Vine Trail – Oak Knoll District Napa County Transportation and Planning Agency PROJECT UPDATE The following is a brief description with photos for the Vine Trail – Oak Knoll District project listing activities performed from 12-07-15 – 12-11-15 GBI Installing retaining wall caps between Trower Ave & Redwood Rd. PnR GBI excavating and installing rock for the retaining wall footing between California Dr. & Hoffman Ln. RM Harris & MBI working on forms & pouring of the barrier walls at Dry Creek Bridge. RM Harris & MBI working on forms & pouring Wine Country Box Culvert barrier walls GBI laying retaining wall cap blocks south of Oak Knoll Ave. GBI forming curbs for parking spaces at Wine Country Ave. & Solano Ave. GBI installing cross drains between Luke Dr. and Oak Knoll Ave. PROJECT PROGRESS PHOTOS GBI Installing cap blocks between Trower & Redwood Rd. PnR.

Upload: trancong

Post on 11-Apr-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Vine Trail – Oak Knoll District Napa County Transportation and Planning Agency

PROJECT UPDATE

The following is a brief description with photos for the Vine Trail – Oak Knoll District project listing activities performed from 12-07-15 – 12-11-15 • GBI Installing retaining wall caps between Trower Ave & Redwood Rd. PnR

• GBI excavating and installing rock for the retaining wall footing between California Dr. & Hoffman Ln.

• RM Harris & MBI working on forms & pouring of the barrier walls at Dry Creek Bridge.

• RM Harris & MBI working on forms & pouring Wine Country Box Culvert barrier walls

• GBI laying retaining wall cap blocks south of Oak Knoll Ave.

• GBI forming curbs for parking spaces at Wine Country Ave. & Solano Ave.

GBI installing cross drains between Luke Dr. and Oak Knoll Ave.

PROJECT PROGRESS PHOTOS

GBI Installing cap blocks between Trower & Redwood Rd. PnR.

GBI excavating and installing rock for the retaining wall footing between California Dr. & Hoffman Ln.

RM Harris & MBI working on forms & pouring of the barrier walls at Dry Creek Bridge.

RM Harris & MBI working on forms & pouring Wine Country Box Culvert barrier walls

GBI laying retaining wall cap blocks south of Oak Knoll Ave.

GBI forming curbs for parking spaces at Wine Country Ave. & Solano Ave.

GBI installing cross drains between Luke Dr. and Oak Knoll Ave.

Submitted by: Danny Willow

Construction Manager/Inspector - Consolidated CM The above represents a summary of the Vine Trail Project Activities through the date listed on the notice heading.