vanderbilt beach road extension design project
TRANSCRIPT
Public Information Meeting n Open House 5:30 p.m. - 7:30 p.m. n Presentation 6:00 p.m. n Tuesday, June 26, 2018 St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
VANDERBILT BEACH ROAD EXTENSION DESIGN PROJECT
Collier Boulevard (CR 951) to 16th Street NE
PUBLIC INFORMATION MEETING
7775 Vanderbilt Beach Road, Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Presentation
2
Canal Alignment
Project Overview
Alternatives
Schedule
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Project Location
3
Co
llier Blvd
De So
to B
lvd
16
thSt N
E
Vanderbilt Beach Road (VBR) ExtensionCollier Boulevard to 16th Street NE
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Project Background
4
Co
llier Blvd
De So
to B
lvd
Vanderbilt Beach Road Extension Corridor Study• 10 mile, “Ultimate” 6-Lane Facility
• Collier Boulevard to Desoto Boulevard
• February 2005 – April 2006
Vanderbilt Beach Road Extension Design• April 2007 – April 2009
• 60% Design on hold
• Last public meeting January 2009
• Design re-initiated January 2018
Legend
Vanderbilt Beach Road Extension
Corridor Study Area
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Current Design Project “Ultimate Facility”
Vanderbilt Beach Road Extension • 7 miles, “Ultimate” 6-Lane Facility• Collier Boulevard to 16th Street NE
Project Goals• Improve traffic capacity and circulation• Improve safety• Provide alternative routes for residents/emergency access• Improve response time for fire/police/emergency services• Minimize/avoid environmental impacts• Address public concerns and comments
During Construction• Focus on safety• Minimize inconvenience
5
Co
llier Blvd
16
thSt N
E
De So
to B
lvd
Legend
Project LimitsSide Street ConnectionsCanal Realignment
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
“Ultimate” Typical Section is a 6-Lane Facility
VBR from Collier Boulevard to 16th Street NE• 6-Lane Facility
• Includes on-street bike lanes, sidewalks, and shared-use pathways
“Interim” Project will construct one-half of roadway (3-lanes or 4-Lanes – to be determined)
6Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Environmental Surveys Environmental surveys are being performed to determine:
• Wetland Boundaries
• Upland Boundaries
• Threatened and Endangered Species
• Surface Water Effects
• Traffic Noise Effects
7Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Original Design - All Streets Connecting
8
Wilso
n B
lvd
• Planned connections at 8 side streets (as previously approved by BCC) • Maximum access to Vanderbilt Beach Road from side streets• Maximum traffic circulation• Maximum alternative routes for residents and emergency vehicles• Improves response time for fire/police/emergency services
27
thSt N
W
25
thSt N
W
23
rdSt N
W
21
stSt NW
19
thSt N
W
17
thSt N
W
15
thSt N
W
13
thSt N
W
29
thSt N
W
Cypress Canal
Canal on North
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120 9
Wilso
n B
lvd
No vehicular access to Vanderbilt Beach Road from 8 side streets
No change to existing circulation
No alternative routes for residents or emergency access
No improvement to response time for fire/police/emergency services
No pedestrian access provided in current design to VBR sidewalk/pathway/bike lanes
No Outlet
27
thSt N
W
25
thSt N
W
23
rdSt N
W
21
stSt NW
19
thSt N
W
17
thSt N
W
15
thSt N
W
13
thSt N
W
29
thSt N
W
No Side Street Connections
Canal on North
Cypress Canal
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Benefits of Frontage Road/Cypress Canal Realignment
10
✓ Relocated Canal Provides 80+ Feet buffer from residential properties on south
✓ Canal/Ponds provide aesthetic benefit
✓ Frontage Roads/Bridges provide access to Sidewalk/Pathway/Bike Lanes
✓Provides alternative routes for residents and fire/police/emergency services
29
thSt.NW
27
thSt.NW
25
thSt.NW
23
rdSt.NW
21
stSt.NW
19
thSt.NW
17
thSt.NW
15
thSt.NW
31
stSt.NW
Massey St.
Do
uglas St.
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Frontage Road/Canal Relocation Alternative
11
Wilso
n B
lvd
27
thSt N
W
25
thSt N
W
23
rdSt N
W
21
stSt NW
19
thSt N
W
17
thSt N
W
15
thSt N
W
13
thSt N
W
Frontage Road 1 – Connects 27th St. NW, 25th St. NW, 23rd St. NW, 21st St. NW
Frontage Road 2 – Connects 19th St. NW, 17th St. NW, 15th St. NW
Relocate Cypress Canal – To south side of roadway (10,000 Feet)
✓ Controlled access to VBR provides better traffic operations and safety
✓ Provides alternative routes for residents and emergency access
✓ Improves response time for fire/police/emergency services
✓ Design discourages through traffic
29
thSt N
W
Canal on South
1 2
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Project Schedule
12
Anticipated Construction
January 2021 –January 2023
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Summary
13
Public Involvement Process has provided important feedback to help develop a solution which satisfies Project Goals.
The Frontage Road/Canal Relocation Alternative:
✓Improves Capacity/Circulation
✓Improves Safety
✓Provides Alternative Routes
✓Improves Emergency Response
✓Minimizes Environmental Impacts
✓Addresses Public Concerns
o Increases “Buffer” to Roadwayo Creates Project Aesthetics
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Stay Connected
Complete a Comment Form
14
Andrew Miller, P.E.
Project Manager
Collier County Growth Management
Department
Transportation Engineering Division
2885 S. Horseshoe Drive, Naples, FL
34104
Phone: (239) 252-5791
Andrew Miller, P.E.
Project Manager
Collier County Growth Management
Department
Transportation Engineering Division
2885 S. Horseshoe Drive, Naples, FL
34104
Phone: (239) 252-5791
Andrew Miller, P.E.
Project Manager
Collier County Growth Management
Department
Transportation Engineering Division
2885 S. Horseshoe Drive, Naples, FL
34104
Phone: (239) 252-5791
For up-to-date project information, please visit our website at
www.CollierCountyFL.govhttps://www.colliercountyfl.gov/your-government/divisions-s-z/transportation-engineering-division/transportation-engineering-projects
Email your comments
Mail written comments
Caroline Blevins
Customer Service Specialist
Collier County Growth Management
Department
2885 S. Horseshoe Drive, Naples, FL
34104
FAX 239- 252-2726
Caroline Blevins
Customer Service Specialist
Collier County Growth Management
Department
2885 S. Horseshoe Drive, Naples, FL
34104
FAX 239- 252-2726
Caroline Blevins
Customer Service Specialist
Collier County Growth Management
Department
2885 S. Horseshoe Drive, Naples, FL
34104
FAX 239- 252-2726
Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n 5:30 p.m. - 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Questions? Please join us in the Exhibit Areas
Project team members are available to answer your specific questions
Exhibits are available showing project design details and alternatives
15Public Information Meeting n 5:30 p.m. – 7:30 p.m. n Tuesday, June 26, 2018 n St. Agnes Catholic Church n 7775 Vanderbilt Beach Road n Naples, FL 34120
Public Information Meeting n Open House 5:30 p.m. - 7:30 p.m. n Presentation 6:00 p.m. n Tuesday, June 26, 2018 St. Agnes Catholic Church n 7775 Vanderbilt Beach Drive n Naples, FL 34120
Thank you for participating
VBR Extension
PUBLIC INFORMATION
MEETING