13835 South Lakes Drive Charlotte, North Carolina 28273 704-588-8877 FAX 704-588-9006 www.pentaengr.com PENTA ENGINEERING, P.A. Employee Owned UREA INFRASTRUCTURE PROJECT POWER UTILITY – NORTH CAROLINA As part of a design build effort, PENTA provided complete engineering and design for a series of Urea Infrastructure projects. The scope of this project consisted of adding a utility-grade Urea Liquor unloading, dilution, storage and transfer system that can be used with the Selective Non-Catalytic Reduction (SNCR) systems at four (4) of the Power Company’s sites. Urea Liquor is delivered to each site by rail car or tanker truck. These new facilities provide for the unloading, dilution and storage of urea liquor, and for the transfer of the liquor for injection into the SNCR system. The equipment requirement at each site varied, based upon the existing equipment and site conditions at each location. PENTA worked closely with our construction partner to identify these differences and deliver site-specific systems. Major pieces of equipment included: Urea Delivery Skids including pumps, piping, valves and instrumentation Dilution Water Skids including pumps, piping, valves and instrumentation Truck Unloading Stations Large capacity, insulated, FRP Holding Tanks with heating pads PENTA’s design and engineering role included: Process design/ P&ID development General arrangement drawings Piping plan and details drawings Piping isometric drawings Pipe supports Civil site plan drawings Structural foundation plan and detail drawings Power and lighting plans Power and lighting panel drawings Motor elementary drawings Grounding drawings Heat tracing drawings 7996-25 North Point Blvd. Suite 117 Winston-Salem, North Carolina 27106 336-759-7401 FAX 336-759-7402

Upload: edenson-flores-trujillo

Post on 18-Dec-2015

214 views

Category:

Documents


1 download

DESCRIPTION

urea

TRANSCRIPT

  • 13835 South Lakes Drive Charlotte, North Carolina 28273 704-588-8877 FAX 704-588-9006 www.pentaengr.com

    PENTA ENGINEERING, P.A. Employee Owned

    UREA INFRASTRUCTURE PROJECT

    POWER UTILITY NORTH CAROLINA

    As part of a design build effort, PENTA provided complete engineering and design for a series of Urea Infrastructure projects. The scope of this project consisted of adding a utility-grade Urea Liquor unloading, dilution, storage and transfer system that can be used with the Selective Non-Catalytic Reduction (SNCR) systems at four (4) of the Power Companys sites. Urea Liquor is delivered to each site by rail car or tanker truck. These new facilities provide for the unloading, dilution and storage of urea liquor, and for the transfer of the liquor for injection into the SNCR system. The equipment requirement at each site varied, based upon the existing equipment and site conditions at each location. PENTA worked closely with our construction partner to identify these differences and deliver site-specific systems.

    Major pieces of equipment included: Urea Delivery Skids including pumps,

    piping, valves and instrumentation Dilution Water Skids including pumps,

    piping, valves and instrumentation Truck Unloading Stations Large capacity, insulated, FRP Holding

    Tanks with heating pads

    PENTAs design and engineering role included: Process design/ P&ID development General arrangement drawings Piping plan and details drawings Piping isometric drawings Pipe supports Civil site plan drawings Structural foundation plan and detail

    drawings Power and lighting plans Power and lighting panel drawings Motor elementary drawings Grounding drawings Heat tracing drawings

    7996-25 North Point Blvd. Suite 117 Winston-Salem, North Carolina 27106 336-759-7401 FAX 336-759-7402