Project Activities ……………………………………………………………………. 3
Mission & Vision Statements ………………………………………………… 5
Executive Summary …………………………………………………………………. 6
Tools,Equipments,Software …………………………………………………… 8
Rural Electrification Projects ……………………………………………….. 10
Solar Water heating Act ……………………………………………………….. 12
Technical Team Profiles …………………………………………………………. 13
Community Project (Youth empowerment project) ………….. 19
International Partners ……………………………………………………………. 20
Directors ………………………………………………………………………………….. 21
PROFILE
Gateway Clean Energy (Africa) Ltd. P.O. Box 42794-00100,Nairobi,Telephone: +254-20-2306998,4450417,Email: [email protected]
URL: www.gatewayenergyafrica.com
GATEWAY CLEAN ENERGY (AFRICA) LIMITED
PROJECT ACTIVITIES
1
Power line construction & pole inspection process
transformer inspection remote ough roads
Pole erection power line survey team power line project design update
Hiab crane inspection unit Auger hole drilling machines
2
Warehouse/construction material unit design/survey team Field technical teeam
Typical temporary storage shed in remote areas A remote market center
mm
Power line roads, remote travel conditions,temporary accommodation units for technical teams
SOLAR ENERGY
3
Solar water heating systems installation and plumber training sessions
Solar energy community awareness programmes Solar training and sales center
Directors Renewable Energy Familiarisation tours
Germany (Solar building intergrated unit) China,Solar factory
PROFILE
4
Gateway Clean Energy (Africa) Ltd. P.O. Box 42794-00100,Nairobi,
Telephone: +254-20-2306998,4450417,Email: [email protected] URL: www.gatewayenergyafrica.com
Registered Company : Gateway Clean Energy (Africa ) Ltd. Certificate of Registration Number : CPR/2009/10949KRA Tax Registratiion Certificate : 460810 KRA Tax Payer PIN : P51316268JKenya Revenue Tax Compliance certificate Number: 19/025617/2013 Registered Member : National Construction Authority of Kenya
1. MISSIONTo lessen the large energy deficit in East Africa through the provision of affordable rural electricity to rural areas and providing renewable energy solutions.
2. VISIONTo be a leading Renewable energy provider through application of meaningful, community and environment friendly means.
3. THE COMPANY
Gateway Clean Energy (Africa) Ltd. Was incorporated in 2009 and is a leading Rural Electrification Authority Contractor of power distribution in rural areas and a provider of Renewable
5
energy solutions (Solar water heating systems,Solar lighting,Wind studies,Hybrid (wind/solar systems) in Kenya. Gateway other activities include; power line survey work,preparation of wayleaves,construction and distribution (LV lines) of electricity to government and private institutions,water irrigation schemes and projects,community boreholes,government and community health centers,Schools,colleges,churches and other rural community projects.With years of experience, our engineering team is perfectly suited to attend to all energy related matters of the company. Gateway Energy is small by design. This enhances the Company efficiency and allows it to be better organized in the field. Additionally, this allows each engineer and technician to be well versed on every aspect of a project.Our engineering team has been responsible for a number of excellent achievements in rural electrification projects, renewable energy projects and water plumbing and dams construction works.We value our relationship with our suppliers ,customers and the rural communities. It is a relationship built on mutual trust and professional respect, providing appropriate solutions to their needs. Gateway clean energy (Africa) Ltd. takes pride in its involvement in the energy sector in Kenya and will continue to contribute to a more sustainable future for Kenya and the rest of Eastern Africa. EQUIPMENT,TOOLS & SOFTWARE
Gateway has embraced modern technology in line construction and solar water and lighting installation equipment. We have
6
invested heavily on powerline construction tools (generators,augerbits,auger drills for hole making,pull-lifts,climbing irons,rollers,climbing shoes,pole clamps,drum jacks,etc.). The acquisition of the HiabTrucks and cranes has reduced field time lines in pole erection,conductor laying and stringing works.SOFTWARE
Gateway embraces new technologies in power line construction and recently invested in various softwares includes; Map Source,Auto cad and Auto cad-powerline design and planning ELECTRIFICATION WORKS CONTRACT
Performance bonds
Gateway provides through our Bank performance contract bonds for all our rural electrification construction projects. The bonds are valid for a year and cover any loss or damage to materials during construction. Work programs
Prior to construction of the line, GCEA provides the employer with a program showing the general methods,arrangements,order and timing for all activities in the works.Project management meetings
GCEA holds regular meetings with REA to review the plans for the remaining works. It is during these meetings that issues of variations (if any) of works and other pertinent issues are discussed.Certificates of works
7
GCEA operates under the following terms of works; 30% payments receipts upon completion of the medium voltage line (HT),60% upon completion of the works(HT/LV) and commissioning of the project by Kenya Power & Lighting Engineers and finally the remaining 10% after the expiry of the defects liability period. AFTER SERVICE SALES SERVICE AND PARTS REPLACEMENT
We provide a very efficient service and maintainance of all our projects within the six months defects liability period for powerline construction. For solar water heating and solar panels we provide twenty five (25yrs) warranty on our equipment (see our warranty certificate online). TRAINING
GCEA solar center runs a Plumbers training program three times a week, the purpose of this program is to familiarise them with the installation techniques and maintenance of the GW solar water heating systems. Issuance of training certificates is done upon completion of the one week training.
