Uttar Pradesh State Roads Project Government of Uttar Pradesh

(Public Works Department)

Environmental Enhancement &

Monitoring Management

Environmental Enhancements

Environmental Enhancement

• OP 4.01 Additional positive actions are encouraged

• Why Road not as an Isolated entityAdd value to the Environment Enhance Environmental Quality of corridor/usersEnhance visual quality Generate goodwill amongst local community towardsthe project by enhancement of common property resourcesG.T. Road still a living example

• WhatPonds at RoadsideMore attractive & useful to local population

Road users who may take break from driving/Traveling

Temples/Shrines• Underlines the importance the project attaches to

the sentiments of host population

Environmental Enhancement

• HowIdentification at Design stageJoint Inspection by Deptt., NGO & Consultant

- Preliminary Assessment Public consultation by NGO

- Utility, willingness, ownership, suggestionsDesign , Drawing , Estimate by Supervision ConsultantExecution carried out by the contractors

Environmental Enhancement

Enhancements Sites in UPSRPUPG/01 UPG/02 UPG/03 UPG/04

Schools 1 2 1 2

Enhancement - - - 1

Relocation 13 2 3 6

Ponds 1(under

construction)

2(to be started)

-(recently dropped)

2(completed)

Shrines/Temples

Environmental EnhancementPONDS

UPG/04

Pond at km

21+648

Before Enhancement

Enhancement Under Progress

Environmental EnhancementPONDS

UPG/04

Pond at km

70+120

Before Enhancement

Enhancement Under Progress

Renovation of Sorahi Temple

The Sorahi Temple is said to be 350 years old built by DatiaNaresh. Presently, the GaytriPariwar, Jahanabad is looking after the Temple.

The Sorahi Temple is located at Ghatampur –Chudagarha Project Road (UPG 04) near Jahanabad at km 55+950

At Present

Environmental Enhancement

School before Boundary wall School after Boundary wall

School before Boundary wall School after Boundary wall

UPG/02UPG/02

UPG/03UPG/03

SCHOOL

Reaction of people about Enhancements

• Initially people were apprehensive at consultation stage about the enhancements.

• With subsequent consultations they agreed for the proposal.

• They provided all the support e,g, in storage of construction material in their premises and in removal of structures.

• Good rapport has been developed between people and PWD.

Monitoring Management

Environmental Monitoring

• WhatAir (SPM, RSPM, Lead,NOx,Sox,Co etc)Noise (Day , night)Water (pH, SS, BoD, CoD,TDS,Oil & grease, DO etc.)

• HowData sourcesData collection (Meteorological conditions, Methods , Accuracy)Presentable formats

Environmental Monitoring

• Objectives/Purpose

To know the Baseline (Air, water, Noise, soil, Flora, Fauna etc.)To observe the trendTo draw inferences (reduction in Sulphur in Diesel, Lead content, Technological substitutions)

Environmental MonitoringA

mbient A

ir Monitoring: UPG

/01

* One hourly value

At Construction Sites

March 2005 December 2005Parameters

NAAQS for Residential &

Rural and Other Areas

SPM (µg/m3) 200 µg/m3

100 µg/m3

80 µg/m3

80 µg/m3

-

4ppm

1 µg/m3

RSPM (µg/m3)

SO2 (µg/m3)

NOx (µg/m3)

HC (ppm)*

CO (ppm)*

Pb (µg/m3)

Near Madanapur

Village

Near Malawan

Camp

At Madanapur (km 17 –

18)

At GanjMoradab

ad (km 148-149)

324 372 378 401 411

- 122 115 139 152

79 10 8 9 8

68 16 15 14.5 13.6

- < 0.1 < 0.1 < 0.1 < 0.1

- < 0.1 < 0.1 < 0.1 < 0.1

- ND ND ND ND

Pre Construction Monitoring(Bilgram)

Environmental MonitoringSpecifications Locations

Drinking Water

(IS-10500)

Waste Water

(IS-3025)

Sample 1

Sample 2

Sample 3

Sample 4

pH 6.5 - 8.5 5.5 - 9.0 7.41 7.32 7.64 7.53

TDS (mg/l) 2000 --- 591 578 651 421

TSS (mg/l) --- 100 4 3 3 19

COD (mg/l) --- 250 5 6 8 25

DO (mg/l) --- --- 4.2 4.4 4.2 6.9

Oil & Grease (mg/l) --- 10 < 1 < 1 < 1 < 1

BOD, 3 days at 27oC, mg/l --- 30 < 1 < 1 < 1 7.6

Parameters

Sample 1 Katra (Ground Water from Hand Pump) Sample 2 Jalalabad (Ground Water from Hand Pump)Sample 3 Malawan (Ground Water from Bore well) Sample 4 Kalyani River (Surface Water)

Water QualityUPG/01

Environmental Monitoring UPG/01

0

10

20

30

40

50

60

70

Daytime Night time Daytime Night time

Leq dB(A), March 2005 Leq dB(A), December 2005

Bachelor Hostels Construction Site Near HMP & CrusherNear WMM Plant Limit

Am

bient Noise M

onitoring: UPG/01

Reporting system

Reports

• Monthly Environmental and Social Report

• Quarterly Environmental and Social Report

Contract wise Performance on Environmental Management Plan

0

50

100

150

200

250

300

350

400

Dec 2004 Mar 2005 Jun 2005 Sep 2005 Dec 2005

Quarter Ending

Scor

e

UPG/01 UPG/02 UPG/03 UPG/04

Management Information system

Identification of potential enhancement spots

List of activities involved in enhancement process

Monthly Progress

Activity wise up-to-date progress

Up to date progress can be viewed at any point of time

Activities involved & Time frame for main module

# Requirement gathering from end user 1 months

# System Design 1 months

# System Development 1.5 months

# Testing 15 days

# Deployment 5 days

# Training 7days

# Updating Continuous process

Activities involved & Time frame for any additional module

# Requirement gathering from end user 3 days

# System Design 3 days

# System Development 7 days

# Testing 3 days

# Deployment 2 days

# Training 2 days

# Updating Continuous process

Screen for Air Monitoring report

Pivot Table – Various views can be generated for analysis purpose

Utility of Information system

• Planning• Monitoring• Impact assessment• Analyzing data• Forecasting• Caters the need of end users

S.K. Yadav

PIU,UPSRP