Page 1: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

Using Reliability Centered Maintenance to Reduce Risk in the Manufacturing Process

Gary Josebeck, ASQ CRE, CMRP

Page 2: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

“Risk-Based Thinking” in the new ISO 9001:2015 standard.

FMECA: This “Risk-Based Thinking” approach to Asset Management

Implementing the FMECA Strategy

Managing the FMECA results

Q&A

Page 3: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

Risk-Based Thinking

Risk-Based Thinking

Risk-Based Thinking

Risk-Based Thinking

Risk-Based Thinking

Risk-Based Thinking

Risk-Based Thinking

Risk-Based Thinking

Risk-Based Thinking

Page 4: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

“ISO…calls for action to address risks…, but does not require risk management, risk assessment, or risk treatment.” (Desai & Briggs, 2015)

“…must apply “risk-based thinking” in their internal environments.” “ISO 9001:2015 allows …the flexibility to apply as little [or as much] effort as is needed”. (Robitaille, 2015)

Page 5: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

“Clauses 6.1.1 and 6.1.2 say organizations must ‘determine the risks and opportunities’ that must be addressed to ensure the QMS can: ◦ ‘Achieve its intended results

◦ Prevent or reduce undesired effects

◦ Achieve continual improvement’”

(Anonymous, 2014)

Page 6: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

ISO 9001:2015 defines Risk as: ◦ “The effect of uncertainty on an expected result”

OR…. ◦ “Combination of the probability of an event and its

consequence. (Anonymous, 2009)

Page 8: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 9: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

http://www.rogerdanielsalignment.com/brake-system-maintenance-tips/index.html

Page 10: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

http://www.rogerdanielsalignment.com/brake-system-maintenance-tips/index.html

Page 11: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 12: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 13: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 14: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 15: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 16: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 17: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 18: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 19: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 20: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 21: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 22: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 23: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 24: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 25: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 26: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 27: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 28: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 30: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 31: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 32: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard
Page 33: Using Reliability Centered Maintenance to Reduce Risk in ... · Gary Josebeck, ASQ CRE, CMRP “Risk-Based Thinking” in the new ISO 9001:2015 standard

Robitaille, D. (2015). Consider Risk. Quality Progress. Retrieved from http://www.qualityprogress.com

Desai, D & Briggs, S. (2015). Prepare for a New Structure. Quality Progress. Retrieved from http://www.qualityprogress.com

Aston, B. (2015). Determine Your Documentation Needs. Quality Progress. Retrieved from http://www.qualityprogress.com

Gluck, A. (2015). ISO 31000 Guides Risk-Based Thinking. Quality Progress. Retrieved from http://www.qualityprogress.com

Anonymous. (2014) ISO 9001:2015 specifically addresses risk. Is your organization

ready?. S.Q.S.S. Retrieved from http://www.sqss.gr//en/new/575-iso-9001

Anonymous. (2009). Risk-based Inspection. American Petroleum Institute