upper township school district upper township …township+ms… · heating, refrigerating, and...
TRANSCRIPT
_____________________________________________________________________________ New Jersey BPU - Energy Audits
UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP MIDDLE SCHOOL
ENERGY ASSESSMENT
for
NEW JERSEY BOARD OF PUBLIC UTILITIES
CHA PROJECT NO. 21415
June 2012
Prepared by:
6 Campus Drive
Parsippany, NJ 07054
(973) 538-2120
_____________________________________________________________________________ New Jersey BPU - Energy Audits i
TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY ..................................................................................................... 1
2.0 INTRODUCTION AND BACKGROUND ............................................................................ 2
3.0 EXISTING CONDITIONS ..................................................................................................... 3
3.1 Building - General .......................................................................................................................... 3
3.2 Utility Usage .................................................................................................................................. 3
3.3 HVAC Systems ............................................................................................................................... 4
3.4 Control Systems ............................................................................................................................ 6
3.5 Lighting/Electrical Systems ........................................................................................................... 6
3.6 Plumbing Systems ......................................................................................................................... 7
3.6.1 Domestic Hot Water System ................................................................................................. 7
3.6.2 Plumbing Fixtures .................................................................................................................. 7
4.0 ENERGY CONSERVATION MEASURES........................................................................... 8
4.1 ECM-1 HVAC Geothermal Ground Source Heat Pumps Replacement ......................................... 8
4.2 ECM-2 Replace Domestic Water Heaters ..................................................................................... 8
4.3 ECM-3 Install Variable Speed Drives, High Efficiency Motors....................................................... 9
4.4 ECM-4 HVAC Air Handling Equipment Replacement ................................................................. 10
4.5 ECM-5 HVAC Demand Control Ventilation ................................................................................. 10
4.6 ECM-6 HVAC Building Automation System Upgrade/Re-commissioning ................................... 11
4.7 ECM-7 CoolTrol Walk-in Controls ............................................................................................... 12
4.8 ECM-8 Variable Speed Kitchen Hood Controllers ...................................................................... 13
4.9 ECM-9 Lighting Replacement Upgrades ..................................................................................... 14
4.10 ECM-10 Lighting Controls Installation (Occupancy Sensors) ...................................................... 14
4.11 ECM-11 Lighting Replacements with Lighting Controls (Occupancy Sensors)............................ 15
4.12 ECM-12 Replace Electric Kitchen Equipment with Natural Gas Equipment .............................. 15
4.13 System Improvement Opportunities .......................................................................................... 16
5.0 PROJECT INCENTIVES ...................................................................................................... 17
5.1 Incentives Overview .................................................................................................................... 17
5.1.1 New Jersey Pay For Performance Program ......................................................................... 17
_____________________________________________________________________________ New Jersey BPU - Energy Audits ii
5.1.2 New Jersey Smart Start Program ........................................................................................ 18
5.1.3 Direct Install Program ......................................................................................................... 18
6.0 ALTERNATIVE ENERGY SCREENING EVALUATION ................................................ 19
6.1 Solar ............................................................................................................................................ 19
6.1.1 Photovoltaic Rooftop Solar Power Generation ................................................................... 19
6.1.2 Solar Thermal Hot Water Plant ........................................................................................... 20
6.2 Demand Response Curtailment .................................................................................................. 20
7.0 EPA PORTFOLIO MANAGER ........................................................................................... 22
8.0 CONCLUSIONS & RECOMMENDATIONS ..................................................................... 24
APPENDICES A Utility Usage Analysis
B Equipment Inventory C ECM Calculations D New Jersey Pay For Performance Incentive Program E Photovoltaic (PV) Rooftop Solar Power Generation F Solar Thermal Domestic Hot Water Plant G EPA Portfolio Manager
_____________________________________________________________________________ New Jersey BPU - Energy Audits iii
REPORT DISCLAIMER
This audit was conducted in accordance with the standards developed by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) for a Level II audit. Cost and savings calculations for a given measure were estimated to within ±20%, and are based on data obtained from the owner, data obtained during site observations, professional experience, historical data, and standard engineering practice. Cost data does not include soft costs such as engineering fees, legal fees, project management fees, financing, etc. A thorough walkthrough of the facility was performed, which included gathering nameplate information and operating parameters for all accessible equipment and lighting systems. Unless otherwise stated, model, efficiency, and capacity information included in this report were collected directly from equipment nameplates and /or from documentation provided by the owner during the site visit. Typical operation and scheduling information was obtained from interviewing facility staff and spot measurements taken in the field.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 1 of 25
1.0 EXECUTIVE SUMMARY The Upper Township School District engaged CHA to perform an energy audit in connection with the New Jersey Board of Public Utilities’ Local Government Energy Audit Program. This report details the results of the energy audit conducted for:
Building Name Address Square
Feet Construction Date
Upper Township Upper Middle School
525 Perry Road Marmora, NJ 08270 94,264
Original: 1973 Additions/Renovations:
1983 & 2001 The Energy Conservation Measures (ECMs) identified in this report will allow more efficient use of energy and if pursued have the opportunity to qualify for the New Jersey SmartStart Buildings Program and/or Direct Install Program. Potential annual savings of $103,000 for the recommended ECMs may be realized with a payback of 4.3 years. A summary of the costs, savings, and paybacks for the recommended ECMs follows:
Summary of Energy Conservation Measures
Energy Conservation Measure Approx. Costs ($)
Approx. Savings ($/year)
Payback (Years)
w/o Incentive
Potential Incentive
($)
Payback (Years)
w/ Incentive
Recommended For
Implementation (X)
ECM-1
HVAC Geothermal Ground Source Heat Pumps Replacement
950,200 1,100 >20 20,760 >20
2 Replace Domestic Water Heater (DWH) 20,100 17,100 1.2 720 1.1 X
3 HVAC Install Variable Speed Drives, High Efficiency Motors
115,400 35,300 3.3 16,529 2.8 X
4 HVAC Air Handling Equipment Replacement 186,400 2,000 >20 6,000 >20
5 HVAC Demand Control Ventilation 25,400 2,800 9.1 0 9.1 X
6 HVAC Building Automation System Upgrade/Re-commissioning
34,800 10,500 3.3 0 3.3 X
7 CoolTrol Walk-in Controls 15,000 2,300 6.5 0 6.5 X
8 Variable Speed Kitchen Hood Controllers 33,800 600 >20 0 >20
9 Lighting Replacement Upgrades 184,500 14,800 12.5 26,515 10.7
10 Lighting Controls Installation (Occupancy Sensors)
46,300 14,900 3.1 5,000 2.8
11 Lighting Replacements with Lighting Controls (Occupancy Sensors)
230,800 22,300 10.3 31,515 8.9 X
12 Replace Electric Kitchen Equipment with Natural Gas Equipment
36,000 12,700 2.8 0 2.8 X
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 2 of 25
2.0 INTRODUCTION AND BACKGROUND New Jersey’s Clean Energy Program, funded by the New Jersey Board of Public Utilities, supports energy efficiency and sustainability for Municipal and Local Government Energy Audits. Through the support of a utility trust fund, New Jersey is able to assist state and local authorities in reducing energy consumption while increasing comfort. The Upper Township Middle School located in Marmora, NJ, is a 94,264 square foot mainly single story block structure with a high bay gym, and cafeteria and stage areas. The majority of HVAC equipment is located on rooftops over the areas being served. The building was constructed in 1973, with a later addition of classrooms and existing spaces renovation in 1983 and 2001. A ground source heat pump (GSHP) system was installed in 1996 and expanded during the 2001 addition; the closed loop system uses a bore well field with polyethylene tubing, and provides heating and cooling. All systems and equipment operate on electrical power, and natural gas is not connected to the middle school. A 150 kW emergency power generator supports emergency lights, life safety systems, and security/access control systems. Occupancy includes approximately 496 students and 82 faculty and staff. The middle school operates Monday through Friday from 8:00 am to approximately 4:00 pm, with the gym being used until 11:00 pm. The gym are also used on Saturday and Sunday between 8:00 am to 4:00 pm for athletic events.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 3 of 25
3.0 EXISTING CONDITIONS
3.1 Building - General Built in 1973, the 94,264 square foot, mainly one-story facility has high bay areas for the gym, cafeteria and stage areas. Additional construction includes the Block A rooms and gym expansion in 1983, and the Block C rooms and a stage in 2001. There is a lower level area beneath the stage that is not being used. The main entrance comes into a lobby in front of the Main and Guidance Offices, on the north side of the building. The middle school has approximately 496 students and 82 faculty and staff, and appeared fully utilized during the site visit. The building can be assumed to be fully occupied by the 578 people until 4:00 pm during the week, and approximately 150 people for the remaining hours, and on Saturday and Sunday for the gym. Custodial staff is in the building for approximately seven hours after 4:00 pm during the week. The hours of operation are:
⋅ Monday through Friday 8:00 am to 4:00 pm; gym open till 11:00 pm ⋅ Saturday & Sunday, gym only, 8:00 am to 4:00 pm
The original building is constructed of block walls and brick veneer with an air space between; this includes the taller high bay gym, cafeteria, and stage areas. An almost vertical surface with asbestos roof shingle covering with an overhang is used for the upper portion of the wall on the 1973 parts of the building; the shingles are slated for removal/abatement. Later additions incorporated foamboard insulation in the wall assembly for improved envelope. The veneer on the additions is also concrete masonry unit (CMU) with a rough stone face finish; a stucco-type material is used for the upper portion of the wall on the 1983 and 2001 additions. The majority of the interior walls are painted block walls; 3-5/8” metal studs filled with fiberglass insulation finished with gypsum board are used in spaces such as the main office area, and some renovated spaces. The flat roof system is comprised of a structural steel framing with a metal deck having rigid foamboard insulation with various systems on top. The stage has a black EPDM membrane; the gym, cafeteria, offices, and science rooms have a dark-colored asphalt rolled roofing with stone ballast; Block B rooms have a light-colored asphalt rolled roofing with stone ballast; and the 1983 Block A rooms have a black EPDM membrane. All roofing is slated for replacement in the 2012-2013 school year. Windows are minimal (<20% on walls where used), and are double pane set in aluminum frames with a light tint; they are in fair condition. A window replacement is planned for the 2012-2013 school year to change out all windows. The majority of the entrance doors are part glass and part solid metal; doors are also expected to be replaced in the 2012-2013 school year. The middle school has exposed walls facing the north, east, south, and west. The majority of the single story classroom blocks/wings are 14’ in height, with the gym, cafeteria, and the stage areas being approximately 25’ high. A 25’ high stage is at the westernmost part of the building. The building has one partial lower level area underneath the stage currently not being used, and all ground level areas have slab floors at grade.
3.2 Utility Usage Utilities include electricity and potable water. Electricity is delivered by Atlantic City Electric and supplied by South Jersey Energy Company. Potable water is provided on-site via a well. See Appendix A for a detailed utility analysis.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 4 of 25
The middle school has one electric meter. From January 2011 through February 2012, the electric usage for the electric meter was approximately 1,795,200 kWh at a cost of about $260,000. Review of electricity bills during this period showed that the complex was charged at the following rates: supply unit consumption cost of $0.098 per kWh; demand unit cost of $6.39 per kW; and blended unit cost of $0.145 per kWh. The middle school had a maximum electrical demand of 447.0 kW and minimum of 288.0 kW. The monthly average over the observed 12 month period was 406.0 kW. Electrical usage was generally higher in the summer months when air conditioning equipment was operational. The middle school does not utilize natural gas; due to the cost of electricity, natural gas could be routed to the building for use in the cafeteria kitchen to replace HVAC electric resistance heating equipment and provide domestic hot water heating. Certain ECM calculations in this report assume natural gas utility will be connected to the building in the future; a unit cost ($/therm) is assumed. The delivery component of the electric bills will always be the responsibility of the utility that connects the facility to the power grid or gas line; however, the supply can be purchased from a third party; as is currently the case with electricity. The electricity commodity supply entity will require submission of one to three years of past energy bills. Contract terms can vary among suppliers. According to the U.S. Energy Information Administration, the average commercial unit costs of electricity and natural gas in New Jersey during the same periods as those noted above was $0.141 per kWh and $0.959 per therm. The electricity supply rate charged by South Jersey Energy Company for the 12 month period resulted in a slightly greater cost to the school district compared to average state values. It is recommended that the present electricity supplier be maintained and current electricity supply rate charge be renegotiated; electric bills should be monitored and checked monthly. A list of approved electrical commodity suppliers can be found in Appendix A.
3.3 HVAC Systems The systems and equipment described below serve the middle school building. Specifics on the mechanical equipment can be found within the equipment inventory located in Appendix B. 3.3.1 Ground Source Heat Pumps The middle school is heated and cooled by a GSHP system. The bore well field is located in ground at the rear on the south side of the building. The system was installed in 1996, and expanded in 2001 for the addition. The GSHP system operates year-round. The bore well field is connected to a ground water loop pumping system with two 40 HP pumps that operate in lead-lag. The pumps are constant volume with standard efficiency motors, and a 3-way modulating valve for system control. Ground loop water is provided to heat pumps located above ceilings in the spaces they serve. The older areas of the building have loop water provided by two 7.5 HP pumps that operate lead-lag. The pumps are variable speed pumps with high efficiency motors, and zone control valves for system control. Building loop water is provided to dual temperature duct coils and air handlers in the original 1973 and 1983 addition building areas. GSHP system piping and valves appear to be insulated. The 2001 stage areas have building loop water provided by two 15.0 HP pumps that operate in lead-lag. The pumps are variable speed pumps with standard efficiency motors, and zone control valves for system control. Building loop water is provided to rooftop energy recovery units, and GSHP system piping and valves appeared to be insulated.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 5 of 25
Four water-to-water GSHPs are located in a mechanical room. The heat pumps have water from the ground loop bore well field connected on one side, and building loop water piping to the middle school’s 1973 and 1983 areas connected on the other. The pumps provide heating and cooling water to three terminal air handling units (AHUs) with dual temperature duct mounted coils, and two rooftop mounted energy recovery units. There are 52 water-to-air GSHPs located in ceilings above the areas they serve, and some are cabinet-type equipment inside the spaces. The pumps have water from the ground loop bore well field connected on one side, and ductwork to the spaces being served connected on the other side. These heat pumps serve the Block A areas, Block B areas, Block C areas. 3.3.2 Air Handling Units with Dual Temperature Duct Mounted Coils Three AHUs are located on the rooftop above the areas/spaces they serve. Each AHU is mounted on an extended curb, with outside air intake and relief air dampers, and air mixing box. Supply and return ductwork is routed down through the roof curbs to a duct distribution system above the ceilings to each space. Water piping is not connected to the air handlers; dual temperature duct mounted coils provide heating and cooling by controlling off of the space thermostats. During the heating season, hot water is used in the coils; during cooling season, chilled water is used. The rooftop units (RTUs) serve Rooms 1B through 6B, front main office/principal’s offices suite, and cafeteria. 3.3.3 Energy Recovery Units Two ventilation hot water heating energy recovery rooftop units (RTUs) are located above the areas/spaces they serve. Each RTU is mounted on an extended curb, with outside air intake and relief air dampers, with an air mixing box. Supply and return ductwork is routed down through the roof curbs to a duct distribution system above the ceilings to each space. Building loop water from the geothermal GSHP system is connected to the units for heating. These units serve the 1983 addition Block A rooms and areas, and the 2001 stage, storage, and music room areas. 3.3.4 Packages DX Heat Pump Rooftop Units Four packaged direct expansion (DX) cooling and heating heat pump RTUs are located above the gym. The RTUs are mounted on an extended curb, with outside air intake and relief air dampers, and air mixing box. Supply and return ductwork is routed down through the roof curbs to a duct distribution system above the ceiling to the space. 3.3.5 DX Cooling Split System Units One split system DX cooling air conditioner with indoor ceiling mounted air handler was installed in 2008 to serve the Computer Server Room. The condensing unit is located above the area/space being served. 3.3.6 Kitchen Equipment The cafeteria kitchen contains an 8’x12’ walk-in cooler and 8’x12’ walk-in freezer. Kitchen ventilation is provided by a single 16’x4’ cooking hood with a 1.5 HP constant volume fan mounted on a rooftop curb with ductwork connecting to the hood.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 6 of 25
The kitchen cooking equipment includes a steamer, tabletop kettle, double-stack oven, full sizes range top with oven and food warmer. The equipment utilizes about 106 kW when operational. 3.3.7 Exhaust Systems Exhaust system fans are integrated into the middle school building automation system (BAS), and generally operate during building occupancy.
