Page 1: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

URFinancials Project Demo Days March 20, 2013

Page 2: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

2

Darren Picciano

For those joining the Webex: • 1) Please access the chat feature at the top of

your screen. • 2) Please chat directly with Darren Picciano

(He will then pose the questions on your behalf)

• 3) Select Darren in the drop down menu in the chat window (do not select “everyone”)

Chatting for WebEx Participants

Page 3: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Topics

UR Financials project update

The Workday Financial Data Model (FDM)

Demonstrations:

1. Demonstration #1 – Inherited Worktags

2. Demonstration #2 – Create a Journal Entry a. Run a Financial Report for cost center

b. Create a Journal entry

c. Rerun a Financial Report for cost center

d. Drill down into detailed transactions

3. Demonstration #3 - Perform a Pro Rate (allocation) a. Run a Financial Report

b. Run a pro rate (allocation)

c. Review the effects of the pro rate (allocation)

Data Conversion Approach

Reporting Approach

Questions and Answers

Survey

3 UR Financials - Demo Days 3/20/13

Page 4: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Disclaimer

The material in this presentation is a first look at some of the design concepts of the UR Financials project. It is preliminary in nature and there is a 99% certainty that the design concepts WILL CHANGE over the course of the life of the project (the next 468 days). Please proceed with caution and use it primarily as “talking points” in discussion with the team.

4 UR Financials - Demo Days 3/20/13

Page 5: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Scope

5

Our primary focus is the elimination of high-risk financial information systems (FRS)

Team to recommend opportunities for business process improvement

Our implementation will be based on a standard solution where ever possible

There will be opportunities to enhance the Chart of Accounts (COA). Integration of COA back into interfaced systems (111) will be evaluated on a system by system basis

Feedback is encouraged and welcome

UR Financials - Demo Days 3/20/13

Page 6: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Project Update “Planning Phase” of the project complete

Workday is on site holding design workshops

GATE 1 review was held with IT Leadership and received a “Pass”

Currently “refining” project scope

Like for like functionality (FRS vs. Workday)

Business process improvement opportunities

Workday version 19 came out on Monday. We project that much of our implementation will be locked on version 21 (circa November 2013)

6 UR Financials - Demo Days 3/20/13

Page 7: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Workday Financial Data Model (FDM)

7

FRS separates each grant, contract, or specific activity as individual accounts within their respective general ledger fund. Sub-ledger (S/L) accounts

are used to record the University's revenues and expenses. Each subsidiary ledger number refers to a specific type of accounts (i.e., ledger 1’s are

income accounts, ledger 2’s are expense accounts, etc.).

FRS Account Number Format

L - BBAAA - SSSS

Sub-

code

Account Id • Used to identify Fund Group and Fund

Value

Ledger number

The FRS account number format is as follows:

L- Ledger Number (0) or Sub-ledger Number (1 to 9)

B - Fund Group

A - Account Identifier (e.g., gift, sponsored program, special purpose, endowment principal)

S - Natural account for transactions

The FRS ledgers are as follows:

Ledger 0 – The University's general ledger accounts start with a 0 (zero)

Ledger 1 – Budgeted Revenue - Income Only

Ledger 2 – Budgeted Appropriations and Expenditures - Expenses Only

Ledger 3 – Self Supporting Activities - Revenue and Expenses Recorded

Ledger 4 – Restricted Endowment - Revenue Appropriations - Expenditures Only

Ledger 5 – Sponsored Research and Other Sponsored Projects Appropriation and

Expenditures- Expenses Only

Ledger 6 – Other Restricted Funds Appropriation & Expenditures - Expenses Only

Ledger 7 – Funds for Renewal and Replacement Appropriations - Expenditures Only

Ledger 8 – NOT USED

Ledger 9 – Agency Funds - Revenues and Expenses Recorded

UR Financials - Demo Days 3/20/13

Page 8: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Workday FDM “Worktags” The Financial Data Model is the multidimensional structure of Workday accounting and financial reporting. The FRS accounts and attributes will be

captured as “worktags”. Workday uses tags to identify the various dimensions of the business. These tags are called “Worktags” and will form the

building blocks of the new chart of accounts in Workday.

