vessel | relume · hi-fog locker thruster room transducer tank 18 b.w. b.w. tank 17 esc. sludge...

4
OFFSHORE SURVEY & ROV VESSEL | RELUME

Upload: others

Post on 24-Jan-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

OFFSHORE SURVEY & ROV VESSEL | RELUME
MAIN ENGINES 2 x 8L20 8-cylinder 900 rpm Wartsila Diesel 1317 kW 2 x 6L20 6-cylinder 900 rpm Wartsila Diesel 988 kW DECK EQUIPMENT
1 x 25-tonne crane @ 12 m (12 tonnes @ 20 m)- Active heave compensated - Knuckle boom main crane, starboard-mounted. Subsea rated to 1000 metres
1 x 11-tonne crane @12m(2.5 tonnes @ 30m)– General purpose telescopic crane, port side-mounted
1 x 5-tonne stern A-frame (see appendix)
DECK AREA
5 T/m²
SERVICE EQUIPMENT
Main deck suitable for 1 x work ROV, launching over port side.
Mezzanin deck suitable for 1 x Obs ROV launching over port side.
Container ISO fittings are available on main deck, in total eleven 20 ft units can be fitted.
ACCOMMODATION
• 10 x single berth Officers cabins • 28 x twin berth cabins • 2 x Client offices, Operations room, Conference room • Total POB: 66
REVISION NO 1
SPECIFICATIONS
IMO No:
Bahamas Nassau C6TR4 Lloyd’s Register of Shipping-LMC 100A1, UMS,DP(AA), NAV, IBS. SPS Code compliant 9280720
BUILDER AND DIMENSIONS
Builder: Date of build: Hull No: LOA: Beam: Design draft: Gross tonnage: Net tonnage:
Damen Shipyards, Vlissingen, NL 2004
82.60 metres 16.50 metres 4.00 metres 3526 1057
PERFORMANCE
10 kts- 8 m³/day 13 kts- 12 m³/day
Fuel cons. Survey speed-DP2: 3-6 m³/day
LIMITING WEATHER CONDITIONS
Always according to Master’s decision. Indicative limitations: Wind force 8 (Beaufort scale)
Sea state 5 (WMO sea state code)
BUNKERS
Fuel: 540 m3 Potable water: 145m³ w/ 2xRO plants w/ output 80m³/24hr
MANNING
PROPULSION
2 x Rolls Royce (Aquamaster) Azimuth units of 1500 kW each. 2 x Rolls Royce (Kamewa) Bow Tunnel Thruster units of 700 kW each. Station holding capacity, DP class 2
POWER SUPPLY
• 2 x 4L20 4-cylinder 900 rpm Wartsila Diesel Engines of 420 KW capacity each for crane and deck power
• From main Switchboard-500A at 440V (deck sockets)
OWNER: IFAN(International Foundation for Aids to Navigation MANAGEMENT: MENAS Marine Services Ltd.
80 m2 @ 3t m²
NAVIGATION AND POSITIONING
• Kongsberg Simrad K-POS system to L loyd’s DP (AA) standard
• Kongsberg Simrad HiPAP 501 HPR • 3 x DGPS (IALA, C-Nav 3050 & Veripos LD6-A2). • 2 x Wind Sensors Young • 2 x MRU=Seatex MRU-5 & MRU-H • 3 x Gyro Sperry NAVIGAT X MK 1 digital gyrocompass Mod.10’ • Tautwire Bandak LTW MK14B System • Kongsberg RADius 1000 • FMEA, DP Capability Analysis and Annual Trials -
Petrofac, Aberdeen* • FLS Furuno CH137 • Litton Sperry System to Lloyd’s NAV1 • SatMarin KU Band Unlimited Azimuth Transmit/
Receive System • Fleet 77 and Sat C fully integrated communications
system • IBS • ECDIS
BATHYMETRY AND GEOPHYSICS
Multibeam Echo Sounder: Kongsberg EM 2040D Single Beam Echo Sounder: Kongsberg EA 600
OFF-LINE SOFTWARE Chesapeake SonarWiz
QPS/IVS Processing Suite