Common exhaust plenums serve classrooms with rooftop mounted constant volume exhaust fans. Larger classrooms and spaces (such as the gym and cafeteria) have dedicated exhaust fans. Exhaust fans are used for restrooms and custodial closets throughout the building and each of the locker room areas has a dedicated exhaust fan on the roof.
3.4 Control Systems The middle school is controlled by an Apogee Siemens BAS. The system consists of direct digital control (DDC) based field devices and components. All DDCs are integrated into a computerized front end running the Siemens BAS software for equipment sequencing, scheduling, monitoring, and alarming. This includes the geothermal ground source heat pump system/pumps, RTUs, energy recovery units, rooftop packaged DX units, dual temperature duct mounted coils, and exhaust system fans. Each heat pump has a wall mounted thermostat; setpoints in the building are 68°F heating and 74°F cooling during occupied times, and 55°F heating and 85°F cooling during unoccupied times. However, thermostats can be adjusted by the occupants to override the centralized control system. The practice of adjusting the space control setpoint does not allow the building HVAC systems, mainly the geothermal GSHPs, to utilize an unoccupied schedule. The higher cooling chilled water and lower heating hot water temperatures at which the system is designed to operate does not allow building spaces to recover quickly; therefore, when a space setpoint is adjusted, it takes longer to come back to system setpoint, and the system must continue to operate. Currently, this results in almost continuous geothermal system operation without setback. The Siemens BAS uses an outdated DOS-based interface that is not user friendly, and is not as functional as systems using current technology; the controls are functional due to the diligent maintenance and oversight by Township facilities personnel. The BAS system requires a complete software and interface upgrade, and field devices upgraded/replaced as needed with modern DDCs. This will require re-commissioning of the BAS, which should include the front end system, software upgrade, graphics interface, BAS controllers/field devices, and confirmation of existing HVAC equipment controllers/components and HVAC systems dampers, valves, etc. that are not part of the equipment. This would allow more accurate control of HVAC systems, prevent local thermostat adjustment by occupants, allow improved trending/logging functions, and monitor that appropriate ventilation is provided. Improved trending and logging assists in identifying improved scheduling and systems startup times. HVAC systems will be tuned up during this process, which should result in more efficient operation.
3.5 Lighting/Electrical Systems The facility has reballasted and relamped all existing fixtures since the original building was erected. The facility primarily consists of fixtures with T-8 32 watt bulbs, compact fluorescent twin biaxial bulbs, compact fluorescent spiral bulbs, and incandescent bulbs are also used in select areas. Metal halides are used in the high bay cafeteria and gym. The primary source of control for the lights is switches which the
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 7 of 25
teachers and custodial staff turn off at the end of the school day. All magnetic ballasts have been upgraded to electronic. Exterior lights consist mainly of pole mounted shoe-box type metal halide lights, pole mounted globe-type compact fluorescent, incandescent lights, and wall pack high pressure sodium fixtures on daylight sensors and timers. There are also three mercury vapor shoe-box type pole lights. Incandescent bulbs are used in recessed can-type canopy lights, and incandescent flood lights are also located on exterior walls. The light fixtures listed in the report and analyses are powered by the middle school’s electrical system and are part of the lighting analysis.
3.6 Plumbing Systems 3.6.1 Domestic Hot Water System The wood shop mezzanine contains one 144 kW Adamson electric hot water heater with a 675 gallon Old Dominion iron and steel hot water storage tank from 1973; they serves the entire middle school except for Block C rooms and areas. The boiler room contains two 120 gallon, 24 kW Rheem/Rudd electric hot water heaters installed in 2001; they serve the 2001 Block C rooms and areas. Hot water is provided to restrooms, lockers, janitor’s closets, and the majority of the hot water piping appears to be insulated. Hot water demand is primarily for the cafeteria kitchen; hot water demand is very low as gym showers are not used. Domestic hot water temperature is maintained at 140°F, and chemical disinfection soap is provided in the restrooms. 3.6.2 Plumbing Fixtures The middle school original lavatories, water closets, and urinals have been replaced with low flow plumbing fixtures during renovations, and through attrition. Lavatories are 2.5 GPM with push type faucets, water closets are 1.6 GPF, and urinals are 1.0 GPF.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 8 of 25
4.0 ENERGY CONSERVATION MEASURES
4.1 ECM-1 HVAC Geothermal Ground Source Heat Pumps Replacement Existing Florida Heat Pump (1996) and Water Furnace (2001) GSHPs provide heating and cooling to the entire building. Replacement of the 1996 GSHPs with higher efficiency units was assessed. The 2001 GSHP units can be replaced by attrition in the future. The assumption of this calculation is that the operating hours and capacities of the 1996 GSHP unit equipment stays the same. The energy results from operating higher efficiency units. Due to the unfavorable payback, this measure is not recommended. GSHP equipment should be replaced with higher efficiency units by attrition in the future. GSHP units have an expected life of 15 years, according to ASHRAE, and total energy savings over the life of the project are estimated at 110,700 kWh and $16,500. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-1 HVAC Geothermal Ground Source Heat Pumps Replacement Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
950,200 7,380 0 0 1,100 0 1,100 (1.0) 20,760 >20 >20 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended.
4.2 ECM-2 Replace Domestic Water Heaters The middle school has an Adamson electric water heater and two Rheem/Rudd electric water heaters. The Adamson 1973 unit is significantly oversized for the building’s current needs. During periods of little or no domestic hot water use, both units must still heat the water within the storage tank. Energy required maintaining the 675 gallons and 120 gallons of hot water temperature setpoint during times of zero demand is known as standby losses; replacement of these units with higher efficiency natural gas units was assessed. According to the U.S. Department of Energy, 2.5% of stored capacity is lost every hour during HW heater standby. This value was applied to the total volume of the existing DHW heater storage tank to determine the annual standby losses. Proposed efficiency was based on a typical tank-type, high efficiency, condensing hot water heater. The new water heaters will require gas and water piping modifications, venting, and electrical connections. This ECM is predicated on natural gas utility being connected to the middle school. The cost for gas connection to the building is not included.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 9 of 25
Domestic hot water heaters have an expected life of 12 years, according to ASHRAE, and total energy savings over the life of the project are estimated at 632,280 therms of natural gas and $205,200. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-2 Replace Domestic Water Heaters Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
20,100 52,690 170 -988 17,100 0 17,100 9.2 720 1.2 1.1 * Incentive shown is per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities. This measure is recommended.
4.3 ECM-3 Install Variable Speed Drives, High Efficiency Motors
The geothermal ground source heat pump system is served by two 40 HP ground water loop pumps operating in lead-lag (P-1A/P-1B) and two 7.5 HP building zone water loop pumps also operating in lead-lag (P-2A/P-2B); there are also additional building zone water loop pumps. The ground water loop pumps have high efficiency motors, but are constant volume. The building zone water pumps are constant volume with standard efficiency motors. An energy recovery unit with constant volume supply and exhaust fan motors serves the Block A rooms and office area heat pumps (HRU-1). Four RTUs with constant volume fans serve the gym (RTU-1-4). Exhaust fans with constant volume motors (EF-1, 2) also serve the gym. Larger motors that operate pumps and fans continuously waste electrical energy. The hot water system pumps and air handlers serving these spaces are HVAC systems that operate at a constant speed (water and air flows) even though the building load does not require all the flow to maintain temperatures. By adding inverter duty, high efficiency motors with VSDs to reduce the flow by slowing the motors down, significant electrical energy can be saved. Pressure actuated controllers are used to measure the water or system air static pressure in the HVAC systems and as valves close, the system pressure increases and fan or pump speed is reduced. Space temperature and carbon dioxide (CO2) sensors are also used to reduce air handling unit flow when space conditions permit. For systems that have pumps or fans that cannot be slowed down (due to the nature of the system design), electrical saving can still be obtained by replacing older less efficient motors with new higher efficiency motors. The assumption of this calculation is that the operating hours, motor horsepower, and capacity stays the same. The energy savings are seen from operating higher efficiency motors and reducing power draw with the variable speed drives. Motors and variable speed drives have an expected life of 20 years, according to ASHRAE, and total energy savings over the life of the project are estimated at 4,872,800 kWh and $706,000. The implementation cost and savings related to this ECM are presented in Appendix C and summarized as follows:
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 10 of 25
ECM-3 HVAC Install Variable Speed Drives, High Efficiency Motors
Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
115,400 243,640 0 0 35,300 0 35,300 5.1 16,529 3.3 2.8 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended.
4.4 ECM-4 HVAC Air Handling Equipment Replacement Three packaged DX cooling rooftop units with dual temperature duct coils serve Rooms 1B through 6B (AHU-1), main office/principal’s office/guidance (AHU-2), and cafeteria (AHU-3). Replacement of these units by more energy efficient AAON units with supply fan VSDs and digital scroll compressors was assessed. The assumption of this calculation is that the operating hours, number of units, and capacities stay the same. The energy savings are the result of operating higher efficiency units. Rooftop units have an expected life of 15 years, according to ASHRAE, and total energy savings over the life of the project are estimated at 207,750 kWh and $30,000. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-4 HVAC Air Handling Equipment Replacement Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
186,400 13,850 0 0 2,000 0 2,000 (0.8) 6,000 >20 >20 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended.
4.5 ECM-5 HVAC Demand Control Ventilation Rooftop air handling units serve the cafeteria (AHU-3), and gym (RTU-1-4). It is assumed the original system controls provide the full design ventilation outside air flow. Reducing outside air during occupied periods will reduce heating and cooling energy. The quantity of ventilation will be based on maintaining an acceptable CO2 level in the space as an indicator of indoor air quality. A limit of 1000 PPM of CO2 is recommended in ASHRAE Standard 62-1982, Ventilation for Acceptable Indoor Air Quality. Sensors will be installed to measure the building CO2 concentration, and control sequence of operation programmed into the BAS. During unoccupied periods, outside air dampers should be closed.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 11 of 25
Equipment supply and outside airflows were obtained from existing design drawings where possible, or from vendors per serial/model numbers found in the field. For the analysis, estimated savings for demand control ventilation are based on reducing equipment run times per day from 12 to 10 hours per day, turning equipment fans off two hours/day. The energy savings are the differences in utility usage. This ECM is predicated on natural gas utility being connected to the middle school. The cost for gas connection to the building is not included. Controls have an expected life of 18 years, according to ASHRAE, and total energy savings over the life of the project are estimated at 271,260 kWh, 10,188 therms, and $50,400. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-5 HVAC Demand Control Ventilation Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
25,400 15,070 0 566 2,800 0 2,800 0.9 0 9.1 9.1 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended.
4.6 ECM-6 HVAC Building Automation System Upgrade/Re-commissioning The middle school HVAC BAS controls consists of an outdated Siemens BAS installed with the ground source heat pump system in 1996; the systems monitors and sequences all HVAC systems and equipment. Due to BAS condition and software, HVAC system sequencing, scheduling, and monitoring are limited. To reduce the energy used by HVAC systems, at a minimum the BAS system requires software upgrade, and complete re-commissioning, testing and balancing of all HVAC systems. Complete replacement with a modern DDC system with current software and functionality would be beneficial. The new BAS should be capable of enabling the facility operator to:
⋅ Schedule the HVAC system to maintain higher/lower temperatures during unoccupied times (Occupied/Unoccupied setback)
⋅ Schedule the toilets, and other exhaust system fans to operate only during occupied times; provide system schedules based on building operational schedule. (365 day Zone Scheduling)
⋅ Control outdoor air dampers based on actual carbon dioxide levels. (Demand Control Ventilation)
⋅ Control of outdoor air dampers to provide economizer cooling vs. mechanical cooling ⋅ Control of discharge air temperature based on actual internal loads (Discharge Air Reset) ⋅ Control hot water system temperature based on outside temperature (Hot Water Reset) ⋅ Prioritize HVAC systems start-up time to reduce peak demand (Demand Load Shedding) ⋅ Control the start/ stop times and temperatures to match actual heat gain/loss that the building
experiences based on outdoor temperature (Optimum Start/Stop) ⋅ Monitor energy consumption of equipment
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 12 of 25
⋅ Add occupancy sensors to control UV operation in all classrooms (unit fans turned off and outside air dampers closed when room is unoccupied, temperature is maintained per DDC setpoint
Additional benefits of this system are that it can provide useful trending information to the owner such as daily, monthly and seasonal energy usage, and also provide alarm messages to the facilities operator via the internet indicating that a piece of equipment needs repair or maintenance. The BAS should also allow the facility to monitor the energy consuming equipment in the building remotely in real-time, track the facility energy performance, and remotely adjust setpoints and schedules to optimize the facility operation. Full color graphics and logical programming functions should also be provided. The annual electrical consumption is taken from the utility bills. Per the U.S. Energy Information Administration the percent of a buildings cooling and heating is 26% and 82%, respectively. Utilizing these numbers, the annual electrical usage was found; based on project experience retro-commissioning produces a 10% energy savings. Commissioning can have an expected life of 18 years, according to ASHRAE, and total energy savings over the life of the project are estimated at 840,240 kWh, 66,420 therms and $189,000 It is also noted that to continue to gain this annual savings proper maintenance of equipment needs to take place. This ECM is predicated on natural gas utility being connected to the middle school. The cost for gas connection to the building is not included. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-6 HVAC Building Automation System Upgrade/Re-commissioning Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
34,800 46,680 0 3,690 10,500 0 10,500 4.4 0 3.3 3.3 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended.