FRS account, sub-code, and attributes

Company

Fund

Cost Center

Grant

Ledger

Account

Spend

Category

Gift

Revenue

Category Worktags

Project NACUBO

Expense Code

(AICPA/ A21)

UR Financials - Demo Days 3/20/13

Page 9: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Workday FDM “Worktags”

UR Financials - Demo Days 3/20/13

Page 10: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Workday FDM Examples Here are few examples of how FRS transactions will be captured in Workday.

UR Financials - Demo Days 3/20/13

Page 11: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Workday Navigation

11

Search Box

“Worklet” Active Links

Report Links

Workfeed

UR Financials - Demo Days 3/20/13

Page 12: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #1 – Inherited Worktags (Grant 527695)

12 UR Financials - Demo Days 3/20/13

Input Worktag • Grant

Inherited Worktag(s) • Fund • Cost Center

Journal Header

Page 13: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #2 – Run Financial Report (Cost Center 298765)

13 UR Financials - Demo Days 3/20/13

Cost Center

Detailed Lines

Page 14: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #2 – Run Financial Report (Cost Center 298765)

14 UR Financials - Demo Days 3/20/13

Drillable Amounts

Cost Center Summary

Lines

Page 15: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #2 – Create a Journal Entry

15 UR Financials - Demo Days 3/20/13

Detailed Lines

Journal Posting

Message

Page 16: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #2 – Run Financial Report (Cost Center 298765)

16 UR Financials - Demo Days 3/20/13

Changed Amount

Cost Center Summary

Lines

Page 17: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #2 – Run Financial Report (Cost Center 298765)

17 UR Financials - Demo Days 3/20/13

Report by Period

Page 18: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #2 – Drill Down Into Financial Report (Cost Center 298765)

18 UR Financials - Demo Days 3/20/13

Drill Into $27,000

Page 19: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #3 – Run A Financial Report (No Pro Rated Amounts)

19 UR Financials - Demo Days 3/20/13

Sender Cost

Centers

Receiver Cost

Centers

Page 20: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Demonstration #3 – Run A Financial Report (With Pro Rated Amounts)

20 UR Financials - Demo Days 3/20/13

Allocations Out

Allocations In

Page 21: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Data Conversion Strategy

Team recommends converting the following FRS data into Workday:

G/L - 1 years worth (FY14) of month end balance. Posted as a journal entry. Need to determine the level of detail (i.e. FRS account)

Grants – open receivables

A/P – open invoices

FY14 Budgets (for year over year comparisons)

Can start converting July 2013 data in Fall of 2013

21 UR Financials - Demo Days 3/20/13

Page 22: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Reporting Strategy:

• Workday = Go-Live and the Future

• Cognos & FRS = Frozen at Go-Live

22

Go Live 7/14 Now until 6/30/14

FRS -DW

Cognos & FRS

Workday

• Current reporting structure

frozen at 6/30/14

• Data as of 7/1/14

• 1 Yr. converted data

• Reporting activities

Workday-

DW

Future

• Limited Workday Data

Warehouse

UR Financials - Demo Days 3/20/13

Page 23: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

UR Financials Website

23

Home – Current News, Events, etc.

Welcome

Timeline

FAQs

Project Team

Resources – Links to Presentations

Contact Us – Email to project team

Search capabilities UR Financials - Demo Days 3/20/13

Page 24: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

Questions and Answers

Please fill out the survey

UR Financials - Demo Days 3/20/13 24

Page 25: URFinancials Project...2013/03/20  · • Current reporting structure frozen at 6/30/14 • Data as of 7/1/14 • 1 Yr. converted data • Reporting activities Workday-DW Future •

25 UR Financials - Demo Days 3/20/13