us army corps of engineers building strong ® st. louis district low water operations russell errett...

35
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

Upload: alexina-moore

Post on 18-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

US Army Corps of Engineers

BUILDING STRONG®

St. Louis DistrictLow Water Operations

Russell Errett

Water ControlSt. Louis District

February 2013

Page 2: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Overview St. Louis District Overview Low Water Operations

►L&D Operations►Middle Mississippi River Forecast Errors►Reservoir Deviation/Directive Operations

Middle Mississippi River Rock Removal Questions

Page 3: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

USACE

Page 4: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Lake Shelbyville

Rend Lake

Carlyle Lake

Wappapello Lake

Mark Twain Lake

Mississippi River

Illi

no

is R

ive

r

Missouri River

St. Louis District

Page 5: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

District Overview 5 Flood Control Reservoirs Projects

►Lake Shelbyville, Carlyle Lake, Rend Lake, Mark Twain Lake, and Wappapello Lake

5 Lock and Dam Projects►L&D 24, L&D 25, Mel Price L&D, L&D 27, and

Kaskaskia L&D 9 Watersheds draining into the Mississippi

River within the St. Louis District►Salt, Cuivre, Lower Missouri, Meramec, Upper

St. Francis, Castor, Lower Illinois, Kaskaskia, and Big Muddy Rivers

Page 6: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Mississippi River

Illi

no

is R

ive

r

Missouri River

Locks and Dams

Locks 27

Melvin PriceLocks & Dam

Kaskaskia L&D

L&D 25

Dam 27

L&D 24

Page 7: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

419.0

412.5

Mel Price L&D

RM - 201.116.2

14.2

414.0

L&D 25

RM – 241.2

Grafton

RM – 218.6

Alton

RM – 203.0

Melvin Price Locks and Dam► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if

at maximum drawdown, or Alton at 414.0)

Low Flow / Flat Pool

Page 8: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

419.0

412.5

Mel Price L&D

RM - 201.116.2

14.2

414.0

L&D 25

RM – 241.2

Grafton

RM – 218.6

Alton

RM – 203.0

Melvin Price Locks and Dam► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if

at maximum drawdown, or Alton at 414.0)

Increasing / Decreasing Flow

Page 9: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

419.0

412.5

Mel Price L&D

RM - 201.116.2

14.2

414.0

L&D 25

RM – 241.2

Grafton

RM – 218.6

Alton

RM – 203.0

Melvin Price Locks and Dam► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if

at maximum drawdown, or Alton at 414.0)

Maximum Drawdown

Page 10: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

419.0

412.5

Mel Price L&D

RM - 201.116.2

14.2

414.0

L&D 25

RM – 241.2

Grafton

RM – 218.6

Alton

RM – 203.0

Melvin Price Locks and Dam► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be

exceeded if at maximum drawdown, or Alton at 414.0)

Open River

Page 11: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Government Owned Flowage Easements

Mel Price L&D

RM - 201.1

L&D 25

RM – 241.2

Grafton

RM – 218.6

Low Flow / Flat Pool

Melvin Price Locks and Dam

► Pool Limits: 412.5 - 419.0► Alton Lower Limit: 414.0 ► Hinge Point Limits,

Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0)

Flow

Page 12: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Government Owned Flowage Easements

Mel Price L&D

RM - 201.1

L&D 25

RM – 241.2

Grafton

RM – 218.6

Increasing / Decreasing Flow

Melvin Price Locks and Dam

► Pool Limits: 412.5 - 419.0► Alton Lower Limit: 414.0 ► Hinge Point Limits,

Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0)

Flow

Page 13: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Government Owned Flowage Easements

Mel Price L&D

RM - 201.1

L&D 25

RM – 241.2

Grafton

RM – 218.6

Melvin Price Locks and Dam

► Pool Limits: 412.5 - 419.0► Alton Lower Limit: 414.0 ► Hinge Point Limits,

Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0)

Flow

Maximum Drawdown

Page 14: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Government Owned Flowage Easements

Mel Price L&D

RM - 201.1

L&D 25

RM – 241.2

Grafton

RM – 218.6

Melvin Price Locks and Dam

► Pool Limits: 412.5 - 419.0► Alton Lower Limit: 414.0 ► Hinge Point Limits,

Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0)

Flow

Open River

Page 15: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Hinge Point Operation Lock and Dam 24

► Pool Limits: 445.5 - 449.0 ► Hinge Point Limits, Louisiana: 11.5 - 12.2 (May be exceeded if at

maximum drawdown) Lock and Dam 25

► Pool Limits: 429.7 - 434.0 ► Hinge Point Limits, Mosier Landing: 434.0 - 437.0 (May be

exceeded if at maximum drawdown) Melvin Price Locks and Dam

► Pool Limits: 412.5 - 419.0 Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at

maximum drawdown, or Alton at 414.0) Kaskaskia Lock and Dam

► Pool Limits: 363.0 - 368.8 ► Hinge Point, Red Bud: 368.0 - 370.0

Page 16: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Critical Link

Critical Link

Illinois River@ Meredosia

Mississippi River@ L&D 22

Missouri River@ Hermann

Mississippi River@ St. Louis

Page 17: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Middle Mississippi River

