Using GIS to Assess Risk and Prioritize Storm Sewer Maintenance,
Repair and Replacement
CEAM Conference January 27, 2016
Janna Kieffer, P.E. Barr Engineering Co.
Liz Stout, P.E. City of Minneapolis
![Page 2: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/2.jpg)
Agenda • History of storm sewer management • Objectives of the project • Project approach • Next steps
![Page 3: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/3.jpg)
History of storm sewer management
• Where we started – Mapping:
![Page 4: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/4.jpg)
History of storm sewer management
• Next step-Electronic mapping – Clearer and easier to read but not much more
helpful
![Page 5: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/5.jpg)
History of storm sewer management
• Mapping update into GIS - Goals
• Asset Management • MS4 requirements • Updated stormwater modeling
![Page 6: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/6.jpg)
History of storm sewer management
• Field Data Collection • Pipes:
• size, type, invert elevations, outlet and inlet type
• Structures: • Diameter, type, depth, condition
• We had a lot of data…
![Page 7: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/7.jpg)
History of storm sewer management
• Met the city’s primary goals: – Asset management
• Now using a software called CityWorks for work orders and maintenance records
– MS4 Requirements • System is mapped and spill vectors to receiving
waters are known – H&H modeling
• Flood areas have been mapped and pipe upgrades have been identified
![Page 8: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/8.jpg)
History of Storm Sewer Management
• Maintenance – Reactive: When there was a catastrophic pipe failure
creating a public nuisance, flooding or a sink-hole
![Page 9: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/9.jpg)
History of storm sewer management
We had a lot of data…BUT What we didn’t have: – Televising data for storm sewer – Field inspections and conditions of our pipes
![Page 10: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/10.jpg)
Objectives of this project
Use existing data to create a simple, cost effective analysis • Target areas for inspections • Target critical areas for replacement/lining • Create a logical CIP program • Minimize emergency maintenance
![Page 11: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/11.jpg)
Simplified approach to evaluating storm sewer fa ilure risk
Storm Sewer Failure Risk
Likelihood of Failure
Consequences of Failure
![Page 12: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/12.jpg)
Storm Sewer Failure Risk
Likelihood of Failure
Consequences of Failure
Simplified approach to evaluating storm sewer fa ilure risk
![Page 13: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/13.jpg)
Key factors affecting the likelihood of pipe fa ilure
– Pipe age – Pipe material – Susceptibility to corrosion – Susceptibility to abrasion – Joint separation
![Page 14: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/14.jpg)
Pipe age and material can affect fa ilure likelihood
– Pipe age- not historically tracked by City – Pipe material
• Vitrified Clay Pipe (VCP) • Metal (CMP, CIP, CSP, DIP) • Plastic • Reinforced Concrete
![Page 15: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/15.jpg)
Storm sewer materials in Minnetonka
![Page 16: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/16.jpg)
Soil properties affect failure likelihood
• Soil properties- from NRCS web soil survey – Corrosive soils- steel, concrete – Load supporting capacity
![Page 17: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/17.jpg)
![Page 18: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/18.jpg)
![Page 19: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/19.jpg)
Example: risk of steel corrosion (from NR C S web soil survey)
High Risk Moderate Risk
![Page 20: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/20.jpg)
Ground slope can also affect failure likelihood
-Add GIS graphic on ground slope
• Steep slopes identified – Somewhat steep (4:1 to
2:1 slopes) – Steep (2:1 to 1:1 slopes) – Very Steep (>1:1 slopes)
![Page 21: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/21.jpg)
Failure likelihood rating system
Factors used in Minnetonka rating system equation: • Pipe material • Corrosion risk • Soil structural support capacity • Ground slope
![Page 22: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/22.jpg)
Distribution of failure likelihood ratings
Top 10%
Top 2% -Most pipes in top 10% are metal or vitrified clay -Some RCP pipes w/steep slopes are in top 10% -All pipes in top 2% are metal or vitrified clay
![Page 23: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/23.jpg)
![Page 24: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/24.jpg)
![Page 25: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/25.jpg)
Top 10% Failure Likelihood - CMP - Soils w/high
corrosivity
Top 2% Failure Likelihood - CMP - Soils w/high
corrosivity - Steep Slope
![Page 26: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/26.jpg)
Storm Sewer Failure Risk
Likelihood of Failure
Consequences of Failure
Simplified approach to evaluating storm sewer fa ilure risk
![Page 27: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/27.jpg)
Potential consequences of pipe failure
www.dewattoport.com
• Four “consequence” scenarios considered: 1. Failure that results in significant
pooling/inundation 1. Failure at road crossing- potential road washout
![Page 28: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/28.jpg)
Potential consequences of pipe failure
• Four “consequence” scenarios considered:
3. Failures at steep slopes-
potential landslide/washout
3. Failures that impact
critical structures
![Page 29: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/29.jpg)
Failure causing significant pooling/inundation
![Page 30: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/30.jpg)
Example: Holiday-W ing-R ose C ha in of La kes
![Page 31: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/31.jpg)
Step 1- determine trunk storm sewer
![Page 32: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/32.jpg)
Step 1- determine trunk storm sewer
Wing Lake
![Page 33: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/33.jpg)
S tep 2- ma p potentia l inunda tion a rea s
![Page 34: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/34.jpg)
S tep 3- determine # of potentia lly impa cted structures
![Page 35: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/35.jpg)
Step 3- determine # of potentia lly impa cted structures
![Page 36: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/36.jpg)
Failure causing significant pooling/inundation
![Page 37: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/37.jpg)
Failure causing significant pooling/inundation
• Factors considered in scoring system – Trunk storm sewer identified – Inundation areas mapped – # of structures within inundation areas identified – Scoring based on number of potentially inundated
structures
![Page 39: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/39.jpg)
Failure at road crossing- potentia l roa d wa sh-out
• Step 1: Identify pipes that cross a roadway or railway (3500 of 11,000)
![Page 40: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/40.jpg)
Failure at road crossing- potentia l roa d wa sh-out
• Are these pipes part of the trunk storm sewer system?
