us 62 corridor safety study (hermitage-mercer)...public officials’ briefing (3:30 pm to 4:30 pm)...

13
Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety Study (Hermitage-Mercer)

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Public Officials’ Briefing (3:30 PM to 4:30 PM)

Public Open-House Meeting (5:00 PM to 7:00 PM)

May 15, 2019

US 62 Corridor Safety Study

(Hermitage-Mercer)

Page 2: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Agenda

• Introductions

• Study Area / Purpose

• Existing Conditions

– Physical Infrastructure

– Traffic Operations

– Safety

• Outreach & Coordination

• Schedule & Next Steps

Page 3: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

• US 62 Study Corridor:

– Keel Ridge Road (Hermitage) to US 19 (Mercer Borough)

– Lackawannock, East Lackawannock, and Jefferson Twp’s

Study Area

11-mile US 62Project Corridor

Page 4: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Study Purpose

1. Evaluate transportation-related safety

needs along the US 62 Study Corridor

– Physical Infrastructure

• Roadway, Drainage, Guiderail

– Traffic Operations

• Traffic Volumes, Growth, and Capacity

• Travel Conditions (Auto, Truck, Transit)

• I-80 Emergency Detour Route

– Safety

• Crash Trends, Travel Speeds, Sight Distance

2. Develop an Action Plan of possible

short-term and long-term projects

Page 5: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

• Shoulder and Lane Widths

• Guiderail Conditions

• Intersection Sight Distance

• Passing Sight Distance

• Climbing Lanes

• Speed Limits

• Driveway Access

Physical Infrastructure

Page 6: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Daily Traffic Counts Spot Speed Study

Peak Hr Intersection Counts Travel Observations

Traffic Operations

Page 7: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Traffic Operations

• 7,100-10,500 veh per day (350-500 peak hr / peak dir)

• 7:30 AM and 4:30 PM peak travel periods

• 12.5 minute travel time w/ < 1.0 minute of delay

• Posted 55 mph: 50-61 mph average (54-64 mph 85th %)

• Posted 35 mph: 35-36 mph average (39 mph 85th %)

Page 8: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

• 200 crashes in 5 years (≈ 2 to 4 per month)

• No notable trends by type, severity, etc.

• Cluster, rate, HSM analysis ongoing

Safety Data

US 62 Corridor Crash Cluster Map (5 Year Period, 2013-2017)

Page 9: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Outreach & Coordination

• Mobility Needs via PennDOT Connects Policy

– Pedestrians / Bicycles

– Public Transit

– Transportation Systems Management & Operations (TSMO)

– Intelligent Transportation Systems (ITS)

– Freight / Economic Activity / Manufacturing

– Stormwater & Green Infrastructure

– Utilities, Health, Community / Cultural Events

POLICY GOAL: Better Communities and Mobility Powered through Collaboration

Page 10: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Outreach & Coordination

• Public Meetings

• Public Officials Briefings

• Stakeholder Groups

• Online Survey

Stakeholder Groups

Corridor Maintenance and Planning/Engineering

School District and Transit Agency

Emergency Services

Business Owners/Operators

PennDOT District 1-0 Website: www.penndot.gov/District1

MCRPC Website: https://mcrpc.com/transportation/

Page 11: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Outreach & Coordination

Online WikiMap Survey (Live May 1-31):

https://wikimapping.com/US-62-Corridor-Safety-Study.html

www.penndot.gov/District1; https://mcrpc.com/transportation/

Page 12: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Schedule & Next Steps

• May-June: Finalize Background Analysis

• June-July: Develop Improvement Alternatives

• End Summer: Public Meeting #2 / Review Alternatives

• Early Fall: Refine Alternatives

• Late Fall: Implementation Plan and Final Report

Page 13: US 62 Corridor Safety Study (Hermitage-Mercer)...Public Officials’ Briefing (3:30 PM to 4:30 PM) Public Open-House Meeting (5:00 PM to 7:00 PM) May 15, 2019 US 62 Corridor Safety

Tom McClelland, P.E., PennDOT Project Manager

PA Department of Transportation

(814) 678-7081 / [email protected]

Matt Stewart, MCRPC Senior Planner

Mercer County Regional Planning Commission

(724) 981-2412 x3206 / [email protected]

Chad D. Reese, P.E., WRA Project Manager

Whitman, Requardt & Associates, LLP

(724) 779-7940 / [email protected]

Contact Information