VALIYATHURA GODOWN PROJECT-III

Administrative Sanction No. GO (Rt.) No.216/2017/ F&CSD dtd.28.06.2017

Estimated cost Rs. 3.9 crores.

PMC M/s. HPL

Area

24,993.80sqft

Present Status The Construction work completed .

Godown inaugurated on 11/09/2020.

OUTSIDE VIEW

INSIDE VIEW