4.7 ECM-7 CoolTrol Walk-in Controls The middle school contains an 8’x12’ walk-in cooler, an 8’x12’ walk-in freezer. These units currently do not have any control on them and run continuously throughout the day. Installation of a CoolTrol® Cooler Control System was assessed. The evaporator fans run 25% to 80% less, saving electricity and reducing compressor run time, and the door and frame heaters are controlled based on space dewpoint, reducing run time by up to 95% in coolers and 60% in freezers. CoolTrol controls have an expected life of 18 years, according to the manufacturer, and total energy savings over the life of the project are estimated at 290,880 kWh and $41,400. The implementation cost and savings related to this ECM are presented in Appendix C and summarized as follows:
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 13 of 25
ECM-7 CoolTrol Walk-in Controls
Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
15,000 16,160 0 0 2,300 0 2,300 1.8 0 6.5 6.5 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended.
4.8 ECM-8 Variable Speed Kitchen Hood Controllers The kitchen contains a 16’x4’ cooking hood with a constant volume 3.0 HP exhaust fan motor. Installing a variable speed kitchen hood controller to reduce run time of the exhaust fan was assessed. Upon activation, the hood lights turn on and the fan reaches a preset minimum speed of between 10% and 50%. When cooking appliances turn on, the fan speed increases based on exhaust air temperature. During actual cooking, the speed increases to 100% until smoke and heat are removed. By reducing exhaust fan speed, energy consumption is decreased. Reducing the supply of summer hot, humid make-up air during idle cooking periods will increase occupant comfort. The system and equipment can also act as an economizer when indoor and outdoor conditions are appropriate for free cooling. The controls also reduce hood noise in the kitchen by up to 90% when the fans slow down. The controls can improve fire safety by monitoring the exhaust air temperature. If the temperature approaches the fusible link rating of the fire suppression system, an alarm can sound and/or the cooking appliances are shut down. This system should also be integrated into the upgraded and re-commissioned BAS. Energy savings are calculated from the reduction of exhaust and make-up fan speed. Kitchen hood controls have an expected life of 18 years, according to the manufacturer, and total energy savings over the life of the project are estimated at 75,240 kWh and $10,800. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-8 Variable Speed Kitchen Hood Controllers Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
33,800 4,180 0 0 600 0 600 (0.7) 0 >20 >20 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 14 of 25
4.9 ECM-9 Lighting Replacement Upgrades The classrooms and occupied spaces have upgraded to electronic ballast and utilize mainly 4 foot 32W T-8 fluorescent bulbs; U-tube T-8s and 2 foot T-8s are also used in other fixtures. Can lights and surface mounted standard bulb fixtures use biaxial compact fluorescent lamps to replace original incandescent bulbs. A fluorescent lamp converts electrical power into useful light more efficiently than an incandescent lamp or T-12 bulbs. A comprehensive fixture survey was conducted of the entire building. Each switch and circuit was identified, and the number of fixtures, locations, and existing wattage established (Appendix C). There is an opportunity to continue to reduce consumption by upgrading the classrooms to a super T-8 fixtures, and the metal halides in the high bay areas (gym and cafeteria ) to an induction fixture. Energy savings for this measure were calculated by applying the existing and proposed fixture wattages to estimated times of operation. The difference between energy requirements resulted in a total annual savings of 118,260 kWh with an electrical demand reduction of about 42 kW. Supporting calculations, including assumptions for lighting hours and annual energy usage for each fixture, are provided in Appendix C. Lighting has an expected life of 15 years, according to the manufacturer, and total energy savings over the life of the project are estimated at 1,773,900 kWh and $222,000. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-9 Lighting Replacement Upgrades Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive
* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
184,500 118,260 42 0 14,800 0 14,800 0.2 26,515 12.5 10.7 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended in lieu of ECM-11.
4.10 ECM-10 Lighting Controls Installation (Occupancy Sensors) The current middle school lighting is controlled by manual switches. Lights are generally turned on in the morning and shut off at night. During occupied times, there are rooms that are not occupied; however the lights remain on. Adding occupancy controls to the individual rooms will automatically control the lights based on actual occupancy. The occupancy sensor can be wall mounted near the switch or placed at the ceiling for larger room coverage. All occupancy sensors are equipped with a manual override feature. These sensors are generally not recommended in public toilet rooms. Lighting controls have an expected life of 15 years, according to the manufacturer, and total energy savings over the life of the project are estimated at 1,538,700 kWh and $223,500. The implementation cost and savings related to this ECM are presented in Appendix C and summarized as follows:
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 15 of 25
ECM-10 Lighting Controls Installation (Occupancy Sensors) Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
46,300 102,580 0 0 14,900 0 14,900 3.8 5,000 3.1 2.8 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is not recommended in lieu of ECM-11.
4.11 ECM-11 Lighting Replacements with Lighting Controls (Occupancy Sensors) Due to interactive effects, the energy and cost savings for occupancy sensors and lighting upgrades are not cumulative. This measure is a combination of ECM-9 and ECM-10 to reflect actual expected energy and demand reduction. The lighting retrofits and controls have an expected lifetime of 15 years, according to the manufacturer, and total energy savings over the life of the project are estimated at 2,932,050 kWh and $334,500. The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-11 Lighting Replacements with Lighting Controls (Occupancy Sensors) Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI Incentive * (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
230,800 195,470 42 0 22,300 0 22,300 0.5 31,515 10.3 8.9 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended.
4.12 ECM-12 Replace Electric Kitchen Equipment with Natural Gas Equipment The middle school contains a commercial cafeteria kitchen with a double stack oven, full size range with oven, food warmer, and tabletop kettle cooker. This equipment consumes approximately 100 kW during the six hours of kitchen operation each school day of the week. With the higher cost of electricity compared to natural gas, connecting natural gas utility to the facility should be considered. The assumption of this calculation is that the operating hours and electrical power consumption of the existing electrical equipment are replaced with newer, more efficient equipment using natural gas. The savings are compared to the cost of new gas kitchen equipment; the connection cost (if any) to the natural gas utility and piping in the building are not included. The difference in utility usage cost between electricity and natural gas are the savings. Commercial kitchen equipment has an expected life of 15 years, according to the manufacturer; total energy savings over the life of the project are estimated at 1,711,650 kWh and $190,500.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 16 of 25
The implementation cost and savings related to this ECM are presented in Appendix C and summarized below:
ECM-12 Replace Electric Kitchen Equipment with Natural Gas Equipment Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
36,000 114,110 0 -3,894 12,700 0 12,700 4.3 0 2.8 2.8 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities. This measure is recommended.
4.13 System Improvement Opportunities The following item can be implemented by the owner to provide energy savings: There are four vending machines within the middle school. As an energy saving opportunity, it is recommended that a vending miser be added. It is also recommended that if the machine is vendor owned, it be upgraded or removed if not high efficiency equipment.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 17 of 25
5.0 PROJECT INCENTIVES
5.1 Incentives Overview 5.1.1 New Jersey Pay For Performance Program The facility will be eligible for incentives from the New Jersey Office of Clean Energy. The most significant incentives are available from the New Jersey Pay for Performance (P4P) Program. The P4P program is designed for qualified energy conservation projects applied to facilities whose demand in any of the preceding 12 months exceeds 100 kW. This average minimum has been waived for buildings owned by local governments or municipalities and non-profit organizations, however. Facilities that meet this criterion must also achieve a minimum performance target of 15% energy reduction by using the EPA Portfolio Manager benchmarking tool before and after implementation of the measure(s). If the participant is a municipal electric company customer, and a customer of a regulated New Jersey Utility, only gas measures will be eligible under the Program. Available incentives are as follows: Incentive #1: Energy Reduction Plan – This incentive is designed to offset the cost of services associated with the development of the Energy Reduction Plan (ERP).
• Incentive Amount: $0.10/SF • Minimum incentive: $5,000 • Maximum Incentive: $50,000 or 50% of Facility annual energy cost
The standard incentive pays $0.10 per square foot, up to a maximum of $50,000, not to exceed 50% of facility annual energy cost, paid after approval of application. For building audits funded by the New Jersey Board of Public Utilities, which receive an initial 75% incentive toward performance of the energy audit, facilities are only eligible for an additional $0.05 per square foot, up to a maximum of $25,000, rather than the standard incentive noted above. Incentive #2: Installation of Recommended Measures – This incentive is based on projected energy savings as determined in Incentive #1 (Minimum 15% savings must be achieved), and is paid upon successful installation of recommended measures. Electric
• Base incentive based on 15% savings: $0.09/ per projected kWh saved • For each % over 15% add: $0.005 per projected kWh saved • Maximum incentive: $0.11/ kWh per projected kWh saved
Incentive cap: 25% of total project cost Incentive #3: Post-Construction Benchmarking Report – This incentive is paid after acceptance of a report proving energy savings over one year utilizing the Environmental Protection Agency (EPA) Portfolio Manager benchmarking tool. Electric
• Base incentive based on 15% savings: $0.09/ per projected kWh saved. • For each % over 15% add: $0.005 per projected kWh saved. • Maximum incentive: $0.11/ kWh per projected kWh saved
Incentives #2 and #3 can be combined to yield additive savings.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 18 of 25
Under incentive #1 of the New Jersey Pay for Performance Program, the 94,264 square foot middle school building is eligible for about $9,430 toward development of an Energy Reduction Plan. The current ECM’s meet the minimum savings of 15% and therefore the building would be eligible for incentives #2 and #3. In total, incentives through the NJ P4P program are expected to total about $124,525, reducing the total project payback from 5.6 years to 4.1 years. See Appendix D for calculations. 5.1.2 New Jersey Smart Start Program For this program, specific incentives for energy conservation measures are calculated on an individual basis utilizing the 2011 New Jersey Smart Start incentive program. This program provides incentives dependent upon mechanical and electrical equipment. If applicable, incentives from this program are reflected in the ECM summaries and attached appendices. If the complex qualifies and enters into the New Jersey Pay for Performance Program, all energy savings will be included in the total site energy reduction, and savings will be applied towards the Pay for Performance incentive. A project is not applicable for both New Jersey incentive programs. 5.1.3 Direct Install Program The Direct Install Program targets small and medium sized facilities where the peak electrical demand does not exceed 150 kW in any of the previous 12 months. Buildings must be located in New Jersey and served by one of the state’s public, regulated electric or natural gas utility (if applicable) companies. On a case-by-case basis, the program manager may accept a project for a customer that is within 10% of the 150 kW peak demand threshold. Direct Install is funded through New Jersey’s Clean Energy Program and is designed to provide capital for building energy upgrade projects to fast track implementation. The program will pay up to 70% of the costs for lighting, HVAC, motors, natural gas (if applicable), refrigeration, and other equipment upgrades with higher efficiency alternatives. If a building is eligible for this funding, the Direct Install Program can significantly reduce the implementation cost of energy conservation projects. The program pays 70% of each project cost up to $75,000 per electrical utility account; total funding for each year is capped at $250,000 per customer. Installations must be completed by a Direct Install participating contractor, a list of which can be found on the New Jersey Clean Energy Website at http://www.njcleanenergy.com. Contractors will coordinate with the applicant to arrange installation of recommended measures identified in a previous energy assessment, such as this document. The facility is potentially eligible to receive funding from the Direct Install Program. The total estimated implementation cost for ECMs potentially eligible for Direct Install funding is $1,492,900; the total potential amount funded through Direct Install program is estimated to be $75,520. This includes demand control ventilation, temperature setback, premium efficiency motors and upgrades to the lighting system. The program normally has a potential to pay 70% of the initial costs, leaving 30% to be paid out of pocket. However, funding is capped at $250,000 so that would be the maximum amount available. Direct Install funding has the potential to significantly reduce the payback period of Energy Conservation Measures.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 19 of 25
6.0 ALTERNATIVE ENERGY SCREENING EVALUATION
6.1 Solar 6.1.1 Photovoltaic Rooftop Solar Power Generation The facility was evaluated for the potential to install rooftop photovoltaic (PV) solar panels for power generation. Present technology incorporates the use of solar cell arrays that produce direct current (DC) electricity. This DC current is converted to alternating current (AC) with the use of an electrical device known as an inverter. The building’s roof has sufficient room to install a large solar cell array. All rooftop areas have been replaced, and are in good condition. Installation of a permanent PV array at this time was assessed. The PVWATTS solar power generation model was utilized to calculate PV power generation. The closest city available in the model is Newark, New Jersey and a fixed tilt array type was utilized to calculate energy production. The PVWATT solar power generation model is provided in Appendix P. Federal tax credits are also available for renewable energy projects up to 30% of installation cost. Since the facility is a non-profit organization, federal taxes are paid and this project is eligible for this incentive. Installation of (PV) arrays in the state New Jersey will allow the owner to participate in the New Jersey solar renewable energy certificates program (SREC). This is a program that has been set up to allow entities with large amounts of environmentally unfriendly emissions to purchase credits from zero emission (PV) solar-producers. One SREC credit is equivalent to 1000 kilowatt hours of PV electrical production; these credits can be traded for period of 15 years from the date of installation. The average SREC value per credit is estimated to be about $95/ SREC per year based on current market data, and this number was utilized in the cash flow for this report. The existing load justifies the use of 400 kW PV solar array; however, max incentives from the New Jersey SREC program can only be applied to a maximum system size of 50 kW. The system costs for PV installations were derived from contractor budgetary pricing in the state of New Jersey for estimates of total cost of system installation. It should be noted that the cost of installation is currently about $8.00 per watt or $8,000 per kW of installed system, for a 50 kW system. Other cost considerations will also need to be considered. PV panels have an approximate 20 year life span; however, the inverter device that converts DC electricity to AC has a life span of 10 to 12 years and will need to be replaced multiple times during the useful life of the PV system. The implementation cost and savings related to this ECM are presented in Appendix E and summarized as follows:
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 20 of 25
Photovoltaic (PV) Rooftop Solar Power Generation – 50 kW System
Budgetary Annual Utility Savings Total
New Jersey
Renewable
New Jersey
Renewable Payback Payback
Cost Savings Energy
Incentive* SREC** (without
incentive) (with
incentives)
Electricity Natural Gas Total
$ kW kWh Therms $ $ $ $ Years Years
$400,000 0.0 59,150 0 $8,600 $8,600 $0 $5,600 >25 >25
* 30% federal tax credit ** Estimated Solar Renewable Energy Certificate Program (SREC) for 15 years at $200/1000 kWh This measure is not recommended due to payback time period exceeding 25 years. 6.1.2 Solar Thermal Hot Water Plant Active solar thermal systems use solar collectors to gather the sun’s energy to heat water, another fluid, or air. An absorber in the collector converts the sun’s energy into heat. The heat is then transferred by circulating water, antifreeze, or sometimes air to another location for immediate use or storage for later utilization. Applications for active solar thermal energy include providing hot water, heating swimming pools, space heating, and preheating air in residential and commercial buildings. A standard solar hot water system is typically composed of solar collectors, heat storage vessel, piping, circulators, and controls. Systems are typically integrated to work alongside a conventional heating system that provides heat when solar resources are not sufficient. The solar collectors are usually placed on the roof of the building, oriented south, and tilted around the site’s latitude, to maximize the amount of radiation collected on a yearly basis. Several options exist for using active solar thermal systems for space heating. The most common method involves using glazed collectors to heat a liquid held in a storage tank (similar to an active solar hot water system). The most practical system would transfer the heat from the panels to thermal storage tanks and transfer solar produced thermal energy to use for domestic hot water production. DHW is presently produced by electric water heaters and, therefore, this measure would not offer natural gas utility savings. Currently, an incentive is not available for installation of thermal solar systems; a Federal tax credit of 30% of installation cost for the thermal applications is available. This is not recommended since the an incentive is not currently available, the building is not occupied year-round, and domestic hot water demand is not excessive.
