- 1 - U.S. DEPARTMENT OF STATE OBO FACILITIES MANAGEMENT DIVISION STATEMENT OF WORK DATE: 25 October 2016 PROJECT: Zagreb, Croatia SERVICES: MGT section carpet/paint/furniture project 1. BACKGROUND AND PURPOSE a. The U.S. Embassy in Zagreb and Overseas Buildings Operations (OBO) has a requirement to replace carpet, paint, and remove / install new office furniture in a portion of the US Embassy building. This project requires qualified technicians to perform a replacement/installation according to both Zagreb and US standard industry practices. 2. GENERAL REQUIREMENTS a. The Contractor shall provide personnel, material, equipment, escort and supervision to complete the technical requirements in this Statement of Work. The Contractor shall be responsible for hiring labor, equipment vendors and shall follow security and safety directives as explained by the Embassy. b. Government furnished parts: i. Office furniture – See attachments “Allsteel Submittal.pdf, and OFS SEI APTOS Private Office Submittal.pdf.” 1. Contractor is expected to inventory all material on the lists to ensure all parts are available. Discrepancies shall be reported to COR. ii. Carpet tiles – See attachment “Equation Interface.pdf.” iii. Adhesive for the carpet tiles UZIN U 1000 c. The Contractor shall have limited access into the Embassy and outside the areas designated for the project except with permission by the Embassy. The Contractor shall address the impact of the consequent disruption and provide for a continuing level of operation of the Embassy functions caused by the proposed work. 3. SCOPE OF WORK a. The Contractor shall be required to prepare reports, bill of materials, quality control schedules and construction costs. These documents shall provide the necessary interfaces, coordination, and communication among the Embassy, OBO, and Contractor for the carpet replacement, painting, and furniture demolition, removal and/or installation. b. 1 st floor:

Upload: others

Post on 16-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

- 1 -

U.S. DEPARTMENT OF STATE OBO FACILITIES MANAGEMENT DIVISION

STATEMENT OF WORK DATE: 25 October 2016 PROJECT: Zagreb, Croatia SERVICES: MGT section carpet/paint/furniture project

1. BACKGROUND AND PURPOSE

a. The U.S. Embassy in Zagreb and Overseas Buildings Operations (OBO) has a requirement to replace carpet, paint, and remove / install new office furniture in a portion of the US Embassy building. This project requires qualified technicians to perform a replacement/installation according to both Zagreb and US standard industry practices.

2. GENERAL REQUIREMENTS

a. The Contractor shall provide personnel, material, equipment, escort and supervision to complete the technical requirements in this Statement of Work. The Contractor shall be responsible for hiring labor, equipment vendors and shall follow security and safety directives as explained by the Embassy.

b. Government furnished parts:

i. Office furniture – See attachments “Allsteel Submittal.pdf, and OFS SEI APTOS Private Office Submittal.pdf.”

1. Contractor is expected to inventory all material on the lists to ensure all parts are available. Discrepancies shall be reported to COR.

ii. Carpet tiles – See attachment “Equation Interface.pdf.” iii. Adhesive for the carpet tiles UZIN U 1000

c. The Contractor shall have limited access into the Embassy and outside the areas

designated for the project except with permission by the Embassy. The Contractor shall address the impact of the consequent disruption and provide for a continuing level of operation of the Embassy functions caused by the proposed work.

3. SCOPE OF WORK

a. The Contractor shall be required to prepare reports, bill of materials, quality

control schedules and construction costs. These documents shall provide the necessary interfaces, coordination, and communication among the Embassy, OBO, and Contractor for the carpet replacement, painting, and furniture demolition, removal and/or installation.

b. 1st floor:

Page 2: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

- 2 -

i. Disassemble and/or move all furniture in the affected rooms.

1. Affected rooms: 213, 231, 232, 243, 247, 248, 249, 250, 251, 252, 253, 256, 257, 258.

2. Total number of desks: 36 3. All other office furniture noted in paragraph 3.b.ii.1.

ii. Paint all walls in the affected rooms per 3.b.i.1. 1. Patch all imperfections on the walls before painting. 2. Remove all outlet and switch covers, making note of the circuit

labels before painting. 3. Protect all edges of painted areas with masking tape. 4. Walls must be painted with DuluxTrade EggShell, color Golden

Fern 35YY 86/117. 5. Total area to be painted is 1083 sq. meters, or 11657 sq. feet.

iii. Replace the carpet tiles in affected rooms per 3.b.i.1. with USG supplied carpet and adhesive.

1. Total area of carpet to be replaced is approximately 585 square meters or 6297 square feet.

iv. Install the new furniture per attached submittals, and Furniture Plan. v. Note: Contractor is responsible to verify all measurements.

vi. Note: Contractor is responsible for moving all the files, file cabinets, and the free standing furniture which is not being disassembled from the work area to the temporary offices, and then back after the work has been completed. The temporary offices will be located within the same building (Chancery), and accessible by carts. Freight elevator can be used in order to move the furniture, files, and other materials.

4. CONTRACT ADMINISTRATION

a. The OBO does not make representations or warranties of whatsoever kind or nature, either expressed or implied, as to the quality, level of completion, accuracy, extent of compliance with the standards, codes and requirements described or referred to in this SOW, or the extent of coordination between or among the documents provided to the Contractor.

b. Neither the Embassy’s nor OBO’s review, approval, or acceptance of, nor payment for the services required under this contract shall be construed to operate as a waiver of any rights under this contract or any cause of action against the Contractor arising out of the performance of this contract.

c. The OBO has the right to inspect and test all services called for by the contract,

to the extent practicable at all times and places during the term of the contract. The OBO may perform quality assurance inspections [QAI] and to confirm the work is being performed according to the Statement of Work.

5. RESPONSIBILITY OF THE CONTRACTOR

a. The Contractor shall be responsible for the professional quality, technical

accuracy, and the coordination of all construction and other services furnished under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its construction and other services.

b. The Contractor shall identify a Project Manager who shall be responsible for the overall management of this Contract. The Project Manager will be approved by the Embassy.

Page 3: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

- 3 -

c. The Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety and similar matters. The Contractor shall promptly report all accidents resulting in lost time, disabling, or fatal injuries to the Contracting Officer’s Representative (COR). The COR is the Facility Manager, Doug Barnes

6. CONSTRUCTION REQUIREMENTS

a. The Contractor shall be responsible for all required materials, equipment and

personnel to manage, administer, and supervise this project. All workmanship shall be of good quality and performed in a skillful manner as determined of OBO.

b. The Contractor shall have limited access to or be admitted into any building on the compound outside the areas designated for the project except with permission by the Embassy.

c. The Contractor will be permitted to use the area within the compound for

operation of his construction equipment and temporary facilities. The Contractor is responsible for obtaining any additional off compound storage areas required.

7. CRITERIA

a. The Contractor shall replace the replace carpeting and repaint interior walls in

accordance with U.S. codes and standards. OBO will review and comment on the Contractor’s submissions using the following codes and standards:

i. International Building Code ii. Safety and Health Requirements Manual:

http://obo.m.state.sbu/ops/shem/Documents/Corps%20of%20Engineers_2008_English.pdf

8. DELIVERABLE SCHEDULE

a. The Contractor shall commence work under this contract promptly, execute the work diligently, and achieve final completion and acceptance of the carpeting and painting including final cleanup of the premises within the contract period specified.

