U.S Army Corps of Engineers Savannah District. Civil Works & Navigation Boundaries. SC. Savannah R. ATLANTIC OCEAN. GA. Savannah Harbor. AIWW. Brunswick Harbor. St. Mary’s R. Navigation Projects. Sav’h Harbor 32.5 Miles AIWW 161 Miles Brunswick 24 Miles Total 217.5 Miles. - PowerPoint PPT PresentationTRANSCRIPT
OP-Navigation.ppt 1
U.S Army Corps of U.S Army Corps of EngineersEngineers
Savannah DistrictSavannah District
OP-Navigation.ppt 2
SCSC
GAGA
ATLANTIC OCEAN
Savannah R.St. Mary’s R.St. Mary’s R.
Savannah HarborSavannah Harbor
Brunswick Brunswick HarborHarbor
AIWWAIWW
Civil Works & NavigationCivil Works & Navigation BoundariesBoundaries
OP-Navigation.ppt 3
Sav’h HarborSav’h Harbor 32.5 Miles32.5 Miles AIWWAIWW 161 Miles161 Miles Brunswick Brunswick 24 Miles24 Miles
TotalTotal 217.5 Miles217.5 Miles
Navigation ProjectsNavigation Projects
OP-Navigation.ppt 4
ScheduledScheduled FY08 Dredging Work in FY08 Dredging Work in Savannah District Savannah District
South Atlantic DivisionSouth Atlantic Division
Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor
FY08 Savannah &FY08 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl
OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP
Sea Turtles-screens & observersSea Turtles-screens & observers
Striped bass spawningStriped bass spawning
Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging
Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging
Est. 6,000K CYEst. 6,000K CY
BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY
BOBO2323
BOBO1515
OP-Navigation.ppt 5
Savannah DistrictSavannah District
FY 07 Hopper Dredge ProgramFY 07 Hopper Dredge Program
OP-Navigation.ppt 6
ScheduledScheduled FY08 Dredging Work in FY08 Dredging Work in Savannah District Savannah District
South Atlantic DivisionSouth Atlantic Division
FY08 Savannah &FY08 Savannah &Brunswick Entrance ChlBrunswick Entrance Chl
OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP
Sea Turtles-screens & observersSea Turtles-screens & observers
Hopper DredgeHopper DredgeMaintenance DredgingMaintenance Dredging
BOBO10/1510/15Est. 2,000K CYEst. 2,000K CY
BOBO2323
OP-Navigation.ppt 7
Savannah DistrictSavannah District
Project: Savannah Entrance ChannelProject: Savannah Entrance Channel Type of work: MaintenanceType of work: Maintenance Depth: 42/44 ftDepth: 42/44 ft Width: 600 ftWidth: 600 ft Length: 11.4 milesLength: 11.4 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: sand/silt/clayType of Material: sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean
site and near shore sitessite and near shore sites Distance to Placement Area: up to 11.5 Distance to Placement Area: up to 11.5
milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY06Last Dredged: FY06 Environmental Window: Dec 15- March Environmental Window: Dec 15- March
3131 Reason for Window: Right Whales and Reason for Window: Right Whales and
Sea TurtlesSea Turtles
OP-Navigation.ppt 8
Savannah DistrictSavannah District
Project: Brunswick Entrance ChannelProject: Brunswick Entrance Channel Type Work: MaintenanceType Work: Maintenance Depth: 36/38 feetDepth: 36/38 feet Width: 500 feetWidth: 500 feet Length: 16.8 milesLength: 16.8 miles Quantity: 1.0 MCYQuantity: 1.0 MCY Type of Material: Sand/silt/clayType of Material: Sand/silt/clay Placement Areas: EPA approved ocean Placement Areas: EPA approved ocean
site and near shore sitessite and near shore sites Distance to Placement Area: up to 19 Distance to Placement Area: up to 19
milesmiles Type of Equipment: HopperType of Equipment: Hopper Small Business Set Aside: NoSmall Business Set Aside: No Last Dredged: FY07Last Dredged: FY07 Environmental Window: 15 Dec-13 MarchEnvironmental Window: 15 Dec-13 March Reason for Window: Right Whales and Reason for Window: Right Whales and
Sea TurtlesSea Turtles
OP-Navigation.ppt 9
Savannah DistrictSavannah District
FY07 Hydraulic Cutter Head FY07 Hydraulic Cutter Head Dredge ProgramDredge Program
OP-Navigation.ppt 10
ScheduledScheduled FY08 Dredging Work in FY08 Dredging Work in Savannah District Savannah District
South Atlantic DivisionSouth Atlantic Division
Savannah & Brunswick Savannah & Brunswick Inner HarborInner Harbor
OCTOCT NOVNOV DECDEC JANJAN FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG SEPSEP
Striped bass spawningStriped bass spawning
Hydraulic Pipeline DredgeHydraulic Pipeline DredgeMaintenance DredgingMaintenance Dredging
Est. 6,000K CYEst. 6,000K CY
BOBO1515
OP-Navigation.ppt 11
Savannah DistrictSavannah District Project: Savannah & Brunswick Inner Project: Savannah & Brunswick Inner
HarborsHarbors Type of work: MaintenanceType of work: Maintenance Depth: (SH)40/46 ft, (BH)36 ftDepth: (SH)40/46 ft, (BH)36 ft Width: (SH)500 ft, (BH)400 ftWidth: (SH)500 ft, (BH)400 ft Length: (SH)21.3 miles, (BH)3 milesLength: (SH)21.3 miles, (BH)3 miles Quantity: 6.0 mcyQuantity: 6.0 mcy Type of Material: sand/silt/mudType of Material: sand/silt/mud Placement Area: Upland placement sitesPlacement Area: Upland placement sites Distance to Placement Area: up to 2 Distance to Placement Area: up to 2
milesmiles Type of Equipment: Hydraulic Type of Equipment: Hydraulic
cutterhead pipelinecutterhead pipeline Small Business Set Aside: YesSmall Business Set Aside: Yes Last Dredged: FY07Last Dredged: FY07 Environmental Window: (SH) March 15-Environmental Window: (SH) March 15-
May 30 (above Station 63+000) (BH)April May 30 (above Station 63+000) (BH)April 1-August 11-August 1
Reason for Window: (SH)Striped Bass Reason for Window: (SH)Striped Bass Spawning (BH) Least tern nestingSpawning (BH) Least tern nesting
OP-Navigation.ppt 12
SAVANNAH DISTRICTNEW WORK
DREDGING PROGRAM
NAD/SAD REGIONAL DREDGING
MEETING/WEDA US Army Corps of Engineers Savannah District
OP-Navigation.ppt 13
Savannah DistrictSavannah District
FY09 FY10 FY11 FY12
Project Dredge QuantityDisposal
Area1st Qtr
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd
Qtr3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
Savannah Harbor Expansion Entrance Channel
Hopper Pipeline
11.4 MBeach Ocean Littoral
Savannah Harbor Expansion
Inner HarborPipeline 14.3 M Upland
OP-Navigation.ppt 14
Type of Work: New WorkDepth: 47‘Width: variesLength: 36+ MilesQuantity: 25.7 McyType of Material: Hard Sand, Silts and Clay Placement Area: Upland & Open waterDistance to Placement Area: upto 15MilesType of Equipment: Hopper/PipelineSmall Business Set Aside: NoLast Dredged: 2007Schedule: Bid Opening November 2008POC: T. Alan Garrett
Savannah Harbor Expansion