victor steinbrueck park renovation - seattle€¦ · 03-08-2016  · while cars, freight, bicycles...

44
VICTOR STEINBRUECK PARK RENOVATION PPMHC Design Review Committee - Concept Design Meeting 2

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

VICTOR STEINBRUECK PARK RENOVATIONPPMHC Design Review Committee - Concept Design Meeting 2

Page 2: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

PROCESS

Summer: Conceptual Design (options) Design - Meeting 1

Fall: Schematic Design

Design Meeting 1: July Play, FurnishingsDesign Meeting 2: August Connectivity, GatheringDesign Meeting 3: September Native American Culture, Lighting

Public Open House 2: October

Preferred Design: NovemberSchematic Design December

Page 3: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

GUIDELINES

In considering applications for a Certificate of Approval for events, uses, or physical design changes within the park, the Commission shall apply the principles of these Guidelines subject to the following:

2.12.6 The Park’s character-defining features should be retained and should not be altered, disguised or concealed. Character-defining features stem from the Park’s original design and contribute significantly to the Park’s physical character. Character-defining features include the berms and their concrete walls, decorative railing, totem poles, shelter, children’s council circle/pentagon, benches and seats, original planting and landscape plan, original lighting fixtures, plazas and walkways.

2.12.7 The addition of new features not part of the original design... is strongly discouraged.

Page 4: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

CONNECTIVITY

Page 5: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Page 6: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

VICTOR STEINBRUECK PARKPublic Open House 1

CONNECTIVITYThe park is an extension of the Market, along a new pedestrian route

connecting downtown to the waterfront.

Artist’srenderingofapreliminaryconceptfortheOverlookWalkandMarketFrontproject,adjacenttothepark.Theoverlookwalkisindesignnow.ImagebyWaterfrontSeattle.

Threeneighboringprojects—MarketFront,theOverlookWalk,andtheremovaloftheAlaskanWayViaduct—willchange thepark’s immediatecontext. Theparkrenovation will take these projects into account inordertoreinforcethepark’spresenceandimportancein Seattle.

The city has adopted a visionary plan to rebuild its waterfront and better connect it to downtown,following the removal of the Alaskan Way Viaduct.Theplanfeaturesanarrayofnewpublicopenspaces,including the Overlook Walk, which spans from theSeattle Aquarium to the new MarketFront project.MarketFrontwillbeanewwaterfront-facingextensionof the historic Market, providing opportunities forfarmers and crafts people, social services, and senior housingaswellaspublicopenspace.Togethertheseprojects will provide a continuous pedestrian routebetweentheMarketandElliottBay,agrandgesturetoconnecttwoofSeattle’sgreatestassets—immediatelyadjacenttoVictorSteinbrueckPark.

Artist’srenderingoftheMarketFrontProject,adjacenttothepark.TheMarketFrontsitewasdesignedtoaccommodateaparkconnectiontothefutureOverlookWalk,downtothewaterfront.ImagebyMarketFront.

MARKETFRONT PROJECT

MARKETFRONT PROJECT

OVERLOOK WALK

PARK

PARKPIKE PLACE MARKET

PIKE PLACE MARKET

PIKE PLACE MARKET

PARK

2017MarketFront Project complete late 2016 / early 2017

FUTURE CONDTIONOverlook Walk to Alaskan Way

EXISTING CONDITION

2ND AVE

1ST AVE

WESTERN AVE

3RD AVEVIRGINIA ST

STEWART ST

PINE ST

PIKE ST

UNION ST

UNIVERSITY ST

SENECA ST

PIER 62 & 63

SEATTLEAQUARIUM

PIER 57

PIER 56

PIKE PLACEMARKET

SEATTLE ARTMUSEUM

HARBOR STEPS

POTENTIALMODIFICATION & REUSE

OF PIER 62/63 AS PUBLICSPACE AND/OR REMOVAL

FOR AQUATIC HABITAT

POTENTIALPUBLIC SPACE

TRIANGLE AREA TOLINK WATERFRONT TO

MARKET AND UPLANDS

POTENTIAL TO LINK VICTOR STEINBRUECKPARK TO WATERFRONT

UNION ST OVERLOOK STEPS & SEATTLE

ART MUSEUM LINK DOWNTOWN TOWATERFRONT

POTENTIAL HILLCLIMBASSIST

AT UNION STREET

POTENTIALVIEWING POINT AND

WATER ACCESSBETWEEN PIERS

POTENTIAL NEWPUBLIC SPACE

AND/OR AQUATICHABITAT AT

WATERFRONT PARK

POTENTIAL TO LINK PIKE PLACE MARKET

TO WATERFRONT

POTENTIAL FOR HISTORIC BUILDING

FRONTAGES TO OPEN ONTO PUBLIC REALM

PUBLIC PIERS“Opportunity for a major new public space, linking Pike Place Market and Victor Steinbrueck Park to theAquarium and Waterfront.”