6.2 Demand Response Curtailment Presently, electricity is delivered by Atlantic City Electric, which receives the electricity from regional power grid RFC. SJ Energy Co. is a regional transmission organization (RTO) that coordinates the movement of wholesale electricity in all or parts of 13 states and the District of Columbia including the State of New Jersey. Utility Curtailment is an agreement with the utility provider’s regional transmission organization and an approved Curtailment Service Provider (CSP) to shed electrical load by either turning major equipment off or energizing all or part of a facility utilizing an emergency generator; therefore, reducing the electrical demand on the utility grid. This program is to benefit the utility company during high demand
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 21 of 25
periods and utility provider offers incentives to the CSP to participate in this program. Enrolling in the program will require program participants to drop electrical load or turn on emergency generators during high electrical demand conditions or during emergencies. Part of the program also will require that program participants reduce their required load or run emergency generators with notice to test the system. A pre-approved CSP will require a minimum of 100 kW of load reduction to participate in any curtailment program. From January 2011 through February 2012, the Upper Regional School District middle school had a maximum electricity demand of 447.0 kW and a minimum of 288.0 kW. The monthly average over the observed 12 month period was 406.0 kW. This measure is not recommended because the facility is not operating year round, and the building does not have back up/emergency generator power.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 22 of 25
7.0 EPA PORTFOLIO MANAGER The EPA Portfolio Manager benchmarking tool was used to assess the building’s energy performance. Portfolio Manager provides a Site and Source Energy Use Intensity (EUI), as well as an Energy Star performance rating for qualifying building types. The EUIs are provided in kBtu/ft2/year, and the performance rating represents how energy efficient a building is on a scale of 1 to 100, with 100 being the most efficient. In order for a building to receive and Energy Star label, the energy benchmark rating must be at least 75. As energy use decreases from implementation of the proposed ECMs, the Energy Star rating will increase. The Site EUI is the amount of heat and electricity consumed by a building as reflected in utility bills. Site energy may be delivered to a facility in the form of primary energy, which is raw fuel burned to create heat or electricity (such as natural gas or oil, if applicable), or as secondary energy, which is the product created from a raw fuel (such as electricity or district steam). Site EUI is a measure of a building’s annual energy utilization per square foot. Site EUI is a good measure of a building’s energy use and is utilized regularly for comparison of energy performance for similar building types.
Site Energy Intensity = (Electric Usage in kBtu + Natural Gas in kBtu) Building Square Footage
To provide an equitable comparison for different buildings with varying proportions of primary and secondary energy consumption, the Portfolio Manager uses the convention of Source EUIs. The source energy also accounts for all losses incurred in production, storage, transmission, and delivery of energy to the site; which provides an equivalent measure for various types of buildings with different energy sources.
Source Energy Intensity = (Electric Usage in kBtu X Site/Source Ratio + Natural Gas in kBtu X Site/Source Ratio) Building Square Footage
The EPA Score, Site EUI, and Source EUI for Upper Township Middle School are as follows:
Energy Intensity
Upper RSD Middle School
National Average
EPA Score 59 50 Site (kBtu/sf/year) 54 59 Source (kBtu/sf/year) 182 197
The Upper Middle School is considered a lower than average energy consumer by the EPA Portfolio Manager which gives it a higher than average EPA score. For the middle school to qualify for the Energy Star label the EPA score is required to be above 75. There are several energy conservation measures recommended in this report, that if implemented will further reduce the energy use intensity and increase the EPA score of the middle school. The Portfolio Manager account can be accessed by entering the username and password shown below at the login screen of the Portfolio Manager website (https://www.energystar.gov/istar/pmpam/). A full EPA Energy Star Portfolio Manager Report is located in Appendix H.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 23 of 25
The user name (“UpperTownshipSchools”) and password (“ENERGYEFFICIENT2011”) for the building’s EPA Portfolio Manager Account has been provided to Laurie A. Ryan, Business Administrator/Board Secretary for the Upper Township School District.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 24 of 25
8.0 CONCLUSIONS & RECOMMENDATIONS The energy audit conducted by CHA at the Upper Township Middle School identified potential ECMs for lighting and control replacement, water heater replacement, variable speed drives with high efficiency motors, demand control ventilation, building management system upgrades. Freezer/cooler controls, and electric kitchen equipment replacement with natural gas equipment were also assessed. Potential annual savings of $103,000 may be realized for the recommended ECMs, with a summary of the costs, savings, and paybacks as follows:
ECM-2 Replace Domestic Water Heaters Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
20,100 52,690 170 -988 17,100 0 17,100 9.2 720 1.2 1.1 * Incentive shown is per the New Jersey SmartStart Program. See section 5.0 for other incentive opportunities.
ECM-3 HVAC Install Variable Speed Drives, High Efficiency Motors Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
115,400 243,640 0 0 35,300 0 35,300 5.1 16,529 3.3 2.8 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities.
ECM-5 HVAC Demand Control Ventilation Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
25,400 15,070 0 566 2,800 0 2,800 0.9 0 9.1 9.1 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities.
ECM-6 HVAC Building Automation System Upgrade/Re-commissioning Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
34,800 46,680 0 3,690 10,500 0 10,500 4.4 0 3.3 3.3 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities.
_____________________________________________________________________________ New Jersey BPU - Energy Audits Page 25 of 25
ECM-7 CoolTrol Walk-in Controls Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
15,000 16,160 0 0 2,300 0 2,300 1.8 0 6.5 6.5 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities.
ECM-11 Lighting Replacements with Lighting Controls (Occupancy Sensors) Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI Incentive * (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
230,800 195,470 42 0 22,300 0 22,300 0.5 31,515 10.3 8.9 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities.
ECM-12 Replace Electric Kitchen Equipment with Natural Gas Equipment Budgetary Annual Utility Savings Estimated Total Payback Payback
Cost
Maintenance Savings ROI
Incentive* (without (with
Electric Electric Nat Gas Total Savings
incentive)
incentive)
$ kWh kW Therms $ $ $ $ Years Years
36,000 114,110 0 -3,894 12,700 0 12,700 4.3 0 2.8 2.8 * Incentive shown is per the New Jersey Smart Start Program. See section 5.0 for other incentive opportunities.
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX A
Utility Usage Analysis
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX B
Equipment Inventory
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX C
ECM Calculations
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX D
New Jersey Pay For Performance Incentive Program
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX E
Photovoltaic (PV) Rooftop Solar Power Generation
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX F
Solar Thermal Domestic Hot Water Plant
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX G
EPA Portfolio Manager
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX A
Utility Usage Analysis
Upper Township School District: Middle SchoolUtility Bills: Account Numbers
Account Number School Building Location Type Notes63366699997 Middle School Bus Garage Perry Road, across from Middle School Electricity not part of study40557399991 Middle School 525 Perry Road Electricity part of study63366669872 Middle School Sign 525 Perry Road Electricity not part of study
01 Utility Data - Upper Township MSMS Electric 40557399991
Upper Township School District Electric ServiceBilling Address: 525 Perry Rd Delivery - Atlantic City ElectricWoodbine NJ 08270 Supplier - SJ Energy Co.
For Service at: Middle SchoolAccount No.: 40557399991Meter No.: 28114753
Consumption Demand Total Delivery Supply Blended Rate Consumption DemandMonth (kWh) (kW) ($) ($) ($) ($/kWh) ($/kWh) ($/kW)December-10 162,300.00 438.00 23,969.19$ 6,411.58$ 17,557.61$ 0.148$ 0.108$ 6.57$ January-11 132,300.00 447.00 20,495.93$ 6,183.72$ 14,312.21$ 0.155$ 0.108$ 5.75$ February-11 135,300.00 379.20 20,840.52$ 6,203.77$ 14,636.75$ 0.154$ 0.108$ 6.61$ March-11 117,300.00 381.00 18,176.71$ 5,487.20$ 12,689.51$ 0.155$ 0.108$ 5.99$ April-11 112,500.00 441.00 17,040.54$ 5,790.54$ 11,250.00$ 0.151$ 0.100$ 6.16$ May-11 147,000.00 435.00 20,517.99$ 6,876.39$ 13,641.60$ 0.140$ 0.093$ 6.57$ June-11 102,600.00 372.00 15,413.54$ 5,153.54$ 10,260.00$ 0.150$ 0.100$ 6.32$ July-11 120,900.00 288.00 16,794.79$ 5,575.27$ 11,219.52$ 0.139$ 0.093$ 7.89$ August-11 136,200.00 429.00 19,270.88$ 6,631.52$ 12,639.36$ 0.141$ 0.093$ 6.78$ September-11 119,700.00 438.00 16,963.47$ 5,855.31$ 11,108.16$ 0.142$ 0.093$ 6.16$ October-11 106,200.00 405.00 14,898.36$ 5,043.00$ 9,855.36$ 0.140$ 0.093$ 5.77$ November-11 127,500.00 387.00 17,758.54$ 5,926.54$ 11,832.00$ 0.139$ 0.093$ 6.81$ December-11 132,600.00 426.00 18,596.15$ 6,290.87$ 12,305.28$ 0.140$ 0.093$ 6.78$ January-12 142,800.00 417.00 19,291.79$ 6,039.95$ 13,251.84$ 0.135$ 0.093$ 5.76$ Total (All) 1,795,200 447.00 $260,028.40 $83,469.20 $176,559.20 0.145$ 0.098$ 6.39$
Charges Unit Costs
01 Utility Data - Upper Township MSMS Electric 40557399991 Graph
0
50
100
150
200
250
300
350
400
450
500
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
Jan-
11
Feb-
11
Mar
-11
Apr
-11
May
-11
Jun-
11
Jul-1
1
Aug
-11
Sep
-11
Oct
-11
Nov
-11
Dec
-11
Jan-
12
Dem
and
(kW
)
Usa
ge (k
Wh)
Month
Electric Usage - Middle School: 40557399991
(kWh) (kW)
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX B
Equipment Inventory
01 24145 - Upper Township MS Equip Inventory - Rev 001 Upper Twsp Middle School
New Jersey BPU Energy Audit ProgramCHA #24145Upper Township School DistrictMiddle School BuildingOriginal Construction Date: 1973Renovation/Addtion Date: 1983 (Block A Rooms)Renovation/Addtion Date: 1996 (Added 56 Geothermal Wells)Renovation/Addtion Date: 2001 (Block C Rooms, Added 21 Geothermal Wells)
Description QTY Manufacturer Name Model No. Serial No. Equipment Type /
Utility Capacity/Size/Efficiency Location Areas/Equipment Served
Date Installed
Remaining Useful Life
(years)Other Info.
Ground Souce Heat Pump (GSHP)
Bore Field Wells 77 -
Each WellDiameter: 6.5"Depth: 338'(2) PE Tube: 1"Flow: 6.81 GPM
-Closed Loop Bore Well Field with PE Tubing / Electric Pumps
~675 MBH Cooling,~617 MBH Heating
At Rear of Middle School
BuildingMiddle School 1996 19
Firetube with factory burner;Good Condition
GSHP Ground Water Loop Pumps 2 B&G
P-1A & P-1B:Series 1510Size 5G 11.5 BF
P-1A: 1995449P-1B: 1995450
Ground Water Loop Pump / Electric
40 HP / 1,765 RPM / High Eff., 90.2%
Mechanical Room Across
From Gym
Constant Volume Ground Water Loop 1996 4 Good Condition
GSHP Building Water Loop Pumps 2 Armstrong P-2A & P-2B:
Model 4280 NOT AVAILABLE Building Loop Pump / Electric
7.5 HP / 1,765 RPM / Standard Eff., 89.5%
Mechanical Room Across
From Gym
Constant Volume Building Water Loop
to 1973 & 1996 Areas
1996 4 Good Condition
GSHP Building Water Loop Pumps 2 Armstrong
P-3A & P-3B:Base Mounted End Suction
NOT AVAILABLE Building Loop Pump / Electric
15 HP / 1,760 RPM / High Eff., 91%
Mechanical Room A-23
Across From Room 11A
Variable Speed Building Water Loop
to 2001 Block A Areas
2001 9 Good Condition
GSHP Building Water Loop Pump 1 B&G P-4: In-line Series
PR 1-1/2 NOT AVAILABLE Building Loop Pump / Electric
1/6 HP / 1,750 RPM / Standard Eff.
