usman bhatti cv updated 16-oct-16 (2)

8
CurriculumVitae Muhammad Usman Bhatti Permanent Address: 13, Usman block sheryar street canal bank scheme, fateh garh Mughalpura, Lahore, Pakistan MATERIAL COORDINATOR / CONTROLLER SUPERVISOR TURN ARROUND Pakistan Postal Code # 54000. Contact # +971-556257280, +971502349461, +923447086100 TECHNICAL EXPERIENCE: (21 YEARS ) In Logistic Supply Chain Management PROFESSIONAL EXPERIENCE

Upload: musman-bhatti

Post on 21-Jan-2017

29 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Usman Bhatti CV Updated 16-OCT-16 (2)

CurriculumVitae

Muhammad Usman Bhatti

Permanent Address:13, Usman block sheryar street canal bank scheme, fateh garh Mughalpura, Lahore, Pakistan

MATERIAL COORDINATOR / CONTROLLER SUPERVISOR TURN ARROUND

Pakistan

Postal Code # 54000.

Contact # +971-556257280, +971502349461, +923447086100

TECHNICAL EXPERIENCE: (21 YEARS ) In Logistic Supply Chain Management

PROFESSIONAL EXPERIENCE

1. DESIGNATION: Material Coordinator E &P Supervisor (Shut Down)

Page 2: Usman Bhatti CV Updated 16-OCT-16 (2)

COMPANY: FERTIL Ruwais Fertilizer Industries, ABUDHABI (UAE) CONTRACTOR: DOOSAN BABCOCK Ltd.

Working as a Material Coordinator E &P Supervisor (Shut Down) at FERTIL Ruwais Fertilizer Industries ABU DHABI From 04-OCT- 2016 to Still Continue…

2. DESIGNATION: Material Coordinator Officer

COMPANY: ADGAS, DAS ISLAND, ABUDHABI (UAE)

CONTRACTOR: Qatar Engineering & Construction Company. LLC

Working as a Material Coordinator Officer at DAS ISLAND ABU DHABI (ADGAS - TA – 2016 – Train 02 and Boiler 03, 04 LNG PLANT)

OVERSEES COMPANIES WORKING TOGETHER

QCON Engineering & Construction Company Abu Dhabi,

EKL Engineering kinetics Abu Dhabi, G.S E & C Company (KORIEA), Deutsche Babcock Energies (GERMANY), Descon Engineering (UAE), Bechtel Ruwais, Technimount Ruwais, Highway Bridges Construction International, Marubeni Corporation PARCO Mid Country Oil Refinery Project, J.G.C. (G.T.P.S). Wapda Kot Addu, Parco (PARCO Oil Refinery) Kusba Gujarat, A.E.S. Lal Pir Thermal Power Station, SNC, WORLY PEOPLE, SNAM,

Company: FTF Design & Consultants (PVT) Limited 

Duration: 20/ May/ 2016 to 01/OCT/2016

Position: Procurement & Purchase officer

Project: Office # 5, 2nd Floor, Zainab Tower, Link Road Model Town, Lahore.

Company: Qatar Engineering & Construction QCON. Duration: 26/ DEC/ 2015 to 17/MAY/2016

Position: Material Coordinator Officer

Project: DAS ISLAND Abu Dhabi UAE.

Page 3: Usman Bhatti CV Updated 16-OCT-16 (2)

Client: ADGAS

1- Execute inventory control measures to ensure the company minimizes stock holding and maximizes stock system and paperwork accuracy.

2-The role carries responsibility for working with purchasing, goods inwards and dispatch to ensure necessary functions are carried out correctly

The job role may include other reasonable duties/tasks from time to time. The position does not carry any supervisory or management responsibility

Receiving/issuance of all sanitary ware and tiles. Track product history and transaction details through the system To ensure items are properly located for easy tracking and related

Information is generated swiftly. Investigate items lying in the sin bin container and take appropriate steps To ensure the items are placed in the right location in the systems. Execute Random audits at location and on product levels and tally with

company System. Control/restrict material transaction for warehouse Staff using user

defined Status control to ensure Picking/Dispatch/Receiving is carried out

smoothly and efficiently. Prepare necessary reports on stock counts, inbound & outbound status

reports Stock movement, aging report and any other reports as required by the

finance. Ensure proper codes are assigned to all the item Arranging delivery of building material to the customer site Supervision of storekeeper/warehouseman. Making the receiving inspection report (RIR) Making the receiving note (RN) Arranging inventory control system Updating stock time to time Sending stock items report to finance & purchasing Conducting audit once in a year Keeping records of RIR, RN, MRN,GRN Act as store and receiving head for all the materials. Supervision of all buyers/planner. Sending monthly inventory report to warehouse & purchasing manager.

