© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

One Sap Vale BW-BPC, SRM and Mobile Infrastructure Solutions

August 03 , 2012

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.2

Disclaimers

CONFIDENTIALITY STATEMENT

This statement ensures Vale that HP shall maintain absolute secrecy of the facts (Procedures and Values) that shall be disclosed to HP. This information shall be used for HP procedures only. The activities comply with the Installment of Service Contract, which shall not be disclosed to others without prior consent from Vale.

PROPERTY STATEMENT

The information contained in this document, especially prepared for Vale, is confidential and belongs to HP. HP presents this document on the understanding that it shall be maintained in strict confidentiality by Vale, which shall only use it for evaluation of the services proposed.

Vale should not disclose the subject matter of this document or the items here described, including organizational concepts, and should neither duplicate it nor use it for other purposes without formal consent from HP. Upon confirmation of the proposed service as here described, through an HP contract, such contract shall establish the conditions for usage of such information.

PROPOSAL STATEMENT

This document was prepared in order to provide general information about the services that HP shall be able to offer. More specific terms and conditions shall be defined in the agreement for the services.

This document is not a legally binding offer of services. Therefore, its acceptance does not constitute any contractual obligation. HP has the commitment to negotiate in good faith an agreement that fairly represents a business contract of mutual acceptance. No legal obligation for HP shall exist until the agreement is duly signed by HP.

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

BW-BPC set-up

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.4

Sizing x Servers configuration

BW-BPC set-up

Sizing:

Servers configurations:

Important: Memory are adjusted 16GB/Core because hardware performance, and core for Apps are based (N, N +N), where +N is stand-by server, then 16 cores will be configuration (8, 8 +8) = 24 are needed;

SAP application

System Role

Target Server

Qty O.S.Recommended Config/server

Phase 1 - Scenario 1

BW-LSA + BPC

DB/CI Cluster

SD-21

vParHP-UX

14 cores, 128GB

SD-21

vParHP-UX

14 cores, 128GB

APP Servers

Bl890 i2 2HP-UX

16 cores, 256GB

Phase 2 - Scenario 2

BW-LSA + BPC

DB/CI Cluster

SD-21

vParHP-UX

16 cores, 128GB

SD-21

vParHP-UX

16 cores, 128GB

APP Servers

Bl890 i2 2HP-UX

28 cores, 256GB

Phase

ActionItem Type

Envir.

Instance

Function Platform Hostname O.S.Core Initia

l

Memory Initial

Core Sized

Memory Sized

Core Adde

d

Memory

AddedHardware required

RU by socket

1(+) add HW PRDLP0, LPJ

db SD2-1 CATOR2ENCLUS011/VLUNX045

HP-UX

8 128 14 224 6 961/2 - SD2 BL - 2 quad proc. x 128gb Small

1(+) add HW PRDLP0, LPJ

db SD2-3 CATOR2ENCLUS013/VLUNX046

HP-UX

8 128 14 224 6 961/2 - SD2 BL - 2 quad proc. x 128gb Small

1(+) add HW DRLP0, LPJ

db SD2-5 CAMKH1ENCLUS003/CAVACN36

HP-UX

8 128 14 224 6 961/2 - SD2 BL - 2 quad proc. x 128gb Small

1(+) add HW DRLP0, LPJ

appsBl890C i2 - stacked

NEWSERVER01HP-UX

6 48 16 256 10 208Using BL890C I2 ordered @ Mobile Phase 1 (MCC) Medium

1(+) add HW PRDLP0, LPJ

appsBl890C i2 - stacked

NEWSERVER02HP-UX

9 72 24 384 15 3121x Physical BL890C I2 to SCC Medium

2(+) expand

HW PRDLP0, LPJ

db SD2-1 CATOR2ENCLUS011/VLUNX045

HP-UX

14 224 16 256 2 32Using Blades SD-2 ordered @ Phase 1 Small

2(+) expand

HW PRDLP0, LPJ

db SD2-3 CATOR2ENCLUS013/VLUNX046

HP-UX

14 224 16 256 2 32Using Blades SD-2 ordered @ Phase 1 Small

2(+) expand

HW DRLP0, LPJ

db SD2-5 CAMKH1ENCLUS003/CAVACN36

HP-UX

14 224 16 256 2 32Using Blades SD-2 ordered @ Phase 1 Small

2(+) expand

HW DRLP0, LPJ

appsBl890C i2 - stacked

NEWSERVER01HP-UX

16 256 28 384 12 1281x Physical BL890C I2 Medium

2(+) expand

HW PRDLP0, LPJ

appsBl890C i2 - stacked

NEWSERVER02HP-UX

24 384 42 576 18 1921x Physical BL890C I2 Large

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.5

BW-BPC set-up Phase 1Hardware:• Installation of 03 Physical SD-2 blade on PRD/DR for LP0/LPJ DB/CI;

• Installation of 02 Physical BL890Ci2 blade on PRD/DR for LP0/LPJ Apps

Operating Systems:• Installation of 02 (two) O.S. Instances in PRD/DR LP0/LPJ Apps;

• Support for hardware installation of 02 Physical SD-2 blade on PRD/DR for LP0/LPJ DB/CI;

Sap DB/CI and Apps:• Support for hardware installation for 02 Physical SD-2 blade on

PRD/DR for LP0/LPJ DB/CI;

• Installation of 04 (four) APPS instances in new Physical BL890Ci2 blade on (02) PRD and (02) DR for LP0/LPJ Apps;

• Adjustments in 10 (ten) APPS instances in re-size of proc. and memory;

Phase 2Hardware• Expansion for LPO/LPJ DB/CI and Apps using the blades ordered

@phase 1;

Operating systems• Support for hardware expansion for LPO/LPJ DB/CI and Apps;

SAP DB/CI and Apps: • Support for hardware expansion for LPO/LPJ DB/CI and Apps ;

Installation and/or expansionPhas

eInstan

ce Type Action Envirnmt

Function Hardware O.S

.D.B

.SAP CI

SAP Apps

1             2     14

  LP0, LPJ HW (+) add DR apps 1/2 - 2x Physical BL890C I2        

          db 1/2 - SD2 BL - 2 quad proc. x 128gb        

        PRD apps 1/2 - 2x Physical BL890C I2        

          db 1/2 - SD2 BL - 2 quad proc. x 128gb        

    OS image (+) add DR apps   1      

        PRD apps   1      

      (+) expand DR db          

        PRD db              SAP APP (+) add DR apps         2        PRD apps         2

      (+) expand DR apps         4

        PRD apps         6

    SAP DB/CI

(+) expand PRD db          

2                    

  LP0, LPJ HW (+)

expand DR apps Using BL890C I2 ordered @ Phase 1        

          db Using Blades SD-2 ordered @ Phase 1        

        PRD apps Using BL890C I2 ordered @ Phase 1        

          db Using Blades SD-2 ordered @ Phase 1        

    OS image

(+) expand DR apps          

          db                  PRD apps                    db          

    SAP APP (+) expand DR apps          

        PRD apps          

    SAP DB/CI

(+) expand PRD db          

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.6

Other activities

BW-BPC set-up

All phases• Set up of storage and SAN networks;• Set up ofbackup agents, backup servers, tape libraries and VTL, set of tapes;• Configuration of ITSM tools, monitoring agents, threshold parameter;• BCRS, adjustments in Technical Disaster & Recovery Plan;

