1 SAFETY NOTICE Vehicle Safety Recall - Technical Service Bulletin Replacement Procedure PROMPT ACTION REQUIRED Attention: Subject: Models Affected: McNeilus Service Technicians Pressure Relief Device (PRD) on CNG Tank McNeilus Concrete Standard and Bridgemaster V Mixers fitted with Emcara PRD valves on the CNG Tanks November 2019 VSR-WI-006-A-Replacement Procedure Date: NHTSA Campaign Number: 19V-656 Purpose: McNeilus Truck and Manufacturing, Inc. has been alerted by our supplier that a concern affecting safety exists in some Emcara Pressure Relief Device (PRD) valves on CNG tanks (for your information, Emcara’s NHTSA Recall number is 15E059). Some McNeilus Standard and Bridgemaster V Concrete Mixer models were shipped with an Emcara CNG PRD which may not vent properly. The purpose of the thermal PRD is to relieve pressure in the CNG system if the CNG tank is reaching an unsafe level of pressure, as might occur with a thermal event that heats up a tank. In the event of a thermal event, the thermal PRD may not vent properly, which increases the likelihood of a CNG tank over-pressurizing and rupturing. A tank rupture creates an increased risk of fire and injury to the truck occupants, firefighters, or bystanders. Affected Vehicles: The affected vehicle population is PRD valves fitted on tanks assembled by McNeilus between 2013 and 2018 and are PRD valves with serial numbers as found in the attached list. Use VSR-WI-005-A to inspect the serial numbers on the PRD valves. As of April 2016, certain PRD valves only need the pin inspected. See Table 1 for a PRD valve serial number list of PRDs that only need the pin inspected (found at the end of this bulletin). Follow the procedure in Appendix A to inspect the pin and repair or replace as needed. See Table 2 for a PRD valve serial number list of PRDs that require block replacement and pin inspection (found at the end of this bulletin) Time Completion: Affected units shall be inspected using McNeilus qualified service technicians - at no cost to the owner. The time of accomplishment may vary due to a number of factors; however, the estimated time for completion of the procedure is 6.0 hours under normal circumstances. This work instruction is limited to Internal McNeilus Use Only.

Upload: others

Post on 14-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

1

SAFETY NOTICE

Vehicle Safety Recall - Technical Service BulletinReplacement Procedure

PROMPT ACTION REQUIRED

Attention:Subject:Models Affected:

McNeilus Service TechniciansPressure Relief Device (PRD) on CNG TankMcNeilus Concrete Standard and Bridgemaster V Mixers fitted with Emcara PRD valves on the CNG TanksNovember 2019

VSR-WI-006-A-Replacement Procedure

Date:

NHTSA Campaign Number: 19V-656

Purpose:McNeilus Truck and Manufacturing, Inc. has been alerted by our supplier that a concern affecting safety exists in some Emcara Pressure Relief Device (PRD) valves on CNG tanks (for your information, Emcara’s NHTSA Recall number is 15E059). Some McNeilus Standard and Bridgemaster V Concrete Mixer models were shipped with an Emcara CNG PRD which may not vent properly. The purpose of the thermal PRD is to relieve pressure in the CNG system if the CNG tank is reaching an unsafe level of pressure, as might occur with a thermal event that heats up a tank. In the event of a thermal event, the thermal PRD may not vent properly, which increases the likelihood of a CNG tank over-pressurizing and rupturing. A tank rupture creates an increased risk of fire and injury to the truck occupants, firefighters, or bystanders.

Affected Vehicles:The affected vehicle population is PRD valves fitted on tanks assembled by McNeilus between 2013 and 2018 and are PRD valves with serial numbers as found in the attached list. Use VSR-WI-005-A to inspect the serial numbers on the PRD valves.As of April 2016, certain PRD valves only need the pin inspected. See Table 1 for a PRD valve serial number list of PRDs that only need the pin inspected (found at the end of this bulletin). Follow the procedure in Appendix A to inspect the pin and repair or replace as needed.See Table 2 for a PRD valve serial number list of PRDs that require block replacement and pin inspection (found at the end of this bulletin)

Time Completion:Affected units shall be inspected using McNeilus qualified service technicians - at no cost to the owner. The time of accomplishment may vary due to a number of factors; however, the estimated time for completion of the procedure is 6.0 hours under normal circumstances.

This work instruction is limited to Internal McNeilus Use Only.

Page 2: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

2

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. Required Action:Review and verify the ownership of all affected serial numbers of trucks. If McNeilus records indicate there are one or more affected units, a Serial Number List is enclosed. Please be reminded that it is a violation of Federal law for companies to sell or lease the CNG systems or vehicles that use CNG systems covered by this notification until this recall has been performed on these vehicles. Substantial civil penalties apply to violations of this law.

Contact:If you have questions or need further information, please contact a National Service Representative at 888-686-7278.

Special Instructions:For all PRD valves replaced, be sure to record the old and new PRD valve serial numbers, and the VIN of the truck on the JDE Work Order.

