ureneo nederland b.v.€¦ · on behalf of the german nuclear power plant operators, rwe nuclear...

1
Confir matio n on quality assu ran ce ac co rding to nuclea r st an dard KTA 1401 On behalf of the German nuclear power plant operators, RWE Nuclear GmbH as a partner of the VGB PowerTech e.V. working group "Assess- ment of Contractors" confirms Ureneo Nederl an d B.V. Drienemansweg 1, 7601 Almelo/NL for the site Drienemansweg 1, 7601 Almelo/ NL and the scope of supply and services Enrichment of Uranium the qualification for system- and product related quality assurance. The assessment was performed on January 25 th , 2019 by order of Framatome GmbH based on the standard KTA 1401 vc::iB POWERTECH - En!3W . _... •• Preussen _. Elektra . as weil as on the assessment documents of the VGB PowerTech e.V. RWE working group "Assessment of Contractors" in consideration of product . related requirements. Details of the assessment are given in the report IBGSI/2019/en/0053. This confirmation is valid until December 13 rd , 2021 provided that the conditions on which the assessment was based have not been changed. Essen,April 2019 i.// cbJ- Torsten Metzler Eduard Kessler RWE Nuclear GmbH Valtenfall Europe Nuclear Energy

Upload: others

Post on 13-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ureneo Nederland B.V.€¦ · On behalf of the German nuclear power plant operators, RWE Nuclear GmbH as a partner of the VGB PowerTech e.V. working group "Assess ment of Contractors"

Confirmation on quality assurance according to nuclear standard KTA 1401

On behalf of the German nuclear power plant operators, RWE Nuclear GmbH as a partner of the VGB PowerTech e.V. working group "Assess­ment of Contractors" confirms

Ureneo Nederland B.V. Drienemansweg 1, 7601 Almelo/NL

for the site Drienemansweg 1, 7601 Almelo/ NL

and the scope of supply and services

Enrichment of Uranium

the qualification for system- and product related quality assurance.

The assessment was performed on January 25th , 2019 by order of

Framatome GmbH

based on the standard KTA 1401

vc::iB POWERTECH

- En!3W

. _... •• Preussen _. Elektra .

as weil as on the assessment documents of the VGB PowerTech e.V. RWE working group "Assessment of Contractors" in consideration of product . related requirements.

Details of the assessment are given in the report IBGSI/2019/en/0053.

This confirmation is valid until December 13rd, 2021 provided that the conditions on which the assessment was based have not been changed.

Essen,April 23~, 2019

i.// cbJ-Torsten Metzler Eduard Kessler

RWE Nuclear GmbH

Valtenfall Europe Nuclear Energy