Vendôme Intermodal Hub – Transitional Measures
• Objectives
– Reduce the impact of projected ridership growth;
– Improve the flow of traffic in the metro and train stations;
– Facilitate pedestrian traffic to the MUHC;
– Implement measures to ensure the rapid evacuation of facilities and
expedite emergency responses in the Vendôme hub, as required.
• Project Map
a. Interventions in the station (STM)
b. Interventions in the tunnel (STM and AMT)
c. Interventions to exterior access (AMT)
d. Extension of existing tunnel (AMT)
a
c
d
b
Vendôme Intermodal Hub – Transitional Measures
• Scope of STM Work
1
5
4
2 3
1) Demolish a floor slab to build a new staircase;
2) Build new stairs (4 flights), from the fare booth mezzanine to the pedestrian walkway, and install exit turnstiles;
3) Reposition existing turnstiles;
4) Demolish the existing staircase to build a new one leading to the AMT corridor;
5) Demolish a storage room to make room for the 2nd corridor and install gates and fire doors.
Vendôme Intermodal Hub – Transitional Measures
• Scope of STM Work – Zone 1
Vendôme Intermodal Hub – Transitional Measures
retour au plan
Location of new staircase Slab to demolish for new staircase
• Scope of STM Work – Zone 2
AFTER BEFORE
Vendôme Intermodal Hub – Transitional Measures
retour au plan
Walkway New staircase leading from the ticket booth mezzanine to the walkway
• Scope of STM Work – Zone 3
Vendôme Intermodal Hub – Transitional Measures
retour au plan
Turnstiles to relocate
• Scope of STM Work – Zone 4
Vendôme Intermodal Hub – Transitional Measures
retour au plan
Stairway to demolish to build a new one (leading to the AMT corridor)
AMT corridor
• Scope of STM Work – Zone 5
Vendôme Intermodal Hub – Transitional Measures
retour au plan
Storage room to demolish
Vendôme Intermodal Hub – Transitional Measures
• Scope of AMT Work – Train Station Tunnel
Relocation of equipment
(fare vending machine,
information kiosk, benches)
Redesign of the metropolitan ticket office
Vendôme Intermodal Hub – Transitional Measures
• Scope of AMT Work – Train Station Tunnel
Extension of the station tunnel toward the MUHC
Vendôme Intermodal Hub – Transitional Measures
• Scope of AMT Work – Train Station Tunnel
Access to new path and to the fare vending machine via the
northern station entrance
• Envergure des travaux AMT – Sentier
New path between de Maisonneuve Blvd. and the train station
Vendôme Intermodal Hub – Transitional Measures
Pôle intermodal Vendôme - Mesures transitoires
• Scope of AMT Work – Path
New path between de Maisonneuve Blvd. and the train station
• Mitigation Measures
– Work will be phased to ensure customer traffic flow and safety
– STM work will be performed mainly at night
– Work to extend the train station tunnel to the MUHC will be performed starting from the south
– Path work will have no impact on customers
– Relocation of the 102 bus stop to the bus loop
– Opportunity analysis underway to assess the relevance of improving the public transit network to address the service needs of customers with functional limitations from the metro
Vendôme Intermodal Hub – Transitional Measures
• Next Steps
– Short Term – Transitional Measures:
• Work in the existing station entrance until June 2015 (2 phases)
• Fare vending machine and path work: until March 2015
• Tunnel work: until February/March 2015
– Medium Term – Permanent Solution:
• Confirmation of government funding for the permanent solution
• Implementation of permanent solution
Vendôme Intermodal Hub – Transitional Measures
• Financing
– This work is funded by the ministère des Transports du Québec and
Mobility Montréal.
Vendôme Intermodal Hub – Transitional Measures
Thank you!!
Vendôme Intermodal Hub – Transitional Measures
For more details:
stm.info/travaux
amt.qc.ca/vendome