Above Ceiling of Stage
Variable Speed Building Water Loop to 2001 Stage Areas
2001 9 Good Condition
Domestic Hot Water Heater & Storage Tank 1
Heater: AdamsonTank:
Old Dominion Iron & Steel
DWH#1: PE 1574JHeater:
AE14.4DG7H48E Domestic Hot Water Heating / Electric
675 Gallon / 144 Kw / 480/3Ph/60Hz
Wood Shop Mezzanine
Entire Middle School Except for 2001 Block C Areas
1973 -27 Good Condition
Domestic Hot Water Heater 2 Rheem Rudd DHWH#2,#3:E120A-24-G
DHWH#2:BQ08010301E002
9DHWH#3:
BQ08010301E0030
Domestic Hot Water Heating / Electric 120 Gallon / 24 Kw Boiler Room Middle School 2001
Block C Areas 2001 1 Good Condition
HP-1Ground Source Heat Pump 11 Florida Heat
PumpHP-1:SL045 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Vertical Cabinet
1600 CFM / CLG: 40 MBH @ 11.7 EER
HTG: 30 MBH @ 3.1 COP
In Area Served Above Ceiling
Middle School 1996 Block A Rooms 1996 -1 Good Condition
HP-2Ground Source Heat Pump 1 Florida Heat
PumpHP-2:SL045 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Vertical Cabinet
1600 CFM / CLG: 40 MBH @ 11.7 EER
HTG: 30 MBH @ 3.1 COP
In Area Served Above Ceiling Art Room 11A 1996 -1 Good Condition
HP-3Ground Source Heat Pump 1 Florida Heat
PumpHP-3:SL045 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Vertical Cabinet
1600 CFM / CLG: 40 MBH @ 11.7 EER
HTG: 30 MBH @ 3.1 COP
In Area Served Above Ceiling - 1996 -1 Good Condition
HP-4Ground Source Heat Pump 1 Florida Heat
PumpHP-4:SL045 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Vertical Cabinet
1600 CFM / CLG: 40 MBH @ 11.7 EER
HTG: 30 MBH @ 3.1 COP
In Area Served Above Ceiling Home Ec Room 3A 1996 -1 Good Condition
HP-5Ground Source Heat Pump 1 Florida Heat
PumpHP-5:SL045 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Vertical Cabinet
1600 CFM / CLG: 40 MBH @ 11.7 EER
HTG: 30 MBH @ 3.1 COP
In Area Served Above Ceiling Resource Room 12A 1996 -1 Good Condition
HP-6A, 6B, 6CGround Source Heat Pumps 3 Florida Heat
PumpHP-6A, 6B, 6C:SL065 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
1270 CFM / CLG: 48 MBH @ 12.6 EER
HTG: 42 MBH @ 3.0 COP
In Area Served Above Ceiling Rooms 7B,8B,9B 1996 -1 Good Condition
01 24145 - Upper Township MS Equip Inventory - Rev 001 Upper Twsp Middle School
New Jersey BPU Energy Audit ProgramCHA #24145Upper Township School DistrictMiddle School BuildingOriginal Construction Date: 1973Renovation/Addtion Date: 1983 (Block A Rooms)Renovation/Addtion Date: 1996 (Added 56 Geothermal Wells)Renovation/Addtion Date: 2001 (Block C Rooms, Added 21 Geothermal Wells)
Description QTY Manufacturer Name Model No. Serial No. Equipment Type /
Utility Capacity/Size/Efficiency Location Areas/Equipment Served
Date Installed
Remaining Useful Life
(years)Other Info.
HP-7A, 7BGround Source Heat Pumps 2 Florida Heat
PumpHP-7A, 7B:SL065 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
1540 CFM / CLG: 54 MBH @ 11.8 EER
HTG: 50 MBH @ 3.1 COP
In Area Served Above Ceiling Media Center 2B 1996 -1 Good Condition
HP-8A, 8BGround Source Heat Pumps 2 Florida Heat
PumpHP-8A, 8B:SL080 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
1420 CFM / CLG: 54 MBH @ 11.8 EER
HTG: 50 MBH @ 3.1 COP
In Area Served Above Ceiling
Science Room 1S & Science Room 2S 1996 -1 Good Condition
HP-9Ground Source Heat Pump 1 Florida Heat
PumpHP-9:SL080 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
1860 CFM / CLG: 63 MBH @ 11.8 EER
HTG: 52 MBH @ 3.1 COP
In Area Served Above Ceiling
Computer Lab L1 & Media Center Area
L21996 -1 Good Condition
HP-10Ground Source Heat Pump
(1996)1 Florida Heat
PumpHP-10:SL040 NOT AVAILABLE
HVAC / GSHP Electric Cooling & Heating, Vertical Cabinet
CLG: 36 MBH @ 12.9 EER
HTG: 29.4 MBH @ 3.1 COP
Inside Area Served
Middle School 1996 Board Offices 1996 -1 Good Condition
HP-11A, 11BGround Source Heat Pumps 2 Florida Heat
PumpHP-11A, 11B:WH300-4CSC
HP-11A: CM095227HP-11B:
CM095228
HVAC / GSHP Electric Cooling & Heating, Water to Water
CLG: 219.3 MBH @ 9.0 EER
HTG: 200.6 MBH @ 2.8 COP
Mechanical Room A-23
Across From Room 11A
Middle School 1973 Areas AHUs &
Terminal Equipment1996 -1 Good Condition
HP-11C, 11DGround Source Heat Pumps 2 Florida Heat
PumpHP-11C, 11D:WH300-4CSC
HP-11C: CM095226HP-11D:
CH091244
HVAC / GSHP Electric Cooling & Heating, Water to Water
CLG: 219.3 MBH @ 9.0 EER
HTG: 200.6 MBH @ 2.8 COP
Mechanical Room A-23
Across From Room 11A
Middle School 1973 Areas AHUs &
Terminal Equipment1996 -1 Good Condition
HP-10A thru 10GGround Source Heat Pumps
(2001)7 Water Furnace HP-10A thru 10G:
Spectra Series NOT AVAILABLEHVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
330 CFM / CLG: 9.9 MBH @ 12.0 EER
HTG: 7.4 MBH @ 3.0 COP
In Area Served Above Ceiling
Middle School 2001 Block C Classroom &
Office Areas2001 4 Good Condition
HP-16A thru 16GGround Source Heat Pumps 7 Water Furnace HP-16A thru 16G:
Spectra Series NOT AVAILABLEHVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
550 CFM / CLG: 16.7 MBH
@ 12.0 EERHTG: 12.8 MBH
@ 3.0 COP
In Area Served Above Ceiling
Middle School 2001 Block C Classroom &
Office Areas2001 4 Good Condition
HP-19A thru 19DGround Source Heat Pumps 4 Water Furnace HP-19A thru 19D:
Spectra Series NOT AVAILABLEHVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
650 CFM / CLG: 19.2 MBH
@ 12.0 EERHTG: 15.1 MBH
@ 3.0 COP
In Area Served Above Ceiling
Middle School 2001 Block CClassroom &
Office Areas2001 4 Good Condition
HP-24Ground Source Heat Pump 1 Water Furnace HP-24:
Spectra Series NOT AVAILABLEHVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
800 CFM / CLG: 27 MBH @ 12.0 EER
HTG: 18 MBH @ 3.0 COP
In Area Served Above Ceiling
Middle School 2001 Block C Classroom
Areas OA2001 4 Good Condition
HP-30A thru 30FGround Source Heat Pumps 6 Water Furnace HP-30A thru 30F:
Spectra Series NOT AVAILABLEHVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
960 CFM / CLG: 31.2 MBH
@ 12.0 EERHTG: 21.6 MBH
@ 3.0 COP
In Area Served Above Ceiling
Middle School 2001 Block C Classroom
Areas2001 4 Good Condition
HP-36Ground Source Heat Pump 1 Water Furnace HP-36:
Spectra Series NOT AVAILABLEHVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
1120 CFM / CLG: 36.4 MBH
@ 12.0 EERHTG: 26 MBH @ 3.0 COP
In Area Served Above Ceiling
Middle School 2001 Block C Classroom Corridor & Vestibule
2001 4 Good Condition
HP-42Ground Source Heat Pumps 2 52 HP-42:
Spectra Series NOT AVAILABLEHVAC / GSHP Electric Cooling & Heating, Horizontal Cabinet
1450 CFM / CLG: 44.5 MBH
@ 12.0 EERHTG: 31.8 MBH
@ 3.0 COP
In Area Served Above Ceiling
Middle School 2001 Block C Rooms Science Lab 1 & Science Lab 2
2001 4 Good Condition
01 24145 - Upper Township MS Equip Inventory - Rev 001 Upper Twsp Middle School
New Jersey BPU Energy Audit ProgramCHA #24145Upper Township School DistrictMiddle School BuildingOriginal Construction Date: 1973Renovation/Addtion Date: 1983 (Block A Rooms)Renovation/Addtion Date: 1996 (Added 56 Geothermal Wells)Renovation/Addtion Date: 2001 (Block C Rooms, Added 21 Geothermal Wells)
Description QTY Manufacturer Name Model No. Serial No. Equipment Type /
Utility Capacity/Size/Efficiency Location Areas/Equipment Served
Date Installed
Remaining Useful Life
(years)Other Info.
AHU-1 1 Trane PCCB-BAA-CBHB0AAAA0FA K96G64988
HVAC / Air Handling Unit to Hot Water Heating, Chilled Water Cooling Duct Mounted Dual Temperature Coils; Both Served by GSHPs Water
7600 CFM to (6) Dual Temperature Coils:
CLG: 352 MBH (total)HTG: 288 MBH (total)
/ 5.0 HP SF / Standard Eff. Motor
Rooftop Above Area Served
Rooms 1B thru 6B Dual Temperature
Duct Coils1996 -1 Good Condition
AHU-2 1 Trane PCCB-BAA-CBHB0AAAA0FA K96G64291
HVAC / Air Handling Unit to Hot Water Heating, Chilled Water Cooling Duct Mounted Dual Temperature Coils; Both Served by GSHPs Water
6090 CFM to (7) Dual Temperature Coils:
CLG: 312 MBH (total)HTG: 221 MBH (total)
/ 5.0 HP SF / Standard Eff. Motor
Rooftop Above Area Served
Front Offices, Principals Office,
Guidance & Faculty Work Rooms Dual Temperature Duct
Coils
1996 -1 Good Condition
AHU-3 1 Trane PCCB-CDACB HC 0A AA A0 GA K96G64987
HVAC / Air Handling Unit to Hot Water Heating, Chilled Water Cooling Duct Mounted Dual Temperature Coils; Both Served by GSHPs Water
9000 CFM to (7) Dual Temperature Coils:
CLG: 529 MBH (total)HTG: 365 MBH (total)
/ 7.5 HP SF / Standard Eff. Motor
Rooftop Above Area Served Cafteria 2001 4 Good Condition
HRU-1 1 Greenheck ERV-522S-B-ES 01B10701HVAC / Ventilation, Hot Water Heating Energy Recovery Unit
5885 CFM / 7.5 HP SF, 7.5 HP EF
Standard Eff.
Rooftop Above Area Served
Middle School 2001 Block A Classroom &
Office Area Heat Pumps
2001 4 Good Condition
HRU-2 1 Greenheck ERV-251H-B-ES 01B10697HVAC / Ventilation, Hot Water Heating Energy Recovery Unit
807 CFM / 1/2 HP SF, 1/2 HP EF
Standard Eff.
Ceiling Above Area Served
Middle School 2001 Stage, Storage &
Music Room Areas Heat Pumps
2001 4 Good Condition
RTU-1 1 York B1CH108E01846FDB (S)NKKM108971
HVAC / DX Electric Cooling & Heating Package Heat Pump Unit
6000 CFM / CLG: 180 MBH, HTG: 188 MBH/ 5.0 HP SF with
Economizer
Rooftop Above Area Served Gym 2001 4 Good Condition
RTU-2 1 York B1CH108E01846FDB (S)NKKM107748
HVAC / DX Electric Cooling & Heating Package Heat Pump Unit
6000 CFM / CLG: 180 MBH, HTG: 188 MBH/ 5.0 HP SF with
Economizer
Rooftop Above Area Served Gym 2001 4 Good Condition
RTU-3 1 York B1CH108E01846FDB (S)NKKM108970
HVAC / DX Electric Cooling & Heating Package Heat Pump Unit
6000 CFM / CLG: 180 MBH, HTG: 188 MBH/ 5.0 HP SF with
Economizer
Rooftop Above Area Served Gym 2001 4 Good Condition
RTU-4 1 York B1CH108E01846FDB (S)NKKM108696
HVAC / DX Electric Cooling & Heating Package Heat Pump Unit
6000 CFM / CLG: 180 MBH, HTG: 188 MBH/ 5.0 HP SF with
Economizer
Rooftop Above Area Served Gym 2001 4 Good Condition
EF-1, EF-2 2 Greenheck CBE-48-30 229901229903 HVAC / Ventilation
10,300 CFM /3.0 HP exhaust fan /
Standard Eff.
Rooftop Above Area Served Gym 1973 -19 Good Condition
AC-1 1 Liebert Mini-Mate PFHO27A-PL3 0631N132308
HVAC / Electric DX Cooling with Indoor Section
800 CFM / CLG: 24 MBH
/ 1/2 HP SF Indoor7.51 EER
Rooftop Above Area Served
Computer Server Room 2008 11 Good Condition
Kitchen: Walk-in Cooler 1 Tafco - - 8'x12' Walk-in Cooler / Electric DX - Kitchen - - - Good Condition
Kitchen: Walk-in Freezer 1 Tafco - - 8'x12' Walk-in Cooler / Electric DX - Kitchen - - - Good Condition
Kitchen: Cooking Exhaust Hood 1 - -
4'x16' Cooking Exhaust Hood / Electric Ventilation Fan
Greenheck UCHB-30-15, (SN: 229903)
1.5 HP EF / Std. Eff.Kitchen - - - Good Condition
01 24145 - Upper Township MS Equip Inventory - Rev 001 Upper Twsp Middle School
New Jersey BPU Energy Audit ProgramCHA #24145Upper Township School DistrictMiddle School BuildingOriginal Construction Date: 1973Renovation/Addtion Date: 1983 (Block A Rooms)Renovation/Addtion Date: 1996 (Added 56 Geothermal Wells)Renovation/Addtion Date: 2001 (Block C Rooms, Added 21 Geothermal Wells)
Description QTY Manufacturer Name Model No. Serial No. Equipment Type /
Utility Capacity/Size/Efficiency Location Areas/Equipment Served
Date Installed
Remaining Useful Life
(years)Other Info.
