using planner workbench navigator_spd
TRANSCRIPT
-
8/14/2019 Using Planner Workbench Navigator_SPD
1/12
System Process DocumentUsing Planner Workbench Navigator
Department
Responsibility/Role
File Name 27637620.docRevision
Document Generation Date 15/01/2010 09:45:00
Date Modified 1/15/2010 09:45:00 AM
Last Changed by
Status
Using Planner Workbench Navigator
Trigger:
Concept
In this topic, you will navigate to the main Planner Workbench page.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/15/2010 09:45:00 AM Page 1
-
8/14/2019 Using Planner Workbench Navigator_SPD
2/12
System Process DocumentUsing Planner Workbench Navigator
Procedure
Step Action
1. Begin by navigating to the Planner Workbench page.
Double-click the Workbench link.
Page 2 Last changed on: 1/15/2010 09:45:00 AM
-
8/14/2019 Using Planner Workbench Navigator_SPD
3/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
2. Use the Organizations page to select an instance:organization.
Last changed on: 1/15/2010 09:45:00 AM Page 3
-
8/14/2019 Using Planner Workbench Navigator_SPD
4/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
3. Find organization TST:M1 TST:Seattle Manufacturing.
Click the vertical scrollbar.
Step Action
4. Click the TST:M1 TST:Seattle Manufacturing list item.
Page 4 Last changed on: 1/15/2010 09:45:00 AM
-
8/14/2019 Using Planner Workbench Navigator_SPD
5/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
5. Click the OKbutton.
orPress [Alt+O].
Last changed on: 1/15/2010 09:45:00 AM Page 5
-
8/14/2019 Using Planner Workbench Navigator_SPD
6/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
6. Click the Plans tab.
Step Action
7. Use the Navigator page, Plans tab to view and act on results from the
material/capacity plan.
Page 6 Last changed on: 1/15/2010 09:45:00 AM
-
8/14/2019 Using Planner Workbench Navigator_SPD
7/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
8. Click the View By list.
Last changed on: 1/15/2010 09:45:00 AM Page 7
-
8/14/2019 Using Planner Workbench Navigator_SPD
8/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
9. Use the View By populist to specify how to see the hierarchy of entities in each
plan.
Click the Organizations list item.
Step Action
10. The Plans hierarchy displays the material/capacity plans available for review in
this organization.
Page 8 Last changed on: 1/15/2010 09:45:00 AM
-
8/14/2019 Using Planner Workbench Navigator_SPD
9/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
11. Select the plan whose details you want to see.
Click the Const-Cap (Constrained Plan - Capacity) tree item.
Last changed on: 1/15/2010 09:45:00 AM Page 9
-
8/14/2019 Using Planner Workbench Navigator_SPD
10/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
12. Since View By is Organizations, the planned organizations of this plan display next
in the hierarchy.
Click the TST:D2 tree item.
Step Action
13. Product groups display next.
Click the COMPUTER.HANDHELD (Handheld Computers and PDAs) tree
item.
Page 10 Last changed on: 1/15/2010 09:45:00 AM
-
8/14/2019 Using Planner Workbench Navigator_SPD
11/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
14. Items display next.
Click the AS66311 (Vision Pad DX - Mobile Computer) tree item.
Last changed on: 1/15/2010 09:45:00 AM Page 11
-
8/14/2019 Using Planner Workbench Navigator_SPD
12/12
System Process DocumentUsing Planner Workbench Navigator
Step Action
15. The final level to display is the Supplier.
Step Action
16. You have successfully navigated to the main window of Planner Workbench.
End of Procedure.
Page 12 Last changed on: 1/15/2010 09:45:00 AM