Enclosures:PRD Valve Replacement ProcedureCNG PRD Valve Replacement Fuel Release Tracking SheetList of Affected Serial Numbers/Vehicles

SAFETY NOTICEBefore entering vehicle’s body or drum or performing maintenance to the vehicle, read and follow OSHA Regulations concerning entry and working in “CONFINED SPACE” OSHA 1910.146 and “LOCKOUT/TAGOUT” OSHA 1910.147.Follow OSHA Regulations while performing any work to the vehicle.Follow all safety instructions in your manual.Shut off truck engine, lock cab doors, and keep keys in your pocket before entering vehicle’s body or drum or performing any work to the vehicle.Place magnetic “DANGER” signs on both cab doors. Failure to do so can result in serious personal injury or death.If you have any questions regarding this notice or require further assistance, call McNeilus at 888-686-7278.

WARNINGWear proper Personal Protective Equipment (PPE) such as hard hats, safety glasses or goggles, sturdy gloves, hearing protection,steel toed boots, and snug fitting sturdy long-sleeve shirt and long pants when operating, fueling, defueling, or maintaining the truck. Reflective clothing is recommended for drivers and employees.Serious personal injury or death can resultwithout proper PPE.

WARNINGUse proper fall protection equipment and training when inspecting or maintaining the CNG cylinder on the truck. Failure to use proper fall protectionequipment may result in serious personal injury or death.

Page 3: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

3

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. Table of ContentsPROCEDURE A: PREPARATION ......................................................................................................... 4PROCEDURE B: DEFUELING THE CNG TANKS ............................................................................... 5

Defueling Requirements ............................................................................................................ 5Step 1: Defueling Options ................................................................................................................. 6

Defueling Hose for Vehicle to Vehicle Defueling ........................................................................ 6Step 2: Defueling Options ................................................................................................................. 7Step 2.1: Grounding Information ....................................................................................................... 8

PROCEDURE C: CLEANING THE CNG TANKS AND FITTINGS ...................................................... 8PROCEDURE D: REMOVING THE EXISTING PRD ASSEMBLY ...................................................... 8

Procedure 1. Removing the existing PRD and Trigger Line for Frame Mount CNG System ............ 8Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 10

PROCEDURE E: REPLACING THE PRD .......................................................................................... 12Option 1. Installing the Replacement PRD block and using the Existing Trigger Line .................... 12Option 2. Installing the entire replacement PRD and Trigger Line Assembly.................................. 18

Procedure 1. Installing the entire replacement PRD and Trigger Line for Frame Mount CNG Systems only ........................................................................................................................... 18Procedure 2. Installing the entire replacement PRD and Trigger Line for Twin Vertical Mount CNG Systems only .................................................................................................................. 20

PROCEDURE F: TESTING FOR LEAKS ........................................................................................... 23PROCEDURE G: REINSTALLING THE COVER ON THE FRAME MOUNT CNG SYSTEM ......... 23PROCEDURE H: FUELING PROCEDURE (ALL SYSTEMS) ........................................................... 23PROCEDURE I: RETURNING THE PRD TO MCNEILUS................................................................. 24PROCEDURE J: FINAL INSTRUCTIONS .......................................................................................... 26APPENDIX A .........................................................................................................................................27

If the PRD block is an LT102B, follow these work instructions for Pin Cap Inspection and Repair or Replace as needed. ........................................................................................................................ 27

APPENDIX B .........................................................................................................................................30Trigger Line Bend Point .................................................................................................................. 30

Page 4: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

4

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. PROCEDURE: EMCARA PRD VALVE REPLACEMENTRead the entire procedure before beginning.

Tools and Equipment Required:• PRD serial number tracking sheet• Cleaning supplies

– warm water– mild dish soap– large scrub brush or mop with a long handle– small, soft bristle scrub brush

• Torque wrenches• Various hand tools• White lithium grease• 7/8” crows foot wrench• Leak detection solution• System Field Inspection Took Kit (LT100) (Emcara PN A0005)

• Includes one each of magnetic ball holder, pressure simulator, pin cap tool, pressure simulator shim

• O-ring (2-016, V1476) for retainer nut (Emcara PN C0167) (if needed)

Parts Required Dependent upon CNG System Configuration (order from McNeilus):Choose the parts required based on the CNG system you are working on.

Item Part Number Description Qty.

1 1489155 PRD, Emcara, 96” Varies (determined by inspection procedure)

2 1487827 PRD, Emcara, 72” Varies (determined by inspection procedure)

Parts to Purchase if Needed:5 1462077 20 ft. Defueling Hose 16 1464662 50 ft. Defueling Hose 1

Procedure A: Preparation1. IMPORTANT: The inspection procedure from VSR-WI-005-A-Inspection Procedure bulletin

determined which PRDs were in the serial number range and needed to be replaced. Use the information procured from the inspection procedure to determine which PRDs to replace.IMPORTANT: Read the entire bulletin before starting the procedure so that you can gather all of the necessary parts and equipment.

2. Place unit on a flat surface, block truck tires, and observe all conditions of the Safety Notice concerning Lockout/Tagout posted in this bulletin. Contact McNeilus Truck and Manufacturing, Inc. at 888-686-7278 if you have any questions.

3. Battery Disconnect SwitchIf your vehicle is equipped with a BATTERY DISCONNECT switch, it is located near the battery box. Use the battery disconnect switch when performing any maintenance so the vehicle cannot accidentally be started.1. Turn the battery disconnect switch (Figure 1, Item 1) counterclockwise so the hole on the switch aligns with the hole in the bracket (Figure 1, Item 2).2. Install the safety lockout device ring (Figure 2, Item 1) through the holes on the battery disconnect switch and the bracket.