Kitchen: Dishwasher 1 Blakeslee - Appliance / Hot Water - Kitchen - - - Good Condition
Kitchen: Steamer 1 Cleaveland - -2-Box Table Top Steamer / Appliance / Electric
15 Kw Kitchen - - - Good Condition
Kitchen: Kettle 1 Cleaveland KET-12-T WT4922-03G-02Table Top, 3 Gallon Kettle / Appliance / Electric
13.1 Kw Kitchen - - - Good Condition
Kitchen: Double Stack Oven 1 Garland - -
Commercial 2-stack, 4 shelves Each Oven / Appliance / Electric
42 Kw Kitchen - - - Good Condition
Kitchen: Range Top with Oven 1 General Electric - -
Commercial Range top & Oven / Appliance / Electric
30 Kw Kitchen - - - Good Condition
Kitchen: Food Warmer 1 Traulsen - -Commercial Single Section 6'x6' Hot Box / Appliance / Electric
3.0 Kw Kitchen - - - Good Condition
Kitchen: Steam Serving Table 1 - - - Appliance / Electric 2.8 Kw Kitchen - - - Good Condition
Kitchen: Cooler 2 Traulsen - -
Commercial Doulbe Single Section 6'x6' Cooler / Appliance / Electric
0.9 Kw Kitchen - - - Good Condition
Kitchen: Clothes Washer & Dryer 1 - - -
Stacked Residential Clothes Washer & Dryer / Appliance / Electric
- Kitchen - - - Good Condition
Vending Machines 4 - NOT AVAILABLE NOT AVAILABLE Vending / Electric DX -
Refrigerated Soda Vending Machines with
Lighting
Cafteria, Faculty Room & Students
Use- - Good Condition
Emergency Generator 1 Onsite Energy 150RJC6DT3 305508-1-1-0206 Emergency Power / No. 2 Fuel Oil
150 Kw / 280 Gallon Fuel Tank
Outside On Grade Behind Storage Areas
Emergency Lights, Life Safety Systems & Security/Access Control Systems
- - Good Condition
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX C
ECM Calculations
Approx. Costs
Payback (Years)
($)w/
Incentive
ECM-1 HVAC Geothermal Ground Source Heat Pumps Replacement 950,200 900 1055.8 20,760 1032.7
ECM-2 Replace Domestic Water Heater (DWH) 20,100 17,100 1.2 720 1.1 X
ECM-3 HVAC Install Variable Speed Drives, High Efficiency Motors 115,400 35,300 3.3 16,529 2.8 X
ECM-4 HVAC Air Handling Equipment Replacement 186,400 2,000 93.2 6,000 90.2
ECM-5 HVAC Demand Control Ventilation 25,400 2,800 9.1 0 9.1 X
ECM-6 HVAC Building Automation System Upgrade/Re-commissioning 34,800 10,500 3.3 0 3.3 X
ECM-7 CoolTrol Walk-in Controls 15,000 2,300 6.5 0 6.5 X
ECM-8 Variable Speed Kitchen Hood Controllers 33,800 600 56.3 0 56.3 ECM-9 Lighting Replacement Upgrades 184,500 14,800 12.5 26,515 10.7 X
ECM-10 Lighting Controls Insallation (Occupancy Sensors) 46,300 14,900 3.1 5,000 2.8 X
ECM-11 Lighting Replacements with Lighting Controls (Occupancy Sensors) 230,800 22,300 10.3 31,515 8.9 X
ECM-12 Replace Electric Kitchen Equipment with Natural Gas Equipment 44,900 12,700 3.5 0 3.5 X
Approx. Savings ($/year)
Payback (Years) w/o
Incentive
Summary of Energy Conservation Measures
Energy Conservation Measure Potential Incentive
($)*
Recommended For
Implementation
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
ECM Summary Sheet
ECM-1 HVAC Geothermal Ground Source Heat Pumps ReplacementBudgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years950,200 6,240 0 0 900 0 900 (1.0) 20,760 >20 >20
ECM-2 Replace Domestic Water Heater (DWH)Budgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years20,100 52,690 170 -988 17,100 0 17,100 9.2 720 1.2 1.1
ECM-3 HVAC Install Variable Speed Drives, High Efficiency MotorsBudgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years115,400 243,640 0 0 35,300 0 35,300 5.1 16,529 3.3 2.8
ECM-4 HVAC Air Handling Equipment Replacement Budgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years186,400 13,850 0 0 2,000 0 2,000 (0.8) 6,000 >20 >20
ECM-5 HVAC Demand Control VentilationBudgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years25,400 15,070 0 566 2,800 0 2,800 0.9 0 9.1 9.1
ECM-6 HVAC Building Automation System Upgrade/Re-commissioning Budgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years34,800 46,680 0 3,690 10,500 0 10,500 4.4 0 3.3 3.3
ECM-7 CoolTrol Walk-in ControlsBudgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years15,000 16,160 0 0 2,300 0 2,300 1.8 0 6.5 6.5
ECM-8 Variable Speed Kitchen Hood Controllers Budgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years33,800 4,180 0 0 600 0 600 (0.7) 0 >20 >20
ECM-9 Lighting Replacement UpgradesBudgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years184,500 118,260 42 0 14,800 0 14,800 0.2 26,515 12.5 10.7
ECM-10 Lighting Controls Insallation (Occupancy Sensors)Budgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years46,300 102,580 0 0 14,900 0 14,900 3.8 5,000 3.1 2.8
ECM-11 Lighting Replacements with Lighting Controls (Occupancy Sensors)Budgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years230,800 195,470 42 0 22,300 0 22,300 0.5 31,515 10.3 8.9
ECM-12 Replace Electric Kitchen Equipment with Natural Gas EquipmentBudgetary Estimated Total Payback Payback
Cost Maintenance Savings ROI Incentive * (without (with Electric Electric Nat Gas Total Savings incentive) incentive)
$ kWh kW Therms $ $ $ $ Years Years44,900 114,110 0 -3,894 12,700 0 12,700 3.2 0 3.5 3.5
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
Annual Utility Savings
ECM Master Rev 8
Upper Township School District - NJBPUCHA Project #24145525 Perry Road Yearly Usage MTCDEMarmora, NJ 08270 0.145$ $/kWh blended 0.00042021
0.098$ $/kWh consumpti 1,795,200 0.000420216.39$ $/kW 447 0
natural gas rate assumed for purposes of ECM calculations 1.00$ $/Therm - 0.00533471-$ $/kgals - 0
Item Cost Simple LifekW kWh therms cooling kWh kgal/yr $ Payback MTCDE Expectancy
ECM-1 HVAC Geothermal Ground Source Heat Pumps Replacement 0.0 6,240 0 0 0 $ 900 950,200$ 1,055.8 2.6 15ECM-2 Replace Domestic Water Heater (DWH) 168.0 52,685 -988 0 0 $ 17,100 20,100$ 1.2 16.9 12ECM-3 HVAC Install Variable Speed Drives, High Efficiency Motors 0.0 243,636 0 0 0 $ 35,300 115,400$ 3.3 102.4 20ECM-4 HVAC Air Handling Equipment Replacement 0.0 13,854 0 0 0 $ 2,000 186,400$ 93.2 5.8 15ECM-5 HVAC Demand Control Ventilation 0.0 15,072 566 0 0 $ 2,800 25,400$ 9.1 9.4 18ECM-6 HVAC Building Automation System Upgrade/Re-commissioning 0.0 46,675 3,690 0 0 $ 10,500 34,800$ 3.3 39.3 18ECM-7 CoolTrol Walk-in Controls 0.0 16,157 0 0 0 $ 2,300 15,000$ 6.5 6.8 18ECM-8 Variable Speed Kitchen Hood Controllers 0.0 4,176 0 0 0 $ 600 33,800$ 56.3 1.8 18ECM-9 Lighting Replacement Upgrades 42 118,261 0 0 0 $ 14,800 $184,500 12.5 49.7 15ECM-10 Lighting Controls Insallation (Occupancy Sensors) 0 102,581 0 0 0 $ 14,900 $46,300 3.1 43.1 15ECM-11 Lighting Replacements with Lighting Controls (Occupancy Sensors) 42 195,470 0 0 0 $ 22,300 $230,800 10.3 82.1 15ECM-12 Replace Electric Kitchen Equipment with Natural Gas Equipment 0.0 114,114 -3,894 0 0 $ 12,700 44,900$ 3.5 27.2 15
Utility Costs
Upper Township Middle School Savings
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
EQUIPMENT QTY.
HP-1,2,3,4,5 40.0 30.0 5 350.0
HP-6A,6B,6C,42 48.0 42.0 4 360.0
HP-7A,7B,8A,8B 54.0 50.0 4 416.0
HP-9 63.0 52.0 1 115.0
HP-10,36 63.0 52.0 2 230.0
HP-11A,11B,11C,11D 219.3 200.6 4 1,679.6
HP-10A,10B,10C, 10D,10E,10F,10G 10.0 7.5 7 122.5
HP-16A,16B,16C,16D,16E,16F,16G 16.7 12.8 7 206.5
HP-19A,19B,19C,19D 19.2 15.1 4 137.2
HP-24 27.0 18.0 1 45.0
HP-30A,30B,30C, 30D,30E,30F 31.2 21.6 7 369.6
591 502 4,031 MBHECM-1: HVAC Geothermal Ground Source Heat Pumps Replacement
ECM Description Summary
Electric Cost $0.145 / kWhAverage run hours per Week 50 HoursSpace Balance Point 55 FSpace Temperature Setpoint 74 deg FCooling BTU/Hr Rating of existing DX equipment 591,400 Btu / HrHeating BTU/Hr Rating of existing DX equipment 501,600 Btu / HrAverage EER (cooling) 11.7Average COP (heating) 3.1Existing Annual Electric Usage 33,872 kWh
Item Value UnitsProposed Average EER 14.4Proposed Average COP 3.8Proposed Annual Electric Usage 27,632 kWh
Annual Electrical Usage Savings 6,240 kWhAnnual Cost Savings $905Total Project Cost $950,200Simple Payback 1,050 years
OAT - DB Cooling Hrs AssumedBin Annual at Temp Above hrs of
Temp F Hours balance point Operation102.5 0 0 100% 097.5 3 1 89% 192.5 34 10 79% 887.5 131 39 68% 2782.5 500 149 58% 8677.5 620 185 47% 8772.5 664 0 0% 067.5 854 0 0% 062.5 927 0 0% 057.5 600 0 0% 052.5 610 0 0% 047.5 611 0 0% 042.5 656 0 0% 037.5 1,023 0 0% 032.5 734 0 0% 027.5 334 0 0% 022.5 252 0 0% 017.5 125 0 0% 012.5 47 0 0% 07.5 22 0 0% 02.5 13 0 0% 0-2.5 0 0 0% 0-7.5 0 0 0% 0
Total 8,760 383 55% 209
ANNUAL SAVINGS
Assumed % of time of operation
Setpoint.Total BTU/hr of DX cooling equipment to be replaced.
Units are 10 years old, EER of 12.0, COP of 3.0 when new.
CommentsNew ductless mini-splits (per manufacturer)
Unit will cycle on w/ temp of room. Possible operating time shown belowNew ductless mini-splits (per manufacturer)
2001 Block C Areasand Main Offices
By replacing older air handling equipment which uses more efficient fan motors and higher SEER/EER DX condensing units, significant electrical energy can be saved. The fan motors will also be replaced with premium efficiency motors. Control schemes can be incorporated that were not possible with the older equiopment as well. It is recommended these
ASSUMPTIONS
2001 Block C Areas
TOTAL MBH
Units are 10 years old, EER of 12.0, COP of 3.0 when new.Total BTU/hr of DX cooling equipment to be replaced.
2001 Block C Areasand Main Offices
OA to Block C Areas
AREA SERVEDBlock A1996 Areas, Art Room 11A, Home Ec Room 3A, and
Resource Room 12ARooms 7A,7B,7C and2001 Block C Areas
Media Center 2B, Science Room 1S
2001 Block C Areas
DX HEATING
CAPACITY(MBH)
DX COOLING CAPACITY
(MBH)
Comments
Computer Lab L1 &Media Center Area L2
1996 Board Offices and 2001 Block C Areas
1973 Areas AHUs and Terminal Equipment
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-1: HVAC Geothermal Ground Source Heat Pumps Replacement - Cost Equipment: 1.10
QTY UNITMAT. LABOR EQUIP. MAT. LABOR EQUIP.
-$ -$ -$ -$ Existing (53) GSHPs demolition 46 EA 100$ 1,000$ 5,060$ 62,100$ -$ 67,160$ (7) GSHPs, 1.0 ton with cooling and heating 7 EA 1,690$ 400$ 13,013$ 3,780$ -$ 16,793$ - Valves & Piping to GSHP CHW & HW coils 7 EA 250$ 300$ 1,925$ 2,835$ -$ 4,760$ - Reprogram DDC system for (1) GSHP 7 EA 75$ 200$ 578$ 1,890$ -$ 2,468$ (7) GSHPs, 1.5 tons with cooling and heating 7 EA 1,960$ 445$ 15,092$ 4,205$ -$ 19,297$ - Valves & Piping to GSHP CHW & HW coils 7 EA 250$ 300$ 1,925$ 2,835$ -$ 4,760$ - Reprogram DDC system for (1) GSHP 7 EA 75$ 200$ 578$ 1,890$ -$ 2,468$ (4) GSHPs, 2.0 tons with cooling and heating 4 EA 2,140$ 470$ 9,416$ 2,538$ -$ 11,954$ - Valves & Piping to GSHP CHW & HW coils 4 EA 250$ 300$ 1,100$ 1,620$ -$ 2,720$ - Reprogram DDC system for (1) GSHP 4 EA 75$ 200$ 330$ 1,080$ -$ 1,410$ (1) GSHP, 2.5 tons with cooling and heating 1 EA 2,340$ 500$ 2,574$ 675$ -$ 3,249$ - Valves & Piping to GSHP CHW & HW coils 1 EA 250$ 300$ 275$ 405$ -$ 680$ - Reprogram DDC system for (1) GSHP 1 EA 75$ 200$ 83$ 270$ -$ 353$ (7) GSHPs, 3.0 tons with cooling and heating 7 EA 2,400$ 575$ 18,480$ 5,434$ -$ 23,914$ - Valves & Piping to GSHP CHW & HW coils 7 EA 250$ 300$ 1,925$ 2,835$ -$ 4,760$ - Reprogram DDC system for (1) GSHP 7 EA 75$ 200$ 578$ 1,890$ -$ 2,468$ (1) GSHP, 3.5 tons with cooling and heating 1 EA 2,590$ 615$ 2,849$ 830$ -$ 3,679$ - Valves & Piping to GSHP CHW & HW coils 1 EA 250$ 300$ 275$ 405$ -$ 680$ - Reprogram DDC system for (1) GSHP 1 EA 75$ 200$ 83$ 270$ -$ 353$ (4) GSHPs, 4.0 tons with cooling and heating 4 EA 2,850$ 670$ 12,540$ 3,618$ -$ 16,158$ - Valves & Piping to GSHP CHW & HW coils 4 EA 300$ 400$ 1,320$ 2,160$ -$ 3,480$ - Reprogram DDC system for (1) GSHP 4 EA 75$ 200$ 330$ 1,080$ -$ 1,410$ (7) GSHPs, 5.0 tons with cooling and heating 7 EA 3,270$ 890$ 25,179$ 8,411$ -$ 33,590$ - Valves & Piping to GSHP CHW & HW coils 7 EA 300$ 400$ 2,310$ 3,780$ -$ 6,090$ - Reprogram DDC system for (1) GSHP 7 EA 75$ 200$ 578$ 1,890$ -$ 2,468$ (4) GSHPs, 6.0 tons with cooling and heating 4 EA 3,100$ 1,200$ 13,640$ 6,480$ -$ 20,120$ - Valves & Piping to GSHP CHW & HW coils 4 EA 300$ 400$ 1,320$ 2,160$ -$ 3,480$ - Reprogram DDC system for (1) GSHP 4 EA 75$ 200$ 330$ 1,080$ -$ 1,410$ (4) GSHPs, 20.0 tons with cooling and heating 4 EA 16,700$ 3,100$ 73,480$ 16,740$ -$ 90,220$ - Valves & Piping to GSHP CHW & HW coils 4 EA 400$ 500$ 1,760$ 2,700$ -$ 4,460$ - Reprogram DDC system for (1) GSHP 4 EA 75$ 300$ 330$ 1,620$ -$ 1,950$ Electrical - misc. 46 LS 1,000$ 5,000$ 50,600$ 310,500$ -$ 361,100$
-$ -$ -$ -$
719,859$ Subtotal71,986$ 10% Contingency
158,369$ 20% Contractor O&P-$ 0% Engineering
950,200$ Total
Description UNIT COSTS SUBTOTAL COSTS TOTAL COST REMARKS
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
ECM-2: Replace Electric DHW Heater w/ Condensing Gas-Fired DHW Heater
ECM Description Summary
Item Value UnitsOccupied days per week 7 days/wkWater supply Temperature 50 ˚FHot Water Temperature 140 ˚FHot Water Usage per day 165 gal/dayAnnual Hot Water Energy Demand 44,942 MBTU/yr
Existing Tank Size 915 GallonsHot Water Temperature 140 ˚FAverage Room Temperature 70 ˚FStandby Losses (% by Volume) 2.5%Standby Losses (Heat Loss) 13.3 MBHAnnual Standby Hot Water Load 116,891 MBTU/yr
Total Annual Hot Water Demand (w/ standby losses) 161,833 Mbtu/yrExisting Water Heater Efficiency 90%Total Annual Energy Required 179,814 Mbtu/yrTotal Annual Electric Required 52,685 kWh/yrAverage Annual Electric Demand 6.01 kWPeak Electric Demand 168.00 kW
New Tank Size 360 Gallons
Hot Water Temperature 140 ˚FAverage Room Temperature 70 ˚FStandby Losses (% by Volume) 2.5%Standby Losses (Heat Loss) 5.3 MBHAnnual Standby Hot Water Load 45,990 MBTU/yr
Prop Annual Hot Water Demand (w/ standby losses) 90,932 MBTU/yrProposed Avg. Hot water heater efficiency 92%Proposed Total Annual Energy Required 98,839 MBTU/yrProposed Fuel Use 988 Therms/yr
Elec Utility Demand Unit Cost $6.39 $/kWElec Utility Supply Unit Cost $0.10 $/kWhNG Utility Unit Cost $1.00 $/ThermExisting Operating Cost of DHW $18,045 $/yrProposed Operating Cost of DHW $988 $/yrAnnual Utility Cost Savings $17,100 $/yr
Daily Hot Water Demand
FIXTURE *BASE WATER USE GPM
DURATION OF USE (MIN) MALE FEMALE MALE FEMALE TOTAL
GAL/DAY% HOT WATER
TOTAL HW GAL/DAY
LAVATORY (Low-Flow Lavs use 0.5 GPM) 2.5 0.25 3 3 40 40 150 50% 75SHOWER 2.5 5 1 1 2 2 50 75% 38KITCHEN SINK 2.5 0.5 1 1 5 6 75% 5MOP SINK 2.5 2 1 1 10 50 75% 38Dishwasher (gal per u 10 1 1 0 1 10 100% 10
TOTAL 256 165*GPM is per standard fixtures, adjust as necessary if actual GPM is known. **These are the occupanct that use the fixtures. If fixture does not exist change to (0).
