«Highvill Astana»

➢ : «Highvill Kazakhstan»➢ : 20.32 ➢ : 28,000 м2

4

Martial Arts Palace with 5000 places in Astana

➢ : JSC «KazTransGaz», LTD «CC StroyContract»➢ : 32,248 м2

➢ : 275,485 м3

5

General Prosecutor Building of the Republic of Kazakhstan

National Security Committee Building

6

The multifunctional Ice Palace

: Branch “NC” “KTЖ” JSC: 32,703 м2

7

Service point of passenger cars «Talgo»

Customer: «Wagon leasing company» JSC Total area: 9,450 м2

8

Project Management Consultancy throughout the project:(Astana city)

1. RC “Etalon"2. RC “Meruert" on 13th Magistral3. RC “Infinity" Kabanbai-batyr avenue4. RC “Taraz" Abay street and Valikhanov street intersection 6. The green Market : Tlendiev avenue 7. RC “Khan Tengri” Kenesary and Sembinov street8. 496-apartment RC on Imanov-Tsylokovski street9. Administrative building in the new administrative center of Astana10. Business Center “Barys"11. Bowling Center12. The exhibition hall, design and architectural studio with built-in and attached parking: Mirzoyana-Fabrichnaya street, 6 micro district13. The Hotel complex the and Business Center “Beijing Palace”14. Recreational and touristic complex in the village of Cauchy15. Kindergarten with 320 places in the RC "Astana High Vill Town“

Technical supervision:(Astana city)

1. Kindergarten № 13 “Tulpar" on Gertsena street, 84 2. Kindergarten № 22 “Alem" on Zheltoksan street, 223. Kindergarten № 30 “Kainar" on Bogenbai batyr street, 32/2

9

10

1. Management Consultancy to SB Petrochemical – private shareholder of Kazakhstan Petrochemical

Industries Inc. LLP

2. Management consultancy on KazAzot upgrade project, Aktau

3. Management consultancy on Atyrau refinery project to Sinopec Engineering and KSS

11

1. KPI PDH/PP (500000TPA) Kazakhstan:1.1. Open Book Estimation1.2. FEED Verification1.3. EPC Bidding including bid clarifications1.4. Bid Evaluation

2. APPC PDH/PP (450,000TPA) Saudi Arabia and TASNEE PDH/PP (450,000TPA) Saudi Arabia:2.1. Basic Engineering2.2. Detail Engineering2.3. Procurement2.4. Construction2.5. Pre-commissioning2.6. Commissioning2.7. Plant start up2.8. Project Performance Test2.9. As built documentation

2.10. Project Close Out2.11. Plant Operation & Engineering/Maintenance2.12. Plant turnaround including catalyst change

3. Rompetrol / Petromidia Refinery (Package 2010 Upgrading Program);4. "Atyrau Oil Refinery” LLP (PMC)5. "Shymkentnefteorgsintez” JSC (PMC)6. Pavlodar Refinery (Upgrading Program)7. Lukoil International (PMC)8. “Fortum”, cooling towers in Niagan and Chelyabinsk (New construction)9. Wastewater Treatment Plant g .Obninsk (New construction)

10. The complex liquefied hydrocarbon gases in Ust-Luga, Leningrad region (New construction) 12

13