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.7

Servers overview @ MCC/SCC

BW-BPC set-up

DR:

DB/CI Apps

PDY/QAS:

DB/CI & Apps

DEV:

DB/CI & Apps PRD:

DB/CI Apps

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.8

Servers distribution

BW-BPC set-up

DB/CI currentBW-LSA Phase 1:

DB/CI with BW-LSA Phase 1 + BPC Phase 1 :

Part. Type

HostnameSD2-1Enc:

Cator2enclus011

HostnameSD2-3Enc:

Cator2enclus013

HostnameSD2-5Enc:

Camkh1enclus003

SAP ApplicationSCC

PRODSids

MCCPRE-PROD

Sids

Blade total

proc (quad core)

total cores sized

Phase1

cores ACTIVE

cores iCAPed ram

total cores sized

add cores

needed

Min. Proc. Needed (quad)

N vlunx001 vlunx002 vlunx043 ECC EP0 EC0 3 6 8 8 16 384 24 ~ ~N vlunx014 vlunx015 vlunx049 BI BP0 ~ 1 2 4 4 4 128 8 ~ ~N vlunx005 vlunx028 vlunx050 EP WP0 ~ 1 2 4 4 4 128 8 ~ ~V vlunx045 vlunx046 cavacn36 BW-LSA LP0/LPJ ~ 1 2 4 8 ~ 128 8 2 1 (4 core)V                              V                              

Part. Type

HostnameSD2-1Enc:

Cator2enclus011

HostnameSD2-3Enc:

Cator2enclus013

HostnameSD2-5Enc:

Camkh1enclus003

SAP ApplicationSCC

PRODSids

MCCPRE-PROD

Sids

Blade total

proc (quad core)

total cores sized

Phase1

cores ACTIVE

cores iCAPed ram

total cores sized

add cores

needed

Min. Proc. Needed (quad)

N vlunx001 vlunx002 vlunx043 ECC EP0 EC0 3 6 8 8 16 384 24 ~ ~N vlunx014 vlunx015 vlunx049 BI BP0 ~ 1 2 4 4 4 128 8 ~ ~N vlunx005 vlunx028 vlunx050 EP WP0 ~ 1 2 4 4 4 128 8 ~ ~V vlunx045 vlunx046 cavacn36 BW-LSA+BPC LP0/LPJ ~

24 14 ~ 224 14

V NEW NEW NEW MI HP0 ~ 1 4 64 V ~ ~ ~

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.9

Servers distribution

BW-BPC set-up

Applications:MCC Blade Servers for PPR/DR 'App' Servers SCC Blade Servers for PRODUCTION 'App' Servers

BLADEBlade Mode

l

Processor Arch

OS Processors COREs Threa

dsRAM GB

Max RAM for

iVMsTier ABAP

Dia InstJAVA Dia

InstDUAL

Dia Instmax sized cores

max sized RAM comment BLADE

Blade Mode

l

Processor Arch

OS Processors COREs Threa

dsRAM GB

Max RAM for

iVMsTier ABAP

Dia InstJAVA Dia

InstDUAL

Dia Instmax sized cores

max sized RAM comment

VLUNX02

6

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PPR ER0 ~ ~ 16 128 installed

VLUNX003

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ 16 128 installed

PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer needed

PPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 0 0 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 0 0 new

CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 28 224 Memory Utilization (average, peak) v. low v. low Memory Utilization (average, peak) v. low v. low

VLUNX02

7

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PPR ER0 ~ ~ 16 128 needed

VLUNX010

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ 16 128 installed

PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer needed

PPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 8 64 new

               

CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average, peak) v. low v. low Memory Utilization (average, peak) v. low v. low

NEWSERVER01

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PPR ER0 ~ ~ new

CAVAVS08

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ 16 128 needed

PPR ~ ~ ~ new PROD ~ ~ BP0 0 0 no longer needed

PPR ~ ~ PR0 new PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ new PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ new PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ new PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ new PROD HP0 ~ ~ 8 64 new

                     

CPU utilization (average, peak) v. low v. low total > 0 0 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average, peak) v. low v. low Memory Utilization (average, peak) v. low v. low

NEWSERVER02

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ new

PROD ~ ~ BP0 new

PROD ~ ~ PP0 newPROD NP0 ~ ~ newPROD ~ ~ WP0 newPROD ~ ECP ~ newPROD LP0 LPJ ~ newPROD HP0 ~ ~ new

                   

CPU utilization (average, peak) total > 0 0Memory Utilization (average, peak)

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

SRM set-up

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.11

Sizing x Servers configuration

SRM set-up

Sizing:

Servers configurations:

SAP app.

System Role

Target Server O.S. Recommended configuration per wave

        Pilot Wave 1 Wave 2 Wave 3

SRM

DB/CI Cluster

SD-2 HP-UX1 vPar, 4 cores, 16GB

1 vPar, 8 cores, 80GB

1 vPar, 10 cores, 96GB1 vPar, 14 cores, 128GB

SD-2 HP-UX1 vPar, 4 cores, 16GB

1 vPar, 8 cores, 80GB

1 vPar, 10 cores, 96GB1 vPar, 14 cores, 128GB

APP ServersBl460 G7 or Gen8

Linux 2 bl460 G72 bl460 G7 (12c/96GB)

2 bl460 G7 (12c/96GB) + 1 bl460 Gen8 (12c/128GB)

2 bl460 G7 (12c/96GB) +2 bl460 Gen8 (12c/128GB)