During periods of little or no domestic hot water use, domestic hot water heaters must still heat the water within their storage tank. Energy required maintaining the hot water temperature setpoint during times of zero demand is known as standby losses. According to the U.S. Department of Energy, 2.5% of stored capacity is lost every hour during HW heater standby. This value was applied to the total volume of the existing DHW heater storage tank to determine the annual standby losses. Proposed efficiency was based on a tank-type, high efficiency condensing hot water heater.
Formula/Comments
Termperature of water coming into building
Per Manufacturer
Calculated from usage belowEnergy required to heat annual quantity of hot water to setpoint
Per manufacturer nameplatePer building personnel
( 2.5% of stored capacity per hour, per U.S. Department of Energy )
Building demand plus standby losses
Electrical Savings
Per Manufacturer's Nameplate (Demand Savings)
replace 675 gallon unit with 120 gallon unit; total of three (3) new 120 gallon DHWH
( 2.5% of stored capacity per hour, per U.S. Department of Energy )
#USES PER DAY FULL TIME OCCUPANTS**
Based on Navien CR180 instantaneous, condensing DHW Heater
Standby Losses and inefficient DHW heater eliminated
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-2: Replace Electric & Gas-Fired DHW Heaters w/ Condensing Gas-Fired DHW Heater - Cost Equipment: 1.10
MAT. LABOR EQUIP. MAT. LABOR EQUIP.
Electric DHW Heater Removal 3 LS 150$ -$ 608$ -$ 608$ -$ -$ -$ -$
High Efficiency Gas-Fired DHW Heater 3 EA 2,500$ 280$ 8,250$ 1,134$ -$ 9,384$ Miscellaneous Electrical 3 LS 150$ 495$ -$ -$ 495$ Venting Kit 3 EA 450$ 650$ 1,485$ 2,633$ -$ 4,118$ Miscellaneous Piping and Valves 3 LS 200$ 660$ -$ -$ 660$
-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
15,264$ Subtotal1,526$ 10% Contingency3,358$ 20% Contractor O&P
-$ 0% Engineering20,100$
a
REMARKS
Total
Description QTY UNIT UNIT COSTS SUBTOTAL COSTS TOTAL COST
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
ECM-3A: Install Variable Speed Drives - GSHP System Pumps
Variable InputsBlended Electric Rate $0.15GSHP System "On" Point 95VFD Efficiency 98.5%
ECM Description Summary
Pump ID Qty HP Total HPExisting Motor
Motor Eff. New Motor Motor
Eff. Exist. Motor kW
Note 1New Motor kW
Note 2P-1A, P-1B 1 40.0 40.0 91.0% 94.1% 26.23 25.37P-2A, P-2B 1 7.5 7.5 88.5% 91.0% 5.06 4.92
Total: 31.29 30.29
OAT - DB OAT - WB Annual Heating Pump Existing Proposed Speed Proposed ProposedAvg Avg Hours in Hours Load Pump Pump efficiency Pump Savings
Temp F Temp F Bin Bin % kWh kW % kWh kWh(A) (B) (C ) (D) (E) (F) (G) (H) (I) (J)
=IF(A>TP,0,C) =0.5+0.5* =D*AA =BB*E^2.5/CC =D*G =F-H(50-A)/(50-10))
See Note 3 See Note 3 See Note 3 See Note 4 See Note 5
97.5 75 3 0 0% 0 0.0 0.0% 0 092.5 74 34 34 30% 1,064 1.5 56.7% 91 97387.5 72 131 131 30% 4,099 1.5 56.7% 350 3,74982.5 69 500 500 30% 15,645 1.5 56.7% 1,337 14,30877.5 67 620 620 30% 19,400 1.5 56.7% 1,658 17,74272.5 64 664 664 30% 20,777 1.5 56.7% 1,775 19,00267.5 62 854 854 33% 26,722 1.9 60.3% 2,620 24,10262.5 58 927 927 38% 29,006 2.6 67.2% 3,654 25,35357.5 53 600 600 43% 18,774 3.6 73.4% 2,960 15,81452.5 47 610 610 53% 19,087 6.2 84.1% 4,512 14,57647.5 43 611 611 58% 19,119 8.0 88.8% 5,497 13,62242.5 38 656 656 64% 20,527 10.0 92.7% 7,097 13,43037.5 34 1,023 1,023 69% 32,010 12.4 95.9% 13,188 18,82332.5 30 734 734 75% 22,967 15.0 98.2% 11,196 11,77127.5 25 334 334 81% 10,451 17.9 99.8% 5,996 4,45522.5 20 252 252 86% 7,885 21.2 100.0% 5,332 2,55317.5 16 125 125 92% 3,911 24.7 100.0% 3,092 81912.5 11 47 47 97% 1,471 28.7 99.7% 1,351 1207.5 6 22 22 100% 688 30.7 99.0% 683 52.5 2 13 13 100% 407 30.7 99.0% 404 3-2.5 -3 0 0 0% 0 0.0 0.0% 0 0-7.5 -8 0 0 0% 0 0.0 0.0% 0 0
8,760 8,757 274,012 72,792 201,219
Notes: 1) Existing motor power based on operation with existing motor efficiency, operating at 80% load factor when at full load. Formula: Motor HP x 0.746 x 0.8 / Exist. Motor Eff., New motor power is based on same formula using the new motor efficiency. 2) New motor power is the same as existing motor power adjusted for the new efficiency, if a new motor is proposed. 3) Weather data from NOAA for Newark, New Jersey. 4) The pump load is estimated at 100% at X deg. OAT and 50% at X deg. OAT and varies linearly in between. 5) The required VFD motor draw is based on a 2.5 power relationship to load.
201,219 kWh29,200$ 58,900$
2 YearsSimple Payback
Larger motors that operate pumps unnecessarily consume electrical energy. The hot water system pumps operate at a constant speed even though the building load does not require all of the flow to maintain temperatures. By adding speed controllers to the motors, called Variable Frequency Drives (VFD’s), and reducing the flow (by slowing the motors down), significant electrical energy can be saved. Pressure actuated controllers are used to measure the water pressure in the hto water system and as valves close, the system pressure increases and in turn the pump speed is reduced.
PUMP SCHEDULE
SAVINGS ANALYSIS
Annual Utility SavingsAnnual SavingsInstall Variable Speed Drives- HW Pump Cost
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-3A: Install Variable Speed Drives - GSHP System Pumps - Cost Equipment: 1.10
MAT. LABOR EQUIP. MAT. LABOR EQUIP.-$ -$ -$ -$
40.0 HP VFD 2 ea 4,200$ 1,200$ 9,240$ 3,240$ -$ 12,480$ 40.0 HP Motors 2 ea 2,000$ 200$ 4,400$ 540$ -$ 4,940$ 7.5 HP VFD 2 ea 3,465$ 772$ 7,623$ 2,084$ -$ 9,707$ 7.5 HP Motors 2 ea 1,500$ 200$ 3,300$ 540$ -$ 3,840$ Reprogram DDC system 4 ea 100$ 350$ 440$ 1,890$ -$ 2,330$ Electrical - misc. 4 ls 200$ 150$ 880$ 810$ -$ 1,690$ 2-way or 3-way control valve(s) for system sequence 2 ea 1,000$ 2,000$ 2,200$ 5,400$ -$ 7,600$ Pipe pressure sensor/transmitter 1 ea 850$ 500$ 935$ 675$ -$ 1,610$ Misc. piping modification 1 ea 200$ 150$ 220$ 203$ -$ 423$
-$ -$ -$ -$
44,619$ Subtotal4,462$ 10% Contingency9,816$ 20% Contractor O&P
-$ 0% Engineering58,900$
REMARKS
Total
Description QTY UNIT UNIT COSTS SUBTOTAL COSTS TOTAL COST
Upper Township School District - NJBPUCHA Project #24145 AIR HANDLER AREA SERVED FAN MOTOR HP
Upper Township Middle School HRU-1 Block A Offices &
Front Office Area 7.5
RTU-1 Library 5.0
ECM-3B: Install Variable Speed Drives - AHU Fans RTU-2 All Purpose Room 5.0
RTU-3 Gym 5.0Utility Costs RTU-4 Gym 5.0Blended Electric Rate $0.15 EF-1 Gym 3.0
EF-2 Gym 3.033.5
ECM Description Summary
UNIT HPExisting Motor
Eff (Note 1)New Motor Eff
(Note 1)Existing Motor
kW New Motor kWBuilding Balance
PointHRU-1 7.5 85.2% 91.0% 5.25 4.92 55.0RTU-1 5.0 87.5% 89.5% 3.41 3.33RTU-2 5.0 87.5% 89.5% 3.41 3.33RTU-3 5.0 87.5% 89.5% 3.41 3.33RTU-4 5.0 87.5% 89.5% 3.41 3.33EF-1 3.0 86.5% 89.5% 2.07 2.00EF-2 3.0 86.5% 89.5% 2.07 2.00
23.03 22.26 VFD Eff. (CC) 98.5%
OAT - DB Occupied AHU Existing Existing Fan Proposed Speed Proposed SavingsAvg Bin Hours Hours in Hours in Fan Fan Load Fan efficiency Fan Fan
Temp F Bin Bin Kw kWh % kW % kWh kWh(A) (B) (C ) (D) (F) (F) (E) (G) (H) (I) (J)
102.5 0 0 0 23.0 0 50% 3.99 81.5% 0 097.5 3 1 1 23.0 21 50% 3.99 81.5% 4 1692.5 34 10 10 23.0 233 50% 3.99 81.5% 50 18387.5 131 39 39 23.0 898 50% 3.99 81.5% 191 70782.5 500 149 149 23.0 3,428 50% 3.99 81.5% 729 2,69877.5 620 185 185 23.0 4,250 50% 3.99 81.5% 904 3,34672.5 664 198 198 23.0 4,552 50% 3.99 81.5% 969 3,58367.5 854 254 254 23.0 5,855 50% 3.99 81.5% 1246 4,60962.5 927 276 276 23.0 6,355 50% 3.99 81.5% 1352 5,00357.5 600 179 179 23.0 4,113 50% 3.99 81.5% 875 3,23852.5 610 182 182 23.0 4,182 52% 4.46 83.7% 969 3,21347.5 611 182 182 23.0 4,189 57% 5.50 87.6% 1141 3,04842.5 656 195 195 23.0 4,497 61% 6.66 91.1% 1429 3,06837.5 1,023 304 304 23.0 7,013 66% 7.97 94.0% 2582 4,43132.5 734 218 218 23.0 5,032 70% 9.41 96.3% 2135 2,89727.5 334 99 99 23.0 2,290 75% 11.01 98.2% 1114 1,17622.5 252 75 75 23.0 1,728 80% 12.75 99.5% 961 76717.5 125 37 37 23.0 857 84% 14.65 100.0% 545 31212.5 47 14 14 23.0 322 89% 16.71 100.0% 234 887.5 22 7 7 23.0 151 93% 18.94 100.0% 124 272.5 13 4 4 23.0 89 98% 21.33 99.6% 83 6-2.5 0 0 0 23.0 0 100% 22.59 99.0% 0 0-7.5 0 0 0 23.0 0 100% 22.59 99.0% 0 0
TOTALS 2,607 2,607 530 60,054 17,637 42,417
Notes: 1) Existing motor power based on operation with existing motor efficiency, operating at 80% load factor when at full load. Formula: Motor HP x 0.746 x 0.8 / Exist. Motor Eff., New motor power is based on same formula using the new motor efficiency. 2) Weather data from NOAA for Newark, NJ International Airport. 3) Occupied & AHU Bin Hours are based upon current Owner reported occuped schedule. 4) The required VFD motor power draw is based on a 3.0 power relationship to load, since system static pressure will not be controlled.
42,417 kWh6,150$
56,500$
9 YearsSimple Payback
Total Combined Motor Horsepower:
Air handling units with constant volume supply fan motors serve spaces with intermittent large occupancy loads. By adding Variable Frequency Drives (VFD’s) to reducing the air flow by slowing the motors down, significant electrical energy can be saved. The fan motors will also be replaced with a premium efficiency motor. System static pressure will be permitted to float with fan speed, and pressure will not be controlled or monitored. Control strategy is to program the EMCS system to permit the AHU fan to ramp speed linearly between 100% and 50% as OAT varies between the design heating load and building balance point.
