use and installation · 2020-04-03 · when the circuit counter reaches the count of 2,800 minutes,...

24
USE AND INSTALLATION

Upload: others

Post on 08-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

USE AND INSTALLATION

Page 2: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

WARNING: This equipment requires regular maintenance to ensure the treated water’s potability; use it according to the user guide.

Page 3: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

3

USE AND INSTALLATION | ZERO

DIMENSIONS

Page 4: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

4

ZERO | USE AND INSTALLATION

Pipe8X6 mm

2 m 6.56 ft

9300733

Pipe ¼”

1 m3.28 ft

9300522

T-fitting F/F/M

1 piece

9400334

Straight M adapter3/8”

1 piece

9300258

M/Fmini ball valve M/F

1 piece

9400300

Stem elbow ¼”

1 piece

9300728

Straight female connector

2 pieces

9300734

Gooseneck faucet kit

1 piece

XO0001BTW

Drain clampkit

1 piece

1100137

Straight female adapter

1 piece

9300651

Stem elbow 8 mm

2 pieces

9300735

O-ring 3021

1 piece

1100223

COMPONENT LIST

Page 5: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

5

USE AND INSTALLATION | ZERO

INSTALLATION SCHEME

Correct positioning of the device

drain

drain

mix

in

in

out

out

Page 6: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

6

ZERO | USE AND INSTALLATION

INSTALLATION

Before the installation, remove the yellow IN and OUT plugs as well as the DRAIN plug, which is to be inserted again in case the device is relocated

1

2

Drain plug extraction

1. Keep the collet pressed down

2. Take out the plug

Page 7: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

7

USE AND INSTALLATION | ZERO

Drain clamp kit

1 piece

Pipe ¼”

just enough

Stem elbow ¼”

1 piece

DHI

Gasket

Drain clamp kit assembly

DRAIN CIRCUIT INSTALLATION

Page 8: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

8

ZERO | USE AND INSTALLATION

1/3

2/3

Drill ø 6 mm / 15/64”

DRAIN CIRCUIT INSTALLATION

Page 9: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

9

USE AND INSTALLATION | ZERO

3/3

D

H

I

DRAIN CIRCUIT INSTALLATION

drain

Page 10: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

10

ZERO | USE AND INSTALLATION

T-fitting F/F/M

1 piece

Mini ball valve M/F

1 piece

Straight female connector

1 piece

Pipe8X6 mm

just enough

Stem elbow 8 mm

2 pieces

B CA F G E

INLET CIRCUIT INSTALLATION

Straight M adapter 3/8”

1 piece

Page 11: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

11

USE AND INSTALLATION | ZERO

INLET CIRCUIT INSTALLATION

Before installation, ensure to turn off the cold water valve

CLOSE

PLEASE NOTE! Before installation, cover with Teflon Tape (not included).

Page 12: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

12

ZERO | USE AND INSTALLATION

1/4

2/4

A

B C

Cold water pipe

INLET CIRCUIT INSTALLATION

PLEASE NOTE! Before installation, cover with Teflon Tape (not included).

PLEASE NOTE! Before installation, cover with Teflon Tape (not included).

Page 13: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

13

USE AND INSTALLATION | ZERO

3/4

4/4

G

E

F

INLET CIRCUIT INSTALLATION

in

Page 14: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

14

ZERO | USE AND INSTALLATION

Fixing nut

1 piece

Toothed washer

1 piece

Plastic washer

1 piece

Rubber gasket

1 piece

Spacer with o-ring

1+1 pieces

54321

Faucet

1 piece

For the faucet working instructions, see page 18.

L

FAUCET INSTALLATION

Page 15: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

15

USE AND INSTALLATION | ZERO

1/2

2/2

L

1

54

32

FAUCET INSTALLATION

Drill ø 12 mm / 15/32”

Page 16: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

16

ZERO | USE AND INSTALLATION

O-ring 3021

1 piece

Straight female adapter

1 piece

Pipe8X6 mm

justenough

Stem elbow 8 mm

1 piece

Straight female connector

1 piece

K J G E F

OUTLET CIRCUIT INSTALLATION

Page 17: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

17

USE AND INSTALLATION | ZERO

out

K J G E

F

OUTLET CIRCUIT INSTALLATION

1/2

2/2

Page 18: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

18

ZERO | USE AND INSTALLATION

red light 7 sec

blue light 7 sec

yellow light 7 sec

light off 7 sec

red blue yellow light 3 sec

ATTENTION: DON’T MOVE THE TAP KNOB BEFORE THE SEQUENCE IS COMPLETED

If the reset is correct, the blue LED flashes while you suply water. If the reset is not correct, the red LED flashes.

