value engineering change proposal …modot.mo.gov/valueengineering/documents/scanned proposals/vecp...

8
Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT OF TRANSPORTATION Conceptual Proposal Final Proposal Date 11/17/11 Contract ID 100205-601 Job No. J6U0807 County St. Louis Original Bid Cost $54,889,970.33 Contractor Fred Weber, Inc. By Justin Brooks Designed By Jacobs Engineering Group Phone (314) 267-8471 VECP# (to be completed by C.O.) VECP or PDVECP 1. Description of existing requirements and proposed change(s). Advantages/Disadvantages See attachment 2. Estimate of reduction in construction costs. $248,023 3. Prediction of any effects the proposed change(s) will have on other department costs, such as maintenance and operations. None 4. Anticipated date for submittal of detailed change(s) of items required by Section 104.6 of the Specifications. 11/17/11 (date) 5. Deadline for issuing a change order to obtain maximum cost reduction, noting the effect of contract completion time or delivery schedule. 12/16/11 Delay Schedule (date) (effect) 6. Dates of any previous or concurrent submission of the same proposal. N/A (date and/or dates)

Upload: duongkhanh

Post on 30-Mar-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT

Form C-104 Rev. 02/2009

VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT OF TRANSPORTATION

Conceptual Proposal Final Proposal Date 11/17/11

Contract ID 100205-601 Job No. J6U0807

County St. Louis Original Bid Cost $54,889,970.33

Contractor Fred Weber, Inc. By Justin Brooks

Designed By Jacobs Engineering Group Phone (314) 267-8471

VECP# (to be completed by C.O.) VECP or PDVECP 1. Description of existing requirements and proposed change(s). Advantages/Disadvantages

See attachment

2. Estimate of reduction in construction costs. $248,023

3. Prediction of any effects the proposed change(s) will have on other department costs, such as

maintenance and operations.

None

4. Anticipated date for submittal of detailed change(s) of items required by Section 104.6 of the Specifications.

11/17/11

(date) 5. Deadline for issuing a change order to obtain maximum cost reduction, noting the effect of

contract completion time or delivery schedule.

12/16/11 Delay Schedule

(date) (effect) 6. Dates of any previous or concurrent submission of the same proposal.

N/A

(date and/or dates)

donahj
Typewritten Text
11-76
Page 2: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT

Additional Comments:

** Portion Below This Line To Be Filled Out by MoDOT **

Comments: I recommend approval as does the Core/Area Team. This was approved by the Woodsmill Park Apartment complex located off of Post Road. MoDOT will realize a significant cost savings to the contract as a result of this change.

Submitted By Resident Engineer Date Comments:

Approval Recommended

Rejection Recommended

District Engineer Date

Comments:

Approval Recommended

Rejection Recommended

Federal Highway Administration Date Required for FHWA Full Oversight Projects

Comments:

Approval

Rejection State Construction and Materials Engineer Date

Distribution: Resident Engineer, Project Manager, District Construction & Materials Engineer, State Construction & Materials Engineer, FHWA Value Engineering Administrator – MoDOT, P. O. Box 270, Jefferson City, MO 65102

MORRIR
Typewritten Text
MORRIR
Typewritten Text
MORRIR
Typewritten Text
X
donahj
Typewritten Text
donahj
Typewritten Text
X
dawn.perkins
Typewritten Text
dawn.perkins
Typewritten Text
dawn.perkins
Typewritten Text
I recommend approval based on the review and approval by MoDOT personnel and provided the Type D Concrete Barrier be built as specified.
dawn.perkins
Typewritten Text
dawn.perkins
Typewritten Text
X
Page 3: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT

Existing Requirements/Proposed Changes: Construct Post & Panel Wall A7807 between relocated Post Rd and Proposed Rt. 141 from STA 256+56 to STA 262+00 (see detail on attached Typical Section Sheet 2 of 15). Proposed Change: Modify configuration of relocated Post Rd so that edge of Post Rd is outside of permanent wall easement. Slope can then be extended down to limits of permanent easement, eliminating the need for retaining wall A7807. A ground mount soundwall can be constructed between Soundwalls 8 & 9 at the top of the slope adjacent to Proposed Rt. 141 pavement (see details on attached revised Typical Section Sheet 2 of 15). Advantages: Eliminating Post & Panel Wall A7807 would reduce the total cost of the project. Disadvantages: None

Page 4: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT
Page 5: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT
Page 6: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT

MH

DI

DI

MH

SIGN

DI

DI

DI

MH

MH

MH

SIGN

DI

SIGN

MH

HYD

MH

SIGN

DI

DI

DI

DI MH

DI

DI

MH

SIGN

MH

FLAG

SIGN

SIGN

HYD

PP

PP

PP

PP

SAN

SAN

SAN

SANSAN

SAN

SAN

CI

CI

CI

DI

CI

CI

HYD

SIGN

WVSAN

CI

CI

CI

CI

CI

STORM

DI

DI

DI

CI

AI

AMEREN UE

MAWC MAWC6"

DI

FL SE 473.13

FL NW 473.28

T 480.35

17Q3-022D

18" RCP

RC

P

18"

FL 463.03

WVWV

WV

HYD MAWC6"

MA

WC

MA

WC

6"

AMEREN UE

AMERE

N

UE

LACLE

DE

GAS

AMEREN UE

AMEREN UE

AMEREN UE

N.B. ROADWAY

S.B. ROADWAY

> ROUTE 141

TRUSTEESTEPHEN F. BRAUER,

115 TRUSTEE ET. AL.STEPHEN F. BRAUER,

119LP

LP

LP

LP

US SURVEY 367

G

CREVE COEUR CREEK

LPLP

LP

B

(R)

CHESTERFIEL

D CIT

Y LI

MIT

TO

WN

AN

D C

OU

NTR

Y CIT

Y LI

MIT

(R)

COURT

TENNIS

CREVE COEUR CREEK

LP

US SURVEY 367

LP

(UIP)

TOWER

GG

APART

SCALE

500 100 150

10

4’FBD

4’FBD

S.L.

S.L.

4’FBD

S.L.

S.L.

R/W LINE

R/W LINE

R/W LINE

G

G

G

G

(DRAINAGE)

EASEMENT

PERMANENT

TRANSMISSION LINES

OVERHEAD ELECTRIC

CREVE COEUR CREEK

LP

POST R

OA

D

MATC

H LI

NE 251+00 - S

HEET 8

MATC

H LI

NE 264+00 - S

HEET 11

R/W LINE

S.L.

ESM’T.

TEMP. CONSTR.

ESM’T.

CONSTR.

TEMP.

STA 251+00 TO STA 264+00

ROUTE 141 CONSTRUCTION PLAN

ESM’T.

TEMP. CONSTR.

+00

+00

CONC. BARRIER

TYPE C

CONC. BARRIER

TYPE D

+00

APART

APART

APART

APART

APART

APART

APART

APART.

APARTMENTS, LLCWOODS MILL PARK

SEE SHEET 10A.

FOR WOODSMILL PARK DETAILED PLAN,

36’

36’

(R)

FENCE

POLES (R)

LIGHT

POLES (R)

LIGHT

(R)

RET. WALL

(R)

PVMT.

+50

+00

S.L.

(R)

PVMT(R)

PVMT

10-6U0807-009

SOUND WALL

10-6U0807-007

SOUND WALL

STA 266+00.00 (RTE. 141), 57.33’RT.

STA 262+42.28 (RTE. 141), 57.33’RT. TO

SOUND WALL NO. 10-6U0807-009

+50

C&G

6" TYPE B

(R)

PVMT

BIT.

+30

2. FOR PROFILE DATA, SEE SHEET 78.

1. FOR ALIGNMENT CURVE DATA AND BEARINGS, SEE SHEET 121.

NOTES:

(SEE SHEET 154)

DETENTION BASIN

SEE SHEET 155

FILL BERM,

END EOP TAPER+29.60, 5.02’ LT.

END EOP TAPER+29.52, 10.98’ RT.

(J6U0807D)

RELOCATION

SEWER LINE

FENCE

6’ ORNAMENTAL

BERM

10’

BE

GI

N T

YPE C CET

+32.92

EN

D T

YPE C CET

+48.01

CO

NC. B

ARRIER

EN

D T

YPE

D

+00.00

CO

NC. B

ARRIER

BE

GI

N T

YPE

D

+48.00

CET

TYPE CGATES

STEEL FENCE

ORNAMENTAL

0.7

S

TA

. L

.G

. 1

0%

GR

AD

E

TY

PE

I D

RIV

EW

AY

+4

0.0

0,

16

’ G

RA

VE

L

SIDEWALK (R)

(BY OTHERS)

RELOCATION

FIBER OPTIC

TOWER (UIP)

138 KV

345 KV

34 KV

TB

AB

OTB

AB

O

TB

AB

OED. JONES

138 KV

345 KV

T45N R5E

T45N R5E

V DITCH

SEE SHEET 188B

OUTLET PROTECTION

SEE SHEET 188B

OUTLET PROTECTION

SEE SHEET 188B

OUTLET PROTECTION

SEE SHEET 188B

OUTLET PROTECTION

REVISED14

121.5’ LT.