9. SECURITY

a. This is a non-classified project. The work to be performed under this contract requires that the Contractor, its employees and sub-contractors submit corporate, financial and personnel information for review by the Embassy. Information submitted by the Contractor will not be disclosed beyond the Embassy.

END OF STATEMENT OF WORK

Page 4: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

Product Equilibrium Colour 304286 Equation

Product Specifications

Product Number 1190

Product Construction Tufted Patterned Structured Tip Sheared Pile

Yarn System 100% Recycled Solution Dyed Nylon

Backing Type Graphlex

Size – Packaging 50 x 50 cm – 4 m² Box

Pile Yarn Weight 814 g/m² ± 5%

Total Weight 4269 g/m² ± 5%

Pile Height 4.1 mm ± 0.5 mm

Total Thickness 7.5 mm ± 0.5 mm

Gauge – Ends per 10 cm 1/12 - 47.2

Tufts per m² 167,560/m² ±5%

Performance Specifications

Wear Classification EN 1307 33 Heavy Contract

Castor Chair Rating ≥2.4 (EN 985) Continuous Use

Flammability (EN ISO 9239-1) Euroclass Bfl-s1 (EN 13501-1)

Light Fastness ≥6 (ISO 105-B02)

Light Reflectance Value (LRV)LRV – L value LRV – Y value

56.2 24.1

Dimensional Stability ≤0.2% (ISO 2551/EN 986)

Impact Sound Insulation ΔL EN ISO 10140-3 26 dB

Rating of Sound Absorption (α )EN ISO 11654 0.20

Sound Absorption (α ) EN ISO 354

125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz

0.02 0.03 0.07 0.22 0.30 0.40

Environmental Specifications

Total Recycled Content 61.59%

Pre-Consumer (Total) 52.11%

Post-Consumer (Total) 9.48%

Yarn Recycled Content 100%

Pre-Consumer (Yarn) 50%

Post-Consumer (Yarn) 50%

Indoor Air Quality GUT Prodis ID 84479CB4

French A+

Danish Indoor Climate

Compliant with LEED EQ 4.3 credit

GUI Standard

Potential Green Building ContributionBREEAM (UK/International) View potential BREEAM contribution

BRE Green Guide Ratings

Commercial Domestic Education Health Retail Retail

A+ A A+ A+ A+ A+

LEED (US/International) View Potential Leed Contribution

HQE (France) View Potential HQE Contribution

DGNB (Germany) View Potential DGNB Contribution

Environmental Product Declaration EPD-IFF-20120021-CBD1-EN

®

w

w

s

(Fashion) (Durability)

Ashlar Monolithic Quarter Turn

Installation Method

Interface EuropeanManufacturing BV reserve theright to change or modifyspecifications.

Page 1 of 2

Equilibrium

Page 5: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

26 dB 0.20 ≥6 ≥2.4

Carbon Footprint

Full Life Cycle Carbon Footprint According to EPD or EPD calculation method

Raw Materials and Production 8.47 kg CO₂ eq./m²

Delivery and Installation 0.53 kg CO₂ eq./m²

Use (10 Years) 2.92 kg CO₂ eq./m²

End of Life (Waste to Energy) 8.76 kg CO₂ eq./m²

Total (10 Years Lifetime) 20.68 kg CO₂ eq./m²

Carbon Neutral Cool Carpet Standard

Installation Impacts

Installation Waste In a typical installation (rectangular building, installedbefore walls) using the installation method below:

Quarter turn – 3-4%

Monolithic – 3-4%

Ashlar – 3-5 %

For reference: 2 m wide broadloom typicallygenerates 7-10% installation waste

TacTiles Optimised for glue-free installation with TacTilesconnectors with virtually zero VOCs

End of Life Options

ReUse Can be cleaned and reused in a non-criticallocation to extend its useful life.

Recycling Can be returned through the Interface ReEntry schemeand be reused as raw material in new carpet tiles.

Waste to Energy Can be incinerated in appropriate waste to energyplant.

Technical Information

Installation See recommended Interface installation guidelines

Maintenance See recommended Interface maintenance guidelines

Warranty 15 years

Manufacturing Location ISO 9001 & 14001 Certified Facilities in Europe

Performance Qualifications

Certifications

®

®®

Page 2 of 2

Equilibrium

Page 6: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts
Page 7: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

Allsteel|CHL

–RFP

SAQMMA16R0657

Page 8: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts
Page 9: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

PricingSubm

ittal&ProductSpecification

Page 10: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

USDe

partmen

tofS

tate

OBO

Requ

estfor

System

sFurniture

Quo

tatio

nRF

PSA

QMMA1

6R06

57

Unit

Ext.

Unit

Ext.

Qty

List

List

Discou

ntSell

Sell

OverallFloo

rPlan

147

2,93

8.18

472,93

8.18

**91

,525

.91

91,525

.91

$**

BlendedDiscou

ntTo

talProdu

ct91

,525

.91

$

(9ho

ursa

t$65

.00pe

rhou

r)De

sign

Services

585.00

$

TOTA

L92

,110

.91

$

Page 11: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Entire Floor Bill of Materials 1 of 5

9/1/2016 10:26:59 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %1 ALS Z04236WR Raceway Panel Frame w/o Top Trim 42-1/2H x

36W4 $ 268.00 $ 48.24 $ 192.96 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

2 ALS Z42236S 22-1/2H x 36W Steel Tile 85 $ 173.00 $ 31.14 $ 2,646.90 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

3 ALS Z41536T 15Hx36W Tackable Acoustic Non-Ported Tile 4 $ 120.00 $ 21.60 $ 86.40 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

4 ALS Z43736V 37-1/2H x 36W Veneer Non-Ported Tile 4 $ 666.00 $ 119.88 $ 479.52 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

5 ALS Z05024WR Raceway Panel Frame w/o Top Trim 50H x 24W

42 $ 244.00 $ 43.92 $ 1,844.64 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

6 ALS Z42224S 22-1/2H x 24W Steel Tile 47 $ 149.00 $ 26.82 $ 1,260.54 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

7 ALS Z42224T 22-1/2Hx24W Tackable Acoustic Non-Ported Tile

47 $ 126.00 $ 22.68 $ 1,065.96 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

8 ALS Z05036WR Raceway Panel Frame w/o Top Trim 50H x 36W

81 $ 278.00 $ 50.04 $ 4,053.24 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

9 ALS Z41536E 15Hx36W Tackable Acoustic Ported Tile 22 $ 200.00 $ 36.00 $ 792.00 82.000

$(C) GRD C FAB~ Undecided FABRIC Option~ Undecided COLOR Option

10 ALS Z40736V 7-1/2H x 36W Veneer Non-Ported Tile 44 $ 348.00 $ 62.64 $ 2,756.16 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

11 ALS Z42236T 22-1/2Hx36W Tackable Acoustic Non-Ported Tile

57 $ 146.00 $ 26.28 $ 1,497.96 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

12 ALS Z236SK Segment Kit 36W 34 $ 50.00 $ 9.00 $ 306.00 82.000

.P CLR: Black13 ALS Z41536SW 15Hx36W Tool Tile 22 $ 274.00 $ 49.32 $ 1,085.04 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

14 ALS Z44524V 45H x 24W Veneer Non-Ported Tile 37 $ 612.00 $ 110.16 $ 4,075.92 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