Page 5: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

5

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 3. Install a padlock (Figure 2, Item 2) onto the safety lockout device ring, lock it, and put the key in your pocket. If more than one person is working on the vehicle, each person must install his or her own padlock.

ON

12

Figure 1

ON

DANGERThis energy source has

Unauthorized removal of

this lock/tag may result

in immediate discharge.

Remarks:

been LOCKED OUT!

1

2

Figure 2

WARNINGFor trucks without a battery disconnect switch, to prevent accidental vehicle start-up, which could cause death or serious injury, disconnect battery cables (negative cable first) before proceeding. Disconnect negative (-) battery cable first. If positive (+) cable should contact ground withnegative (-) cable connected, the resultingsparks can cause a battery explosion, whichcould result in death or serious injury.

Battery Cable Disconnect - No Switch ApplicationIf your vehicle is not equipped with a battery disconnect switch, disconnect the negative (black) battery cable first, then disconnect the positive (red) cable.

4. You must use the proper fall protection equipment when working on this bulletin procedure. Contact McNeilus Truck and Manufacturing, Inc. at 888-686-7278 if you have any questions.

WARNINGUse proper fall protection equipment and training when inspecting or maintaining the CNG cylinder on the truck. Failure to use proper fall protectionequipment may result in serious personal injury or death.

Procedure B: Defueling the CNG TanksAll CNG tanks in the CNG system must be depleted of all fuel before replacing the PRD valve(s).

WARNINGThe defueling process must occur outside, away from flammable materials.Failure to comply could result in an explosion and serious personal injury or death.

There are multiple methods to defuel the CNG tanks in the CNG system. Choose the method that is appropriate for the equipment you have. Read the entire Procedure before beginning.

• Defueling RequirementsThe most important information with defueling is ensuring the technician’s safety which requires training and careful attention to using proper procedures. Defueling is not something technicians should “figure out” when it is time to perform it, but requires significant preparation. Every facility that services CNG vehicles should prepare for defueling ahead of time, especially in case emergency defueling becomes necessary.

Page 6: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

6

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

WARNINGBasic Rules for Defueling• Deplete as much fuel as possible prior to defueling• Notify appropriate nearby personnel prior to defueling• Always ground (earth ground) the vehicle and the fuel system being defueled• Never defuel indoors• Always defuel in a well-ventilated area (outside)• Always wear personal protective equipment such as safety glasses, gloves, safety shoes, hard hats• Be familiar with evacuation routesFailure to comply could result in serious personal injury or death.

WARNINGEven if the truck has stalled after running it out of fuel, and you think all fuel has been depleted, check the high pressure gauge to make sure it is at zero.If the gauge is not at zero, continue to deplete the fuel until the gauge reads zero. Failure to comply may result in serious personal injury or death.

Step 1: Defueling OptionsChoose one of the following options:

Option 1: Run truck as low on fuel as possible. Once the fuel level has been depleted as much as possible, remaining fuel shall be depleted during Step 2: Defueling Options. Continue at Step 2: Defueling Option. OR Option 2: Use vehicle to vehicle defueling to reduce pressure as far as possible (see Vehicle to Vehicle Defueling Procedure Set-Up).

Vehicle to Vehicle Defueling Procedure Set-UpDefueling Hose for Vehicle to Vehicle Defueling

A defueling hose is used to transfer CNG fuel from a supplying (defueling) vehicle to a receiving (fueling) vehicle. There are two different length defueling hoses available from McNeilus Truck and Manufacturing, Inc.

20 foot defueling hose is part number 146207750 foot defueling hose is part number 1464662

1. A defueling hose can be used only if one of the vehicles is equipped with a defueling receptacle. The supplying vehicle must have the defueling valve.

2. In order for the CNG fuel to flow, the tank pressure in the supplying vehicle must be higher than the tank pressure in the receiving vehicle.

3. Open access doors on the fuel control module on both vehicles.4. Before connecting the defueling hose to either vehicle, open the purge valve on the defueling hose

to release any pressure that may be in the hose. Close the purge valve after pressure is released.5. Turn the defueling control valve to the Normal Operation position to release pressure in the

defueling circuit. This also allows the hose’s defueling nozzle to be connected to the defueling receptacle. It is not possible to make the connection if the valve is not in the Normal Operation position.

6. Connect the hose’s defueling nozzle to the defueling receptacle of the supplying vehicle by pulling back on the quick connect collar on the hose and pushing it onto the vehicle’s coupler (Figure 3).

Page 7: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

7

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Figure 3: Defueling hose attached to defueling receptacle on supplying vehicle.

Defueling Hose Defueling Receptacle

7. Connect the hose’s fueling nozzle to the fueling (NGV1) receptacle on the receiving vehicle.8. Slowly turn the defueling control valve on the supplying vehicle to Defueling Enabled to initiate the

flow of CNG fuel from the supplying vehicle to the receiving vehicle.9. Adjust this flow to a steady flow rate. Too fast of a flow rate will cause the system to freeze up.10. When fuel stops flowing, check the gas pressure by reading the high pressure gauges of both

vehicles. Both CNG tank pressure gauges should equalize.11. Stop the flow of CNG fuel by turning the defueling control valve to the Normal Operation position.

NOTE: Pressure in the defueling hose is vented so that the hose can be disconnected.12. Disconnect the fuel hose from the supplying vehicle by pulling back on the quick connect collar on

the hose and pulling the hose away from the vehicle’s coupler.13. Continue at Step 2: Defueling Options.

