users’ office news
DESCRIPTION
Users’ Office News. Chris Onions ACCU June 10 th , 2009. Issue of Cartes de legitimation type P. The DocLeg system was used for the first user (USER/UPAS) requests for the new “Cartes de legitimation of type P” on April 6 th - PowerPoint PPT PresentationTRANSCRIPT
Users’ Office News
Chris Onions
ACCU
June 10th, 2009
22/04/23 2
Issue of Cartes de legitimation type P
• The DocLeg system was used for the first user (USER/UPAS) requests for the new “Cartes de legitimation of type P” on April 6th
• “Attestations de Fonctions (AF)” are now being replaced at CERN contract renewal time
• 210 cards have been issued for users (as of last week)
22/04/23 3
Issue of Cartes de legitimation type P (2)
• Starting to inform USERs of the possibility of replacing the AFs before contract renewal– Users are being invited by e-mail to choose a time
slot for an appointment – Started with AFs expiring in 2011 (Jan, Feb, Mar, Apr)
• Reminder– Credit card format (see next slide)
– Family members now receive individual cards with photos (must be taken at building 55)
– The User must come to the Users’ Office to collect and sign the card
– The e-mail warning of contract end informs users of the steps to take
Example of card
22/04/23 4
Carte réservée au personnel scientifique du CERN et famille Carte de légitimation de type "P" (à bande bleue avec une barre blanche)
Ci permits
• The new CL gives the right for family members residing with a user in Switzerland to obtain a Ci permit
• Children must have entered CH and been in possession of an AF or CL before the age of 21
22/04/23 5
Ci permits - procedure
• Complete a DEMANDE D'ATTESTATION ("Permis Ci")
• Write a cover letter to the Swiss Mission
The above can be obtained from the Users’ Office
• The Swiss Mission sends the attestation to the home address of the user
22/04/23 6
Ci permits – procedure (2)
• When the family member finds a job, they must go to the OCP with:– The “DEMANDE D'ATTESTATION”– Their CL
• The OCP will deliver a Ci permit, in exchange for the CL
• If the family member has another Swiss permit (e.g. B permit) it must be exchanged for a Ci permit
22/04/23 7
Ci permits – procedure (3)
• The Ci permit is only valid up to the end of validity of the CL
• If the CL is extended, the Ci permit can then be extended at the OCP
• At the end of the CERN contract, all family members must return their CLs and any Ci permits
22/04/23 8
22/04/23 9
Pre-Registration Tool (PRT)
• Docleg took priority
• Work should re-start on this soon
• introduction not before Autumn
Termination of contracts
• When a User does not extend their CERN contract we give them a grace period before terminating the contract
• Now that a User can renew via EDH remotely, this grace period is gradually being reduced
• The User’s CERN access card is in any case invalid after the contract end date
22/04/23 10
Invitation letters/visas
• The list of signatories for official invitation letters has been updated
• Each LHC experiment now has a person who can sign
• The model invitation letters on the Relations with the Host States Service website have been updated– The text has been adapted to changes
following Switzerland joining Schengen22/04/23 11
22/04/23 12
Miscellaneous
• Important changes made recently on the web site:– Visa information updated– Document “Before Coming to CERN”
updated accordingly
• Users’ Office webcam replaced– Password now required, seehttp://cern.ch/ph-dep-UsersOffice/Webcam.htm
Users’ Office 20th Anniversary
• The Users’ Office was set up in July 1989
• We will celebrate the 20th anniversary on Tuesday, September 8th, the day before the next ACCU
• ACCU delegates will be invited
22/04/23 13
Safety courses
• The safety video shown in building 55 was suppressed at the end of March
• The new safety course for newcomers is obligatory for access to the CERN sites and is now available online:– With AIS login: accessible from any computer (office,
home, etc.) on SIR (Safety Information Registration, http://sir.cern.ch )
– Without AIS login: some freely accessible computers are available at the kiosk on the ground floor of building 55, R-002 (CERN access card required)
22/04/23 14
Safety courses (2)
• The 3 levels available online:– level 1 : Safety at CERN– level 2 : General risks– level 3 : Specific risks
• The set “level 1 and 2” (Basic Safety), is obligatory for all.
• Level 3 is obligatory for all except administrative staff
22/04/23 15