15 ALS Z44536V 45H x 36W Veneer Non-Ported Tile 71 $ 762.00 $ 137.16 $ 9,738.36 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

16 ALS SPLA-TP-ELEC-DEK

Ceiling In-Feed 7 $ 256.00 $ 46.08 $ 322.56 82.000

.~~ Special 'M' Number Required17 ALS 8988EBZS Elect Mtg Brkt for Segment Horizontal 12 Pack 14 $ 71.37 $ 12.85 $ 179.90 82.000

.P CLR: Black

Page 12: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Entire Floor Bill of Materials 2 of 5

9/1/2016 10:27:00 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %18 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V Jumper Cable 66W 7 $ 224.00 $ 40.32 $ 282.24 82.000

.M273181 A871366-1019 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V 4-Circuit NEMA 6-20R Duplex Receptacle Circuit 1

19 $ 576.00 $ 103.68 $ 1,969.92 82.000

.M273147 A87750120 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V 4-Circuit NEMA 6-20R Duplex Receptacle Circuit 2

19 $ 576.00 $ 103.68 $ 1,969.92 82.000

.M273148 A87750221 ALS A871224A Power Harness 24W 3 Circuit 14 $ 230.00 $ 41.40 $ 579.60 82.000

.P CLR: Black22 ALS A871236A Power Harness 36W 3 Circuit 28 $ 230.00 $ 41.40 $ 1,159.20 82.000

.P CLR: Black23 ALS EAAC Clip Caddy 22 $ 55.00 $ 9.90 $ 217.80 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

24 ALS EASS Paper Wave 62 $ 107.00 $ 19.26 $ 1,194.12 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

25 ALS EASR36 36" w-Slat Rail Attachment 4 $ 167.00 $ 30.06 $ 120.24 82.000

$(COREP1) Core Clr Opts~ Undecided PAINT Option

26 ALS ZWTS 60H Stride Wall Track (pair) 4 $ 144.00 $ 25.92 $ 103.68 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

27 ALS T53054S Primary 30Dx54W Flat Eg Lam w/Grommets 3 $ 421.00 $ 75.78 $ 227.34 82.000

~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

28 ALS Z307PVH 07-1/2H E-Variable Height Trim 1 $ 47.00 $ 8.46 $ 8.46 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

29 ALS Z342PE 42-1/2H E-End Trim 3 $ 71.00 $ 12.78 $ 38.34 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

30 ALS Z350LL 50H L-90 Light Block Kit with 'L' Top Cap 7 $ 53.00 $ 9.54 $ 66.78 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

31 ALS Z350PE 50H E-End Trim 37 $ 75.00 $ 13.50 $ 499.50 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

32 ALS Z350PF 50H Filler Trim 8 $ 75.00 $ 13.50 $ 108.00 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

33 ALS Z350PL 50H L-90 Degree Trim 7 $ 89.00 $ 16.02 $ 112.14 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

34 ALS Z350TT 50H 3-Way Light Block Kit with 'T' Top Cap 8 $ 60.00 $ 10.80 $ 86.40 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

Page 13: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Entire Floor Bill of Materials 3 of 5

9/1/2016 10:27:00 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %35 ALS Z350XX 50H 4-Way Light Block Kit with 'X' Top Cap 2 $ 66.00 $ 11.88 $ 23.76 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

36 ALS Z3UCON3 3 Universal Connector Blocks f(42-1/2H to 57-1/2H)

17 $ 66.00 $ 11.88 $ 201.96 82.000

37 ALS Z41524TGS 15Hx24W 3/8" Glass Panel Mtd Screen 1 $ 397.00 $ 71.46 $ 71.46 82.000

~ Undecided GLASS Option$(CORE) Core Clr Opts~ Undecided PAINT Option

38 ALS Z41560TGS 15Hx60W 3/8" Glass Panel Mtd Screen 1 $ 691.00 $ 124.38 $ 124.38 82.000

~ Undecided GLASS Option$(CORE) Core Clr Opts~ Undecided PAINT Option

39 ALS Z41596TGS 15Hx96W 3/8" Glass Panel Mtd Screen 40 $ 1,111.00 $ 199.98 $ 7,999.20 82.000

~ Undecided GLASS Option$(CORE) Core Clr Opts~ Undecided PAINT Option

40 ALS ZW810S Single Monitor Arm Silver Finish 27 $ 371.00 $ 111.30 $ 3,005.10 70.000

.SVR CLR: Silver41 ALS ETB2W1 Essentials Tower to Worksurface Bracket 22 $ 67.00 $ 12.06 $ 265.32 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

42 ALS SPLAG-YP-LATBXFFVS

Align F/F Lateral File. 30Wx18Dx29H W/ Veneer Door Fronts

24 $ 1,648.00 $ 296.64 $ 7,119.36 82.000

.M365244 YPBLX283018FFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

43 ALS SPLAG-YP-SPEDBBFVS

Align B/B/F SuppPed 28Hx15Wx24D W/ Veneer Door Fronts

27 $ 1,496.00 $ 269.28 $ 7,270.56 82.000

.M365521 YPPSBX281524BBFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

44 ALS YPTBX502424LFFMS

50Hx24Wx24D Wrdrb L/ D/F/F NoKick SqPull 12 $ 2,040.00 $ 448.80 $ 5,385.60 78.000

$(CORE) Core Clr Opts~ Undecided PAINT Option.L Std Lock

45 ALS YPTBX502424RFFMS

50Hx24Wx24D Wrdrb R/ D/F/F NoKick SqPull 13 $ 2,040.00 $ 448.80 $ 5,834.40 78.000

$(CORE) Core Clr Opts~ Undecided PAINT Option.L Std Lock

46 ALS T630FB Flat Bracket 30D 1 $ 52.00 $ 9.36 $ 9.36 82.000

47 ALS Y62924FENP Frstnd 24Dx29-1/2H End Sup Pnl 1 $ 228.00 $ 41.04 $ 41.04 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

Page 14: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Entire Floor Bill of Materials 4 of 5

9/1/2016 10:27:00 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %48 ALS Y6DG Align Gussets (1 Pair) 6 $ 182.00 $ 32.76 $ 196.56 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

49 ALS ZV51572S Straight 15Dx72W Ven Cntp Sq Eg for Stride 1 $ 830.00 $ 149.40 $ 149.40 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

50 ALS ZV51572SV Straight 15Dx72W Var Hgt Cntp Sq Eg for Stride

1 $ 830.00 $ 149.40 $ 149.40 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

51 ALS T52436S Primary 24Dx36W Flat Eg Lam w/Grommet 2 $ 288.00 $ 51.84 $ 103.68 82.000

~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

52 ALS T52472S Primary 24Dx72W Flat Eg Lam w/Grommets 49 $ 485.00 $ 87.30 $ 4,277.70 82.000

~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

53 ALS T53030STZN T-Span 30Dx30W Flat Eg Lam for Stride w/o Grom

1 $ 340.00 $ 61.20 $ 61.20 82.000

~ Undecided LAMINATE Option~ Undecided EDGE Option

54 ALS T53036S Primary 30Dx36W Flat Eg Lam w/Grommet 1 $ 331.00 $ 59.58 $ 59.58 82.000

~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

55 ALS T53072S Primary 30Dx72W Flat Eg Lam w/Grommets 1 $ 548.00 $ 98.64 $ 98.64 82.000

~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

56 ALS T53072STZ T-Span 30Dx72W Flat Eg Lam for Stride w/Grommets

1 $ 580.00 $ 104.40 $ 104.40 82.000

~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

57 ALS T624FB Flat Bracket 24D 26 $ 45.00 $ 8.10 $ 210.60 82.000

58 ALS T6BK Worksurface Bracket Kit 25 $ 45.00 $ 8.10 $ 202.50 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

59 ALS T6CB12L Cantilever Bkt 12D LH Terrace 2 $ 44.00 $ 7.92 $ 15.84 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