If the tap is closed and you don’t supply water for more than 8 hours, when you open the tap, the yellow LED flashes for 3 seconds. Wait for the LED to turn blue before drinking or using water.

When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve, until you get to 3,000 minutes.

When 3,000 minutes have passed, you will need to change the filter. The red LED stays on or doesn’t flash, indicating that the cartridge is exhausted, even if the tap is not delivering water. The red LED also flashes after a calendar year has passed from the circuit start, indicating that you have to change the filter. In any case, reset the circuit. If 3,000 minutes or a calendar year haven’t passed and you remove and reinsert the battery, the count reset will not happen, as the circuit will normally store the minutes it has delivered within a 3,000 minute or year cycle.

1

1 2 3 4 5

TAP CIRCUIT FUNCTIONSSTART/RESET THE CIRCUIT

Close the tap, insert the battery into the circuit, and insert it into the tap within 30 seconds, verify that the 1 LEDs flash with this sequence: the red for 7 seconds, the blue for 7 seconds and the yellow for 7 seconds. The LEDs remain off for 7 seconds and if the circuit detects a successful reset, the 3 LEDs will flash simultaneously for about 3 seconds. If the circuit didn’t detect the reset, the red LED flashes and stays on constantly, so remove and insert the battery again.

LED light installation sequence

2

3

4

5

Page 19: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

19

USE AND INSTALLATION | ZERO

USE

IF YOU HEAR A NOISE DURING FIRST USE, PLEASE DO THE FOLLOWING PROCEDURE:

• put ZERO in the vertical position in order to let the air flow out of the system

• do at least 3 cycles of filling and emptying to condition the system

• put ZERO in the horizontal position

N.B. the noise should disappear after some cycles and/or after some hours

Page 20: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

20

ZERO | USE AND INSTALLATION

CARTRIDGE REPLACEMENT

Before replacing the cartridges, turn the cold water valve off and turn on the faucet until all of the water runs out.

CLOSE OPEN

Page 21: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

21

USE AND INSTALLATION | ZERO

TO REMOVE TO INSERT

Before you insert the cartridge, wet the O-ring

CARTRIDGE REPLACEMENT

1

2

Turn clockwise

Turn counter-clockwise

Pull Push

Page 22: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

22

ZERO | USE AND INSTALLATION

Remove the cap

CARTRIDGE REPLACEMENT

Small o.d.ø 11.50 mmø 0.45”

Large o.d.ø 12.75 mm

ø 0.5”

Replacement cartridges kit

Post-filterPre-filter

Page 23: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

23

USE AND INSTALLATION | ZERO

UTILITY

Technical specifications

Time flow rate 24 l/h (@ 4 bar)

Working pressure min./Max. 1.5 bar/6 bar | 21.7 PSI/87 PSI*

Temperature min./Max. 5/35°C | 41/95°F

Test conditions

Inlet water temperature rejection

15°C | 59°F

Rejection >90

Recovery (typically at a pressure of 36 psi)

40%

Inlet pressureCapacity supplied

in 1 minute Refill reserve

bar/PSI L/min min.

2.5/36 2.4 15

3/43 2.7 12

4/58 3.2 8

REFILL TIME SUPPLY TIME

Inlet pressure (Bar)Inlet pressure (Bar)

CHEMICAL PHYSIC ANALYSISR&C LAB s.r.l. | Altavilla Vicentina

Samples taken in the factory located on via delle Pezze 35 35013 Cittadella PD, Italy

Min

.

60

45

30

15

0

140

105

70

35

00 01.5 1.53 34.5 4.56 6

Sec

.

Parameter (with by-pass off) IN OUT

Conductivity at 77°f µS/cm 289 14.7

Hydrogen ion concentration pH 8.15 7.54

Chloride mg/l 3.1 0.223

Sulfates mg/l 19.3 0.572

Zinc µg/l Zn 11.8 n.r.

Calcium mg/l Ca 32.4 1.48

Magnesium mg/l Mg 11.5 0.45

Potassium mg/l K 0.7 0.176

Sodium mg/l Na 2.07 0.52

Total phosphorus µg/l P2O5 29.8 n.r.

Hexavalent chromium µg/l Cr 0.94 n.r.

Nitrates mg/l 3.5 2.9

Page 24: USE AND INSTALLATION · 2020-04-03 · When the circuit counter reaches the count of 2,800 minutes, the blue LED stops flashing, and the red LED starts flashing to indicate the reserve,

7097034Aquaporin-ZERO-USER MANUAL | Revised: April 2, 2020

Aquaporin A/S Nymøllevej 78 2800 Kongens Lyngby Denmark

VAT No.: DK28315694 Tel: +45 82 30 30 82 [email protected]

aquaporin.com