1 Ventilatio C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S Ventilation Requirements 1 Ventilation Requirements Presented by: Graylin Johnson Ventilation Inspector Self-Certification Training Class Ventilatio C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S Ventilation Requirements 2 OVERVIEW Permit Applications Ventilation Requirements Ventilation Data Heating Data HVAC Notes Equipment Schedule Ventilation Corrections Code Memos posted on DOB website

Upload: others

Post on 27-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

1

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

1

Ventilation Requirements

Presented by:

Graylin Johnson Ventilation Inspector

Self-Certification

Training Class

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

2

OVERVIEW

• Permit Applications

• Ventilation Requirements

• Ventilation Data

• Heating Data

• HVAC Notes

• Equipment Schedule

• Ventilation Corrections

• Code Memos posted on

DOB website

2

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

3

18-28-403.3 Table of Ventilating

Requirements

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

4

VENTILATION DATA

3

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

5

HEATING DATA

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

6

HVAC NOTES • All ductwork to be galvanized sheet metal.

• Provide locking type dampers to be installed in all supply branches.

• Floor registers shall not exceed 9” from the wall.

• Heat all rooms -10oF outside and +70oF inside.

• Provide C.O. detectors.

• Noise level not to exceed 55 dB

4

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

7

EQUIPMENT SCHEDULE

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

8

IMPORTANT

ISSUES • Where economizer exhaust

is provided for ventilation,

verification should be

provided that exhaust will

be available at times other

than economizer or free

cooling mode.

5

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

9

IMPORTANT

ISSUES

• Garage relief openings

should be shown and

dimensioned on drawings as

1 square foot of free area

per car, and not just noted

as such (mostly applies to

residential).

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

10

IMPORTANT

ISSUES • No common combustion air

ducts are allowed to feed

multiple units in high rises.

6

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

11

IMPORTANT

ISSUES • Dryer venting should be

made of a non-flammable

material.

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

12

IMPORTANT

ISSUES • Outside air intake louvers for

ventilation that terminates in

alleys or driveways should

be protected.

7

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

13

IMPORTANT

ISSUES

• Plenums for supply or return

should normally be

constructed from sheet

metal at built-out locations

other than under the floor or

ceilings.

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

14

IMPORTANT

ISSUES • Fan housings should be

constructed from sheet metal.

Alternate materials are allowed

for return plenums only.

• Access to fans and motors is

required for servicing and

maintenance per Section 18-28-

503.1 (including permanently

lubricated motors with sealed

bearings)

8

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

15

IMPORTANT

ISSUES

• Relief openings through

supply units are not

allowed.

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

16

IMPORTANT

ISSUES

• Lead acid battery room

exhaust has one requirement

for the valve type. A higher

requirement applies for wet

cell battery room exhaust.

9

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

17

IMPORTANT

ISSUES

• Appliances can be direct

vented with a sealed

combustion chamber.

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

18

IMPORTANT

ISSUES • Warm air furnaces should

be installed such that a 90

degree angle between

return air and combustion air

is provided.

10

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

19

IMPORTANT

ISSUES • When undersized equipment

is required, show the vent

load with heat loss on the

plan.

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

20

IMPORTANT

ISSUES

• Outside air intake louvers

should be sized for 100% of

code supply.

11

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

21

IMPORTANT

ISSUES

• Windows used for borrowed

light & vent must be parallel to

the walls of the room utilizing

the borrowed light.

• 10’-0” AFF is the minimum

ceiling height requirement for

borrowed light & vent. Window

head must be minimum

9’-0” AFF.

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

22

IMPORTANT

ISSUES • All required light court

clearances must be

dimensioned on the

drawings.

12

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

23

RECENT CODE

MEMOS • Use of a Door Undercut for Make-

up Air Transfer to Dwelling Unit

• Separation of Air Intake and

Exhaust on Rooftop Equipment

• Power Ventilators for Restaurant

Exhaust-Fan Motor Location

• UL710 Listed Commercial

Cooking Hoods

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

24

SUMMARY • Review the ventilation requirements for each project.

• Complete all ventilation, heat, HVAC and equipment data forms properly and submit them with your plans.

• Follow the guidelines discussed for important issues where they apply.

• Feel free to call with questions at 312-744-7563.

13

Ventilatio

C I T Y O F C H I C A G O D E P A R T M E N T O F B U I L D I N G S

Ventilation

Requirements

25

QUESTIONS &

ANSWERS