60 ALS Y62924PENP Pnl Mnt 24Dx29-1/2H End Sup Pnl 24 $ 250.00 $ 45.00 $ 1,080.00 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

61 ALS Y62930FENP Frstnd 30Dx29-1/2H End Sup Pnl 10 $ 242.00 $ 43.56 $ 435.60 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

62 ALS Y62930PENP Pnl Mnt 30Dx29-1/2H End Sup Pnl 3 $ 263.00 $ 47.34 $ 142.02 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

Page 15: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Entire Floor Bill of Materials 5 of 5

9/1/2016 10:27:00 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %63 ALS EAPT Mail Box 22 $ 76.00 $ 13.68 $ 300.96 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

64 WRT 2128-17 Banana-Board System w/17" Track and Pinnacle2 Arm, Black

27 $ 474.00 $ 201.45 $ 5,439.15 57.500

Grand Total $ 91,506.47 80.652

Page 16: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.01 Bill of Materials 1 of 3

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-01 Bill of Materials.sp4 9/1/2016 10:27:21 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %1 ALS Z04236WR Raceway Panel Frame w/o Top Trim 42-1/2H x

36W2 $ 268.00 $ 48.24 $ 96.48 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

2 ALS Z42236S 22-1/2H x 36W Steel Tile 4 $ 173.00 $ 31.14 $ 124.56 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

3 ALS Z41536T 15Hx36W Tackable Acoustic Non-Ported Tile 2 $ 120.00 $ 21.60 $ 43.20 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

4 ALS Z43736V 37-1/2H x 36W Veneer Non-Ported Tile 2 $ 666.00 $ 119.88 $ 239.76 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

5 ALS Z05024WR Raceway Panel Frame w/o Top Trim 50H x 24W

2 $ 244.00 $ 43.92 $ 87.84 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

6 ALS Z42224S 22-1/2H x 24W Steel Tile 2 $ 149.00 $ 26.82 $ 53.64 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

7 ALS Z42224T 22-1/2Hx24W Tackable Acoustic Non-Ported Tile

2 $ 126.00 $ 22.68 $ 45.36 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

8 ALS Z44524V 45H x 24W Veneer Non-Ported Tile 2 $ 612.00 $ 110.16 $ 220.32 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

9 ALS Z05036WR Raceway Panel Frame w/o Top Trim 50H x 36W

2 $ 278.00 $ 50.04 $ 100.08 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

10 ALS Z41536E 15Hx36W Tackable Acoustic Ported Tile 1 $ 200.00 $ 36.00 $ 36.00 82.000

$(C) GRD C FAB~ Undecided FABRIC Option~ Undecided COLOR Option

11 ALS Z40736V 7-1/2H x 36W Veneer Non-Ported Tile 2 $ 348.00 $ 62.64 $ 125.28 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

12 ALS Z44536V 45H x 36W Veneer Non-Ported Tile 2 $ 762.00 $ 137.16 $ 274.32 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

13 ALS Z236SK Segment Kit 36W 2 $ 50.00 $ 9.00 $ 18.00 82.000

.P CLR: Black14 ALS Z41536SW 15Hx36W Tool Tile 1 $ 274.00 $ 49.32 $ 49.32 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

15 ALS SPLA-TP-ELEC-DEK

Ceiling In-Feed 1 $ 256.00 $ 46.08 $ 46.08 82.000

.M273142 871912-1016 ALS 8988EBZS Elect Mtg Brkt for Segment Horizontal 12 Pack 1 $ 71.37 $ 12.85 $ 12.85 82.000

.P CLR: Black17 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V Jumper Cable 66W 1 $ 224.00 $ 40.32 $ 40.32 82.000

.M273181 A871366-10

Page 17: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.01 Bill of Materials 2 of 3

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-01 Bill of Materials.sp4 9/1/2016 10:27:21 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %18 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V 4-Circuit NEMA 6-20R Duplex Receptacle Circuit 1

1 $ 576.00 $ 103.68 $ 103.68 82.000

.M273147 A87750119 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V 4-Circuit NEMA 6-20R Duplex Receptacle Circuit 2

1 $ 576.00 $ 103.68 $ 103.68 82.000

.M273148 A87750220 ALS A871224A Power Harness 24W 3 Circuit 1 $ 230.00 $ 41.40 $ 41.40 82.000

.P CLR: Black21 ALS A871236A Power Harness 36W 3 Circuit 2 $ 230.00 $ 41.40 $ 82.80 82.000

.P CLR: Black22 ALS Z3UCON3 3 Universal Connector Blocks f(42-1/2H to

57-1/2H)1 $ 66.00 $ 11.88 $ 11.88 82.000

23 ALS T624FB Flat Bracket 24D 1 $ 45.00 $ 8.10 $ 8.10 82.000

24 ALS Z307PVH 07-1/2H E-Variable Height Trim 1 $ 47.00 $ 8.46 $ 8.46 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

25 ALS Z342PE 42-1/2H E-End Trim 1 $ 71.00 $ 12.78 $ 12.78 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

26 ALS Z350LL 50H L-90 Light Block Kit with 'L' Top Cap 1 $ 53.00 $ 9.54 $ 9.54 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

27 ALS Z350PE 50H E-End Trim 1 $ 75.00 $ 13.50 $ 13.50 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

28 ALS Z350PL 50H L-90 Degree Trim 1 $ 89.00 $ 16.02 $ 16.02 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

29 ALS ZW810S Single Monitor Arm Silver Finish 1 $ 371.00 $ 111.30 $ 111.30 70.000

.SVR CLR: Silver30 ALS ZV51572SV Straight 15Dx72W Var Hgt Cntp Sq Eg for

Stride1 $ 830.00 $ 149.40 $ 149.40 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

31 ALS T6BK Worksurface Bracket Kit 1 $ 45.00 $ 8.10 $ 8.10 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

32 ALS T6CB12L Cantilever Bkt 12D LH Terrace 1 $ 44.00 $ 7.92 $ 7.92 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

33 ALS Y62924PENP Pnl Mnt 24Dx29-1/2H End Sup Pnl 1 $ 250.00 $ 45.00 $ 45.00 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

34 ALS Z41524TGS 15Hx24W 3/8" Glass Panel Mtd Screen 1 $ 397.00 $ 71.46 $ 71.46 82.000

~ Undecided GLASS Option$(CORE) Core Clr Opts~ Undecided PAINT Option

35 ALS Z41596TGS 15Hx96W 3/8" Glass Panel Mtd Screen 1 $ 1,111.00 $ 199.98 $ 199.98 82.000

~ Undecided GLASS Option$(CORE) Core Clr Opts~ Undecided PAINT Option

Page 18: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.01 Bill of Materials 3 of 3

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-01 Bill of Materials.sp4 9/1/2016 10:27:21 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %36 ALS YPTBX502424