Portal (wp0) BL890iC2 HP-UX 2 core, 16GB 2 core, 16GB 3 core, 24GB 3 core, 24GB

Phase Action Item

TypeEnvir

.Instanc

e Function Platform Hostname O.S. Core Initial

Memory Initial

Core Sized

Memory Sized

Core Adde

d

Memory

AddedHardware required RU by

socket

pilot (+) add HW DR WP0 web/apps

Bl890C i2 - stacked NEWSERVER03 HP-

UX 0 0 2 16 2 16 Using BL890C I2 ordered @ Mobile Phase 1 (MCC) Small

pilot (+) add HW PRD WP0 web/apps

Bl890C i2 - stacked NEWSERVER04 HP-

UX 0 0 3 24 3 24 Using BL890C I2 ordered @ BPC Phase 1 (SCC) Small

1 (+) expand HW PRD SP0,

SPJ db SD2-2 CATOR2ENCLUS012/CAVACN27

HP-UX 7 104 8 128 1 24 Using Blades SD-2 current Small

1 (+) expand HW PRD SP0,

SPJ db SD2-4 CATOR2ENCLUS014/CAVACN28

HP-UX 7 104 8 128 1 24 Using Blades SD-2 current Small

1 (+) expand HW DR SP0,

SPJ db SD2-6 CAMKH1ENCLUS004/CAVACN34

HP-UX 7 104 8 128 1 24 Using Blades SD-2 current Small

2 (+) add HW PRD SP0, SPJ db SD2-2 CATOR2ENCLUS012/

CAVACN27HP-UX 8 128 10 160 2 32 1 - SD2 BL - 2 quad proc. x 128gb Small

2 (+) add HW PRD SP0, SPJ db SD2-4 CATOR2ENCLUS014/

CAVACN28HP-UX 8 128 10 160 2 32 1 - SD2 BL - 2 quad proc. x 128gb Small

2 (+) add HW DR SP0, SPJ db SD2-6 CAMKH1ENCLUS004/

CAVACN34HP-UX 8 128 10 160 2 32 1 - SD2 BL - 2 quad proc. x 128gb Small

2 (+) add HW PRD SP0, SPJ apps Bl460C G8 -

stacked NEWSERVER05 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large

2 (+) add HW DR SP0, SPJ apps Bl460C G8 -

stacked NEWSERVER06 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large

3 (+) expand HW PRD SP0,

SPJ db SD2-2 CATOR2ENCLUS012/CAVACN27

HP-UX 10 160 14 224 4 64 Using Blades SD-2 ordered @ Phase 2 Small

3 (+) expand HW PRD SP0,

SPJ db SD2-4 CATOR2ENCLUS014/CAVACN28

HP-UX 10 160 14 224 4 64 Using Blades SD-2 ordered @ Phase 2 Small

3 (+) expand HW DR SP0,

SPJ db SD2-6 CAMKH1ENCLUS004/CAVACN34

HP-UX 10 160 14 224 4 64 Using Blades SD-2 ordered @ Phase 2 Small

3 (+) add HW PRD SP0, SPJ apps Bl460C G8 -

stacked NEWSERVER07 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large

3 (+) add HW DR SP0, SPJ apps Bl460C G8 -

stacked NEWSERVER08 Linux 0 0 12 128 12 128 1x bl460 Gen8 (12c/128GB) Large

3 (+) expand HW DR WP0 web/

appsBl890C i2 - stacked NEWSERVER03 HP-

UX 2 16 3 16 1 8 Using BL890C I2 ordered @ Mobile Phase 1 (MCC) Small

3 (+) expand HW PRD WP0 web/

appsBl890C i2 - stacked NEWSERVER04 HP-

UX 3 24 4 24 1 8 Using BL890C I2 ordered @ BPC Phase 1 (SCC) Small

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.12

SRM set-up

PilotHardware:• Installation of 02 Physical BL890Ci2 blade on PRD/DR for WPO;

Operating Systems:• Installation of 02 (two) O.S. Instances in PRD/DR for WPO;

Sap DB/CI and Apps:• Installation of 14 DB/CI instances;

• Installation of 14 APPS instances;

Phase 1Hardware• Expansion of hardware for SP0/SPJ using the blades current;

SAP DB/CI and Apps: • Support for hardware expansion for SPO/SPJ DB/CI ;

Installation and/or expansion

.Phas

eInstan

ceType Action

Envirnmt

Function

HardwareO.S

.D.B.

SAP CI

SAP App

spilot             2 14 14 14

 SD0, SDJ

            2 2  

 SD1, SDG

SAP DB/CI

(+) add DEV apps/db     2 2  

  SP0, SPJ SAP APP (+) add DR apps         4        PRD apps         4

   SAP DB/CI

(+) add PRD db     2 2  

 SQ0, SQJ

SAP DB/CI

(+) add QAS apps/db     2 2  

 SQ1, SQG

SAP DB/CI

(+) add QAS apps/db     2 2  

 SR0, SRJ

SAP DB/CI

(+) add PPR apps/db     2 2  

 SY1, SYG

SAP APP (+) add PDY apps         4

   SAP DB/CI

(+) add PDY db     2 2  

  WP0 HW (+) add DRweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

        PRDweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

   OS image

(+) add DRweb/apps

  1      

        PRDweb/apps

  1      

    SAP APP (+) add DRweb/apps

        1

        PRDweb/apps

        1

1                    

  SP0, SPJ HW(+) expand

DR db Using Blades SD-2 current        

        PRD db Using Blades SD-2 current        

   SAP DB/CI

(+) expand

PRD db          

2             2     4  SP0, SPJ HW (+) add DR apps 1x bl460 Gen8 (12c/128GB)        

          db1 - SD2 BL - 2 quad proc. x 128gb

       

        PRD apps 1x bl460 Gen8 (12c/128GB)        

          db1 - SD2 BL - 2 quad proc. x 128gb

       

   OS image

(+) add DR apps   1      

        PRD apps   1          SAP APP (+) add DR apps         2        PRD apps         2

   SAP DB/CI

(+) expand

PRD db          

3             2     4  SP0, SPJ HW (+) add DR apps 1x bl460 Gen8 (12c/128GB)                PRD apps 1x bl460 Gen8 (12c/128GB)        

     (+) expand

DR dbUsing Blades SD-2 ordered @ Phase 2

       

        PRD dbUsing Blades SD-2 ordered @ Phase 2

       

   OS image

(+) add DR apps   1      

        PRD apps   1          SAP APP (+) add DR apps         2        PRD apps         2

   SAP DB/CI

(+) expand

PRD db          

  WP0 HW(+) expand

DRweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

        PRDweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.13

SRM set-up

Phase 2Hardware:• Installation of 03 Physical SD-2 blade in PRD/DR for SP0/SPJ DB/CI;

• Installation of 02 BL460 Gen8 in PRD/DR for SP0/SPJ Apps

Operating Systems:• Installation of 02 O.S. instances in PRD/DR for SPO/SPJ Apps;

Sap DB/CI and Apps:• Support for hardware expansion in PRD/DR for SPO/SPJ DB/CI;

• Installation of 04 APPS instances in PRD/DR for SPO/SPJ;

Phase 3Hardware:• Expansion of hardware SD-2 blade in PRD/DR for SP0/SPJ DB/CI;

• Installation of 02 BL460 Gen8 in PRD/DR for SP0/SPJ Apps

Operating Systems:• Installation of 02 O.S. instances in PRD/DR for SPO/SPJ Apps;

Sap DB/CI and Apps:• Support for hardware expansion in PRD/DR for SPO/SPJ DB/CI;

• Installation of 04 APPS instances in PRD/DR for SPO/SPJ;

Installation and/or expansion

.Phas

eInstan

ceType Action

Envirnmt

Function

HardwareO.S

.D.B.

