va1 tatl 00100 m m7 dsu 0022.air heater drawing for silo 18 kw
TRANSCRIPT
-
DOCUMENT SUBMISSION STATUS: RE
C 08.12.11 Revised as per CS-M7-M-00245 P.D P.D GAK B 20.10.11 Revised as per CS-M7-M-00240 P.D JKM GAK A 31.08.11 Submitted for Reference P.D JKM GAK
REV DATE DESCRIPTION DRWN CHKD APPD
OWNER
OWNERS CONSULTANT
EPC CONTRACTOR
EPC CONTRACTORS CONSULTANT
FICHTNER Fichtner GMBH & Co. Kg
PROJECT TITLE
VUNG ANG 1 THERMAL POWER PLANT 2 x 600MW M-LOT7 ASH HANDLING PLANT
CONTRACT No. 100210/LILAMA-TECPRO Dated 10.02.2010 DRAWING TITLE : Air Heaters for Silo (18 KW)
SUB-CONTRACTOR :
TECPRO SYSTEMS LIMITED
FUNCTION NAME SIGN DATE
DRWN P.D 31.08.11
CHKD J.K.M 31.08.11
APPD GAK 31.08.11
DOCUMENT No: VA1-TATL-00100-M-M7-DSU-0022
SCALE REV C
VIETNAM OIL AND GAS GROUP (PVN) POYRY ENERGY LTD
VIETNAM MACHINERY INSTALLATION CORPORATION (LILAMA)
-
COVER SHEET FOR AIR HEATERS SILOair heaters 18 kw