RFFMS50Hx24Wx24D Wrdrb R/ D/F/F NoKick SqPull 1 $ 2,040.00 $ 448.80 $ 448.80 78.000

$(CORE) Core Clr Opts~ Undecided PAINT Option.L Std Lock

37 ALS T52472S Primary 24Dx72W Flat Eg Lam w/Grommets 2 $ 485.00 $ 87.30 $ 174.60 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

38 ALS SPLAG-YP-LATBXFFVS

Align F/F Lateral File. 30Wx18Dx29H W/ Veneer Door Fronts

1 $ 1,648.00 $ 296.64 $ 296.64 82.000

.M365244 YPBLX283018FFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

39 ALS SPLAG-YP-SPEDBBFVS

Align B/B/F SuppPed 28Hx15Wx24D W/ Veneer Door Fronts

1 $ 1,496.00 $ 269.28 $ 269.28 82.000

.M365521 YPPSBX281524BBFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

40 ALS EAPT Mail Box 1 $ 76.00 $ 13.68 $ 13.68 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

41 ALS EADH Tool Box Pencil & CD Holder 1 $ 61.00 $ 10.98 $ 10.98 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

42 ALS EASS Paper Wave 1 $ 107.00 $ 19.26 $ 19.26 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

43 WRT 2128-17 Banana-Board System w/17" Track and Pinnacle2 Arm, Black

1 $ 474.00 $ 201.45 $ 201.45 57.500

Grand Total $ 4,053.10 80.856

Page 19: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.02 Bill of Materials 1 of 3

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-02 Bill of Materials.sp4 9/1/2016 10:28:25 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %1 ALS Z05024WR Raceway Panel Frame w/o Top Trim 50H x

24W2 $ 244.00 $ 43.92 $ 87.84 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

2 ALS Z42224S 22-1/2H x 24W Steel Tile 2 $ 149.00 $ 26.82 $ 53.64 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

3 ALS Z42224T 22-1/2Hx24W Tackable Acoustic Non-Ported Tile

2 $ 126.00 $ 22.68 $ 45.36 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

4 ALS Z44524V 45H x 24W Veneer Non-Ported Tile 2 $ 612.00 $ 110.16 $ 220.32 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

5 ALS Z05036WR Raceway Panel Frame w/o Top Trim 50H x 36W

4 $ 278.00 $ 50.04 $ 200.16 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

6 ALS Z42236S 22-1/2H x 36W Steel Tile 4 $ 173.00 $ 31.14 $ 124.56 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

7 ALS Z42236T 22-1/2Hx36W Tackable Acoustic Non-Ported Tile

2 $ 146.00 $ 26.28 $ 52.56 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

8 ALS Z44536V 45H x 36W Veneer Non-Ported Tile 4 $ 762.00 $ 137.16 $ 548.64 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

9 ALS Z41536E 15Hx36W Tackable Acoustic Ported Tile 1 $ 200.00 $ 36.00 $ 36.00 82.000

$(C) GRD C FAB~ Undecided FABRIC Option~ Undecided COLOR Option

10 ALS Z40736V 7-1/2H x 36W Veneer Non-Ported Tile 2 $ 348.00 $ 62.64 $ 125.28 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

11 ALS Z236SK Segment Kit 36W 2 $ 50.00 $ 9.00 $ 18.00 82.000

.P CLR: Black12 ALS Z41536SW 15Hx36W Tool Tile 1 $ 274.00 $ 49.32 $ 49.32 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

13 ALS 8988EBZS Elect Mtg Brkt for Segment Horizontal 12 Pack 1 $ 71.37 $ 12.85 $ 12.85 82.000

.P CLR: Black14 ALS SPLA-TP-ELEC

-DEKCeiling In-Feed 1 $ 256.00 $ 46.08 $ 46.08 82.000

.M273142 871912-1015 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V Jumper Cable 66W 1 $ 224.00 $ 40.32 $ 40.32 82.000

.M273181 A871366-1016 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V 4-Circuit NEMA 6-20R Duplex Receptacle Circuit 1

1 $ 576.00 $ 103.68 $ 103.68 82.000

.M273147 A87750117 ALS SPLAG-TP-ELE

C-DEK10-WIRE DEKKO 250V 4-Circuit NEMA 6-20R Duplex Receptacle Circuit 2

1 $ 576.00 $ 103.68 $ 103.68 82.000

.M273148 A87750218 ALS A871224A Power Harness 24W 3 Circuit 1 $ 230.00 $ 41.40 $ 41.40 82.000

.P CLR: Black

Page 20: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.02 Bill of Materials 2 of 3

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-02 Bill of Materials.sp4 9/1/2016 10:28:25 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %19 ALS A871236A Power Harness 36W 3 Circuit 2 $ 230.00 $ 41.40 $ 82.80 82.000

.P CLR: Black20 ALS Z3UCON3 3 Universal Connector Blocks f(42-1/2H to

57-1/2H)1 $ 66.00 $ 11.88 $ 11.88 82.000

21 ALS T624FB Flat Bracket 24D 1 $ 45.00 $ 8.10 $ 8.10 82.000

22 ALS Z350LL 50H L-90 Light Block Kit with 'L' Top Cap 1 $ 53.00 $ 9.54 $ 9.54 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

23 ALS Z350PE 50H E-End Trim 2 $ 75.00 $ 13.50 $ 27.00 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

24 ALS Z350PL 50H L-90 Degree Trim 1 $ 89.00 $ 16.02 $ 16.02 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

25 ALS ZW810S Single Monitor Arm Silver Finish 1 $ 371.00 $ 111.30 $ 111.30 70.000

.SVR CLR: Silver26 ALS T6BK Worksurface Bracket Kit 1 $ 45.00 $ 8.10 $ 8.10 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

27 ALS T6CB12L Cantilever Bkt 12D LH Terrace 1 $ 44.00 $ 7.92 $ 7.92 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

28 ALS Y62924PENP Pnl Mnt 24Dx29-1/2H End Sup Pnl 1 $ 250.00 $ 45.00 $ 45.00 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

29 ALS Z41596TGS 15Hx96W 3/8" Glass Panel Mtd Screen 2 $ 1,111.00 $ 199.98 $ 399.96 82.000

~ Undecided GLASS Option$(CORE) Core Clr Opts~ Undecided PAINT Option

30 ALS YPTBX502424RFFMS

50Hx24Wx24D Wrdrb R/ D/F/F NoKick SqPull 1 $ 2,040.00 $ 448.80 $ 448.80 78.000

$(CORE) Core Clr Opts~ Undecided PAINT Option.L Std Lock

31 ALS T52472S Primary 24Dx72W Flat Eg Lam w/Grommets 2 $ 485.00 $ 87.30 $ 174.60 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

32 ALS SPLAG-YP-LATBXFFVS

Align F/F Lateral File. 30Wx18Dx29H W/ Venner Door Fronts

1 $ 1,648.00 $ 296.64 $ 296.64 82.000

.M365244 YPBLX283018FFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

Page 21: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.02 Bill of Materials 3 of 3

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-02 Bill of Materials.sp4 9/1/2016 10:28:25 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %33 ALS SPLAG-YP-SP