CARIS HIPS & SIPS
Applanix POSPac MMS
EQUIPMENT
Can accomodate: Vibrocorer: Corers: Samplers: Gradiometer: CPT: Drop Camera:
WROV & Obs ROV 6/3 m system Piston/gravity corer 6/3 m Boxcorer/Grab sampler Innovatum 12 sensor system 5 and 20t systems HD Drop Camera
• *DP Annual Trials & 5-year FMEA revies carried out on 27-28th October 2020
FLAG LOCKER
6123/300 L0089A
78.29 m
75.37 m
75.92 m
16.82 m
73.62 m
16.50 m
6.80 m
UPPERDECK
MAINDECK
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
BASELINE
\ \ s c h e l d e .c
o m \ 0 1 e n g p r o $ \
M E
N A
w i n g s \ p l a n s \
H 1 F 6 5
C ~ 1 .D
m 0 1
1:A
REV. DESCRIPTION NAME CHECK DATEAPPR. NO.OFF. DEPT.
DISTR. TO
4380 AN Vlissingen The NetherlandsP.O. Box 555
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
9.4 m2
13.2 m2
10.4 m2
9.4 m2 9.4 m2 9.6 m2 9.6 m2 9.6 m2 9.7 m2
11.5 m2
9.6 m2 10.7 m2
13.7 m2
14.3 m2
19.7 m2
19.7 m2
10.0 m2
158.0 m2
7.7 m2
12.5 m2
6.1 m2
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
Thruster room
A.C room
E m
H e a d q u a r t e r
Balcony
duct Pipe
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
Swl 130 KN at 12 mtr Swl 75 KN at 18 mtr Swl 44 KN at 24 mtr Swl 25 KN at 30 mtr
Tank
Fuel
Overfl.
Tank
Bilge
F.O.
Daily
Service
Tk.
Void
L o a d in
g
n
Drain tk.
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
Waste
Oil
up up
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
Eng. change room
B.W. Tank 03
B.W. Tank 04
B.W. Tank 05
B.W. Tank 06
B.W. Tank 07
B.W. Tank 08
B.W. Tank 09
B.W. Tank 10
B.W. Tank 11
B.W. Tank 12
B.W. Tank 13
B.W. Tank 14
B.W. Tank 12
Heeling Tank 02
F.W. Tank 02
F.W. Tank 02
B.W. Tank 04
B.W. Tank 03
Tank 01 B.W.
Tank 01 B.W.
G.W. Tank 02
G.W. Tank 01
G.W. Tank 02
B.W. Tank 07 B.W. Tank 05
F.O. Tank 03
F.O. Tank 04
F.O. Tank 02
F.O. Tank 04
F.O. Tank 02
F.O. Tank 03
F.O. Tank 02
B.W. Tank 05B.W. Tank 07
Tank
F.O.
01
02
Passageway
Passageway
Staircase
Passageway
Passageway
Passageway
Passageway
Staircase
Staircase
Staircase
40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
Tank01
Tank02
L.O.
Tank02
L.O.
up
Leak Tank
Room St. Valve
Room St. Valve
Em gen room
F o a
ot tot af
elh eid
spa nne
Sea Inlet
G K
M H
L N
O P
G K
M H
L N
O P
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
Med. Lcr.
H a t c h
E s c a p e
H a t c h
H a t c h
H a t c h
Rope Store
Rope Store
Rope Store
up
up
up
up
Wheelhouse
up
up
H a t c h
Room Aft Diesel Generator
DGR Aft out
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
HATCH
Hatch
Hatch
Lobby
2 Crew 2 Crew 2 Crew 2 Crew 2 Crew
2 Crew2 Crew2 Crew2 Crew2 Crew
32 Persons
24 Persons
10 Persons
UPGRADE 2014
1 Officer 1 Officer
Sea inlet chest
J 12-05-2014 S.V.L.Tanks and inletchest switched/3 Tel. rooms-> 2 Offices 10-6-14
N
L
tank Clean fuel drain
02-09-2014 POSITION SWITCHBOARD/TRAFO'S + SEWAGE MODIFICATION S.V.L. 02-09-14
tank Clean fuel drain
S.V.L. 15-09-14TANKS IN DG ROOM AFT RE-NAMED
T/S
3887/011-8388.05-1A
WIRE MESH
AJVN 11-03-2015
1544
Relume_Datasheet