Page 1: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v1

Vegetated

Filter Strip

Design

Page 2: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v2

Vegetated Filter Strip

L&D Vol. 2 Section 1117.2.1

Provides quality treatment only

Page 3: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v3

Vegetated Filter Strip

Treatment Processes

Page 4: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v4

Design Process

Treatment Goals

Siting Analysis

Veg. Filter Strip Sizing

Other Considerations

Page 5: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v5

Design Process

Treatment Goals

Siting Analysis

Veg. Filter Strip Sizing

Other Considerations

Page 6: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v6

Project Example

I-70 improvements in Columbus

Add 4th lane near ramps

Improve shoulders

All within existing right-of-way

Page 7: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v7

Project Example

Project EDA = 32.5 ac

All within existing right-of-way

Aix = 32.5 ac; Ain = 0.0 ac

T% = [(Aix x 20)+(Ain x 100)] / (Aix + Ain)

T% = [(32.5 x 20)+(0.0 x 100)] / (32.5 + 0)

T% = 20%

20% x 32.5 ac = 6.5 ac

Page 8: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v8

Project Example

Project EDA = 32.5 ac >= 1 ac

Need a post-construction BMP

All redevelopment

Need to treat 6.5 ac (20%)

All in existing right-of-way

All existing right-of-way considered impervious

Therefore no “new impervious area in new permanent

right-of-way”

Water quality treatment only required

Page 9: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v9

Design Process

Treatment Goals

Siting Analysis

Veg. Filter Strip Sizing

Other Considerations

Page 10: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v10

Siting Analysis

Filter strips are 15 – 25 feet wide

Filter strips are either 3:1 or 6:1 or

flatter

Look for long strips of grassy area

next to the road that don’t go directly

into a ditch

Must sheet flow off of road

No concentrated flow

Page 11: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v11

Siting Analysis

Page 12: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v12

Design Process

Treatment Goals

Siting Analysis

Veg. Filter Strip Sizing

Other Considerations

Page 13: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v13

Vegetated Filter Strip Sizing

Treatment credit:

“equal to the area of the roadway contributing

to the slope and the area of the slope”

Filter strip “measured along the vegetated

slope beginning at the vegetation and ending

at the inside edge of the ditch bottom”

Page 14: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v14

Vegetated Filter Strip Sizing

Page 15: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v15

Vegetated Filter Strip Sizing

Page 16: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v16

Vegetated Filter Strip Sizing

Typical cross section:

Page 17: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v17

Vegetated Filter Strip Sizing

12ft + 12ft + 12ft = 36ft

36 > 34

25ft strip at 6:1 slope or flatter

Page 18: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v18

Vegetated Filter Strip Sizing

2.0’

Page 19: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v19

Vegetated Filter Strip Sizing

Treatment requirement = 6.5 ac

Treatment credit

(36 ft pavement +2 ft gravel/grass + 25 ft filter

strip) * length = 63 ft wide * length

Required length of filter strip:

6.5 ac * 43,560 SF/ac = 283,140 SF

283,140 SF / 63 ft = required length

Length = 4,494 ft

Page 20: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v20

Design Process

Treatment Goals

Siting Analysis

Veg. Filter Strip Sizing

Other Considerations

Page 21: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v21

Vegetated Filter Considerations

No concentrated flow

No ditch flow

Add 4” of Item 659 topsoil

Add Item 670, Slope Erosion Protection

At least 70% vegetative cover

No gullies or rills

Show in

the Plans

Page 22: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v22

Sample Plan Note

Page 23: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v23

Vegetated Filter Strip Sizing

Can make VFS width wider, down to bottom of

foreslope at inside edge of ditch or edge of R/W

Page 24: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v24

Vegetated Filter Strip Sizing

2.0’

If the R/W fence were further down the hill,

we could have made the VFS wider.

Page 25: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v25

BMP Calcs Spreadsheet

Page 26: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v26

Narrow Vegetated Filter Strips

L&D, Vol. 2, 1115.6.3

Pedestrian Facilities and Shared Use

Paths

Page 27: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v27

Narrow Vegetated Filter Strips

ALL EDA associated with paths

No roadway improvements

Quantity treatment not required

Min. VFS width equal to width of

contributing impervious area

Max. slope is 3:1

Sheet flow

Page 28: Vegetated Filter Strip Design - Pages - default...Design Process Treatment Goals Siting Analysis Veg. Filter Strip Sizing Other Considerations 6 Project Example I-70 improvements in

w w w. t r a n s p o r t a t i o n . o h i o . g o v28

Questions ?

Jon Prier, P.E.

[email protected]