EDBBFVSAlign B/B/F SuppPed 28Hx15Wx24D W/ Veneer Door Fronts

1 $ 1,496.00 $ 269.28 $ 269.28 82.000

.M365521 YPPSBX281524BBFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

34 ALS EAPT Mail Box 1 $ 76.00 $ 13.68 $ 13.68 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

35 ALS EADH Tool Box Pencil & CD Holder 1 $ 61.00 $ 10.98 $ 10.98 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

36 ALS EASS Paper Wave 1 $ 107.00 $ 19.26 $ 19.26 82.000

$(COREPNT) Core Clr Opts~ Undecided PAINT Option

37 WRT 2128-17 Banana-Board System w/17" Track and Pinnacle2 Arm, Black

2 $ 474.00 $ 201.45 $ 402.90 57.500

Grand Total $ 4,273.45 80.352

Page 22: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.03 Bill of Materials 1 of 2

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-03 Bill of Materials.sp4 9/1/2016 10:28:41 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %1 ALS Z05024WR Raceway Panel Frame w/o Top Trim 50H x 24W 1 $ 244.00 $ 43.92 $ 43.92 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

2 ALS Z42224S 22-1/2H x 24W Steel Tile 1 $ 149.00 $ 26.82 $ 26.82 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

3 ALS Z42224T 22-1/2Hx24W Tackable Acoustic Non-Ported Tile

1 $ 126.00 $ 22.68 $ 22.68 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

4 ALS Z44524V 45H x 24W Veneer Non-Ported Tile 1 $ 612.00 $ 110.16 $ 110.16 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

5 ALS Z05036WR Raceway Panel Frame w/o Top Trim 50H x 36W 1 $ 278.00 $ 50.04 $ 50.04 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

6 ALS Z42236S 22-1/2H x 36W Steel Tile 1 $ 173.00 $ 31.14 $ 31.14 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

7 ALS Z42236T 22-1/2Hx36W Tackable Acoustic Non-Ported Tile

1 $ 146.00 $ 26.28 $ 26.28 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

8 ALS Z44536V 45H x 36W Veneer Non-Ported Tile 1 $ 762.00 $ 137.16 $ 137.16 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

9 ALS T630FB Flat Bracket 30D 1 $ 52.00 $ 9.36 $ 9.36 82.000

10 ALS Z350PE 50H E-End Trim 2 $ 75.00 $ 13.50 $ 27.00 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

11 ALS ZW810S Single Monitor Arm Silver Finish 1 $ 371.00 $ 111.30 $ 111.30 70.000

.SVR CLR: Silver12 ALS T6BK Worksurface Bracket Kit 1 $ 45.00 $ 8.10 $ 8.10 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

13 ALS Y62930PENP Pnl Mnt 30Dx29-1/2H End Sup Pnl 1 $ 263.00 $ 47.34 $ 47.34 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

14 ALS Z41560TGS 15Hx60W 3/8" Glass Panel Mtd Screen 1 $ 691.00 $ 124.38 $ 124.38 82.000

~ Undecided GLASS Option$(CORE) Core Clr Opts~ Undecided PAINT Option

15 ALS YPTBX502424RFFMS

50Hx24Wx24D Wrdrb R/ D/F/F NoKick SqPull 1 $ 2,040.00 $ 448.80 $ 448.80 78.000

$(CORE) Core Clr Opts~ Undecided PAINT Option.L Std Lock

16 ALS T52472S Primary 24Dx72W Flat Eg Lam w/Grommets 1 $ 485.00 $ 87.30 $ 87.30 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

Page 23: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.03 Bill of Materials 2 of 2

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-03 Bill of Materials.sp4 9/1/2016 10:28:41 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %17 ALS T53036S Primary 30Dx36W Flat Eg Lam w/Grommet 1 $ 331.00 $ 59.58 $ 59.58 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

18 ALS SPLAG-YP-SPEDBBFVS

Align B/B/F SuppPed 28Hx15Wx24D W/ Veneer Door Fronts

1 $ 1,496.00 $ 269.28 $ 269.28 82.000

.M365521 YPPSBX281524BBFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

19 WRT 2128-17 Banana-Board System w/17" Track and Pinnacle2 Arm, Black

1 $ 474.00 $ 201.45 $ 201.45 57.500

Grand Total $ 1,842.09 79.274

Page 24: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.04 Bill of Materials 1 of 2

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-04 Bill of Materials.sp4 9/1/2016 10:27:46 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %1 ALS Z04236WR Raceway Panel Frame w/o Top Trim 42-1/2H x

36W2 $ 268.00 $ 48.24 $ 96.48 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

2 ALS Z42236S 22-1/2H x 36W Steel Tile 2 $ 173.00 $ 31.14 $ 62.28 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

3 ALS Z41536T 15Hx36W Tackable Acoustic Non-Ported Tile 2 $ 120.00 $ 21.60 $ 43.20 82.000

$(C) GRD C FAB~ Undecided FABRIC Option

4 ALS Z43736V 37-1/2H x 36W Veneer Non-Ported Tile 2 $ 666.00 $ 119.88 $ 239.76 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

5 ALS T624FB Flat Bracket 24D 2 $ 45.00 $ 8.10 $ 16.20 82.000

6 ALS Z342PE 42-1/2H E-End Trim 2 $ 71.00 $ 12.78 $ 25.56 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

7 ALS ZW810S Single Monitor Arm Silver Finish 2 $ 371.00 $ 111.30 $ 222.60 70.000

.SVR CLR: Silver8 ALS Y62924FENP Frstnd 24Dx29-1/2H End Sup Pnl 1 $ 228.00 $ 41.04 $ 41.04 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

9 ALS Y6DG Align Gussets (1 Pair) 3 $ 182.00 $ 32.76 $ 98.28 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

10 ALS ZV51572S Straight 15Dx72W Ven Cntp Sq Eg for Stride 1 $ 830.00 $ 149.40 $ 149.40 82.000

$(V1) Grade 1 Veneer~ Undecided VENEER Option

11 ALS Y62930FENP Frstnd 30Dx29-1/2H End Sup Pnl 4 $ 242.00 $ 43.56 $ 174.24 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

12 ALS Y62930PENP Pnl Mnt 30Dx29-1/2H End Sup Pnl 2 $ 263.00 $ 47.34 $ 94.68 82.000

$(CORE) Core Clr Opts~ Undecided PAINT Option

13 ALS T52436S Primary 24Dx36W Flat Eg Lam w/o Grom 2 $ 288.00 $ 51.84 $ 103.68 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option

14 ALS T53030STZ T-Span 30Dx30W Flat Eg Lam for Stride w/Grommet

1 $ 340.00 $ 61.20 $ 61.20 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

15 ALS T53072S Primary 30Dx72W Flat Eg Lam w/Grommets 1 $ 548.00 $ 98.64 $ 98.64 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

Page 25: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

SAQMMAR0657 - Typical WS.04 Bill of Materials 2 of 2

O:\PROJECT 29 - SAQMMA16R0657\SUBMITTAL\Typical WS-04 Bill of Materials.sp4 9/1/2016 10:27:46 AM

Item Mfg Part Number Part Description Qty List Sell Ext Sell Sell - %16 ALS T53072STZ T-Span 30Dx72W Flat Eg Lam for Stride

w/Grommets1 $ 580.00 $ 104.40 $ 104.40 82.000

$(L1CORE) L1 Core Lam Opts~ Undecided LAMINATE Option~ Undecided EDGE Option.P Plastic Grommet