Step 2: Defueling OptionsOnce the vehicle is equipped with the defueling receptacle, there must be an approved place to put the natural gas fuel removed from the vehicle. The following are the three most common defueling options.

• Option 1: Defueling with a Defueling Panel (Atmospheric Venting)The first thing to check when using this method is your local air quality regulations. There may be local air quality regulations regarding the release of methane into the atmosphere. If atmospheric venting is acceptable in the area, then a vent stack apparatus that meets the requirements established in either the Uniform Building Code or the International Building Code must be followed. The local authority having jurisdiction—typically the Fire Marshal—should be consulted. Both the vehicle and the fuel system must be grounded (see 2.1 Grounding Information below). If you use this method, you must fill out the CNG Fuel Release Tracking Sheet attached to this bulletin and return it to the e-mail address listed on it.If you have a MA10 Fuel Box system, remove the defueling 3-way valve (Figure 4).

• Option 2: Defueling with a Defueling Panel (Compressor Inlet Method)By far the easiest method, this procedure requires pre-planning and special equipment installed at the CNG fueling station. If there is not a fueling station at the site where the technician is working on the vehicle, it is required to tow the vehicle to the facility to repair after defueling. In this method, the vehicle is connected through the defueling nozzle to the defueling panel and the compressor at the fueling station extracts the gas from the vehicle. The vehicle and its fuel system must be grounded.If you have a MA10 Fuel Box system, remove the defueling 3-way valve (Figure 4).

• Option 3: Defueling with a Defueling Panel (Vent Back to Gas Main Method)The least common method, venting back to gas main, requires pre-planning and specialized equipment. The local gas utility would install special valving, regulation, and piping that allows the gas to be put back into the distribution system. This process works on the basis of pressure equalization between the vehicle and the utility system, so it is possible that there will still be pressure in the vehicle’s onboard fuel system. As in the other defueling methods, both the vehicle and the fuel system must be grounded during the process.

Page 8: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

8

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. If you have a MA10 Fuel Box system, remove the defueling 3-way valve (Figure 4).

Defueling Three-Way Valve

Defueling Connection

CNG Fuel Fill Connection

Figure 4

Step 2.1: Grounding Information

Figure 5: Illustration of a grounding rod in the ground.

WARNINGThe tank must be grounded before venting. The venting orifice must be grounded with a 3-gauge wire minimum to an appropriate ground source at least eight (8) feet (2.44 meters) in the ground.Failure to comply may result in serious personal injury or death.

Procedure C: Cleaning the CNG Tanks and FittingsIf the inspection finds PRD valve(s) in the affected serial number range, the CNG tanks and fittings must be cleaned before replacing the valve(s) to reduce the risk of contamination to the tubes.1. Use warm, soapy water, a mop, and a soft bristle brush to clean the tanks, tubes, and fittings.2. Rinse the components well with clean water.NOTE: A garden hose works well to wet and rinse off the area.

Procedure D: Removing the Existing PRD AssemblySee Procedure 1 for removing the existing PRD and trigger line for the Frame Mount CNG System.See Procedure 2 for removing the existing PRD and trigger line for the Twin Vertical Mount CNG System (Page 10).

Procedure 1. Removing the existing PRD and Trigger Line for Frame Mount CNG System

CAUTIONSupport the full length of the PRD trigger line when working on it or the PRD block. Do not allow the trigger line and wire to twist or kink. Twisting or kinking will ruin the trigger assembly and the entire PRD will need to be replaced.

Page 9: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

9

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 1. On Frame Mount CNG systems, locate the clamps that hold the side covers on. Depending on the

length of the tank, the number of clamps ranges from two to six. Remove and retain the cotter pin from the clamp and open the clamp (Figure 6). Do this on each clamp. The covers are now free from the assembly.

2. Remove the covers and set aside.

Figure 6: Locate the clamps. Remove and retain the cotter pin in the clamp. Open the clamp to free the cover.

3. Remove and retain the bolts, clamps, and nuts that secure the trigger line to the rail (Figure 7). Quantity is dependent on length of trigger line.

Rail

Trigger Line

Figure 7: Remove and retain the bolts, clamps, and nuts that secure the trigger line to the rail.

4. Disconnect the two fittings (feed fitting and vent fitting) from the PRD block (Figure 8). The vent fitting and the vent line can be removed from the assembly and set aside for reconnection. The feed line can dangle.

Figure 8: Disconnect the feed and vent fittings on the PRD.

Page 10: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

10

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 5. Remove and retain the (3) bolts and nuts that secure the PRD block to the rail (Figure 9).

Figure 9: Remove and retain the three bolts and nuts that secure the PRD block to the rail.

6. Carefully remove the PRD block and trigger line from the area.

Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System1. On Twin Vertical Mount CNG systems, locate the middle bracket on the tank cover (Figure 10).2. Remove and retain the bolt, washers, and nut that bolt the bracket to the tank cover (Figure 10).

This opening will give you clearance between the tank/covers and the PRD/tigger line area to extract the PRD/trigger line.

Figure 10: Remove and retain the bolt, washers, and nut that bolt the middle bracket to the tank cover. This is the side that is nearest the cab.

Page 11: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

11

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 3. Remove and retain the bolts, clamps, and nuts that secure the trigger line to the rail (Figure 11).

