

Page 17: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydraulics (2-D Area)

17

Dense 2D Grid along roads

Page 18: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydraulics (Lake and SMF Example)

18

Lake Trashmore (storage)

Pipe Length: 147 ft

Model Schematic Length: 660 ft

Page 19: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydraulics – Stage Area Relationships

Conveyance system storage: Stage-area-storage in open (irregular) conduits

Surface storage at storage nodes: stage-storage area relationships computed from topography (LiDAR and GIS)

Approach foundation: No double-counting surface area and conveyance system storage

19

Page 20: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydraulics – Overland Flow

20

Overflow Link

Subbasin boundary

Irregular links used to equalize flood depths between neighboring subbasins

Page 21: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Hydraulics – Overflow links

21

Link transect computed from topography (LiDAR and GIS)

Overflow Link

Page 22: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Storage Node04520-460

Model Representation of Rim

22

Ground Elevation at 04520-460 : 7.1 ft NAVD 88 Model rim: 17.1 ft

Page 23: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Model Validation

Historical rainfall events based on flood call history

Observed and field surveyed high water elevations from 2016

10-year event profile compared with VDOT hydraulic grade line calculation

23

Page 24: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Coordination and References

Section 2 Model Approach

NEEDED: Pictures to Update the City’s Master Drainage Plans https://www.vbgov.com/government/departments/public-

works/storm-water/Pages/storm-pics-master-drain-plan-6-8-17.aspx

Comprehensive Sea Level Rise https://www.vbgov.com/government/departments/public-

works/storm-water/Pages/pw-slr-8-2015.aspx

24

Page 25: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Master Plan Model Application

Page 26: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Master Plan Model Application

Flows and water surface elevations in the PSMS

Locations with surcharging in the PSMS

Performance of storage facilities

Overland flow between subbasins

Surface flooding (storage node water surface elevations)

Influence of downstream tidal conditions

26

Page 27: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Additional Master Plan Model Applications

1. Site specific evaluationsa. Tailwater to support site design b. System flow-routing understanding, “what-if” scenarios for

downstream impacts and improvements

2. Starting Point for refined site-specific evaluationsa. Site specific topography and critical elevationsb. Site specific drainage featuresc. System flow-routing refinements

3. Intent: Provide information and tools to assist with engineering evaluations and compliance with DPW Standards

27

Page 28: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Model Application – Tailwater Conditions

28

Profile view through Thalia Creek

Thalia CreekThalia Creek

Thalia Creek OutfallTailwater during 100YR Event

I 264 Bonney Road

Overflow Conduits

6 barrel 8’ x 7’ RCB

Overflow Conduit

15” RCP

Constitution Drive Trib. VB Blvd

Overflow Conduit

Irregular Conduit (Trib.)

Page 29: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Model Application – Subbasin Conditions

29

Subbasin

Peak storage junction HGL: 11.46 ft NAVD

Peak pipe flow: 16.8 cfs

Peak overland flow: 72.7 cfs

Peak manhole HGL: 11.37 ft NAVD

Page 30: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Master Plan Model Limitations

Results based on available data: GIS stormwater infrastructure GIS invert elevations LiDAR topography data City impervious area City land use City soils data (from NRCS)

Areas upstream of the modeled PSMS

Overland flow within a single subbasin located upstream of the subbasin storage node

30

Page 31: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Application for Site of Interest

31

Page 32: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Application for Site of Interest

32

Page 33: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Master Plan Model Content

33

Steep gradient from edge of catchment to storage node

Desired boundary conditions: 10-year and 100-year HGL Ground elevation 8 feet 10-year HGL = 9.3 feet and 100-year HGL = 10.1 feet

Page 34: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Application for Site of Interest

Overflow at ground level added from node of concern (04520-494) to the storage node downstream in subbasin

34

Model 1: Before adding overland flow conduit

Storage Node

Page 35: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Additional Overland Flow Path

35

Overflow Link

Page 36: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Refined Model Results

36

Model 1 – no overflow link

Model 2 –overflow link added

Page 37: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Refined Model Results

37

Desired boundary conditions: 10-year and 100-year HGL Ground elevation 8 feet 10-year HGL = 8.5 feet and 100-year HGL = 8.7 feet

Page 38: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

38

Master Plan Model

Watershed 10Veteran Care Center

Master Plan Model Refinement to Reflect Existing Conditions

Site Specific Refinement

Page 39: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

39

Step 1: Delete all the

nodes and links that will be updated/replaced with refined data

Page 40: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

40

Step 2: Update the

delineation and runoff parameters of the subbasins to represent the new development.

In this example, it involves splitting two subbasins into six subbasins

Page 41: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

41

Step 3: Add storage nodes

to represent surface storage and detention facilities.

Storage nodes for surface storage are assigned to the subbasin “Outlet”

Add junctions along the hydraulic system

Page 42: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

42

Step 4: Add links to

represent the hydraulic system: Open channels Stormwater pipes

Page 43: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

43

Step 5: Add overland flow

paths connecting adjacent subbasins and the hydraulic system

Page 44: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

44

Step 6a: Build and assign a

stage-storage curve for each storage node

Page 45: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

45

Step 6b: Assign a transect

for each open channel, ditch and overland flow path

Page 46: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement: Storage Assignment

46

Page 47: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement: Storage Assignment

47

Ditch

Overbank

Critical to not double count storage Define ditch storage and overbank storage separately

Page 48: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement: Storage Assignment

48

Ditch Storage: Transect

Page 49: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

49

Example Model Refinement: Storage Assignment

Subbasin (Overbank) Storage Node

Page 50: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater

Example Model Refinement

Overview of model refinement elements Design drawings or “As-Built” drawings GIS refinements (additional pipes and nodes) Additional control structures (not in GIS) Import new GIS Refine subbasins and process parameters Storage curves New open channels New overland flow links Initial depths

50