SAP CI

SAP App

spilot             2 14 14 14

 SD0, SDJ

            2 2  

 SD1, SDG

SAP DB/CI

(+) add DEV apps/db     2 2  

  SP0, SPJ SAP APP (+) add DR apps         4        PRD apps         4

   SAP DB/CI

(+) add PRD db     2 2  

 SQ0, SQJ

SAP DB/CI

(+) add QAS apps/db     2 2  

 SQ1, SQG

SAP DB/CI

(+) add QAS apps/db     2 2  

 SR0, SRJ

SAP DB/CI

(+) add PPR apps/db     2 2  

 SY1, SYG

SAP APP (+) add PDY apps         4

   SAP DB/CI

(+) add PDY db     2 2  

  WP0 HW (+) add DRweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

        PRDweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

   OS image

(+) add DRweb/apps

  1      

        PRDweb/apps

  1      

    SAP APP (+) add DRweb/apps

        1

        PRDweb/apps

        1

1                    

  SP0, SPJ HW(+) expand

DR db Using Blades SD-2 current        

        PRD db Using Blades SD-2 current        

   SAP DB/CI

(+) expand

PRD db          

2             2     4  SP0, SPJ HW (+) add DR apps 1x bl460 Gen8 (12c/128GB)        

          db1 - SD2 BL - 2 quad proc. x 128gb

       

        PRD apps 1x bl460 Gen8 (12c/128GB)        

          db1 - SD2 BL - 2 quad proc. x 128gb

       

   OS image

(+) add DR apps   1      

        PRD apps   1          SAP APP (+) add DR apps         2        PRD apps         2

   SAP DB/CI

(+) expand

PRD db          

3             2     4  SP0, SPJ HW (+) add DR apps 1x bl460 Gen8 (12c/128GB)                PRD apps 1x bl460 Gen8 (12c/128GB)        

     (+) expand

DR dbUsing Blades SD-2 ordered @ Phase 2

       

        PRD dbUsing Blades SD-2 ordered @ Phase 2

       

   OS image

(+) add DR apps   1      

        PRD apps   1          SAP APP (+) add DR apps         2        PRD apps         2

   SAP DB/CI

(+) expand

PRD db          

  WP0 HW(+) expand

DRweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

        PRDweb/apps

1/2 - Physical BL890C I2 (Same BPC)

       

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.14

Other activities

SRM set-up

All phases• Set up of storage and SAN networks;• Set up ofbackup agents, backup servers, tape libraries and VTL, set of tapes;• Configuration of ITSM tools, monitoring agents, threshold parameter;• BCRS, adjustments in Technical Disaster & Recovery Plan;

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.15

Servers overview @ MCC/SCC

SRM set-up

PDY (DR):

DB/CI Apps

QAS:

DB/CI & Apps

DEV:

DB/CI & Apps PRD:

DB/CI Apps

PRD:

Portal

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.16

Servers distribution

SRM set-up

DB/CI Current:

DB/Ci with SRM :

Part. Type

HostnameSD2-2Enc:

Cator2enclus012

HostnameSD2-4Enc:

Cator2enclus014

HostnameSD2-6Enc:

Camkh1enclus004

SAP ApplicationSCC

PRODSids

MCCPRE-PROD

Sids

Blade total proc

total cores sized

Phase1

cores ACTIVE

cores iCAPed ram

total cores sized

addit. cores

needed

Min. Proc. Needed (quad)

N vlunx008 vlunx009 vlunx011 PI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128 8 ~ ~V vlunx047 vlunx030 vlunx052 EC ECP ECR

4

2 4 8 ~ 128 8 ~ ~V cavacn25 cavacn26 cavacn33 CRM/MI CP0/CPJ/HP0 CR0/CRJ 1 1 4 ~ 64 4 ~ ~V cavacn27 cavacn27 cavacn34 EP WPE WRE 2 3 8 ~ 128 14 6 2 (8core)V cavacn29 cavacn30 cavacn35 MDM/Search-UI MPC/SCP MRC/SCR 2 5 8 ~ 128 13 5 1 (4core)V cavacn31 cavacn32 ~ GRC-AC GP0 ~ 1 3 4 ~ 64 6 2 1 (4core)V ~ ~ ~                      N vlunx019 vlunx020 vlunx053 MDM MP0 1 2 4 4 4 128 8 ~ ~

Part. Type

HostnameSD2-2Enc:

Cator2enclus012

HostnameSD2-4Enc:

Cator2enclus014

HostnameSD2-6Enc:

Camkh1enclus004

SAP ApplicationSCC

PRODSids

MCCPRE-PROD

Sids

Blade total proc

total cores sized

Phase1

cores ACTIVE

cores iCAPed ram

total cores sized

addit. cores

needed

Min. Proc. Needed (quad)

N vlunx008 vlunx009 vlunx011 PI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128 8 ~ ~V vlunx047 Vlunx030 vlunx052 EC ECP ECR

4

2 4 8 ~ 128 8 ~ ~V cavacn25 Cavacn26 cavacn33 CRM CP0/CPJ CR0/CRJ 1 1 4 ~ 64 4 ~ ~V cavacn27 Cavacn27 cavacn34 EP/and SRM WPE/SP0/SPJ WRE/SR0/SRJ 1 8 8 ~ 128 16 8 2(8cores)V cavacn29 Cavacn30 cavacn35 MDM/Search-UI MPC/SCP MRC/SCR 2 5 8 ~ 128 13 5 1 (4core)V cavacn31 Cavacn32 ~ GRC-AC GP0 ~ 1 3 4 ~ 64 6 2 1 (4core)V ~ ~ ~                      N vlunx019 Vlunx020 vlunx053 MDM MP0 1 2 4 4 4 128 8 ~ ~

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.17

Servers distribution

SRM set-up

Applications Intel Blades for SAP Dia Inst [CRM/EP/SRM] @ MCC Intel Blades for SAP Dia Inst [CRM/EP/SRM] @ SCC

BLADE Blade Model

Processor

ArchOS Proces

sors COREs Threads

RAM GB

Max RAM

for SAPTier ABAP DIA

InstJAVA Dia

InstMax

Cores Sized

Max RAM Sized Comments BLADE

Blade Model

Processor

ArchOS Proces

sors COREs Threads

RAM GB

Max RAM for

iVMsTier ABAP DIA

InstJAVA Dia

InstMax

Cores Sized

Max RAM Sized Comments

cavaas39

BL460C G7

x86_64

RHEL

Server 5.7

2 12 24 96 85

PPR CR0 CRJ installed

cavaas37

BL460C G7

x86_64

RHEL

Server 5.7

2 12 24 96 85

PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new

                       