• Are these pipes large (high flow capacity)?
![Page 41: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/41.jpg)
Failure at road crossing- potentia l roa d wa sh-out
• Crossings under “critical” roadways (major roads or evacuation routes)?
• Crossings under
railways?
![Page 42: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/42.jpg)
Failure at road crossing- potentia l roa d wa sh-out
• Does the
crossing have a high likelihood of overtopping based on flood elevations?
![Page 43: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/43.jpg)
Failure at road crossing- potentia l roa d wa sh-out
• Does the crossing embankment have steep
side slopes, increasing potential for wash-out?
![Page 44: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/44.jpg)
Failure at road crossing- potentia l roa d wa sh-out
Top 2% Failure Consequences - Road crossing - Trunk system - Critical roadway - Somewhat steep - Overtopping likely
![Page 45: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/45.jpg)
• Steep slopes identified – Somewhat steep (4:1 to
2:1 slopes) – Steep (2:1 to 1:1 slopes) – Very Steep (>1:1 slopes)
Consequences of pipe failure on steep slopes (increased slope failure risk)
• Scoring based on steepness and pipe size
![Page 46: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/46.jpg)
Consequences of pipe failure on steep slopes (increa sed slope fa ilure risk)
![Page 47: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/47.jpg)
Failure near critical infrastructure
Identified storm sewer located near: – critical roadways and emergency routes – critical structures
![Page 48: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/48.jpg)
What are the consequences of pipe fa ilure?
• Maximum rating of four primary “consequence” scenarios used as consequence rating – Failure at road crossing – Failure that results in significant pooling/inundation – Failure at steep slope – Failure that impacts critical structures
![Page 49: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/49.jpg)
Distribution of failure consequence ra tings
Top 10%
Top 2%
![Page 50: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/50.jpg)
Storm Sewer Failure Risk
Likelihood of Failure
Consequences of Failure
Combined storm sewer failure risk
• Rating scales normalized to compute combined risk
![Page 51: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/51.jpg)
GIS maps identify locations with highest fa ilure risk
![Page 52: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/52.jpg)
GIS data includes attributes used for fa ilure risk ra ting system
![Page 53: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/53.jpg)
Outcomes of storm sewer failure risk a na lysis
Pipes with highest combined risk rating have high failure likelihood AND high consequences
– these pipes should be prioritized for inspection and/or replacement
Some pipes with high failure consequences do not have high overall risk
– primarily concrete or plastic material (lower failure likelihood)
– City should consider inspecting these pipes periodically
![Page 54: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/54.jpg)
Project deliverables assist City with inspection progra m development
• Failure likelihood map with top 2% and top 10% flagged
• Failure consequence map with top 2% and top 10% flagged
• Combined failure risk map with top 2% and top 10% flagged
• Storm sewer database with scoring system
• GIS layers
![Page 55: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/55.jpg)
Next steps
1. Fill in details on unidentified pipe types 2. Pipes rated in top 2% - utilize existing staff to
evaluate actual pipe condition in the field. 3. Establish dedicated funding on an annual basis
to line or replace failing or deteriorating pipes. 4. Use data in conjunction with pavement
management data and water and sewer replacement schedule to coordinate replacements with road reconstructions.
![Page 56: Using GIS to Assess Risk and Prioritize Storm Sewer ...D96B0887-4D81-47D5-AA86-9D2FB8BC0… · Prioritize Storm Sewer Maintenance, Repair and Replacement ... the city has 1,200](https://reader033.vdocuments.mx/reader033/viewer/2022052711/5ab78d5d7f8b9ad5338bb24f/html5/thumbnails/56.jpg)
Questions?
Janna Kieffer, P.E. Barr Engineering Co. [email protected]
Liz Stout, P.E. City of Minneapolis [email protected]