+32.36

113.0’ LT.

+10.16

114.7’ LT.

+77.67

119.5’ LT.

+36.66

119.5’ LT.

+65.57

113.9’ LT.

+83.7

0

114.2’ L

T.

+9

6.6

9

119.5’ LT.

+12.10

(TYP.)

� ’

(TYP.)

� ’

(TYP.)

� ’

LINK FENCE

6’ CHAIN-

FENCE GATE

CHAIN-LINK

REVISED R/W4

ADDED FENCE3

DRAINAGE)

(SLOPE &

PERM. ESMT.

10-6U0807-008

SOUND WALL

STA 262+42.28 (RTE. 141), 57.33’RT.

STA 254+50.00 (RTE. 141), 72’RT. TO

SOUND WALL NO. 10-6U0807-008

STA 262+12.79 (RTE. 141), 86.66’RT.

STA 259+43.72 (RTE. 141), 68.00’RT. TO

RETAINING WALL NO. 10-6U0807-012

10-6U0807-012

RETAINING WALL

REVISED PAVING14

ESM’T.

PERM.

255

260

SA

N

SA

N

SA

N

SA

N

P:\C1X22400\700cadd\702civil\Segm ent_2_Final_Plans\010_PL05_J6U0807_I50_F_R014.dgn 12:08 08-JUL-2011

RE

V.

COUNTY

JOB NO.

CONTRACT ID.

ROUTE STATE

DISTRICT

DA

TE

DE

SC

RIP

TIO

N

MO

DATE PREPARED

BRIDGE NO.

PROJECT NO.

SHEET NO.

PROJECT NO.

1-8

88

-A

SK

-M

OD

OT

(1

-8

88

-2

75

-6

63

6)

JE

FF

ER

SO

N C

IT

Y, M

O 6

5102

10

5 W

ES

T C

AP

IT

OL

CO

MM

ISS

ION

MIS

SO

UR

I H

IG

HW

AY

S A

ND

TR

AN

SP

OR

TA

TIO

N

6

08-JUL-2011

141

ST. LOUIS

J6U0807

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y #

00704

PH

ON

E:

(3

14

) 3

35

-40

00

ST

.LO

UIS

, M

ISS

OU

RI

63102-2

121

50

1 N

OR

TH

BR

OA

DW

AY

JAC

OB

S E

NG

INE

ER

ING

GR

OU

P

Page 7: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT

DI

DI

MH

SIGN

DIM

H

MH

SIGN

DI

SIGN

HYD

MH

CI

HYD

SIGN

WVSAN

CI

CI

CI

CI

WV

HYD

S.B. ROADWAY

> ROUTE 141

LP

S.L.

R/W LINE

US SURVEY 367

DETAILED PLAN

WOODS MILL PARK APARTMENTS

SCALE

3020100

S.L.

POST ROAD

R/W LINE

ESM’T.

TEMP. CONSTR.

(WALL)

ESM’T.

PERM.77.18’RT.

+29.56

TREE (DND)

(DND)

TREE

(R)

CURB

258

5’

R

4’ FBD4’ FBD

10-6U0807-008

SOUND WALL(R)

TREE

10A

4" TYPE 5 BASE

5� " PMBB (PG64-22)

1� " BP-1 (PG64-22)

T45N R5E

SAW CUT

FULL-DEPTH

2’R

1’

1’

5’

SAW CUT

FULL-DEPTH

5’

91

.43

’R

T.

+8

1.5

0

89.63’RT.

+07.00

(DND)

TREE

89.27’RT.

+24.93

P.T.

89.34’RT.

+71.72

425’ R

94.15’RT.

+60.04

4’

5’

R

89.21’

RT.+59.28

80.60’RT.

+51.88

425’ R

425’ R

2’

PAVEMENT SECTION

SHEET FOR NEW

SEE DETAIL THIS

2’

99.56’RT.

