verhaegen rik - safety aspects (fire fighting, oil spills, general aspects, organisation in case of...
DESCRIPTION
Safety - Port EngineeringTRANSCRIPT
-
Emergency and Intervention planning
Rik Verhaegen
-
A small exercise
Think of a figure between 1 and 10
1 chance in 10
Lets do some calculating:
Multiply your figure by 9 When the result has two figures, add the figures. Substract the result by 5 Adapt the figure to a letter (1 = A, 2 = B, 3 = C, ) And the result is
-
Structure
Five disciplinesNIP structure (Emergency Intervention Planning)Multi-disciplinary cordination Operational StrategicOrganisation of intervention areaExample
-
Five Disciplines
Discipline 1
Discipline 2 Discipline 3
Discipline 4
Discipline 5
-
Types of Emergency planning
multidisciplinary emergency and interventionplan(NIP) General emergency and interventionplan (ANIP) Specific emergency and interventionplan (BNIP) 3 Levels
Community Provincial Federal
monodisciplinair interventieplanInternal emergency plan Made by a company or organisation (school, hospital..)
-
Scaling up - Levels
Level Former system Initiated by CP-OPS Policy cordination
Local cord. Phase 1 Officer Officer CP-OPS
Municipal Phase 2 Mayor Officer Mayor
Provincial Phase 3 Governor Officer Governor
Federal Phase 4 Minister Officer Minister
Warnig
Warning
Warning
Remarks:Scaling down by same authorityAll phases do not necessarily have to be started
-
What happens if scaling up is not done to the right level ?
-
Problem 1
-
Problem 1 apears to be solved
-
Problem 1 + problem 2
-
So now we have to scale up
-
Problem 1 method 2
-
Problem 1 solved
-
Problem 2 (could have been avoided)
-
Problem 2 solved
-
or not
-
CP-OPS
Command Post operations Multi-disciplinary command Operational responsabilities from the disciplines assisting Dir-CP-Ops
with the operational coordinationDIR CP-OPS is in charge
MKO CP-OPS
-
CP-OPS tasks
cordination - operational decision making Tactical choices
Heavy material or not Pumps where and how ?
Organisation of intervention area RV-point and parkings Establishing zones Traffic control inarea
Prioritizing choicesPolicy decisions untill installation of CC (Coordination Committee)
-
Yellow Zone
Intervention area
Orange ZoneCP-OPS
Red Zone
CC
VMP
-
CC
Cordination Committee Multi-disciplinary cel assisting the relevant authority with policy
coordination.Command depends on level: Municipal Mayor Provincial Governor
-
CC Examples of tasks
Policy decisions integral approach strategic choices
Scaling up or down commandeer / requisitioning material and recourses Evacuation and care alternative mobility
Use of recourses : deciding on prioritieslogisticscontrol communications
-
Details versus essentials
ALSO, THE BRIDGE IS OUT AHEAD
-
GCC lay-out
Policy
AdvisorsLiaison
Disc 1
Disc 2 Disc 5
Disc 4Disc 3
-
Information flowCP-OPS CC CC company
OSR
CP-OPS
CC authority CC company(CALAHAN)
-
Example logbook
-
OSR Chart
-
The zip : CALAHAN (Calamiteiten Haven Antwerpen)
-
27
Reporting gathering information
-
28
Execution of intervention
-
29
Common image
-
30
Reporting
-
Demonstration
CALAHAN
-
Questions?