Quantity is dependent on length of trigger line.

Figure 11: Remove and retain the bolts, clamps, and nuts that secure the trigger line to the rail. Quantity is dependent on length of trigger line.

4. Disconnect the two fittings (feed fitting and vent fitting) from the PRD block (Figure 12). The vent fitting and the vent line can be removed from the assembly and set aside for reconnection. The feed line can dangle.

Figure 12: Disconnect the feed fitting and vent fitting on the PRD.

Page 12: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

12

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 5. Remove and retain the (3) bolts and nuts that secure the PRD block to the bracket (Figure 13).

Figure 13: Remove and retain the three bolts and nuts that secure the PRD block to the bracket.

6. Carefully remove the PRD block and trigger line from the area.

CAUTIONSupport the full length of the PRD trigger line when working on it or the PRD block. Do not allow the trigger line and wire to twist or kink. Twisting or kinking will ruin the trigger assembly and the entire PRD will need to be replaced.

Procedure E: Replacing the PRDOptions to replace the PRD include:

Option 1: Installing the replacement PRD block while using the Existing Trigger LineOROption 2: Installing the entire replacement PRD and Trigger Line Assembly

Option 1. Installing the Replacement PRD block and using the Existing Trigger LineNOTE: In an effort to limit contamination, leave the plugs on the PRD until you are ready to test the pressure or connect the fittings.NOTE: The unacceptable PRD block will need to be packaged for shipment. See Procedure I: Returning the PRD to McNeilus for packaging instructions.1. Use the magnetic tool to help keep the internal ball bearing in place. Thread the magnetic tool into

the vent port.2. Rotate the PRD block to remove it from the trigger line. Slide the trigger line out of the PRD block.

a. Alternatively, the trigger line compression nut can be loosened and then the retainer nut can be rotated out of the PRD block.

Page 13: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

13

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

CAUTIONSupport the full length of the PRD trigger line when working on it or the PRD block. Do not allow the trigger line and wire to twist or kink. Twisting or kinking will ruin the trigger assembly and the entire PRD will need to be replaced.

3. Remove the magnetic tool to release the ball bearing. Keep the ball bearing in a clean, safe place in case the ball bearing on the replacement PRD becomes lost (replacement PRD blocks come with the ball bearing).

4. Inspect the trigger line and internal wire for contamination or damage (bending). If debris or damage is found, the entire PRD block and trigger line assembly must be replaced.

CAUTIONDo not apply excessive force on the trigger line. Do not pull the retainer nut away from the trigger line. Support the full length of the PRD trigger line when working on it or the PRD block. Do not allow the trigger line and wire to twist or kink. Twisting or kinking will ruin the trigger assembly and the entire PRD will need to be replaced.

5. Inspect the replacement PRD block for contaminants or damage.6. Make sure the ball bearing is in place and hold the PRD with the “label up” to trap the ball bearing in

its bore (Figure 14).

Figure 14: Ball bearing in the PRD.

7. Install the magnetic ball holder into the PRD block vent port. This will hold the ball bearing in place while the PRD block is installed.

8. Lubricate the new O-ring with the O-ring lubricant and place it in the PRD block.9. Loosen but do not remove the compression fitting from the retainer nut on the trigger line.10. Insert the trigger line into the PRD block.11. Rotate the PRD block or the retainer nut ONLY to install the trigger line against the retainer nut and

the PRD block. Do not allow the trigger line to twist or kink.12. Use a torque wrench with a crows foot to torque the retainer nut to the PRD block as shown in

Figure 15 to 20 ft-lbs. Do not allow the trigger line to twist or kink.

Page 14: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

14

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Figure 15: Torque the retainer nut to the PRD block.

13. Hand tighten the compression nut on the trigger line. After it is hand tightened, tighten an addition quarter-turn.

14. Insert the pressure simulator into the inlet of the PRD block. Ensure the screw on the pressure simulator pops out slightly when the simulator is bottomed against the PRD block as shown in Figure 16.

Figure 16: Insert the pressure simulator into the inlet of the PRD block for testing.

15. Slip the metal pressure simulator shim into the space between the screw and the pressure simulator (Figure 17). If the shim is able to slide through the gap, the ball bearing is seated properly.a. If the shim cannot be placed in the space, assembly is not correct. Remove the trigger line from the PRD block and repeat Steps 3-15, making sure the ball bearing is properly seated.

Figure 17: Insert the metal pressure simulator shim to the space between the screw and the pressure simulator for testing.

16. If the PRD block is an LT102B, follow the Pin Cap Inspection and Repair or Replace in Appendix A prior to completing the following steps.

17. If it is necessary, use a 1/4” manual tube bender to bend the tube to specifications in Appendix B.18. Attach the replacement PRD to the rail using the original (3) bolts and nuts (Figure 18 for Frame

Mount and Figure 19 for Twin Vertical Mount).

Page 15: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

15

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Figure 18: Remove and retain the three bolts and nuts that secure the PRD block to the rail.

Figure 19: Attach the new PRD block to the bracket using the retained three bolts and nuts.

19. Install the bolts, clamps, and nuts that secure the trigger line to the rail (Figure 20 for Frame Mount and Figure 21 for Twin Vertical Mount). Quantity is dependent on length of trigger line.

CAUTIONInstall the bolts for the trigger line clamps in the same direction as originally installed. Install the bolt threads so that they face away from the CNG tank. Failure to do so may cause damage to the CNG tank.