+30.27

5’

R

CURB & GUTTER

24" TYPE M ROLLED

& GUTTER

ROLLED CURB

TRANSITION

& GUTTER

ROLLED CURB

24" TYPE M

ROLLED CURB

EXISTING

SAWCUT

FULL DEPTH

& GUTTER

ROLLED CURB

24" TYPE M

PAVEMENT

EXISTINGEXISTING PAVEMENT

22’ AND VARIES

22’ AND VARIESVARIES

FULL DEPTH SAWCUT

TO BE REMOVED BEYOND SAWCUT

EXISTING PAVEMENT

4" TYPE 5 BASE

5� " PMBB (PG64-22)

1� " BP-1 (PG64-22)

EXISTING PAVEMENT

22’ AND VARIES

FULL DEPTH SAWCUT

TO BE REMOVED

EXISTING ROLLED CURB

CURB

6" TYPE S

CURB

6" TYPE S5’

CURB (TYP.)

TRANSITION

PAVEMENT SECTION

SHEET FOR NEW

SEE DETAIL THIS

OR GREATER

SLOPE 2%

OR GREATER

SLOPE 2%

TO BE REMOVED BEYOND SAWCUT

EXISTING PAVEMENT

SECTION A-A

POST ROAD DETAIL

SECTION B-B

POST ROAD DETAIL

SECTION C-C

POST ROAD DETAIL

C

C

B

B

A

A

TO DRAIN

GRADE

96.92’RT.

+44.04

P.C.

PAVEMENT SLOPE

MATCH EXISTING

TO BE REMOVED BEYOND SAWCUT

EXISTING PAVEMENT

TO BE REMOVED

EXISTING ROLLED CURB

PAVEMENT SLOPE

MATCH EXISTING

(F

ACE

OF C

URB)

111.02’RT.

+70.65

(F

ACE

OF C

URB)

108.08’RT.

+85.93

PAVEMENT. (SEE SECTIONS A-A, B-B AND C-C THIS SHEET)

THE LONGITUDINAL AND TRANSVERSE SLOPES OF THE ADJACENT EXISTING

IN NEWLY PAVED AREAS, 24" TYPE M GUTTER OR 6" TYPE S CURB SHALL MATCH

NOTE:

REVISED PAVING14

REVISED14

REVISE DETAIL14

B

B

109.06’RT.

+70.27

103.17’RT.

+84.99

(DND)

CURB

(DND)

INLET

GUTTER

CURB AND

EXISTING

MATCH

P:\C1X22400\700cadd\702civil\Segm ent_2_Final_Plans\010A_PL10_J6U0807_I10_F_R014.dgn 12:09 08-JUL-2011

RE

V.

COUNTY

JOB NO.

CONTRACT ID.

ROUTE STATE

DISTRICT

DA

TE

DE

SC

RIP

TIO

N

MO

DATE PREPARED

BRIDGE NO.

PROJECT NO.

SHEET NO.

PROJECT NO.

1-8

88

-A

SK

-M

OD

OT

(1

-8

88

-2

75

-6

63

6)

JE

FF

ER

SO

N C

IT

Y, M

O 6

5102

10

5 W

ES

T C

AP

IT

OL

CO

MM

ISS

ION

MIS

SO

UR

I H

IG

HW

AY

S A

ND

TR

AN

SP

OR

TA

TIO

N

6

08-JUL-2011

141

ST. LOUIS

J6U0807

CE

RT

IFIC

AT

E O

F A

UT

HO

RIT

Y #

00

70

4P

HO

NE

: (

31

4)

33

5-4

00

0S

T.L

OU

IS, M

ISS

OU

RI

63102-2

121

50

1 N

OR

TH

BR

OA

DW

AY

JAC

OB

S E

NG

INE

ER

ING

GR

OU

P

Page 8: VALUE ENGINEERING CHANGE PROPOSAL …modot.mo.gov/ValueEngineering/documents/Scanned Proposals/VECP 11...Form C-104 Rev. 02/2009 VALUE ENGINEERING CHANGE PROPOSAL MISSOURI DEPARTMENT

VALUE ENGINEERING CHECK SHEET

TYPE OF WORK (Check one that applies)

o Bridge/Structure/Footings o Drainage Structures (RCP, RCB, CMP’s, ect.) o TCP/MOT o Paving (PCCP, ect.) ü Grading/MSE Walls o Signal/Lighting/ITS o Misc

SUMMARY OF PROPOSAL (If needed, condense summary to a couple of lines)

Post Road will be slightly realigned to eliminate need for retaining wall.

SCANNING OF DOCUMENT If the proposal is large, please mark or make note, which pages need to be scanned into the database. If there are special instructions, make note of them here. _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

donahj
Typewritten Text
VE 11-76