17 ALS SPLAG-YP-LATBXFFVS

Align F/F Lateral File. 30Wx18Dx29H W/ Venner Door Fronts

1 $ 1,648.00 $ 296.64 $ 296.64 82.000

.M365244 YPBLX283018FFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

18 ALS SPLAG-YP-SPEDBBFVS

Align B/B/F SuppPed 28Hx15Wx24D W/ Veneer Door Fronts

1 $ 1,496.00 $ 269.28 $ 269.28 82.000

.M365521 YPPSBX281524BBFLS$(CORE) Core Clr Opts~ Undecided PAINT Option$(V1) Grd 1 Veneer~ Undecided VENEER OptionEL PULL: Matte Silver.STD Standard Random key~ Undecided LOCK Option

19 WRT 2128-17 Banana-Board System w/17" Track and Pinnacle2 Arm, Black

2 $ 474.00 $ 201.45 $ 402.90 57.500

Grand Total $ 2,600.46 79.463

Page 26: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

Drawing

Submittal

Page 27: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts
Page 28: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts
Page 29: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts
Page 30: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts
Page 31: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts
Page 32: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

Page 1 of 4

Supplies Express , Inc. 5141 Pleasant Forest Drive, Centreville, VA 20120

Phone: (703) 818-9679 / (703) 818-8257 FAX: (703) 818-7439

DESIGNER: ERIN CRUDDEN (703) 516-1935PROJECT: EXECUTIVE SUITE DATE SUBMITTED: 9/22/2016VENDOR: OFS BRANDS / STYLINEVEN. ID: Vendor NumberXJ: 00-0000 GSA: DEL. DATE: EXP. DT:

Date: Quote Prepared By:Quote #:Quote Expiration Date:GSA or Open Market:GSA Contract #:GSA Contract Expiration Date:Lead Time on Order:FOB Destination / FOB origin:Are extra crating costs required for product to be secure for overseas shipment?

ITEM DESCRIPTION QTY TYPE UNIT $ SUBTOTAL1 PRIVATE OFFICE APTOS TYPICAL WORK STATION '1'

PER APPROVED ON 9/22/2016 - TO CONSIST OF THE FOLLOWING ITEMS (REF: QUOTE DATED 9/22/2016 FINISH: NAT. CHERRY ON CHERRY 'NCC' QUARTERED PULL STYLE: INTEGRAL 'AS' GROMMET COLOR: POLISHED 'PAL' EDGE DETAIL: KNIFE S/M: APTOS PRIVATE OFFICE TYPICAL 1 CONSISTING OF ITEMS BELOW:

1 EA 3,007.88$

34-7230LPD.B4Z.AS.G2.H2X - SINGLE LEFT B/B/F PEDESTAL DESK, LOCKING, GROMMET RIGHT 'G2, RECESSED MODESTY PANEL DIMENSIONS: 72"W X 30"D X 29.5"H

1 EA 1,045.88$ 1,045.88$

34-2442RR.B4Z.FZ.G1 - RIGHT RETURN UNIT, NO PEDESTAL, NO GROMMET 'G1', HINGED DOOR ACCESS PANEL 'FZ' DIMENSIONS: 42"W X 24"D X 29.5"H

1 EA 489.48$ 489.48$

34-7224CLF.B4Z.AS.G1.H2X - DOUBLE LATERAL FILE CREDENZA, LOCKING, NO GROMMETS 'G1' DIMENSIONS: 72"W X 24"D X 29.5"H

1 EA 1,330.18$ 1,330.18$

OCD - WOOD SLANTED FRONT PENCIL DRAWER 1 EA 133.46$ 133.46$ CP-1 - 4 x 4 CLAMP PLATE 2 EA 4.44$ 8.88$

09222016

September 22, 2016Carol D. Allin - Supplies EXPRESS, Inc.

GS-29F-0304H

Corner Post on all sides for Overseas Shipment Included in Cost of Item

December 22, 2016GSA

6 - 8 Weeks A.R.O. Destination

September 21, 2018

SEPTEMBER 21, 2018

INTERIOR SPECIFICATION SHEET

GS-29F-0304H

SHIP TO: NORTH BRUNSWICK, NJ

Page 33: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

Page 2 of 4

ITEM DESCRIPTION QTY TYPE UNIT $ SUBTOTAL2 PRIVATE OFFICE APTOS TYPICAL WORK STATION '2'

PER APPROVED ON 9/22/2016 - TO CONSIST OF THE FOLLOWING ITEMS (REF: QUOTE DATED 9/22/2016 FINISH: NAT. CHERRY ON CHERRY 'NCC' QUARTERED PULL STYLE: INTEGRAL 'AS' GROMMET COLOR: POLISHED 'PAL' EDGE DETAIL: KNIFE S/M: APTOS PRIVATE OFFICE TYPICAL 2 CONSISTING OF ITEMS LISTED BELOW:

2 EA 2,767.95$

34-7230RPD.B4Z.AS.G4.H2X - SINGLE RIGHT B/B/F PEDESTAL DESK, LOCKING, GROMMET LEFT 'G4, RECESSED MODESTY PANEL DIMENSIONS: 72"W X 30"D X 29.5"H

2 EA 1,045.88$ 2,091.76$

34-2442BR.B4Z.FZ.G1 - BRIDGE UNIT, NO PEDESTAL, NO GROMMET 'G1', HINGE DOOR ACCESS PANEL 'FZ' DIMENSIONS: 42"W X 24"D X 29.5"H

2 EA 415.17$ 830.34$

34-7224CRLL.B4Z.AS.FZ.G1.H2X - SINGLE LEFT LATERAL FILE CREDENZA, LOCKING, HINGE DOOR ACCESS PANEL 'FZ' DIMENSIONS: 72"W X 24"D X 29.5"H

2 EA 1,155.68$ 2,311.36$

OCD - WOOD SLANTED FRONT PENCIL DRAWER 2 EA 133.46$ 266.92$ CP-1 - CLAMP PLATE 8 EA 4.44$ 35.52$

Page 34: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

Page 3 of 4

ITEM DESCRIPTION QTY TYPE UNIT $ SUBTOTAL3 PRIVATE OFFICE APTOS TYPICAL WORK STATION '3'

PER APPROVED ON 9/22/2016 - TO CONSIST OF THE FOLLOWING ITEMS (REF: QUOTE DATED 9/22/2016 FINISH: NAT. CHERRY ON CHERRY 'NCC' QUARTERED PULL STYLE: INTEGRAL 'AS' GROMMET COLOR: POLISHED 'PAL' EDGE DETAIL: KNIFE S/M: APTOS PRIVATE OFFICE TYPICAL 3 CONSISTING OF ITEMS BELOW:

4 EA 2,767.95$

34-7230LPD.B4Z.AS.G2.H2X - SINGLE LEFT B/B/F PEDESTAL DESK, LOCKING, GROMMET RIGHT 'G2, RECESSED MODESTY PANEL DIMENSIONS: 72"W X 30"D X 29.5"H

4 EA 1,045.88$ 4,183.52$

34-2442BR.B4Z.FZ.G1 - BRIDGE UNIT, NO PEDESTAL, NO GROMMET 'G1', HINGE DOOR ACCESS PANEL 'FZ' DIMENSIONS: 42"W X 24"D X 29.5"H

4 EA 415.17$ 1,660.68$

34-7224CRRL.B4Z.AS.FZ.G1.H2X - SINGLE RIGHT LATERAL FILE CREDENZA, LOCKING, HINGE DOOR ACCESS PANEL 'FZ' DIMENSIONS: 72"W X 24"D X 29.5"H