Page 16: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

16

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Rail

Trigger Line

Figure 20: Remove and retain the bolts, clamps, and nuts that secure the trigger line to the rail.

Figure 21: Install the bolts, clamps, and nuts that secure the trigger line to the rail. Quantity is dependent on length of trigger line.

20. Install the bolt, nut, and loom clamp that secures the trigger line to the rail (Figure 22). Install all original bolts, nuts, and clamps.

CAUTIONInstall the bolts for the trigger line clamps in the same direction as originally installed. Install the bolt threads so that they face away from the CNG tank. Failure to do so may cause damage to the CNG tank.

Page 17: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

17

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Figure 22: Install the bolts, nuts, and clamps that secure the trigger line to the rail.

21. Remove the plugs from the PRD.22. Apply a light film of white lithium grease to the surface of the O-Ring only on both the feed and vent

line fittings.23. Connect the feed and vent line fittings to the PRD (Figure 23 or Figure 24 depending on system

configuration).• Use a torque wrench to torque the SAE -6 O-ring Boss Fitting to 25 ft-lbs.• Use a torque wrench to torque the SAE -8 O-ring Boss Fitting to 55 ft-lbs.

Figure 23: Reconnect the feed and vent fittings on the PRD.

Page 18: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

18

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Figure 24: Reconnect the plumbing on Twin Vertical Mount.

24. Repeat Procedure E for each PRD that is in the affected date range and serial number range.25. Continue at Procedure F: Testing for Leaks.

Option 2. Installing the entire replacement PRD and Trigger Line AssemblyProcedure 1. Installing the entire replacement PRD and Trigger Line for Frame Mount CNG Systems only

NOTE: In an effort to limit contamination, leave the plugs on the PRD until you are ready to test the pressure or connect the fittings.NOTE: The unacceptable PRD block and trigger line will need to be packaged for shipment. See Procedure I: Returning the PRD to McNeilus for packaging instructions.NOTE: Procedure 2 for Twin Vertical Mount system starts on Page 20.

CAUTIONSupport the full length of the PRD trigger line when working on it or the PRD block. Do not allow the trigger line and wire to twist or kink. Twisting or kinking will ruin the trigger assembly and the entire PRD will need to be replaced.

1. Install the new PRD block and trigger line.2. Attach the new PRD block to the rail using the retained (3) bolts and nuts (Figure 14).

Page 19: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

19

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Figure 25: Remove and retain the three bolts and nuts that secure the PRD block to the rail.

3. Install the bolts, clamps, and nuts that secure the trigger line to the rail (Figure 15). Quantity is dependent on length of trigger line.

CAUTIONInstall the bolts for the trigger line clamps in the same direction as originally installed. Install the bolt threads so that they face away from the CNG tank. Failure to do so may cause damage to the CNG tank.

Rail

Trigger Line

Figure 26: Remove and retain the bolts, clamps, and nuts that secure the trigger line to the rail.

4. Apply a light film of white lithium grease to surface of only the O-Ring on both the feed and vent line fittings.

Page 20: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

20

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 5. Connect the feed and vent line fittings to the PRD (Figure 16).

• Use a torque wrench to torque the SAE -6 O-ring Boss Fitting to 25 ft-lbs.• Use a torque wrench to torque the SAE -8 O-ring Boss Fitting to 55 ft-lbs.

Figure 27: Reconnect the feed and vent fittings on the PRD.

6. Repeat Procedure E for each PRD that is in the affected date range and serial number range.7. Continue at Procedure F: Testing for Leaks.

Procedure 2. Installing the entire replacement PRD and Trigger Line for Twin Vertical Mount CNG Systems only

NOTE: In an effort to limit contamination, leave the plugs on the PRD until you are ready to test the pressure or connect the fittings.NOTE: The unacceptable PRD block and trigger line will need to be packaged for shipment. See Procedure I: Returning the PRD to McNeilus for packaging instructions.1. Install the new PRD and trigger line.2. Attach the new PRD block to the bracket using the retained (3) bolts and nuts (Figure 17).

Figure 28: Attach the new PRD block to the bracket using the retained three bolts and nuts.

Page 21: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

21

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 3. Install the bolts, clamps, and nuts that secure the trigger line to the rail (Figure 18). Quantity is

dependent on length of trigger line.

CAUTIONInstall the bolts for the trigger line clamps in the same direction as originally installed. Install the bolt threads so that they face away from the CNG tank. Failure to do so may cause damage to the CNG tank.

Figure 29: Install the bolts, clamps, and nuts that secure the trigger line to the rail. Quantity is dependent on length of trigger line.

4. Apply a light film of white lithium grease to surface of only the O-Ring on both the feed and vent line fittings.

5. Connect the feed and vent line fittings to the PRD (Figure 19).• Use a torque wrench to torque the SAE -6 O-ring Boss Fitting to 25 ft-lbs.• Use a torque wrench to torque the SAE -8 O-ring Boss Fitting to 55 ft-lbs.

Page 22: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

22

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Figure 30: Reconnect the plumbing.

6. Reinstall the bolt, washers, and nut that bolt the bracket to the tank cover (Figure 20).

Figure 31: Reinstall the bolt, washers, and nut that bolt the middle bracket to the tank cover. This is the side that is nearest the cab.

