US NAVY CIVIL ENGINEER CORPS OVERVIEW LTJG Joshua Sharp 19 January 2012. What Is Today’s Navy Civil Engineer Doing?. Expeditionary / Facilities Rotation Expeditionary Construction Platoon Commander, Naval Mobile Construction Battalion 5 Construction Management - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: US NAVY CIVIL ENGINEER CORPS OVERVIEW LTJG Joshua Sharp 19 January 2012](https://reader033.vdocuments.mx/reader033/viewer/2022042616/56813323550346895d99fea5/html5/thumbnails/1.jpg)
US NAVY CIVIL ENGINEER CORPS OVERVIEW
LTJG Joshua Sharp19 January 2012
![Page 2: US NAVY CIVIL ENGINEER CORPS OVERVIEW LTJG Joshua Sharp 19 January 2012](https://reader033.vdocuments.mx/reader033/viewer/2022042616/56813323550346895d99fea5/html5/thumbnails/2.jpg)
NF MARIANAS2
What Is Today’s Navy Civil Engineer Doing?
•Expeditionary / Facilities Rotation–Expeditionary Construction
•Platoon Commander, Naval Mobile Construction Battalion 5
–Construction Management•Assistant Resident Officer in Charge of Construction, Guam Naval Hospital Replacement Project
–Public Works•Assistant Public Works Officer, Naval Base Guam
![Page 3: US NAVY CIVIL ENGINEER CORPS OVERVIEW LTJG Joshua Sharp 19 January 2012](https://reader033.vdocuments.mx/reader033/viewer/2022042616/56813323550346895d99fea5/html5/thumbnails/3.jpg)
NF MARIANAS3
Guam Naval Hospital Replacement
Existing Naval Hospital Constructed 1954
Replacement facility rendering
FACILITY IMPROVEMENTS
• Full diagnostic capability w/ MRI • Efficient patient staff circulation patterns• High traffic clinics located near the main
entrance and circulation spines
AWARD INFORMATION
• Design – Bid – Build• Award amount $158M• Designer: Sherlock Smith and Adams
(SS&A): Montgomery, AL• Contractor: Watts Webcor and Obayashi
a JV (WWO): Honolulu, HI
LEED SILVER
• $1.2M in energy savings.• Rainwater used as non-potable water
saving 1.4 MG/yr.• 823 KG/yr reduction in potable water
use.
![Page 4: US NAVY CIVIL ENGINEER CORPS OVERVIEW LTJG Joshua Sharp 19 January 2012](https://reader033.vdocuments.mx/reader033/viewer/2022042616/56813323550346895d99fea5/html5/thumbnails/4.jpg)
NF MARIANAS4
Project Overview
PHASE I - Construct New Hospital ECD: JUL 2013PHASE II - Demolish Old Hospital ECD: OCT 2014