Various • 12 – 14 Nov: Trigger upgrade EDR – Ambitious and short on time to get it all done • 15 Nov: HCAL Run-2 readiness review – Apparently had some issues not everyone was aware of… • Control room progress – Date now settled for changeover (May 2014) – Magnitude of issues I have to deal with is shrinking: e.g., where will the outlets be? how is the carpet going to be changed? Etc. – Need to make sure underground control room can be used for subsystem commissioning (while upstairs being worked on) • Counting central shift credits for 2014 – ~19 weeks of global runs scheduled for 2014 – Three alignment cosmic runs at B=0T and B=3.8T, one Pre- Collisions Cosmic Challenge (PCCC) in Nov-Dec, several Mid-Week Global Runs… 25 Nov 2013 G. Rakness (UCLA) 1

Upload: noreen

Post on 04-Jan-2016

36 views

Category:

Documents


1 download

DESCRIPTION

Various. 12 – 14 Nov: Trigger upgrade EDR Ambitious and short on time to get it all done 15 Nov: HCAL Run-2 readiness review Apparently had some issues not everyone was aware of… Control room progress D ate now settled for changeover (May 2014) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Various

Various• 12 – 14 Nov: Trigger upgrade EDR

– Ambitious and short on time to get it all done• 15 Nov: HCAL Run-2 readiness review

– Apparently had some issues not everyone was aware of…• Control room progress

– Date now settled for changeover (May 2014)– Magnitude of issues I have to deal with is shrinking: e.g., where will

the outlets be? how is the carpet going to be changed? Etc.– Need to make sure underground control room can be used for

subsystem commissioning (while upstairs being worked on)• Counting central shift credits for 2014

– ~19 weeks of global runs scheduled for 2014– Three alignment cosmic runs at B=0T and B=3.8T, one Pre-Collisions

Cosmic Challenge (PCCC) in Nov-Dec, several Mid-Week Global Runs…

25 Nov 2013 G. Rakness (UCLA) 1

Page 2: Various

To do• Run Coordination hoo-hah– Make call for shifts in 2014– Control room: talk to sysadmins (underground control

room), Maf (carpets), Frans (computers)– Finish job description – Inquire about subsystem DCS status– Follow up question on lumi section length– How to improve 2015 operations?

• Pick up neutron note– Read it again… what all is left to be done?– Chad’s analysis documented here: http://

cern.ch/rakness/internal/log/1111/log.html 25 Nov 2013 G. Rakness (UCLA) 2