victaulic grooved piping implications for workforce management
DESCRIPTION
Grooved Piping Implications For Workforce ManagementTRANSCRIPT
Grooved piping implications for workforce management
Grooved Construction Reduces Field Manhours
Total Field Manhours
Civil / Structural
Equipment
Electrical
Piping
Large Component of Total Manhours
Grooved Construction Reduces Risk & Contingency
“Variable” Costs• Risk-Intensive
• High Contingency Factors
• Exposure
"Fixed" vs. "Variable" Costs - Welded
Labour“Variable” Costs: 60%
Material“Fixed” Costs: 40%
WELDED
“Fixed” Costs• Reduced Risk
• Low Contingency Factors
• Reduced Exposure
GROOVED"Fixed" vs. "Variable" Costs - Grooved
GROOVED
Material“Fixed” Costs: 60%
Labour“Variable” Costs: 40%
Grooved Method History British War Department sought faster way to join pipe in WWI
– Rapid deployment of water and fuel to front lines
– Faster than welding or threading
VICTAULIC company name– “VICTory Joint” for use on hydrAULICs
Anatomy of a Grooved Joint
Roll Grooving Technology
Grooved Coupling Assembly
Grooved 2 to 60-inch
Mechanical Joining Methods
Pressed ½ to 2-inch
Plain or ringed end 16 to 192-inch +
Customers & Specifiers
Hoover Dam
Ontario Power Generation Healey Falls G.S.
145” Penstock Expansion Joints
Canoe Creek Run-of-RiverBritish Columbia
36” Grooved Penstock
GTAA Cogen PlantOntario, Canada
• Cooling Water
• Circulating Water
• Service Water
• City Water
• Plant Air
• Instrument Air
FACT: The average age of welders is 54.*
* According to the American Welding Society
Skilled Labour AllocationSpecialized Welders
Pipefitters
Systems/Applications: (P91)
Steam NG Hydrogen
Systems/Applications: Cooling Water Compressed Air Water Treatment Fire Water Domestic Water Process Water (Penstocks)
Crew Mix: Specialized Welder Pipefitter (journeyman)
Crew Mix: Journeyman Fitter Apprentice
Schedule Impact with Grooved Construction
Case StudyPortlands Energy Centre
Toronto, Ontario, Canada
Portlands Energy CentreToronto, Ontario, Canada
• Challenged with schedule restraints
• Allocated available welders for P91 systems, pipefitters for grooved systems
• Press system allowed for two-person crew team, rather than three-person team
• Plant was delivered ahead of schedule
John MacFarlandPower Market [email protected]
Resources:www.victaulic.com www.compressedschedule.com