CPU utilization (average, peak) ? ? CPU utilization (average, peak) ? ? Memory Utilization (average, peak) ? ? Memory Utilization (average, peak) ? ?

cavaas40

BL460C G7

x86_64

RHEL

Server 5.7

2 12 24 96 85

PPR CR0 CRJ installed

cavaas38

BL460C G7

x86_64

RHEL

Server 5.7

2 12 24 96 85

PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new

                       

CPU utilization (average, peak) ? ? CPU utilization (average, peak) ? ? Memory Utilization (average, peak) ? ? Memory Utilization (average, peak) ? ?

new wave

1

BL460C G8

x86_64

RHEL

Server 5.7

2 12 24 128 85

PPR CR0 CRJ installed

new wave 1

BL460C G8

x86_64

RHEL

Server 5.7

2 12 24 128 85

PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new

                       

CPU utilization (average, peak) na na CPU utilization (average, peak) na na Memory Utilization (average, peak) na na Memory Utilization (average, peak) na na

new wave 2-3

BL460C G8

x86_64

RHEL

Server 5.7

2 12 24 128 85

PPR CR0 CRJ installed

new wave 2-3

BL460C G8

x86_64

RHEL

Server 5.7

2 12 24 128 85

PPR CR0 CRJ installedPPR ~ WRE installed PPR ~ WRE installedPPR SR0 SRJ # # new PPR SR0 SRJ # # new

                       

CPU utilization (average, peak) na na CPU utilization (average, peak) na na Memory Utilization (average, peak) na na Memory Utilization (average, peak) na na

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

Mobile set-up

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.19

Sizing x Servers configuration

Mobile set-up

Sizing:

Servers configurations:

System Role

Target Server Recommended Config per Phase

    Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

DB/CI Cluster

SD-21 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB

SD-21 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB1 vPar, 4 cores,

48GB

APP Servers2 x BL890 i2

(shared APP svr)03 cores, 32GB 04 cores, 48GB 06 cores, 64GB 08 cores, 80GB 08 cores, 80GBPhas

e Action Item Type

Envir.

Instance Function Platform Hostname O.S.

Core Initia

l

Memory

Initial

Core Sized

Memory Sized

Core Added

Memory Added Hardware required RU by

socket

1 (+) add HW PRD HP0 nw/db SD2-1 CATOR2ENCLUS011 HP-UX     4 64 4 64 1/2 - SD2 BL - 2 quad proc. x 128gb

(Same BPC) Small

1 (+) add HW PRD HP0 nw/db SD2-3 CATOR2ENCLUS013 HP-UX     4 64 4 64 1/2 - SD2 BL - 2 quad proc. x 128gb

(Same BPC) Small

1 (+) add HW DR HP0 nw/db SD2-5 CAMKH1ENCLUS003 HP-UX     4 64 4 64 1/2 - SD2 BL - 2 quad proc. x 128gb

(Same BPC) Small

1 (+) add HW PRD HP0 nw/apps Bl890C i2 - stacked NEWSERVER09 HP-UX     6 48 6 48 Using BL890C I2 ordered @ BPC Phase

1 (SCC) Small

1 (+) add HW DR HP0 nw/apps Bl890C i2 - stacked NEWSERVER10 HP-UX     4 32 4 32 1x Physical BL890C I2 to MCC Small

1 (+) expand HW PRD AP0,

UPO sup/afaria/db Vmware CAVAAS50 Windows 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW PRD UP0 sup/apps Vmware NEWSERVER11 Windows     4 32 4 32 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW PRD UP0 sup/apps Vmware NEWSERVER12 Windows     4 32 4 32 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) expand HW DR AP0,

UPO sup/afaria/db Vmware CAVAAS45 Windows 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW DR UP0 sup/apps Vmware NEWSERVER13 Windows     4 32 4 32 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW DR UP0 sup/apps Vmware NEWSERVER14 Windows     4 32 4 32 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) expand HW QAS UQ0,

AQ0sup/afa/apps/db Vmware CAVAAS46 Windo

ws 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual

1 (+) expand HW DEV UD0,

AD0sup/afa/apps/db Vmware CAVAAS44 Windo

ws 2 16 4 32 2 16 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual

1 (+) add HW PRD AP0 afaria/apps Vmware NEWSERVER15 Windows     2 8 2 8 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW PRD AP0 afaria/apps Vmware NEWSERVER16 Windows     2 8 2 8 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW DR AP0 afaria/apps Vmware NEWSERVER17 Windows     2 8 2 8 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW DR AP0 afaria/apps Vmware NEWSERVER18 Windows     2 8 2 8 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW PRD RP0 relay Vmware NEWSERVER21 Windows     2 8 2 8 VMWare Farm > BL620C HW (05 = 3

prd, 03 dr) virtual

1 (+) add HW PRD ctl sybase ctrl center Vmware NEWSERVER22 Windo

ws     2 8 2 8 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual

1 (+) add HW DR ctl sybase ctrl center Vmware NEWSERVER23 Windo

ws     2 8 2 8 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual

1 (+) add HW PRD ctl VMWARE Site RM. Vmware NEWSERVER24 Windo

ws     2 8 2 8 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual

1 (+) add HW DR ctl VMWARE Site RM. Vmware NEWSERVER25 Windo

ws     2 8 2 8 VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) virtual

2 (+) expand HW PRD HP0 nw/apps Bl890C i2 -

stacked NEWSERVER09 HP-UX 6 48 9 72 3 24 28% BL890C I2 to SCC Small

2 (+) expand HW DR HP0 nw/apps Bl890C i2 -

stacked NEWSERVER10 HP-UX 4 32 6 48 2 16 28% BL890C I2 to MCC Small

3 (+) expand HW PRD HP0 nw/apps Bl890C i2 -

stacked NEWSERVER09 HP-UX 9 72 18 144 9 72 42% BL890C I2 to SCC Medium

3 (+) expand HW DR HP0 nw/apps Bl890C i2 -

stacked NEWSERVER10 HP-UX 6 48 12 96 6 48 42% BL890C I2 to MCC Small

4 (+) expand HW PRD HP0 nw/apps Bl890C i2 -

stacked NEWSERVER09 HP-UX 18 144 24 192 6 48 30% BL890C I2 to SCC Small

4 (+) expand HW DR HP0 nw/apps Bl890C i2 -

stacked NEWSERVER10 HP-UX 12 96 16 128 4 32 30% BL890C I2 to MCC Small

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.20

Mobile set-up

Phase 1Hardware:• Installation of 01 Physical BL890C I2 and 1/2 - SD2 BL - 2 quad proc. x

128gb (Same BPC) in PRD/DR for HPO Netweaver Mobile;

• Installation of VMWare Farm > BL620C HW (05 = 3 prd, 03 dr) to support PRD/DR for SUP, Afaria, Relay and utility servers;

Operating Systems:• Installation of 15 O.S. Instances in PRD/DR;

Sap DB/CI and Apps:• Migration of 01 DB instances, 01 NetWeaver PRD to new vPar;

• Installation of 06 DB instances, 02 NetWeaver DR/TRN, 02 sup, 02 Afaria in PRD/DR;

• Installation of 07 CI “like” instances ctrl, vmware, relay, and NetWeaver;

• Installation of 15 APPS instances;

Installation and/or expansion

.Phas

eInstan

ceType Action

Envirnmt

Function HardwareO.S

.D.B.