Enhanced Facades

Existing Parks

Project Areas

500 ft.

Framework Plan

2:49

VICTOR STEINBRUECK PARK

ImagebyWaterfrontSeattle

Page 7: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Creating a safe and inviting place for pedestrians is an important goal of the central waterfront

design process. While cars, freight, bicycles and other users are important parts of the whole,

the design starts with the needs of pedestrians, both along the corridor and connecting to it.

The pedestrian design for the waterfront features a generously scaled promenade which will

allow pedestrians to stroll near the water or to find a tranquil spot to sit and enjoy the views.

Alaskan Way will be punctuated with pleasant, safe and convenient crossings at every east-

west street.

Key east-west connections will be enhanced with elevators and escalators to make it easier

to enjoy waterfront and other downtown attractions in a single trip and to provide better

connections to transit and parking.

PEDESTRIANSMOBILITY + ACCESS

Tunnel Entrance

Tunnel Stations

Light Rail

Columbia Street Transit Plaza

Elevated Connection

Secondary At-Grade Connections

Primary At-Grade Connections

Bridge

Hill Climb Assist

Stairs

PRIMARY AT-GRADE CONNECTIONS

SECONDARY AT-GRADE CONNECTIONS

ELEVATED CONNECTION

COLUMBIA STREET TRANSIT PLAZA

TUNNEL STATIONS

TUNNEL ENTRANCE

HILL CLIMB ASSIST

BRIDGE

STAIRS

LIGHT RAIL

5

5

BRTSTATION

WATER TAXI DOCK

COLMANDOCK

BROAD

S. WASHINGTON

S. MAIN

S. JACKSON

S. KING

CHERRY ST.COLUMBIAMARIONMADISONSPRINGSENECA

YESLER WAY

UNION

UNIVERSITY

JAMES ST.

JEFFERSON ST.

PIKE

PINE

STEWART

VIRGIN

IA

LENORA BLANCHARD

BELL

BATTERY

WALL

VINE

CEDAR

CLAY

3RD AVE1ST AVE

2ND AVE

4TH AVE

5TH AVE

6TH AVE

7 TH AVE

WESTERN AVE

3000’1500’750’0’

2:118

At grade connections

Proposed hill climb assist (accessible)

Proposed overlook walk

Accessible bridge/elevator/escalator

Stairs only

Victor Steinbrueckpark

Page 8: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Page 9: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Page 10: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

How would a connection support the ideals of the park as it was conceived and as it works today?

SIGNIFICANCE OF MARKETFRONT CONNECTION

• Idea of a waterfront connection always envisioned

• Peggy Gaynor recalled Victor’s concern that the park was “off to the side” …in relative isolation from the market at the time

• VSP encompasses a vacated city street end at Vir-ginia Street; most other downtown waterfront street ends provide pedestrian connections

• VSP is destination viewpoint and belvedere, but can gently flow into another important public space - the Market Front terrace

Page 11: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

SIGNIFICANCE OF MARKETFRONT CONNECTION

• Preserve and Improve Historic District in accordance with District Guidelines

• Provide a continuum of spaces responding to social habits, functionally with surrounding activities to enhance public enjoyment

• Achieve compatible relationships between new structures and rehabilitated buildings

• Provide transitional areas around the Market

Recall 1973 Pike Project Urban Renewal Plan Goals & Objectives

Page 12: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

How would a connection support the use of the park for gathering?

SIGNIFICANCE OF MARKETFRONT CONNECTION

• Since 1982 downtown residential community and market neighborhood has grown by thousands-- placing greater demand and intensity of use on public open space

• Public communities between VSP and Market Front should not be segregated

• VSP as a gathering place is strengthened with better access, connectivity

Page 13: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

1

Connectivity Gathering

Play

Native American Culture

Socializing & Eating

Which are most important to the park’s legacy and future success?