PROJECTS
4. RURAL ELECTRIFICATION PROJECTS GATEWAY COMPLETED POWERLINE CONSTRUCTION AND
SURVEY WORKS (POWERLINE) PROJECTS
S/NO PROJECTS NAME REA NO LENGTH TYPE
MERU 1 Makandi 04909/1004008 3.5 km 33/0.433KV WAJIR 2 Bute Phase III 03410/1106006 12.7 km 33/0.433KV MARSABIT
8
3 Dakabarichia/Durusa Centre 04309/1002001 11.4km 11/0.433KV
4Manyatta Jilo/Goro Rukesa Centre 04309/1002002 5.86 km 11/0.433KV
5 Garqarsa/Durusa Centre 04309/1002003 2.4 km 11/0.433KV MWINGI NORTH 6 Mama Maria Childrens Home 06011/1211030 7.518km 33/0.433KV7 Wakithuki Phase 1 06012/1303037 11.387km 33/0.433KV8 Wakithuki Phase 2 06012/1303038 14.064km 33/0.433KV9 Mwangea Phase 2 06012/1304039 1 km 33/0.433KV
10 Wakithuki Extension 06012/1308042 1 km 33/0.433KV11 Tseikuru/Kalimbui 06010/1105013 36 km 33/0.433KV MUTITO
12 Mutito - Kawala Secondary School 06412/1301038 28 km 33/0.433KV EMBU
13 Kiambere Mixed Secondary 05812/1303023 5.628 km 33/0.433KV
S/NO
PROJECT (POWERLINE LINE SURVEY WORKS) NAME
REA NO. LENGTH
MWALA 1 1. Iani Market 07111/1201021 1.25 KM2 2. Kunikila Sec. school 07110/1108020 1.8 KM3 3. Katheka Sec/Mrkt 07111/1201022 2.08 KM4 4. Kionyoni/Mkt/bh/Ukulani 07111/1201023 6.13 KM5 5. St. Mark Sec/Kundu 07111/1201024 6.3 KM6 6. St. Martins Sec-lani mkt 07111/1201025 7 KM MALAVA 7 1. Matete Sec 15510/1111025 2.5 KM8 2. Mahusi Sec 15511/1209020 3.2 KM9 3. Lukala Shipala & Malekha 15511/1211022 9.6 KM
10 4. Butali Disp/Comm. BH 15510/1111023 2.81 KM11 5. Namushya Sec 15511/1209026 1.95 KM KAJIADO
12 1. Ngatu Oloontulungum-Olgirra 14511/1201012 12.6 KM MASINGA
13 1. Wamboo Pri/Market 06611/1202034 6.94 KM14 2. Wamboo Pri/Market Ext - 0.3 KM TINDERET
15 1. Senetwo Sec School - 7.2 KM NAROK
16 1. Osegel Primary - 5.7 KM17 2. Koitiko Pry / Lengasam Pry 14212/1301052 22.84 KM SAMBURU WEST
18 1. Wamba Poly - 1.1 KM19 2. Nyiro Sec 14212/1301052 49 KM MIGORI
20 1. Asande Primary 19512/1307059 2.79 KM MAKUENI
21 1. Kitise Airtel Mast - 0.148 KM22 2. Masue Airtel Mast - 1.218 KM23 3. Kathonzweni Airtel Mast - 0.389 KM24 4. Mukuyuni Airtel Mast - 1.439 KM MWINGI NORTH
9
25 1. Tseikuru/Kawango Extension - 4.4 KM
4.3 SOLAR ENERGY:
GCEA Solar energy systems include;Solar technicians training at our training unit,Project survey works,design,plumbing works, installation,service and distribution of the following products:
Solar Panels Solar Off Grid systems Solar Grid connected systems Solar Inverters & Controllers Solar Batteries Pressurized Solar water heating systems Solar Lanterns Solar Street lights Hybrid solar systems - Solar & Wind energy integrated
systems Solar Water Heating Systems - Adding Value To Your Home
Eco-friendly homes fetch more money on the property market and the demand for sustainable houses is constantly increasing. In fact, most new homes in Kenya today must now meet sustainability standards. For further details please visit our website; http://www.gatewayenergyafrica.com/solarwaterheating/solarwaterheaterpolicy.html . By installing Solar water heating system in your home, you can make your house and institution more energy efficient and significantly increase its sustainability rating; in turn increasing its resale value.