4 EA 1,155.68$ 4,622.72$

OCD - WOOD SLANTED FRONT PENCIL DRAWER 4 EA 133.46$ 533.84$ CP-1 - CLAMP PLATE 16 EA 4.44$ 71.04$

4 PRIVATE OFFICE APTOS TYPICAL WORK STATION '4' PER APPROVED ON 9/22/2016 - TO CONSIST OF THE FOLLOWING ITEMS (REF: QUOTE DATED 9/22/2016 FINISH: NAT. CHERRY ON CHERRY 'NCC' QUARTERED PULL STYLE: INTEGRAL GROMMET COLOR: POLISHED ' PAL' EDGE DETAIL: KNIFE S/M: APTOS PRIVATE OFFICE TYPICAL 4 CONSISTING OF ITEMS BELOW:

1 EA 3,894.79$

34-7230LPD.B4Z.AS - SINGLE LEFT B/B/F PEDESTAL DESK, LOCKING, NO GROMMET, RECESSED MODESTY PANEL DIMENSIONS: 72"W X 30"D X 29.5"H

1 EA 1,020.74$ 1,020.74$

34-8424MCT.B4Z.G3 - MODULAR CABINET TOP. CENTER GROMMET 'G3' DIMENSIONS: 84"W X 24"D

1 EA 381.90$ 381.90$

34-WI524MDP1.B4Z.AS.H2X - MODULAR BOX/BOX/ FILE PEDESTAL, LOCKING DIMENSIONS: 15"W X 22.63"D X 28.3"H

1 EA 517.58$ 517.58$

34-3029LFC.4BZ.AS.H2X - MODULAR TWO DRAWER LATERAL FILE CABINET, LOCKING DIMENSIONS: 30"W X 24"D X 29.5"H

1 EA 673.96$ 673.96$

34-2472MCT.B4Z.G4 - MODULAR CABINET TOP. GROMMET LEFT GROMMET 'G4' DIMENSIONS: 72"W X 24"D

1 EA 329.03$ 329.03$

34-24EP.B4Z - MODULAR RUN OFF END PANEL DIMENSIONS: 24"W X 28.3"H X 2"THICK

2 EA 148.99$ 297.98$

34-2872MCB.B4Z. - MODULAR BACK PANEL DIMENSIONS: 72"W X 28.10"H

1 EA 256.57$ 256.57$

Page 35: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

Page 4 of 4

ITEM DESCRIPTION QTY TYPE UNIT $ SUBTOTAL34-2884MCB.B4Z. - MODULAR BACK PANEL DIMENSIONS: 84"W X 28.10"H

1 EA 274.69$ 274.69$

OCD - WOOD SLANTED FRONT PENCIL DRAWER 1 EA 133.46$ 133.46$ CP-1 - CLAMP PLATE 2 EA 4.44$ 8.88$

5 CC-W3030RT.B5A.V.DN.QR.NCC / ASX26.MSL.MSL (REF: QUOTE DATED 9/22/2016) INTERMIX ROUND CONFERENCE TABLE TOP WITH DEUCE STYLE METAL BASE DIMENSIONS: 30" DIAMETER X 29.5"H WOOD TOP: NAT. CHERRRY ON CHERRY 'NCC' METAL BASE FINISH: LUSTRE GRAY TOP EDGE DETAIL: SQUARE EDGE 'DN' S/M: ROUND CONFERENCE TABLE 30" DIAMETER

1 EA 503.90$ 503.90$

6 CC-W3636RT.B5A.V.DN.QR.NCC / ASX32.MSL.MSL (REF: QUOTE DATED 9/22/2016) INTERMIX ROUND CONFERENCE TABLE TOP WITH DEUCE STYLE METAL BASE DIMENSIONS: 36" DIAMETER X 29.5"H WOOD TOP: NAT. CHERRRY ON CHERRY 'NCC' METAL BASE FINISH: LUSTRE GRAY TOP EDGE DETAIL: SQUARE EDGE 'DN' S/M: ROUND CONFERENCE TABLE 30" DIAMETER

2 EA 537.54$ 1,075.08$

7 6-3672BC.V.VEN.NCC BOOKCASE WITH THREE STATIONARY SHELVES AND TWO ADJUSTABLE SHELBES, SQUARE EDGE TOP DIMENSIONS: 36"W X 14"D X 72"H FINISH: NATURAL CHERRY ON CHERRY

13 EA 754.56$ 9,809.28$

SUBTOTAL 34,898.63$ Less 63.03 % GSA Discount ALREADY TAKEN

Estimated Freight to North Brunswick, NJ 08902 INCLUDEDCost to Ship Casegoods on Overseas Approved Pallets (5% of Overall List - $ 94,397.00) - OM

1 LOT 4,719.85$

48 Hour Notification to Warehouse Prior to Delivery INCLUDEDTOTAL EXPENSE 39,618.48$

Page 36: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

30 Round

Phone:

Drawn By:

Tag: Email:

Date:

Project Name: SEI Aptos

30 Round

9/21/2016

Ashley Silkwood (Schepers)

[email protected]

800.521.5381 x7388

Page 37: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

36 Round

Phone:

Drawn By:

Tag: Email:

Date:

Project Name: SEI Aptos

36 Round

9/21/2016

Ashley Silkwood (Schepers)

[email protected]

800.521.5381 x7388

Page 38: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

14.00"

36.00"

5S

Phone:

Drawn By:

Tag: Email:

Date:

Project Name: SEI Aptos

Bookcase

9/21/2016

Ashley Silkwood (Schepers)

[email protected]

800.521.5381 x7388

Page 39: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

72.00"

24.00"

42.00"

30.00"

72.00"

72.00"

34-7224CLF

Typ1

Phone:

Drawn By:

Tag: Email:

Date:

Project Name: SEI Aptos

Typ1

9/21/2016

Ashley Silkwood (Schepers)

[email protected]

800.521.5381 x7388

Page 40: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

72.00"

24.00"

42.00"

30.00"

72.00"

96.00"

34-7224CRLL

Typ2

Phone:

Drawn By:

Tag: Email:

Date:

Project Name: SEI Aptos

Typ2

9/21/2016

Ashley Silkwood (Schepers)

[email protected]

800.521.5381 x7388

Page 41: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

72.00"

24.00"

42.00"

30.00"

72.00"

96.00"

34-7224CRRL

Typ3

Phone:

Drawn By:

Tag: Email:

Date:

Project Name: SEI Aptos

Typ3

9/21/2016

Ashley Silkwood (Schepers)

[email protected]

800.521.5381 x7388

Page 42: U.S. DEPARTMENT OF STATE OBO FACILITIES …...Total Weight 4269 g/m² ± 5% Pile Height 4.1 mm ± 0.5 mm Total Thickness 7.5 mm ± 0.5 mm Gauge – Ends per 10 cm 1/12 - 47.2 Tufts

84.00" 30.00"

24.00"

72.00"

30.00"

72.00"

114.00"

126.00"

34-W

1524

MPD

1

34-8424MCT

34-2

472M

CT

34-2884MCB

34-2

872M

CB

34-3029LFC

Typ4

Phone:

Drawn By:

Tag: Email:

Date:

Project Name: SEI Aptos

Typ4

9/21/2016

Ashley Silkwood (Schepers)

[email protected]

800.521.5381 x7388