7. Repeat Procedure E for each PRD that is in the affected date range and serial number range.8. Continue at Procedure F: Testing for Leaks.

Page 23: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

23

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. Procedure F: Testing for Leaks1. Pressurize the system with some fuel so a leak test can be performed.2. Conduct the leak detection test by spraying a leak detector (such as Snoop) on any fitting that had

been removed and reinstalled. Look for bubbles in the area sprayed by the detector. If bubbles appear, tighten fittings.

3. After the fittings pass the leak detection test, the CNG system covers must be reinstalled.

Procedure G: Reinstalling the Cover on the Frame Mount CNG System1. On Frame Mount CNG systems, close the clamps on the covers. Reinstall the cotter pin to latch

the clamp (Figure 32). Do this on each clamp.

Figure 32: Close the clamps on the covers. Reinstall the cotter pin to latch the clamp.

Procedure H: Fueling Procedure (all systems)1. Make sure the vehicle’s engine is turned off.2. Set the parking brake.3. Access the fuel receptacle and remove dust cap.4. Retrieve fueling nozzle from dispenser.5. Turn the control handle 1/4 turn counterclockwise and attach CNG dispensing nozzle to vehicle

receptacle.

Page 24: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

24

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

6. Attach dispensing nozzle to vehicle.7. Turn the control handle 1/2 rotation clockwise to lock the nozzle to the vehicle receptacle. The

vehicle is ready for fueling.

8. Turn control handle to lock the nozzle to the vehicle receptacle.9. After dispensing is complete, turn control handle on nozzle 1/2 turn counterclockwise and remove

CNG dispensing nozzle from vehicle receptacle.

10. Remove the dispensing nozzle from the vehicle receptacle.11. Return dispensing nozzle to appropriate location on dispenser.12. Return dust cap to vehicle fuel receptacle.13. Disengage the parking brake.

Procedure I: Returning the PRD to McNeilusThe removed PRDs must be returned to McNeilus Warranty Department in the following method:1. The label on the PRD block must be crossed out with a marker (Figure 33).

a. If the PRD block was the only component replaced, complete Step 1 and skip to Step 9.b. If the PRD and trigger line were both replaced, complete all steps in Procedure I: Returning the PRD to McNeilus.

Figure 33: Cross out the label on the PRD.

Page 25: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

25

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 2. Using an adjustable wrench or body fixture, hold onto the PRD block and using a 7/8” wrench, hold

onto the flats of the retainer nut (Figure 34).

Figure 34: Separate the trigger line and the PRD block.

3. Loosen the retainer nut from the block using the 7/8” wrench. Remove the retainer nut and slide the trigger completely out of the PRD block.

4. The trigger, spring, and wire must be removed from the trigger tube by cutting the wire from the end of the tube. For models LT102B, use 9/16” wrenches to remove the pin receiver and expose the wire. For models LT130, remove the end cap with 3/4” and 11/16” wrenches to expose the wire to be cut at the centering washer.

5. Figure 35 shows the wire from the LT102B being cut at the pin receiver.6. Figure 36 shows the wire for the LT130 being cut at the centering washer.

Figure 35: Wire from the LT102B being cut at the pin receiver.

Figure 36: Wire from the LT130 being cut at the centering washer.

7. Coil the trigger, spring, and wire to be packaged. Tape the coiled wire at one end to keep it in a bundle (Figure 37).

Figure 37: Coil the trigger, spring, and wire to be packaged for return to McNeilus Warranty.

8. The stainless steel tube must be bent in half or cut and should be properly disposed of on site. For the LT102B model, the retainer nut, pin receiver, and pin cap should be disposed of as well. For the LT130 model, the centering washer and end cap should be disposed of.

9. Repeat Procedure I: Returning the PRD to McNeilus Steps 1-8 for each affected PRD.10. Return the PRDs and coiled trigger/spring/wire assemblies to McNeilus Warranty Department

following the normal warranty return process.

Page 26: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

26

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

(888) 686-7278www.streetsmartparts.com

Procedure J: Final Instructions1. The bulletin is complete. Remove the conditions of Lockout/Tagout, reconnect the battery, and

return truck to service.2. For all PRD valves replaced, be sure to record the old and new PRD valve serial numbers, the VIN

of the truck on the JDE Work Order.3. If any amount to fuel was released to the atmosphere, email the completed CNG PRD Valve

Replacement Fuel Release Tracking Sheet to [email protected].

Page 27: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

27

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. Appendix A

If the PRD block is an LT102B, follow these work instructions for Pin Cap Inspection and Repair or Replace as needed.After completing these instructions, continue at Step 17 of Procedure F: Replacing the PRD Option 1. Installing the replacement PRD while using the Existing Trigger Line on Page 14.The purpose of the tool is to push the taper pin in a set distance of 0.14-0.15” farther than the flush point. Use the “pin tool” to verify the brass taper pin captures the trigger wire securely.

CAUTIONDo not apply excessive force on the trigger line. Do not pull the retainer nut away from the trigger line. Support the full length of the PRD trigger line when working on it or the PRD block. Do not allow the trigger line and wire to twist or kink. Twisting or kinking will ruin the trigger assembly and the entire PRD will need to be replaced.

1. Remove and retain the pin cap from the pin receiver (Figure 38). Hold the pin receivers flats steady with a 9/16” wrench and use a second wrench to unscrew the pin cap. DO NOT turn the pin receiver.