Solar water heating projects:
10
Installation of solar water heating systems in 22 individual residential projects around Kenya.
Design of Solar water heating systems for hotels and resorts. Supply and install 200L Solar water heating systems at Pine
Wood City estate,Athi River 110 units (2012/13). Prepared a proposal for an integrated water heating system
for the second largest Pharmaceutical firm in kenya. Prepared a proposal and design for installation of 69 solar
water systems for Kenyatta National Hospital (largest referral hospital in Kenya).
Wind Energy Prefeasibility study:
Contracted to do the Wind Pre-feasibility studies in Limuru,Kenya for ENBW (a power utility company in Germany.
Contracted to carry out a Participatory rural private sector/community awareness activity for the local communities in Limuru to enlighten them on how the joint partnership of the wind energy project with ENBW will work.
5. ACHIEVEMENT
The Company was appointed as a contractor of the Rural Electrification Authority ( R.E.A ). The Company accomplished the task to the satisfaction of both REA and Kenya Power and Lighting Company. During their inspection of the power lines they noted that the workmanship was of very high standards and GCEA was awarded the position of the “Best Contractor of the Year 2010. The format of report writing that GCEA has developed has now been adopted by the Authority as a sample for other Contractors to emulate.
6.ABOUT GATEWAY ENGINEERS
11
Engineer (Project Cordinator/Technical Team LeaderU)
Engineer Dick Ndiewo Bsc. Mechanical EngineeringDiploma Electrical Engineering (Thomson University,UK)Registered with Kenya Engineers Registration BoardCorporate Member Institute of Engineers of Kenya Affiliate Chartered Institute of Building Services Engineers
Engineer Kipkirui arap KorirDesign,Supervision Transmission lines Registered with Kenya Engineers Registration Board
Allan David Ochieng Finance and Operations manager, Graduate,Bachelor of Commerce,Finance – University of Nairobi. Incharge of operations and oversees all financial aspects of Gateway projects.
Julius Maina Electrical Engineer,Maseno University, site project coordinator – powerline construction,handles inspection of powerline and incharge of general operation at the site.
Titus MusyokaTechnical Officer,Maseno University incharge of Solar water heating systems installation,general plumbing works and drainage.
Andrew MchanaIncharge supplies and project material inventories,graduate Kenya Polytechnic college,supplies and purchasing management.
Project Team
The senior technical team has served in the capacity as Engineers and in some cases they have been contracted and seconded to other institutions in consortium or joint venture arrangement.
12
PROJECTS MANAGED BY THE SENIOR TECHNICAL STAFF# Client Project/Contact
PersonNature of Work TOTAL
CONTRACT Value(KES)
1 MIMI APARTMENTS
Regent Management Limited
Design of Electro mechanical Works (plumbing, drainage and electrical)
55 M
2 MWEMBE TAYARI
The Ofwona family
Design of Electro mechanical Works (plumbing, drainage and electrical)
18 M
3 National Water Conservation and Sewerage Corporation
Second Coastal Water Supply Project.