SAP CI

SAP App

s1            15 6 7 15

  HP0 HW (+) add DR nw/apps 1x Physical BL890C I2        

          nw/db1/2 - SD2 BL - 2 quad proc. x 128gb (Same BPC)

       

        PRD nw/apps 1x Physical BL890C I2        

          nw/db1/2 - SD2 BL - 2 quad proc. x 128gb (Same BPC)

       

   OS image

(+) add DR nw/apps   1      

          nw/db                  PRD nw/apps   1                nw/db              SAP APP (+) add DR nw/apps         3        PRD nw/apps         4

   SAP DB/CI

(+) add PRD nw/db     1 1  

  HT0SAP DB/CI

(+) add TRN nw/apps/db     1 1  

  ctl HW (+) add DRsybase ctrl center

VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

         VMWARE Site RM.

VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

        PRDsybase ctrl center

VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

         VMWARE Site RM.

VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

   OS image

(+) add DRsybase ctrl center

  1      

         VMWARE Site RM.

  1      

        PRDsybase ctrl center

  1      

         VMWARE Site RM.

  1      

   SAP DB/CI

(+) add DRsybase ctrl center

      1  

         VMWARE Site RM.

      1  

        PRDsybase ctrl center

      1  

         VMWARE Site RM.

      1  

  UP0 HW (+) add DR sup/appsVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

        PRD sup/appsVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

   OS image

(+) add DR sup/apps   2      

        PRD sup/apps   2          SAP APP (+) add DR sup/apps         2        PRD sup/apps         2

 UQ0, AQ0

HW(+) expand

QASsup/afa/apps/db

VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

 UD0, AD0

HW(+) expand

DEVsup/afa/apps/db

VMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

  AP0 HW (+) add DR afaria/appsVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

        PRD afaria/appsVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

   OS image

(+) add DR afaria/apps   2      

        PRD afaria/apps   2          SAP APP (+) add DR afaria/apps         2        PRD afaria/apps         2

  RP0 HW (+) add PRD relayVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

   OS image

(+) add PRD relay   1      

    SAP CI (+) add PRD relay       1  

 AP0, UPO

HW(+) expand

DR sup/afaria/dbVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

        PRD sup/afaria/dbVMWare Farm > BL620C HW (05 = 3 prd, 03 dr)

       

    SAP DB (+) add DR sup/afaria/db     2            PRD sup/afaria/db     2    

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.21

Mobile set-up

Phase 2, 3 and 4Hardware:• Expansion of hardware using BL890C I2 in PRD/DR for HP0;

Operating Systems:• Support expansion of hardware in PRD/DR for HPO O.S. instances;

Sap DB/CI and Apps:• Support for hardware expansion in PRD/DR for HPO Apps instances;

Phase 5Hardware:• There isn´t no change, the sizing is the same of Phase 4;

Operating Systems:• There isn´t no change, the sizing is the same of Phase 4;

Sap DB/CI and Apps:• There isn´t no change, the sizing is the same of Phase 4;

Installation and/or expansion

.Phase

Instance Type Action Envirn

mtFuncti

on Hardware O.S.

D.B.

SAP CI

SAP App

s

2                    

  HP0 HW (+) expand DR nw/

appsExpand or add BL890C I2 to SCC        

        PRD nw/apps

Expand or add BL890C I2 to MCC        

    OS image

(+) expand DR nw/

apps         

        PRD nw/apps

         

    SAP APP

(+) expand DR nw/

apps         

        PRD nw/apps

         

3                    

  HP0 HW (+) expand DR nw/

appsExpand or add BL890C I2 to SCC        

        PRD nw/apps

Expande or add BL890C I2 to MCC        

    OS image

(+) expand DR nw/

apps         

        PRD nw/apps

         

    SAP APP

(+) expand DR nw/

apps         

        PRD nw/apps

         

4                    

  HP0 HW (+) expand DR nw/

appsUsing BL890C I2 ordered @ Phase before        

        PRD nw/apps

Using BL890C I2 ordered @ Phase before        

    OS image

(+) expand DR nw/

apps         

        PRD nw/apps

         

    SAP APP

(+) expand DR nw/

apps         

        PRD nw/apps

         

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.22

Other activities

Mobile set-up

All phases• Set up of storage and SAN networks;• Set up ofbackup agents, backup servers, tape libraries and VTL, set of tapes;• Configuration of ITSM tools, monitoring agents, threshold parameter;• BCRS, adjustments in Technical Disaster & Recovery Plan;

Important: • Vale need to provide network infra-structure for the deploy of Mobile Environment;• 2 x 2 connections 10GB networks ports for connect mobile SD2 vPar;

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.23

Servers overview @ MCC/SCC

Mobile set-up

QAS:

DB/CI & Apps

DEV:

DB/CI & Apps PRD:

DB/CI Apps

DR:

DB/CI Apps

SD2-1CATOR2ENCLUS011

vPARnewserver?

?HP-UX

SD2-3CATOR2ENCLUS

013

vPARnewserver?

?HP-UX

SD2-5CATOR2ENCLUS

003

vPARnewserver?

