uranium mining by in-situ recovery (isr) technology
TRANSCRIPT
Uranium Miningby In-Situ Recovery (ISR)
Technology
A summary reviewprepared byBill Boberg
Ur-Energy Inc.Littleton, Colorado
Uranium In-Situ Recovery (ISR) Mining
Low capital costs ($20 to $35 million)Environmentally friendly (common solute is
ground water enriched with oxygen and, ifneeded, carbon dioxide or bicarbonate of soda)
Process essentially reverses the natural processby which the deposits were originally formed
Works very good on solution front deposits inporous & permeable sandstones (Wyoming, Texas,Kazakhstan, Australia, etc.)
Ideally 14 – 24 months mining, 24+ monthsground water restoration and surfacereclamation
Production cost range - $18 to $25 per pound
Prepared by Bill Boberg, Ur-Energy, Inc. 2006
ISR Mine Production Schematic
Basic ISR Process - Satellite
ISR Wellfield Layout
Wellfield cross sectionIn following slide
ISR Mining – Injection and Production Wells
Drilling to Install WellfieldView at Christensen Ranch ISR Mine (Cogema/AREVA)
Powder River Basin, Wyoming
Photo by Tom Nicholson
ISR Wellfield Smith Ranch Mine (PRI/Cameco)Powder River Basin, Wyoming
Photo by Bill Boberg – July 2005
ISR Mining – A Plumbers World
A production welland insulating cover
Header House, controllingboth injection as well asproduction from many wellsin wellfield
Photos by Bill Boberg, Taken at PRI/CamecoSmith Ranch ISL Mine, Powder River BasinWyoming – July 2005
Basic ISR Plant Processing
From the ISR Wellfield to the Plant
From the production well theproduced fluid goes through resintanks where the uranium isstripped from the fluid and is thenreturned to the wellfield
The resin is then transported to themill where it is stripped and theuranium is taken into solutionPhotos by Bill Boberg, Taken at PRI/CamecoSmith Ranch ISL Mine, Powder River BasinWyoming – July 2005
From Solution to Yellowcake
After stripping from the resin, theuranium is taken through severalsteps in solution before beingprecipitated and dried
The final step in the mill is topackage the dry yellowcakein drums
Photos by Bill Boberg, Taken at PRI/CamecoSmith Ranch ISL Mine, Powder River BasinWyoming – July 2005
Yellowcake – The Product
Yellowcakeuranium oxide (U3O8)800+ pounds per drumUS$80,000 per drum @ $100/lb
Filled drums of yellowcake awaitingshipment at Smith Ranch
Photos by Bill Boberg, Taken at PRI/CamecoSmith Ranch ISL Mine, Powder River BasinWyoming – July 2005
ISR MiningGround Water Restoration