Pump Testing, Electro-Mechanical Designs, tender documents preparation (Done as Intersytems Consultants)
510M
4 Victoria Villas 24 Maisonettes Design of Electro mechanical Works (plumbing, drainage and electrical)
170M
5 Thika Riviera Court
60 Villas Design of Electro mechanical Works (plumbing, drainage and electrical)
400 M
6 Municipal Council of Mombasa
West Mainland Sewerage Pumping Stations
Supervision of Installation, Design Review, Preparation of Operation and Maintenance Manual and Training of Operators for West Mainland Sewerage Pumping Stations
5,100M
7 Nairobi City Council
Third Nairobi Water Supply Project
Assisting Resident Engineer Third Nairobi Water Supply Project(Done as Intersytems Consultants)
6,800M
8 Mr. Paul Gogo. Mr. and Mrs. Paul Gogo Rural Residence
Design and Supervision of Mechanical and Electrical Systems for his home in Awasi Kisumu. (Done as Intersytems Consultants)
10 M
9 National Institute of statistics of Rwanda
Rehabilitation of head office in Kigali
Design of Mechanical and Electrical Systems for the proposed office blocks
240 M
13
10 Doshi Iron Mongers Mombasa
Doshi Iron Mongers Chilling Plant Project
Retained by Tropical cooling systems for design and supervision of air conditioning and cooling towers installation.
21 M
11 Dr and Justice Aluoch
Dr and Mrs. Justice Aluoch Residence in Karen Nairobi
Retained by Intersystems Consultants for Design of Electrical and Mechanical systems for his home in Karen Nairobi. (Done as Intersytems Consultants)
4 M
12 West Nile Rural; Electrification Company Limited
West Nile Rural Electrification Project Arua Uganda
Design and Supervision of Installation of the 1.5mW power plant in Arua Uganda as well as training the operation and maintenance staff.
102 M
13 Electromaxx Uganda Limited
Tororo Heavy Fuel Oil Power (20MW) plant
Design, Equipment Selection, Supervision of Installation of 20Mw power plant and the auxiliary equipment
1,275 M
14 Iberafrica Power Ltd
Nairobi South Power Plant Extension
Retained as Planning Engineer for the 53Mw Heavy Fuel Oil Power Plant Extension.
5,406M
18 National Bank of Kenya
Rehabilitation Rehabilitation of Electromechanical equipment for their branches in Limuru, Nandi Hills and Nakuru.
3.9M
NIC Bank Ltd Renovations Rehabilitation of Electromechanical equipment for their branches in Mombasa
4M
18 Nairobi Water Extension of Treatment Works in Ngethu and Sasumua
Supervision and Commissioning of the Electromechanical equipment (Done with Seureca Viola as the lead Consultant)
900M
19 Mrs Hinga Design for proposed Elmi plaza Witu road
Design of Electromechanical for Proposed 9 story Elmi Plaza along Witu Road
400M
20 Lusaka Water Supply Zambia
Design for Lusaka Water Supply Projects
Assessment of existing and Design of Electromechanical equipment for Lusaka City Water Supply.
850 M
21 K.I.E Development of sheds at Barkowino South
Design of Electro mechanical Works (plumbing, drainage and electrical)
36M
14
Sakwa
22 Duncan Goga Development of country home at Ngong
Design of Electro mechanical Works (plumbing, drainage and electrical)
6M
23 Sadiq Court Development of 30 no apartments in 3 blocks at Soit Ololol Road
Design of Electro mechanical Works (plumbing, drainage and electrical)
140M
# Client Project/Contact Person
Nature of Work TOTAL CONTRACT Value(KES)
1 MIMI APARTMENTS
Regent Management Limited
Design of Electro mechanical Works (plumbing, drainage and electrical)
55 M
2 MWEMBE TAYARI
The Ofwona family
Design of Electro mechanical Works (plumbing, drainage and electrical)
18 M
3 National Water Conservation and Sewerage Corporation
Second Coastal Water Supply Project.
Pump Testing, Electro-Mechanical Designs, tender documents preparation (Done as Intersytems Consultants)
510M
4 Victoria Villas 24 Maisonettes Design of Electro mechanical Works (plumbing, drainage and electrical)
170M
5 Thika Riviera Court
60 Villas Design of Electro mechanical Works (plumbing, drainage and electrical)
400 M
6 Municipal Council of Mombasa
West Mainland Sewerage Pumping Stations
Supervision of Installation, Design Review, Preparation of Operation and Maintenance Manual and Training of Operators for West Mainland Sewerage Pumping Stations
5,100M
7 Nairobi City Council
Third Nairobi Water Supply Project
Assisting Resident Engineer Third Nairobi Water Supply Project(Done as Intersytems Consultants)
6,800M
15
8 Mr. Paul Gogo. Mr. and Mrs. Paul Gogo Rural Residence
Design and Supervision of Mechanical and Electrical Systems for his home in Awasi Kisumu. (Done as Intersytems Consultants)
10 M
9 National Institute of statistics of Rwanda
Rehabilitation of head office in Kigali
Design of Mechanical and Electrical Systems for the proposed office blocks
240 M
10 Doshi Iron Mongers Mombasa
Doshi Iron Mongers Chilling Plant Project
Retained by Tropical cooling systems for design and supervision of air conditioning and cooling towers installation.