OPEN HOUSE 1 - “PRIORITIES”

441 203 237

253198Public Open House, Pop Up and Online Survey Results

May 2016

Page 14: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

1 Should the renovation include a direct connection to MarketFront?

OPEN HOUSE 1 - “CONNECTIVITY”

179noyes

9

Public Open House, Pop Up and Online Survey ResultsMay 2016

Page 15: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

2 Which option is best for the south end of the park?

Public Open House, Pop Up and Online Survey ResultsMay 2016

OPEN HOUSE 1 - “CONNECTIVITY”

full connection partial connection no connection

112 24 6

Page 16: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Respect PPMHC guidelines

Reinforce Park/ Market relationship:• provide an accessible and intuitive connection to the Market Help the park remain vital and well-used into the future:

• connect the park to the evolving City context

Social justice:

• create easy access for park users to MarketFront amenities & services, and to the waterfront

OUR GOALS

Page 17: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

88’

+ 1.0’

+ 6.5’

+ 0.0’

40’

7’

MARKETFRONT ADJACENCY (no change to park)

Page 18: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

MARKETFRONT ADJACENCY (no change to park)

Page 19: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

STRAIGHT PATH CONNECTION

PATH

Page 20: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

CENTRAL CONNECTION

STAIRS

PATH

Page 21: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OPTION 1 OPTION 2

Page 22: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

GATHERING

Page 23: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

The park has always been an important meeting and gathering place—both a civic forum and a refuge where people can congregate in relative peace.

Page 24: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

planned spontaneous• political & social rallies• concerts & presentations• markets & fairs• activities (e.g. painting)*• storytelling*• buskers• markets & fairs• organized picnics• cultural gatherings &

celebrations• memorials

• groups of friends• community meeting point

GATHERING

Page 25: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

1 Should a part of the park be redesigned to better accommodate small group gatherings?

OPEN HOUSE 1 - “GATHERING”

96noyes

66

Public Open House, Pop Up and Online Survey ResultsMay 2016

Page 26: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Respect PPMHC Guidelines

Reinforce design intent:• Restore and improve quality in the three “outdoor rooms”• Maintain informality of gathering space in the park

Support impromptu small group gatherings:• Accommodate different types and sizes of groups

Support planned gatherings & events:• Improve flexibility

• Create logical areas for small planned events to occur

OUR GOALS - GATHERING

Page 27: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

ORIGINAL PLAN

picnic area

children’s play /gathering area

sidewalk seating

picnic area

lawn

lawn

belvedere

Page 28: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

GATHERING IN THE PARK TODAY

Removed, quiet, focused

• small events• homeless remembrance

“Tree of Life”

Page 29: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

GATHERING IN THE PARK TODAY

sidewalk seating

Visible, social

• meeting & hanging out• carving

Page 30: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

GATHERING IN THE PARK TODAY

lawn

belvedere

Grand, iconic, large& open, stage-audience

• hanging out, people-watching• performances & events

Page 31: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

GATHERING IN THE PARK TODAY

picnic area

Removed from activity

• small events/activities• not well used

Page 32: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

GATHERING IN THE PARK TODAY

picnic area

lawn

Social & lively, contained & sheltered, diverse, view to MarketFront & Waterfront• eating• meeting & hanging out• small events/activities

Page 33: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

POTENTIAL IMPROVEMENTS

Improve access to lawns

POTENTIAL IMPROVEMENTS

Page 34: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Add platform bases at totem poles

• small performances/ speeches• informal seating

POTENTIAL IMPROVEMENTS

Page 35: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

Restore and improve original picnic areas for gathering• moreflexible• comfortable for different groups• connection to south lawn

POTENTIAL IMPROVEMENTS

Page 36: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OUTDOOR ROOM WITH STRAIGHT PATH

ramp

fixed furnishings

Page 37: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OUTDOOR ROOM WITH STRAIGHT PATH

Page 38: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OUTDOOR ROOM WITH STRAIGHT PATH

Page 39: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OUTDOOR ROOM WITH STRAIGHT PATH

Page 40: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

ramp

moveable furnishings

connection to hill

fixed furnishings

OUTDOOR ROOM WITH CENTRAL CONNECTION

Page 41: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OUTDOOR ROOM WITH CENTRAL CONNECTION

Page 42: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OUTDOOR ROOM WITH CENTRAL CONNECTION

Page 43: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OUTDOOR ROOM WITH CENTRAL CONNECTION

Page 44: VICTOR STEINBRUECK PARK RENOVATION - Seattle€¦ · 03-08-2016  · While cars, freight, bicycles and other users are important parts of the whole, the design starts with the needs

Pike Place Market Historical Commission - Design Review Committee August 3, 2016

OPTION 1 OPTION 2