US Army Corps of Engineers
PLANNING SMARTBUILDING STRONG®
Civil Works Transformation
SMART Feasibility StudiesMilestones & Process
![Page 2: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/2.jpg)
BUILDING STRONG®
SMART Feasibility Study ProcessIn-Progress Reviews (IPRs) as needed
![Page 3: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/3.jpg)
BUILDING STRONG®
The Right Level of Detail at the Right Time
3
Level
of Detail
Drivers
Risk Toleranc
e
CRITERIA
(Metric &
Methodology)
Decision
ScopingAlternatives
Formulation & Comparison
Feasibility Level Analysis
Available Data – uncertainty level is often high
Customized data, often quantitative – uncertainty should have been reduced
Problems & Opportunities
Inventory & Forecast
FormulationEvaluation
Comparison
Selection
![Page 4: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/4.jpg)
BUILDING STRONG®
At Every Step
• Communicate with Vertical Team throughout process, not just at Milestones
• Document and share decisions made by PDT and Vertical Team
• Think critically – Can we make a decision with what we know now?
![Page 5: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/5.jpg)
BUILDING STRONG®
Tools for SMART Planning• Planning Charette –intensive workshop bringing
together Study Team and Vertical Team• In Progress Reviews and other Team Meetings• Decision Management Plan – maps path to the next
major study decision• Risk Register – documents study and project
uncertainty / risk so it can be managed• Decision Log• Examples, Tips, Tools & Techniques on the Planning
SMART Guide
![Page 6: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/6.jpg)
BUILDING STRONG®
1. Encourage public and agency input and interaction. If EIS will be required, issue public NOI & scoping meeting.
2. Accelerate the process with a facilitated Planning Charette with PDT, Vertical Team, non-federal sponsor, USACE expertise appropriate to study, and other key stakeholders.
3. PDT develops a focused array of alternatives using iterations of six-step planning process.
Scoping → Alternatives Milestone
- Endangered Species Issues? - Engineering Issues?
- Real Estate? - Value Engineering?
![Page 7: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/7.jpg)
BUILDING STRONG®
Scoping → Alternatives Milestone4. Alternatives Milestone: VT confirms array of
alternatives and the criteria the PDT will use for evaluation and comparison.
Report Synopsis• Decisions to Date
Tools & Information• Decision Management Plan• Risk Register• Decision Log• Review plan
![Page 8: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/8.jpg)
BUILDING STRONG®
1. PDT uses the models / data needed to reduce unacceptable uncertainty in plan evaluation and comparison.
2. TSP Milestone: VT confirms the tentatively selected plan recommended by the PDT.
3. Public Review: Draft feasibility report released, including evaluation analysis and draft recommendation.
4. Agency Review: ATR, IEPR (if needed). HQ Policy Review. District Counsel’s legal review certification.
Alternatives Formulation & Analysis → TSP & Agency Decision Milestones
![Page 9: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/9.jpg)
BUILDING STRONG®
Alternatives Formulation & Analysis → TSP & Agency Decision Milestones
5. PDT updates draft feasibility report in response to public and agency review.
6. Agency Decision Milestone: Senior HQUSACE Leadership endorses recommended plan for feasibility-level design.
Draft Report• Recommended Plan• Decisions to Date
Tools & Information• Risk Register• Decision
Management Plan• Decision Log• Review plan
![Page 10: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/10.jpg)
BUILDING STRONG®
1. PDT addresses comments from HQUSACE Leadership and scales measures of the recommended alternative, reducing project and study uncertainty, completes the report.
2. Final Report Milestone: DCG-CEO briefed on recommendation and releases Final Report for State and Agency Review.
Feasibility Level Analysis → Final Report Milestone
![Page 11: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/11.jpg)
BUILDING STRONG®
Feasibility Level Analysis → Final Report Milestone
3. Division Engineer Notice of final recommendation. 4. Final EIS (or FONSI) published.
Tools & Information• Risk Register• Decision Log• Review plan
Feasibility Report• Study• Decisions to Date
![Page 12: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/12.jpg)
BUILDING STRONG®
1. PDT finalizes the feasibility study report, addressing state and agency comments.
2. Policy Review & Legal Certification. 3. Chief’s Report prepared.4. Chief’s Report Milestone: Chief signs the report.5. Record of Decision prepared.
Final Feasibility Study Report → Chief’s Report Milestone
![Page 13: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/13.jpg)
BUILDING STRONG®
The Results “No Surprise” Reviews Increased Trust and Cooperation Studies completed in a more reasonable amount of
time Studies cost significantly less High quality and concise decision documents Decisions informed by managing risk and
acknowledging uncertainty Strong, viable Civil Works Project portfolio developed
![Page 14: US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Civil Works Transformation SMART Feasibility Studies Milestones & Process](https://reader030.vdocuments.mx/reader030/viewer/2022032611/56649e005503460f94ae9412/html5/thumbnails/14.jpg)
BUILDING STRONG®
Planning SMART GuidePublished online at www.corpsplanning.us – allows for timely content updates
• Feasibility Study Phases• Scoping• Alternative Formulation & Analysis• Feasibility-Level Design• Chief’s Report
• SMART Planning Tips & Tools• Tips for Highly Effective Studies• Business Line Guides• Risk Register Template• Decision Log• Report Synopsis Example• 100-Page Report Example• Review Primer• And more!