21 M
11 Dr and Justice Aluoch
Dr and Mrs. Justice Aluoch Residence in Karen Nairobi
Retained by Intersystems Consultants for Design of Electrical and Mechanical systems for his home in Karen Nairobi. (Done as Intersytems Consultants)
4 M
12 West Nile Rural; Electrification Company Limited
West Nile Rural Electrification Project Arua Uganda
Design and Supervision of Installation of the 1.5mW power plant in Arua Uganda as well as training the operation and maintenance staff.
102 M
13 Electromaxx Uganda Limited
Tororo Heavy Fuel Oil Power (20MW) plant
Design, Equipment Selection, Supervision of Installation of 20Mw power plant and the auxiliary equipment
1,275 M
14 Iberafrica Power Ltd
Nairobi South Power Plant Extension
Retained as Planning Engineer for the 53Mw Heavy Fuel Oil Power Plant Extension.
5,406M
18 National Bank of Kenya
Rehabilitation Rehabilitation of Electromechanical equipment for their branches in Limuru, Nandi Hills and Nakuru.
3.9M
NIC Bank Ltd Renovations Rehabilitation of Electromechanical equipment for their branches in Mombasa
4M
18 Nairobi Water Extension of Treatment Works in Ngethu and Sasumua
Supervision and Commissioning of the Electromechanical equipment (Done with Seureca Viola as the lead Consultant)
900M
19 Mrs Hinga Design for proposed Elmi
Design of Electromechanical for Proposed 9 story 400M
16
plaza Witu road Elmi Plaza along Witu Road
20 Lusaka Water Supply Zambia
Design for Lusaka Water Supply Projects
Assessment of existing and Design of Electromechanical equipment for Lusaka City Water Supply.
850 M
21 K.I.E Development of sheds at Barkowino South Sakwa
Design of Electro mechanical Works (plumbing, drainage and electrical)
36M
22 Duncan Goga Development of country home at Ngong
Design of Electro mechanical Works (plumbing, drainage and electrical)
6M
23 Sadiq Court Development of 30 no apartments in 3 blocks at Soit Ololol Road
Design of Electro mechanical Works (plumbing, drainage and electrical)
140M
Rural Youth Development Program (currently being developed)
After several years of working with the community in providing Rural electrification in various centers,markets etc., Gateway energy is establishing information centers managed by the local community Youths to disseminate information through use of computers (solar/electricity) to improve their communities quality of life. The centers will provide current information on :
Land use and environmental management - for farmers to understand weather patterns,climate change,information on investment in crops and measures and process output
Small and medium sized enterprises – Provide appropriate information on access of local and international markets and investment resources
17
Health – information on adolescent health , sexuality,preventative health care,curative medicine and common strategies for addressing these needs.
7.GATEWAY REGISTERED OFFICES & SHOWROOM
Loresho Plaza, Loresho Ridge P.O. Box 42794 00100Nairobi.Contact: 020-2365287/2306998Email: [email protected]: www.gatewayenergyafrica.com
8. BANKERSEquity Bank LimitedWestlands BranchP.O Box -14185-00800Nairobi
Kenya Commercial Bank Ltd.Sarit CenterWestlands Branch Nairobi
9. TRANSPORTERSTilo Godana TransportersEastleighNairobi
18
INSURERS Equity Insurance Agency Ltd. Equity Centre, Nairobi
10. INTERNATIONAL ASSOCIATE COMPANY
Prof. Dr. Margarita Mathiopoulos, 1 Aspide InternationalPariser Platz 4A10117 BerlinGermany(Representative/Consultant for the company Energy projects in Eastern Africa)
10. DIRECTORS
1. Clara M. Kathurima Mrs.BSc. Business Management,Miami-Dade College (Miami,Fl.USA)
MBA, (American International Institute of Management & Technology,California,USA)
2. Ambassador H. Mutuma Kathurima EBS MSc Masters,Public Administration, University of Birmigham, United Kingdom.
3. Ms.Audrey K. KathurimaBA, Communication United States International University,Nairobi,Kenya
4. Mr.Melvin Kathurima Bsc. In Aeronotical EngineeringNanjing University of Aeronautics & Astronautics ,China
19