Low Water

Page 18: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Historical DroughtsTop 10 Low Water Stages at St. Louis

1. -6.2 (JAN 1940)

2. -5.8 (JAN 1963)

3. -5.6 (JAN 1964)

4. -5.5 (DEC 1937)

5. -5.4 (DEC 1989)*

6. -4.8 (JAN 1957)

7. -4.6 (JAN 1956)

8. -4.5 (JAN 2003)*

9. -4.3 (DEC 1933)

10. -4.3 (JAN 1954)

-4.6 (JAN 2013)*

*Indicates instantaneous gage reading vs 08:00 reading.

Page 19: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Daily Record Lows• 1967 - 2013: 51 days• POR: 14 days

Record Low• 1967 - 2013: -5.4 ft (Dec 1989)• POR: -6.2 ft (Jan 1940)

St. Louis (1861-Present)

Page 20: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Mel Price Low Water Operations

Approved Deviation to hold Mel Price 0.5 ft above maximum regulated pool►Minimize fluctuations downstream (i.e. St.

Louis Harbor)►Extra storage is used to prevent low dips from

L&D operations upstream►Extra storage can be used to provide a pulse

of water to free grounded tows if needed

Page 21: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Mel Price Low Water Operations Actual W/O Mel Price Deviation

Me

l Pri

ce

Po

ol

St.

Lo

uis

Prevented daily +2 ft stage fluctuations at St. Louis

Page 22: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Mel Price Low Water Operations(September & October)

Actual W/O Mel Price Deviation

Prevented St. Louis from dropping to -4.6

Mel

Pri

ce P

oo

lS

t. L

ou

is

Page 23: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Mel Price Low Water Operations(December & January)

Actual W/O Mel Price Deviation

Mel

Pri

ce P

oo

lS

t. L

ou

is

Prevented St. Louis from dropping to -5.1

Page 24: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Extended River Forecast Errors

Page 25: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Currently St. Louis is at -0.7 ft►7,000 cfs/ft

Upper Mississippi River Flow Forecast►Currently ~ 39,200 cfs►28 days ~ 21,500 cfs (-17,700 cfs)

Missouri River Flow Forecast►Currently ~ 48,700 cfs►28 days ~ 24,000 cfs (-24,700 cfs)

St. Louis 28 day Forecast►Loss of 42,400 cfs ~ loss of 6 ft ~ -6.7 ft at St. Louis

Extended River Forecast(issued late November)

Page 26: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Accounting for Forecast Errors Assuming St. Louis Low of -5.1 ft (i.e. no Mel

Price operation)

►6,000 cfs/ft Upper Mississippi River Flow Forecast

►Error ~ -1,140 cfs Illinois River

►Error ~ -3,000 to -6,000 cfs Missouri River Flow Forecast

►Error ~ -3,300 cfs St. Louis Low:

►Loss of 7,440 to 10,440 cfs ~ -6.3 ft to -6.8 ft

Page 27: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Reservoir Operations

Page 28: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Mississippi River

Illi

no

is R

ive

r

Missouri River

Reservoirs

Mark Twain Lake

Lake Shelbyville

Carlyle Lake

Rend Lake

Wappapello Lake

Page 29: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Project Purposes Lake Shelbyville

Carlyle Lake

Thebes, ILCHESTER, IL

CAIRO, IL

Flood Control Recreation Fish and Wildlife Conservation Water Supply Water Quality Navigation

Lower Kaskaskia River Middle Mississippi River

Page 30: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Project Purposes Lake Shelbyville

Carlyle Lake

Thebes, ILCHESTER, IL

CAIRO, IL

Navigation Authorized to release up to

bankfull (4,000 cfs from Carlyle Lake)

Can provide at least 0.5 ft increase in stages on the Middle Mississippi during low water

Page 31: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Deviations Lake Shelbyville

Carlyle Lake

Thebes, ILCHESTER, IL

CAIRO, IL

Approved Deviation on August 30th

Hold addition storage from the anticipated runoff from Hurricane Isaac Shelbyville ~ 602.0 (+2.3) Carlyle ~ 447.0 (+2.0)

Page 32: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Directives Lake Shelbyville

Carlyle Lake

Thebes, ILCHESTER, IL

CAIRO, IL

Directive issued from our division office on October 17th

Hold up to 10% of guide curve

Page 33: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Reservoir OperationsT

heb

es

Car

lyle

Lak

eL

ake

Sh

elb

yvill

e

Timely releases prevented less than 9 ft depth at Thebes

Page 34: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

Rock Removal Remnants of the 1988-1989 rock removal

►Grand Tower Reach (RM 78.9 to 80.0)►Thebes Reach (RM 38.5 to 46.0)

Rock Pinnacles

Thebes Reach

Page 35: US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

BUILDING STRONG®

? ? ? Questions ? ? ?