?HP-UX

HP0

HP0

HP0

HP0

HP0

HP0

HP0

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.24

Servers distribution

Mobile set-up

DB/CI Current:

DB/Ci with SRM :

Part. Type

HostnameSD2-2Enc:

Cator2enclus012

HostnameSD2-4Enc:

Cator2enclus014

HostnameSD2-6Enc:

Camkh1enclus004

SAP ApplicationSCC

PRODSids

MCCPRE-PROD

Sids

Blade total proc

total cores sized

Phase1

cores ACTIVE

cores iCAPed ram

total cores sized

addit. cores

needed

Min. Proc. Needed (quad)

N vlunx008 vlunx009 vlunx011 PI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128 8 ~ ~V vlunx047 vlunx030 vlunx052 EC ECP ECR

4

2 4 8 ~ 128 8 ~ ~V cavacn25 cavacn26 cavacn33 CRM/MI CP0/CPJ/HP0 CR0/CRJ 1 1 4 ~ 64 4 ~ ~V cavacn27 cavacn27 cavacn34 EP WPE WRE 2 3 8 ~ 128 14 6 2 (8core)V cavacn29 cavacn30 cavacn35 MDM/Search-UI MPC/SCP MRC/SCR 2 5 8 ~ 128 13 5 1 (4core)V cavacn31 cavacn32 ~ GRC-AC GP0 ~ 1 3 4 ~ 64 6 2 1 (4core)V ~ ~ ~                      N vlunx019 vlunx020 vlunx053 MDM MP0 1 2 4 4 4 128 8 ~ ~

Part. Type

HostnameSD2-1Enc:

Cator2enclus011

HostnameSD2-3Enc:

Cator2enclus013

HostnameSD2-5Enc:

Camkh1enclus003

SAP ApplicationSCC

PRODSids

MCCPRE-PROD

Sids

Blade total

proc (quad core)

total cores sized

Phase1

cores ACTIVE

cores iCAPed ram

total cores sized

add cores

needed

Min. Proc. Needed (quad)

N vlunx001 vlunx002 vlunx043 ECC EP0 EC0 3 6 8 8 16 384 24 ~ ~N vlunx014 vlunx015 vlunx049 BI BP0 ~ 1 2 4 4 4 128 8 ~ ~N vlunx005 vlunx028 vlunx050 EP WP0 ~ 1 2 4 4 4 128 8 ~ ~V vlunx045 vlunx046 cavacn36 BW-LSA+BPC LP0/LPJ ~

24 14 ~ 224 14

V NEW NEW NEW MI HP0 ~ 1 4 64 V ~ ~ ~

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.25

Servers distribution

Mobile set-up

ApplicationsMCC Blade Servers for PPR/DR 'App' Servers SCC Blade Servers for PRODUCTION 'App' Servers

BLADEBlade Mode

l

Processor Arch

OS Processors COREs Threa

dsRAM GB

Max RAM for

iVMsTier ABAP

Dia InstJAVA Dia

InstDUAL

Dia Instmax sized cores

max sized RAM comment BLADE

Blade Mode

l

Processor Arch

OS Processors COREs Threa

dsRAM GB

Max RAM for

iVMsTier ABAP

Dia InstJAVA Dia

InstDUAL

Dia Instmax sized cores

max sized RAM comment

VLUNX02

6

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PPR ER0 ~ ~ 16 128 installed

VLUNX003

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ 16 128 installed

PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer needed

PPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 0 0 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 0 0 new

CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 28 224 Memory Utilization (average, peak) v. low v. low Memory Utilization (average, peak) v. low v. low

VLUNX02

7

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PPR ER0 ~ ~ 16 128 needed

VLUNX010

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ 16 128 installed

PPR ~ ~ ~ 0 0 no longer needed PROD ~ ~ BP0 0 0 no longer needed

PPR ~ ~ PR0 3 24 needed PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ 3 24 needed PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ 3 24 needed PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ 3 24 needed PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ 14 112 new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ 8 64 new PROD HP0 ~ ~ 8 64 new

               

CPU utilization (average, peak) v. low v. low total > 50 400 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average, peak) v. low v. low Memory Utilization (average, peak) v. low v. low

NEWSERVER01

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PPR ER0 ~ ~ new

CAVAVS08

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ 16 128 needed

PPR ~ ~ ~ new PROD ~ ~ BP0 0 0 no longer needed

PPR ~ ~ PR0 new PROD ~ ~ PP0 3 24 neededPPR NR0 ~ ~ new PROD NP0 ~ ~ 3 24 neededPPR ~ ~ ~ new PROD ~ ~ WP0 3 24 neededPPR ~ ECR ~ new PROD ~ ECP ~ 3 24 neededPPR LP0 LPJ ~ new PROD LP0 LPJ ~ 14 112 newPPR HP0 ~ ~ new PROD HP0 ~ ~ 8 64 new

                     

CPU utilization (average, peak) v. low v. low total > 0 0 CPU utilization (average, peak) v. low v. low total > 50 400Memory Utilization (average, peak) v. low v. low Memory Utilization (average, peak) v. low v. low

NEWSERVER02

Bl890C i2

ia64 HP-UX 8 32 64 512 450

PROD EP0 ~ ~ new

PROD ~ ~ BP0 new

PROD ~ ~ PP0 newPROD NP0 ~ ~ newPROD ~ ~ WP0 newPROD ~ ECP ~ newPROD LP0 LPJ ~ newPROD HP0 ~ ~ new

                   

CPU utilization (average, peak) total > 0 0Memory Utilization (average, peak)

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.26

Servers distribution

Mobile set-up

VMWareVIRTUAL MACHINES - Non-Prod - MCC VMWARE Farm VIRTUAL MACHINES - PRODUCTION - SCC VMWARE Farm

Environment Virtual Machine Role SAP Sids Tier OS vCPU RAM Temp or Perm Comments Environment Virtual Machine Role SAP Sids Tier OS vCPU RAM Temp or Perm Comments

TIBCO CAMKH1TIBCAS001 Agent ~~~~ NSSR W2K8 2 8 temp or perm installed TREX cator2valeas076 SAP Trex - Slave 1 TP0 PROD RHEL 2 8 Perm installed

TIBCO CAMKH1TIBCAS002 Ems #1 ~~~~ NSSR W2K8 4 16 temp or perm installed TREX cator2valeas077 SAP Trex - Slave 2 TP0 PROD RHEL 2 8 Perm installed

Documentum CAMKH1TIBCAS003 Test Server #1 ~~~~ NSSR RHEL 4 16 temp or perm installed TREX cator2valeas084 SAP Trex Master TP0 PROD RHEL 2 8 Perm installed

TIBCO CAMKH1TIBCAS004 BW/BC #1 ~~~~ NSSR W2K8 4 16 temp or perm installed TREX cator2valeas085 SAP Trex Master Backup TP0 PROD RHEL 2 8 Perm installed

TIBCO CAMKH1TIBCAS005 BW/BC #2 ~~~~ NSSR W2K8 4 16 temp or perm installed VMWARE cator2valeus484 VMWare Virtual Center ~~~~ PROD W2K8 8 24 Perm installed

TIBCO CAMKH1TIBCAS006 BC (DMZ) ~~~~ NSSR W2K8 1 1 temp or perm installed EP Web Disp cavaas31 Web Dispatcher (DMZ) DP0 PROD RHEL 2 8 Perm installed

TIBCO CAMKH1TIBCAS007 Mgmt ~~~~ NSSR W2K8 2 8 temp or perm installed EP Web Disp cavaas32 Web Dispatcher (DMZ) DP0 PROD RHEL 2 8 Perm installed