Company: Civil Aviation Authority. (CAA) Duration: 17/ MAY/ 2015 to 24/DEC/2015

Position: HVAC Coordinator

Page 4: Usman Bhatti CV Updated 16-OCT-16 (2)

Project: Multan International Airport.

Client: CAA

Company: Qatar Engineering & Construction QCON. Duration: 29/ JAN/ 2015 to 27/APR/2015

Position: Material Coordinator Officer

Project: DAS ISLAND Abu Dhabi UAE.

Client: ADGAS

Role & Responsibility:

Issued Material of Piping, Structural, Mechanical, Vessel, Boiler , Flare, etc, Instrument, Modules (etc) from Client Ware House. Shifting The Material Department wise on Site and Internal Ware House. Doing Inventory of Material Shipment & Packages. Segregation of Material. Re Cancellation of Material to Client. Dismantling of Fabricated & Erected Material. Proper Documentation of Issued & Returned Material. Handling Power House, Oil & Gas field Plant, Fertilizer Plant Material e.g.

Company Engineering kinetics co EKL Duration: 03/ MAY/ 2013 to 03/MAY/2014

Position: Material Coordinator Officer

Project: RSHT- 2 (Rawais Sulphur Handing terminal 2) UAE

Client: Gasco / AJES

Company G.S E & C Company

Page 5: Usman Bhatti CV Updated 16-OCT-16 (2)

Duration: 21/ SEP/ 2011 to 07/FEB/2013

Position: Material Coordinator

Project: RRE 2 (Rawais Refinery Expansion) UAE

Company: Deutsche Babcock Energies

Duration: 15 April, 2009 to 03 Nov, 2010

Position: Material Coordinator

Project: EMAL (Emirates Aluminum Smelter Complex) UAE

Role & Responsibility:

Issued Material of Piping, Structural, Mechanical, Vessel, Boiler , Flare, etc, Instrument, Modules (etc) from Client Ware House. Shifting The Material Department wise on Site and Internal Ware House. Doing Inventory of Material Shipment & Packages. Segregation of Material. Re Cancellation of Material to Client. Dismantling of Fabricated & Erected Material. Proper Documentation of Issued & Returned Material. Handling Power House, Oil & Gas field Plant, Fertilizer Plant Material e.g.

Company Descon Engineering UAE

Duration: 15 April, 1998 to 03 June 2000

Position: Material Coordinator

Projects: Bechtel Ruwais Fertilizer Plant Abu Dhabi U.A.E

Asab Gas Development Project Abu Dhabi

Technimount Ruwais Abu Dhabi U.A.E

Role & Responsibility:

Issued Material of Piping, Structural, Mechanical, Vessel, Boiler , Flare, etc Instrument, Modules (etc) from Client Ware House. Shifting The Material Department wise on Site and Internal Ware House. Doing Inventory of Material Shipment & Packages. Segregation of Material.

Page 6: Usman Bhatti CV Updated 16-OCT-16 (2)

Re Cancellation of Material to Client. Dismantling of Fabricated & Erected Material. Proper Documentation of Issued & Returned Material. Handling Power House, Oil & Gas field Plant, Fertilizer Plant Material.

NATIVE EXPERIENCE

Company Highway Bridges Construction International

Duration: 01 April, 1996 to 01 December, 1996

Position: Camp Supervisor (Parco Oil Refinery)

Company Marubeni Corporation PARCO. Mid Country Oil Refinery Project

Duration: 01 Jan, 1997 to 01 November, 1997

Position: Led Man

Role & Responsibility:

Issued Material of Piping, Structural, Mechanical, Vessel, Boiler , Flare, etc, Instrument, Modules (etc) from Client Ware House. Shifting The Material Department wise on Site and Internal Ware House. Doing Inventory of Material Shipment & Packages. Segregation of Material. Re Cancellation of Material to Client. Dismantling of Fabricated & Erected Material. Proper Documentation of Issued & Returned Material. Handling Power House, Oil & Gas field Plant, Fertilizer Plant Material.

Company Descon Engineering UAE

Duration: 08 Jan, 1992 to 03 March 1996.

Position: Material Coordinator/Asst Planner/Lead Man

Projects: ECPL Plant Expansion Project no: 3059 Daharki

Goth Machi Project No: 1023.

Parco (PARCO Oil Refinery) Kusba Gujarat

J.G.C. (G.T.P.S). Wapda Kot Addu, Project no: 1033, 1042

Shut Down Experience:

Page 7: Usman Bhatti CV Updated 16-OCT-16 (2)

Company: Descon Engineering

Duration: 01 Aug, 2001 to 13 Nov, 2007

Position: Material Coordinator/Fabricator A

Duration: Nov, 2010 to Dec, 2010—To --2014

Client: A.E.S. Lal Pir Thermal Power Station