    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTED TECHNIQUES, A SOLUTION FOR ANCHORS

    Veloso, Goncalo A. Geotechnical Engineer

    Introduction

    S.B.M.A. Technology

    Post grouting Techniques and Design

    Investigation Tests Results

    Applications

  • 7/29/2019 Veloso Presentation

    2/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    When permanent anchorages are required on a retaining structure, the firstconcerns for the geotechnical engineer are the ground conditions and the

    anchor achievable capacity

  • 7/29/2019 Veloso Presentation

    3/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    We design our anchors based on the existing ground properties, not thestrand capacity

    S.B.M.A. Single Bore Multiple Anchor system

    Can provide double the capacity of conventional anchors

  • 7/29/2019 Veloso Presentation

    4/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    As an alternative to conventional grouting techniques, anchors can be designedusing post grouting techniques, enabling the enhancement of the properties of

    the soils and therefore increasing the capacity of the anchorages system

    Grout up BoreholeGrout up BoreholeInsert anchor strands togetherInsert anchor strands together

    with a post grouting pipe withwith a post grouting pipe with

    manchetesmanchetes (TAM)(TAM)

    4 8 HoursLater

    Drill BoreholeDrill Borehole

    Post GroutingPost Grouting

    11stst StageStagePost GroutingPost Grouting

    22ndnd StageStage

    4 8 HoursLaterRepeat if

    required

    7 days after

    PrePre--stressstress

    ConclusionConclusion

  • 7/29/2019 Veloso Presentation

    5/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    The design of a ground anchor in cohesive soils is done using the followingequation (Littlejohn, 1970) :

    CuLDTf xxxx =

    lengthfixedoverstrengthshearundrainedAverage-

    factorAdhesion-

    lengthanchorFixed-

    DiameterBorehole-

    LoadWorking-

    Cu

    L

    D

    Tf

    0.45=This means that with conventional grouting techniques in cohesive soils,less than half the clays undrained shear strength is mobilized in tension.

  • 7/29/2019 Veloso Presentation

    6/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    The design of a ground anchor in cohesive soils is done using the followingequation (Littlejohn, 1970) :

    CuLDTf xxxx =

    341 to.=

    This means that with post grouting techniques in cohesive soils, we canenhance the working capacity of anchors up to 3 times or more aconventionally grouted anchor.

    After post groutingAfter post grouting

  • 7/29/2019 Veloso Presentation

    7/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    Post Grouting effect:

  • 7/29/2019 Veloso Presentation

    8/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    Post Grouting effect:

    Enlarged fixed length diameter by post grouting

  • 7/29/2019 Veloso Presentation

    9/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    Post Grouting effect:

    Post Grouted fissures in stiff Clay

  • 7/29/2019 Veloso Presentation

    10/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    Post Grouting effect:

    Section of exhumed post grouted anchor

  • 7/29/2019 Veloso Presentation

    11/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    POST GROUTING TECHNIQUES AND DESIGN

    Post Grouting effect:

    Section of exhumed post grouted anchor

    BoreholeBorehole DiamDiam = 150mm= 150mm

    Max.Max. DiamDiam. After post. After post

    grouting = 210mmgrouting = 210mm

  • 7/29/2019 Veloso Presentation

    12/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    INVESTIGATION TESTS RESULTS

    Earlier this year were carried out investigation tests, to determine the

    behaviour of post grouted S.B.M.A. anchors compared to conventionallygrouted S.B.M.A.s and determine the enhancement achieved by the use ofthese techniques.

  • 7/29/2019 Veloso Presentation

    13/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    INVESTIGATION TESTS RESULTS

    The results exceeded our expectations and the following results were

    obtained:

    For conventionally grouted S.B.M.A anchors

    Average bond stress mobilized:

    Up to 150 kN/m2

    For Post grouted S.B.M.A. anchors

    Average bond stress mobilized:

    up to 450 kN/m2

  • 7/29/2019 Veloso Presentation

    14/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    APPLICATIONS

    -Installation of anchors in poor ground conditions

    -Reduce the number of anchors on a project by proposing to the clienthigher loads and larger spacing between anchors

    -Reduce the overall length of the anchor when space restrictions exist

  • 7/29/2019 Veloso Presentation

    15/15

    How to Enhance Ground Anchors Capacity in Soft Soils

    THANK YOU FOR YOUR TIME

    WWW.KELLER-GE.CO.UK

    WWW.SBMASYSTEMS.COM

    WWW.THEANCHORMAN.COM

    http://www.keller-ge.co.uk/http://www.sbmasystems.com/http://www.theanchorman.com/http://www.theanchorman.com/http://www.sbmasystems.com/http://www.keller-ge.co.uk/