Veivalg og naturopplevelse
- Løypelegging for alle
Design Process for 2010
Nordic Olympic Venue Callaghan Valley – something for everyone
Spring 2004
Spring 2004
CC Design process – initial step
FIRST ON PAPER:
• Create a Stadium solution
– Access to stadium for athletes, teams, (and also
spectators, media etc…)
– Athletes’ Compound (wax cabins, ski test area,
warm-up course)
CC Design process – initial step
FIRST ON PAPER:
• Look at available Terrain and Courses
– Distances and loops required
– Suitable terrain near stadium (for Sprint course)
– Location of and distance to suitable climbs
• Create a paper proposal (course layout) that met FIS
requirements
5km CL
5km FR
Sprint
Olympic CC
Courses
Profile 3.75 km (Blue)
3.75 km blue
Course length: 3860m
Category:
Competition Level: OWG
Height Difference (HD): 40m
Maximum Climb (MC): 33m
Total Climb (TC): 129m
Lowest point: 850m
Highest point: 890m
0 250 500 750 1000 1250 1500 1750 2000 2250 2500 2750 3000 3250 3500 3750850
860
870
880
890
ABC
u.t.(k)Desc.
CC Courses - proposal
Course Max climb Total Climb
• Sprint M (1.5k) 24m 49m
• Sprint W (1.3k) 24m 40m
• 2.5 km CL 42m 99m
• 2.5 km FR 35m 87m
• 3.3 km CL 57m 125m
• 3.3 km FR 35m 131m
• 3.75 km CL 57m 144m
• 3.75 km FR 35m 162m
• 5.0 km CL 57m 181m
• 5.0 km FR 37m 178m
• 7.5 km FR 57m 275m
CC Design process – next step
START PRACTICAL WORK:
• NOTE: Difficult conditions
• NOTE: Moving in terrain best done on snow (snow-shoes)
• Convert/adjust paper-plan to terrain:
– Goal: Find “Canadian Identity”?
– Start with stadium (next slide)
– Follow terrain (old trails etc…)
– Minimize terrain and environmental impacts
– Avoid areas exposed to wind etc…
Biathlon
Cross Country
Cross-Country courses
• Minimize cost and large environmental issues
– Creek crossings
– Road crossings
– Avoid wetlands
– “Set-back” from creeks (30 m or 15 m)
• Further course work
– Identify separate snowmobile courses
– Identify spectator access to trail system
Cross-Country courses
• Consider mass-start and group skiing
– Width of uphills (9m where possible)
• for Overtaking
– Technical/challenging downhill sections must be
wide for safety
– Avoid compression in corners (ex. Sapporo)
– Constant radius through corner
– Important to bank/elevate outside corners
– Places for feeding stations & Coaching zones
– Space for snowmobile camera
Construction process
• Very difficult
• Local construction expertise required
• Large machines needed
• Expensive
• “Hands-on” work important (every 2nd day)
• Make final product look natural (seed grass, add soil to edges of trail etc…)
• Create natural and nice rock walls etc…
• ‘Check-points” along the way (Hermod/FIS)
Install temporary crossing
at Bridge S-12 location
Bridge S-21 footings
complete, rebar installed
Build rock stack
headwall at S-16A
multiplate culvert
Grinding green waste to
be used for composting
2005 Compound Construction
2006 Trail clearing
2006 Trails
Olympic
Area –
1 km2
OL løyper ikke bærekraftig
• Må være løyper for alle nivåer
• For etterbruk er «grønne» (lette) løyper det
viktigste
All trails
Total trails:
50 - 55km
Green: 25%
Blue: 50%
Black: 25%
Olympic area
Other trails
Other trails
Reidar
Zapf-Gilje
Viktige elementer
- for turløyper
• Gode navn
– Top of the World, Norwegian Woods, Lunch lake, osv.
• Gode mål (for skituren)
• Noe å se på underveis
• Egne løyper for hunder (ikke tillatt i andre løyper)
• Godt skilta
• God informasjon før turen
2006 Venue Trails
Our Competitors of to-morrow
Viktige elementer
- skilting og infokart
• I riktige farger
– Grønt for «beginner»
– Blå for «intermediate»
– Svart for «advanced»
• Med information hvor langt til P-plassen (!)
• Infokart ved betaling av dagspass
– I lommeformat