usfs aviation program 5 th year of legacy (p2v) airtanker contract eis study and use of fire...

12

Upload: trevor-lawrence

Post on 14-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation
Page 2: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation
Page 3: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation
Page 4: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation
Page 5: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

USFS Aviation Program

• 5th Year of Legacy (P2V) Airtanker Contract

• EIS study and use of fire chemicals

• Larger AT strategy to OMB -> Congress

• Evaluation of small numbers of Waterscoopers

Page 6: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

HelicoptersNatl Contracts

Large Fire Support award for 2012

expect 30IA 34 thru 2012

Page 7: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

WaterscoopersFS Plans to Evaluate in 2012

Number Unknown but small

Tie in with DOI on their Contracts

Page 8: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

Smokejumper4 Contract - West, NCSB,Grangeville, ReddingAdditional?

Agency Aircraft – 4 C-23 Sherpa2 DHC-6 Twin Otter2 TDC-3

Page 9: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

Airtankers• Large Airtanker Contract

11 P2Vs **• VLAT Contract

1 DC-10• Next Generation Contract

up to 3 in 20124 additional 2013

• Cooperator Aircraft3 Convair 580s

• CIFFC/NIFC Agreement5 Convair 580s

• MAFFS - 8 SystemsBPA MechanicsSupport EquipmentDepot Level Support

Page 10: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

Airtanker Availability

Tanker 2 MAP MAP

Make/Model Days Start Date 1

T-48, P2V-7 N4692A

T-55, P2V-7 N355MA

T-06, P2V-5 N9855F

T-12, P2V-5 N96264

140 21-Apr 30-Sep Friday

Thursday

22-Oct Tuesday

2-May

T-05, - P2V-5F N96278

140 25-May 4-NovT-10, P2V-7 N4235N

160

7-Oct Monday

11-Oct

T-44, P2V-5F N1386C

140 1-May 10-Oct Saturday

Sunday

T-11, P2V7 N14447

140 16-May

T-07, P2V-5F N807NA

140

T-43, P2V-7 N443NA

150 15-Mar 4-Sep Wednesday

160 5-Apr

160 31-Mar 2-Oct Friday

1-Mar 3-Sep Sunday

180 15-Feb 10-Sep Tuesday

T-45, P2V7 N445NA

160 26-Feb 29-Aug Saturday

MAP END

DATE 1

DAY OFF 1

12-Mar 4 412-Apr 7 7

12-May 11 1212-Jun 11 1612-Jul 11 19

12-Aug 13 1912-Sep 14 1912-Oct 11 1412-Nov 7 612-Dec 1 1

Potential for MAFFS Surge May-Sep

LATs in 2012 and Historical

Cooperator, CIFFC/NIFC, Other

Page 11: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

Approved MAFFS Tanker Bases(Approval level: R=reload, H=hub, F=full activation)

• Approved• ABQ Albuquerque, NM R/H/F• BJC Jeffco, CO R• BOI Boise, ID R/H/F• CDC Cedar City, UT R• DRO Durango, CO R• FAT Fresno, CA R• GJT Grand Junction, CO R• HIF Hill AFB, UT R• INW Phoenix-Gateway, AZ R/H/F• LMT Klamath Falls, OR R/H/F• PIH Pocatello, ID R• PRB Paso Robles, CA R• PRC Prescott, AZ R• PUB Pueblo, CO R• ROW Roswell, NM R• SBD San Bernardino, CA R/H/F• SMX Santa Maria, CA R• TWF Twin Falls, ID R• CIC Chico, CA R• WJF Lancaster, CA R

• Activation Sites (no existing pit capability)• AUS Austin-Bergstrom, TX F• COS Peterson AFB, CO H/F• CYS Cheyenne ANGS, WY H/F• DLF Laughlin AFB, TX F• DYS Dyess AFB, TX F• GYH Donaldson Center, SC F• MCC McClellan, CA H/F• NTD Channel Is ANGS, CA H/F• • Awaiting Review• MWH Moses Lake, WA R/H/F• RDM Redmond, OR R• VCV Victorville, CA R• PAFB Wainwright AAF R/H/F• RTS Reno Stead R• ISO Kinston R/H/F• BIL or HLN (Montana) R/H/F• HIB or Ely (Minnesota)

18 Apr 2012

Page 12: USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation

Questions ?Discussion