Compression Fitting

Pin ReceiverPin Cap

Figure 38: Wire from the LT102B being cut at the pin receiver.

2. Examine the brass taper pin, trigger wire, and pin receiver.a. If the trigger wire is missing or loose inside the pin receiver, the entire PRD assembly must be replaced.b. If the pin and the wire are visible or can be felt in place as shown in Figure 39, continue to Step 3. Ensure the brass taper pin is flush against the pin receiver opening, and that the wire is cut flush. If the taper pin is not flush, use a slide wrench or hammer to lightly push the taper pin flush. Cut any exposed wire so that it is flush with the pin receiver.

Page 28: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

28

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only.

Brass Taper Pin Trigger Wire

Pin Receiver Opening

Figure 39: The brass taper pin and trigger wire (circled) must be visible in the receiver opening.

3. Hand tighten the pin cap tool base onto the pin receiver (Figure 40).

Pin Tool Base

Pin Receiver Flats Pin Tool ScrewFigure 40: Make sure the pin tool base contacts the pin receiver body.

4. Hold the pin receiver flats with a 9/16” wrench and use a 1/2” wrench to turn the pin cap tool screw onto the receiver until it contacts the pin cap tool base (Figure 41). DO NOT turn the pin receiver flats. Ensure there is metal-to-metal contact between the base of the pin cap tool and the pin receiver flats as shown in Figure 41.

NOTE: As the pin cap tool screw is tightened, it pushes the taper pin into the pin receiver, wedging the trigger wire against the pin receiver.

Pin Cap Tool Screw

Pin Receiver FlatsFigure 41: Tighten the pin cap tool screw.

5. Remove the pin cap tool from the receiver. Ensure the trigger wire is still visible, and is flush with the pin receiver. If the wire has been pushed into the pin receiver and is no longer flush, the receiver is considered to be non-operational and must be removed from service.

Page 29: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

29

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. 6. Reinstall the normal pin cap on the pin receiver and tighten it until there is metal-to-metal contact

(Figure 42).

Normal Pin Cap

Figure 42: Reinstall the normal pin cap.

7. Draw a straight line connecting the tube, pin receiver, and pin cap using a yellow paint marker. Mark the top of the pin cap with a blue dot to indicate that the pin was pushed farther than the flush point (Figure 43 and Figure 44).

Figure 43: Yellow paint mark on the trigger line components.

Figure 44: Blue dot indicates the trigger line has been inspected and is suitable for use.

8. Continue at Step 17 of Procedure F: Replacing the PRD Option 1. Installing the replacement PRD while using the Existing Trigger Line on Page 14.

Page 30: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

30

VSR-WI-006-A-Replacement ProcedureThis bulletin is limited to Internal McNeilus Use Only. Appendix B

Trigger Line Bend Point

79.88

-8 SAE VENT PORT ORIENT AWAY FROM FRAME OF TRUCK

79.88

R.94BEND MUST BE UPWARD WITH -8 SAE PORT ORIENTED AWAY FROM FRAME OF TRUCK

-6 SAE INLET PORT THIS FACE

Mixer 21” Frame Mount Trigger Line Bend Point

Page 31: Vehicle Safety Recall - Technical Service Bulletin ... · Procedure 2. Removing the existing PRD and Trigger Line for Twin Vertical Mount CNG System 1. On Twin Vertical Mount CNG

VSR-TSB-027-AEmcara PRD Serial Number List of Suspect PRDs

LB00001346 LB00001757 LB00002718LB00001347 LB00001758 LB00002719LB00001348 LB00002121 LB00002733LB00001350 LB00002122 LB00002735LB00001354 LB00002123 LB00002737LB00001355 LB00002124 LB00002746LB00001356 LB00002125 LB00002749LB00001357 LB00002128 LB00002751LB00001358 LB00002129 LB00002754LB00001364 LB00002130 LB00003075LB00001365 LB00002132 LB00003080LB00001366 LB00002138 LB00003081LB00001367 LB00002139 LB00003084LB00001368 LB00002140 LB00003090LB00001369 LB00002142 LB00003175LB00001600 LB00002143 LB00003176LB00001601 LB00002145 LB00003180LB00001602 LB00002148 LB00003181LB00001604 LB00002149 LB00003183LB00001606 LB00002151 LB00003185LB00001607 LB00002152 LB00003187LB00001609 LB00002154 LB00003190LB00001611 LB00002157 LB00003192LB00001612 LB00002158 LB00003195LB00001613 LB00002159 LB00003198LB00001614 LB00002160 LB00003543LB00001615 LB00002161 LB00003544LB00001616 LB00002163 LB00003545LB00001619 LB00002164 LB00003548LB00001620 LB00002180 LB00003551LB00001621 LB00002542 LB00003552LB00001622 LB00002545 LB00003562LB00001624 LB00002547 LB00003563LB00001626 LB00002555 LB00003564LB00001628 LB00002556 LB00003565LB00001629 LB00002557 LB00003705LB00001730 LB00002559 LB00003707LB00001731 LB00002560 LB00003735LB00001733 LB00002571 LB00003745LB00001734 LB00002695 LB00003748LB00001735 LB00002696 LB00003752LB00001739 LB00002697LB00001747 LB00002699LB00001751 LB00002707LB00001754 LB00002710LB00001755 LB00002716LB00001756 LB00002717