TIBCO CAMKH1TIBCAS008 Agent ~~~~ NSSR W2K8 2 8 temp or perm installed SYBASE cavaas49 Sysbase Relay Server (DMZ) ~~~~ PROD W2K8 2 8 Perm installed

TIBCO CAMKH1TIBCAS009 EMS #1 ~~~~ NSSR W2K8 4 16 temp or perm installed SYBASE cavaas50 Unwired Platform / Afaria ~~~~ PROD W2K8 2 16 Perm installed

Documentum CAMKH1TIBCAS010 Test Server #2 ~~~~ NSSR RHEL 4 16 temp or perm installed SYBASE new SUP Data tier PROD W2K8 4 32 Perm new

TIBCO CAMKH1TIBCAS011 BW/BC #1 ~~~~ NSSR W2K8 4 16 temp or perm installed SYBASE new SUP Server #1 PROD W2K8 4 32 Perm new

TIBCO CAMKH1TIBCAS012 BW/BC #2 ~~~~ NSSR W2K8 4 16 temp or perm installed SYBASE new SUP Server #2 PROD W2K8 4 32 Perm new

TIBCO CAMKH1TIBCAS013 BC (DMZ) ~~~~ NSSR W2K8 1 1 temp or perm installed SYBASE new Sybase Relay Server (DMZ) #1 PROD W2K8 2 8 Perm new

TIBCO CAMKH1TIBCAS014 Mgmt ~~~~ NSSR W2K8 2 8 temp or perm installed SYBASE new Sybase Relay Server (DMZ) #2 PROD W2K8 2 8 Perm new

TREX CAMKH1VALEAS018 SAP Trex TP0 dr DR RHEL 2 8 perm installed SYBASE new Afaria Server#1 PROD W2K8 2 8 Perm newTREX CAMKH1VALEAS019 SAP Trex TQ0 QAS RHEL 2 8 perm installed SYBASE new Afaria Server#2 PROD W2K8 2 8 Perm newTREX CAMKH1VALEAS020 SAP Trex TD0 DEV RHEL 2 8 perm installed SYBASE new Sybase Control Center PROD W2K8 2 8 Perm new

VMWARE camkh1valeus042 VMWare Virtual Center ~~~~ NonP, DR W2K8 1 8 perm installed VMWARE new VMWARE Site Recovery Mgr PROD W2K8 2 8 Perm newEP Web Disp cavaas41 Web Dispatcher (DMZ) DQ0, DP0 DR NonP, DR RHEL 2 8 perm installed Mercury BPM new SAP Business Process Monitor ~~~~ PROD XP ? 2 4 Perm

SYBASE cavaas43 Sysbase Relay Server (DMZ) ~~~~ DEV W2K8 2 8 perm installed SYBASE cavaas44 Unwired Platform / Afaria ~~~~ DEV W2K8 2 16 perm installed SYBASE cavaas45 Unwired Platform / Afaria ~~~~ DR W2K8 2 16 perm installed SYBASE cavaas46 Unwired Platform / Afaria ~~~~ QAS W2K8 2 16 perm installed SYBASE cavaas47 Sysbase Relay Server (DMZ) ~~~~ DR W2K8 2 8 perm installed SYBASE cavaas48 Sysbase Relay Server (DMZ) ~~~~ QAS W2K8 2 8 perm installed

BO Explorer CAVAAS51 BO Explorer POC ~~~~ NSSR W2K8 4 16 temp installed VMWARE new VMs for DR with SRM (?) PROD W2K8 2 8 Perm new

total vCPU and RAM Assigned 69 136 total vCPU and RAM Assigned 50 244

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.27

Overview of all components in PRD: NetWeaver Mobile, Sybase Relay, SUP and Afaria

Mobile set-up

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

Clustering

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.29

HP ServiceGuard

Set-up a high-availability clustering solution

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

Downtime/outages

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.31

BW-BPC Downtime (and MI)

• In BPC phase 1 we will need to add new HW (SD2 blade).

• This requires a reboot to add the HW to the nPAR.

• Estimated downtime for the reboot is 02 hours

• It will impact BW-LSA, no impact to ECC (EP0), BI (BP0) or EP (WP0).

• In BPC phase 2 we will need to re-assign the SD2 blade HW released from BI (BP0) Decomisioning.

• This requires a reboot to add this HW to the BW-LSA and MI nPAR.

• Estimated downtime for the reboot is 02 hours

• it will impact BW-LSA and MI, no impact to ECC (EP0) or EP (WP0).

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.32

SRM Downtime

• During installation and cluster configuration / testing we will have 10-20 hours (estimated) of downtime;

• • It will impact all applications

running on hosts cavacn27 and cavacn28: EP and TREX (nfs share) environment.

• And in the future wave 2 will be need to add new HW (SD2 blade) and then will have another downtime (at least 2 hours) for the nPar

• it will impact all the vPARs running in it: SRM-MDM Catalog, SearchUI, GRC-AC ,CRM and EC environment, EP TREX and SRM.

• In future Phase 2 for SRM project, when the other SD2 blade hw is added, this would also require downtime (for a reboot, at least 2 hours) unless both blades were added at the same time.

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.33

Mobile Downtime

• In this case will need to move Mobile to new and dedicated vPar to segregate from CRM environment.

• And will have a downtime (3-6 hour estimated) in current mobile environment.

• Note: a second downtime will be needed to add HW to the BW-LSA/MI nPAR after it is released from BI.

• Estimate is aproximately 2 hours. (See slide from BPC).

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

Impact of CRM on the IP

© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.35

Impact of SRM on the PI1. PI is currently running stacked with GRC on a SD-2 partition. Below is the current nPar config:

This means that the current nPar supports ~5,000 SAPS, and can support ~10,000 SAPS after the activation of the 4 iCAP cores;

2. Additional interfaces will be added to the PI system as part of the SRM implementation. The table below summarizes the requirements to handle these new interfaces:

3. We considerate a 3-tier PI deployment, with the PI APP servers running on HP-UX, we can assume that the current nPar can support current PI + GRC + new interfaces, after the activation of the iCAP cores:

• GRC Phase 2 DB: 6,400 SAPS

• Current PI: SAPS (assuming 2,000 SAPS)

• New interfaces: 1000 SAPS

• Total: ~9,400 SAPS (ok on the 8-way nPar, but will be use 04 cores ICAPed, and add new SAP Dialog instances for PP0, in

vnlux003, vnlux010 and cavavs08);4. The cost of this expansion of PI (04 cores ICAPed and new SAP Dialog) is not included in

this project;

SAP Application SCC PROD Sids MCC PRE-PROD Sids Blade total proc total cores sized

Phase1 cores ACTIVE cores iCAPed ramPI/GRC-NFE PP0/NP0 PR0/NR0 1 2 4 4 4 128

Release SAPS (total) Memory (GB)PI 7.1 5,200 42