vicoz y vicoz two minig concessions in puno peru

12
VICOZ Y VICOZ 2 two mining concessions

Upload: vicoz-empresa-minera-en-venta

Post on 11-Feb-2017

116 views

Category:

Business


1 download

TRANSCRIPT

Page 1: Vicoz y vicoz two minig concessions in Puno Peru

VICOZ Y VICOZ 2 two mining concessions

Page 2: Vicoz y vicoz two minig concessions in Puno Peru

The VICOZ Y VICOZ 2 two concessions, located in the district of Coasa, Province of Carabaya, Department / Region of Puno, is the continuation of a productive experience in the mining field, which began in the second half of the 60 They went in the early stages of exploration finding "flower land" samples of molybdenum, this orderly work was numbed by government policy which began in recent months from October 2068. with the release of the first "mining entrepreneur" who took the first steps in this place with his denunciation of the time, "Santa Rosa de Quives", he and the necessary steps according to law to achieve the VICOZ and denouncements VICOZ 2 300 hectares each, is 600 hectares, the names become the initials of its partners

Page 3: Vicoz y vicoz two minig concessions in Puno Peru
Page 4: Vicoz y vicoz two minig concessions in Puno Peru
Page 5: Vicoz y vicoz two minig concessions in Puno Peru

3. Scope of preliminary studies Coasa, Carabaya, Puno: Dams with Molybdenum Patches1. Deposit: Type veined, Dyke2. outcrop length: a possible trace of dam is observed, structurally very difficult to sample, it should be "trench". In addition, banks have no alteration or mineralization, the case belongs to Coasa granite.3. Power Average: 1.0 to 3.0m (measured in raids)4. Mineralization: Patches molybdenum.5. Main Mena: Molybdenum6. Encampane: Expectant, lack measure and mapping, trenching and sampling.7. Rock Case: Batholith Coasa8. Accessibility: 0.30min of Coasa.9. Potential: It might be interesting geological potential based on further study.10. Future Situation: To enhance this prospectus must invest more / less than $ 50,000 in mapping and sampling of the levees and based on these results to estimate geological resources.

Page 6: Vicoz y vicoz two minig concessions in Puno Peru
Page 7: Vicoz y vicoz two minig concessions in Puno Peru
Page 8: Vicoz y vicoz two minig concessions in Puno Peru

4. scans Harmony with previous stage, preliminary studies and studies and research published by the IMGEMMET ownEconomic Geological Study of Rocks and Industrial Minerals in the region of Puno Bulletin No. 30 Series B Economic Geology 

Page 9: Vicoz y vicoz two minig concessions in Puno Peru
Page 10: Vicoz y vicoz two minig concessions in Puno Peru
Page 11: Vicoz y vicoz two minig concessions in Puno Peru
Page 12: Vicoz y vicoz two minig concessions in Puno Peru

6. Values and VICOZ Y VICOZ 1. 600 hectares or 600 000 m2 fully free to start all phases of mining activity, according to the law.2. It is located in an area of mining and social potential, is a Quechua area.3. Is polymetallic to the priority given moment as molybdenum and tin, along with it, as shown INGEMMET is potential industrial rocks (granite, marble and others).4. Also stresses as INGEMMET, they are located in a strategic area because they are close to the Interoceanic road network have access dirt road that allows you to export to neighboring countries, mainly to neighboring cities with Brazil.5. It has exactly at its north end road dirt road, wide enough for two lanes, which is in good condition and is 2 km to the Interoceanic Highway. Currently from Juliaca, Puno where the airport is to the concessions on public transport can be reached in about 3 hours.7. The partners VICOZ And VICOZ2, are willing to sell its concession to exist immediately real and legal interest.

Proposal A. Considering the great potential of VICOZ and VICOZ2, with their economic values in polymetallic ores and rocks of quality, we estimate a much reduced proposal of US $, to tratar-Proposal B. It estimated the first alternative, a second proposal can be: Receive $ American would reach 30% of the total initial, to start the exploration stage the additional US $ 20% of the total amount will bring and the completion of the first year of operation the total outstanding Americans remaining $ to9tal amount is reached.We are prepared to a final meeting between the parties