Annual Utility SavingsAnnual SavingsInstall Variable Speed Drives- HW Pump Cost
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-3B: Install Variable Speed Drives - AHU Fans - Cost Equipment: 1.10
MAT. LABOR EQUIP. MAT. LABOR EQUIP.
3.0 HP VFD 2 ea 1,335$ 490$ 2,937$ 1,323$ -$ 4,260$ 3.0 HP Motors 2 ea 465$ 85$ 1,023$ 230$ -$ 1,253$ 5.0 HP VFD 4 ea 1,485$ 490$ 6,534$ 2,646$ -$ 9,180$ 5.0 HP Motors 4 ea 525$ 85$ 2,310$ 459$ -$ 2,769$ 7.5 HP VFD 1 ea 3,465$ 772$ 3,812$ 1,042$ -$ 4,853$ 7.5 HP Motors 1 ea 1,500$ 200$ 1,650$ 270$ -$ 1,920$ Reprogram DDC system 7 ea 100$ 1,000$ 770$ 9,450$ -$ 10,220$ Electrical - misc. 7 ea 150$ 150$ 1,155$ 1,418$ -$ 2,573$ Duct pressure sensor/transmitter 7 ea 500$ 200$ 3,850$ 1,890$ -$ 5,740$
42,767$ Subtotal4,277$ 10% Contingency9,409$ 20% Contractor O&P
-$ 0% Engineering56,500$
REMARKS
Total
Description QTY UNIT UNIT COSTS SUBTOTAL COSTS TOTAL COST
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
AREA SERVEDRooms 1B thru 6B 352
Main Ofice Principal's Office/Guidance Office 312Cafeteria 529
Total Electric DX Cooling: 1,193 MBHECM-4: AHU Equipment Replacment
ECM Summary
Electric Cost $0.098 / kWhAverage run hours per Week 50 HoursSpace Balance Point 55 FSpace Temperature Setpoint 74 deg FBTU/Hr Rating of existing DX equipment 1,193,000 Btu / HrAverage EER 8.0 Units are 13 years old, EERs were 10 when new
Existing Annual Electric Usage 31,170 kWh
Item Value UnitsProposed EER 14.4Proposed Annual Electric Usage 17,317 kWh
Annual Electrical Usage Savings 13,854 kWhAnnual Cost Savings $1,358Total Project Cost $186,400Simple Payback 137 years
OAT - DB Cooling Hrs AssumedBin Annual at Temp Above hrs of
Temp F Hours balance point Operation102.5 0 0 100% 097.5 3 1 89% 192.5 34 10 79% 887.5 131 39 68% 2782.5 500 149 58% 8677.5 620 185 47% 8772.5 664 0 0% 067.5 854 0 0% 062.5 927 0 0% 057.5 600 0 0% 052.5 610 0 0% 047.5 611 0 0% 042.5 656 0 0% 037.5 1,023 0 0% 032.5 734 0 0% 027.5 334 0 0% 022.5 252 0 0% 017.5 125 0 0% 012.5 47 0 0% 07.5 22 0 0% 02.5 13 0 0% 0-2.5 0 0 0% 0
Total 8,760 383 55% 209
COOLING CAPACITY
(MBH)EQUIPMENTAHU-1AHU-2AHU-3
By replacing older air handling equipment which uses more efficient fan motors and higher SEER/EER DX condensing units, significant electrical energy can be saved. The fan motors will also be replaced with premium efficiency motors. Control schemes can be incorporated that were not possible with the older equiopment as well. It is recommended these units be replaced by more modern AAON units with supply fan variable speed drives and digital scroll compressors.
ASSUMPTIONS Comments
Unit will cycle on w/ temp of room. Possible operating time shown below
ANNUAL SAVINGS
Assumed % of time of operation
Setpoint.Total BTU/hr of DX cooling equipment to be replaced.
CommentsNew ductless mini-splits (per manufacturer)
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-4: AHU Equipment Replacment - Cost Equipment: 1.10
QTY UNITMAT. LABOR EQUIP. MAT. LABOR EQUIP.
-$ -$ -$ -$ Existing (2) RTUs demolition 3 EA 100$ 1,500$ 330$ 6,075$ -$ 6,405$ (1) RTU, 30.0 tons with DX cooling and HW heating 2 EA 30,000$ 3,500$ 66,000$ 9,450$ -$ 75,450$ - HW Valve & Piping to RTUs HW coil EA 350$ 200$ -$ -$ -$ -$ - Reprogram DDC system for (1) RTU 2 EA 75$ 300$ 165$ 810$ -$ 975$ (1) RTU, 40.0 tons each with DX cooling and HW heating 1 EA 40,000$ 4,500$ 44,000$ 6,075$ -$ 50,075$ - HW Valve & Piping to RTUs HW coil EA 350$ 200$ -$ -$ -$ -$ - Reprogram DDC system for (1) RTU 1 EA 75$ 300$ 83$ 405$ -$ 488$ Electrical - misc. 1 LS 1,000$ 5,000$ 1,100$ 6,750$ -$ 7,850$
-$ -$ -$ -$
141,243$ Subtotal14,124$ 10% Contingency31,073$ 20% Contractor O&P
-$ 0% Engineering186,400$ Total
Description UNIT COSTS SUBTOTAL COSTS TOTAL COST REMARKS
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
CFMOA
CFM7.5 9,000 1,3505.0 6,000 9005.0 6,000 9005.0 6,000 9005.0 6,000 900
27.5 HP 4,950 CFMECM-5: HVAC Demand Control Ventilation
Electric Cost 0.15$ /kWhNatural Gas Cost 1.00$ /therm
Facility Ventilation Heating Load 187,110 BTU/Hour1,2,3
Facility Ventilation Cooling Load 53,460 BTU/Hour1,2,3
Existing Ventilation Heating Usage 2,829 therms5
Existing Ventilation Cooling Usage 23,683 kWh5
Proposed Ventilation Heating Usage 2,263 therms6
Proposed Ventilation Cooling Usage 18,947 kWh6
Proposed Ventilation Fan Savings 10,335 kWh7
Total heating savings 566 thermsTotal cooling savings 15,072 kWhTotal cost savings 2,751
Estimated Total Project Cost $25,400 8
Simple Payback 9 years
Assumptions1 4,950 CFM, OA AHU airflow based exsiting design drawing schedules2 35 °F, Assumed average heating Δt (mixed air and supply)3 10 °F, Assumed average cooling Δt (mixed air and supply)4 20.5 kW of existing supply fan motor calculated based on electrical data from nameplate5 1,512 AHU run time per heating/cooling seasons [12 hours/day, 21 days/month, 6 months/year]6 20% Estimated savings for DCV based on reducing unit run time from 12 hours to 10 hours per day7 504 Assumed supply fan run time reduction based on 2 hours/day fan is "off" due to DCV8 25,400$ estimated measure cost for installation of sensors and associated controls
RTU-1 GYM
FAN MOTOR
HPAIR HANDLER AREA SERVEDAHU-3 CAFETERIA
assumed based on having natural gas connected
ECM Description SummaryIt is assumed the original system controls provide the full design ventilation outside air flow. Reducing outside air during occupied time periods will reduce heating and cooling energy used during the occupied period. A limit of 1000 PPM of CO2 is recommended in ASHRAE Standard 62-1982, Ventilation for Acceptable Indoor Air Quality. During unoccupied periods the outside air dampers should be closed.
RTU-2 GYMRTU-3 GYMRTU-4 GYM
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-5: HVAC Demand Control Ventilation - Cost Equipment: 1.10
MAT. LABOR EQUIP. MAT. LABOR EQUIP.
CO2 sensor 5 ea 500$ 150$ -$ 2,750$ 1,013$ -$ 3,763$ Replace damper actuators 15 ea 250$ 50$ -$ 4,125$ 1,013$ -$ 5,138$ Reprogram DDC system 5 ea 150$ 350$ -$ 825$ 2,363$ -$ 3,188$ Miscellaneous electrical/wiring 5 ls 300$ 750$ -$ 1,650$ 5,063$ -$ 6,713$
18,800$ Subtotal3,760$ 10% Contingency2,820$ 20% Contractor O&P
-$ 0% Engineering25,400$
REMARKS
Total
Description QTY UNIT UNIT COSTS SUBTOTAL COSTS TOTAL COST
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
ECM-6: Re-commission Facility BAS and Integrate Existing HVAC Equipment
69,607 Sq Footage
1,795,200 kWh45,000 Therms assumption based on having natural gas connected
466,752 kWh1
36900 Therms2
46,675 kWh3690 Therms
46,675 kWh3,690 Therms
$10,50034,800$ 4
3.3 years
Assumptions1 26% of facility total electricity dedicated to Cooling; Source: E source, data from U.S. Energy Information Administration2 82% of facility total natural gas dedicated to Heating; Source: E source, data from U.S. Energy Information Administration3 10% Typical Savings associated with Retro-Commissioning of controls based on previous project experience4 Based on $0.50 / Sq Ft recommissioning cost
Existing Facility Cooling Electric usage
ECM Description Summary
The HVAC Building Automation System (BAS) controls consists of an outdated BAS for monitoring and sequencing all HVAC systems and equipment. Due to BAS condition and software, HVAC system sequencing, monitoring, scheduling and monitoring are limited; pneumatic control filed devices, instrument air tubing and compressor are also maintenance intensive. To reduce the energy used by HVAC systems, the BAS system requires replacement by a modern DDC control system with current software and functionality, and complete re-commissioning, Testing and Balancing of all HVAC systems.This cost analysis provides simple payback time period by reducing HVAC system energy consumption during unoccupied hours.
E X I S T I N G C O N D I T I O N SExisting Facility Total Electric usageExisting Facility Total Gas usage
Retro-Commissioning Natural Gas SavingsTotal cost savingsEstimated Total Project CostSimple Payback
Existing Facility Heating Natural Gas usageP R O P O S E D C O N D I T I O N SProposed Facility Cooling Electric SavingsProposed Facility Natural Gas SavingsS A V I N G SRetro-Commissioning Electric Savings
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
ECM-7: Walk-in Cooler & Freezer Controls
1,795,200 kWh107,712 kWh1
53,856 kWh2
16,157 kWh3
16,157 kWh$2,30015,000$ 4
6.5 years
Assumptions1 6% of facility total electricity; Source: E source, data from U.S. Energy Information Administration2 50% of refrigeration attributable to walk-in based on site observations3 30% Electric load reduction typical for walk-in controllers4 Based on (2) "Cooltrol" walk-in controls systems
Simple Payback
ECM Description SummaryFor kitchens that contain walk-in coolers and freezers, CoolTrol is a controller that reduces energy consumption by controlling off of dewpoint temperature. Compressor cycling is reduced and the evaporator fans run 25% to 80% less. Door and frame heaters are also installed and controlled by store dew point temperature; this can reduce run time by up to 95% in coolers and 60% in freezers. The evaporator fan motors are also replaced with hi-efficient fan motors saving 40% to 70% in energy. The proposed system comprises of an anti-sweat door controller, evaporator fan motor replacement and CoolTrol Cooler Control System.
E X I S T I N G C O N D I T I O N SExisting Facility Total Electric usageExisting Facility Refridgeration Electric usage
Existing Facility Walk-In Electric usage
Walk-In Controls System Annual Electric savingsS A V I N G SWalk-In Controls Electric Usage SavingsTotal cost savingsEstimated Total Project Cost
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
ECM-8: Kitchen Hood Control
ECM Description Summary
Motor Operating Savings Conditioned Make Up Air: Heating
Hours of Operation (per day) 6 A Previous Net Exhaust Volume 3,000 CFMDays/Year 190 B New Net Exhaust Volume 2,157 CFM Note 1Weeks/Year 38 C Previous net heat load 98,820 BTU/hrMotor HP 1.5 D new net heat load 71,052 BTU/hrEquivalent KW 0.93 KW E Design Indoor Conditions 68 FCost of Electricity $0.15 KWh F Average Outdoor Air Temp (during Heating) 37.5 FTotal Time/Year 1140 hrs/year G Heating Hours 4,589 hrs/yrTotal KWH/YR 1063 KWh H Total kWh Savings (no natural gas in building) 3,614 kWh
% Rated RPM % Run Time Time Output KWH/YR% Rated
RPM% Run Time H * J
I J K L M I JJ * G I * E ^ 2.5 L *K
100% 9% 103 0.933 96 100% 9% 9.00%90% 11% 125 0.717 90 90% 11% 9.90%80% 14% 160 0.534 85 80% 14% 11.20%70% 35% 399 0.382 153 70% 35% 24.50%60% 18% 205 0.260 53 60% 18% 10.80%50% 13% 148 0.165 24 50% 13% 6.50%40% 0% 0 0.094 0 40% 0% 0.00%30% 0% 0 0.046 0 30% 0% 0.00%20% 0% 0 0.017 0 20% 0% 0.00%10% 0% 0 0.003 0 10% 0% 0.00%
501 N Avg RPM 71.90%
Total Savings .= H - N 562 KWh Cost of Energy = $0.15 / kWh
Reduced Electricity Savings = 562 kWhReduced Fuel Savings = 3,614 thermsReduced Financial Savings = $605
5623,614
605$ 33,800$
56
The Kitchen contains a 16’x4’ cooking hood; the exhaust fan is one constant volume 1.5 HP motor. It is recommended a Me-Link kitchen hood controller be installed to reduce run time of the exhaust fan. A variable speed drive with a high efficiency motor will need to be installed on the exhaust fan.Upon activation, the hood lights turn on and the fans reach a preset minimum speed of between 10% and 50%. When cooking appliances turn on, the fan speed increases based on exhaust air temperature. During actual cooking, the speed increases to 100% until smoke and heat are removed. The controller will also send a signal to the kitchen makeup air units to turn on/off the supply fan motor, or to modulate the speed on the supply fan drive based on exhaust air quantity. Variable speed drives with high efficiency motors will need to be installed on the exhaust fan and makeup air units supply fans motors.Reducing exhaust and make-up fan speed reduces energy consumption. The system and equipment can also act as an economizer when indoor and outdoor conditions are right for free cooling. Finally, the controls reduce hood noise in the kitchen by up to 90% when the fans slow down.
Annual Electric Utility Savings kWhAnnual Electric Heating Savings kWh (no natural gas)
Simple Payback Years
Annual SavingsAdd Variable Speed Kitchen Hood
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-8: Kitchen Hood Control - Cost Equipment: 1.10
MAT. LABOR EQUIP. MAT. LABOR EQUIP.-$ -$ -$ -$
Me-Link Kitchen Hood Control System 1 ea 15,000$ 2,000$ 16,500$ 2,700$ -$ 19,200$ 1.5 HP VFDs (1-exhaust fan) 1 ea 1,000$ 350$ 1,100$ 473$ -$ 1,573$ 1.5 HP Motors 1 ea 400$ 85$ 440$ 115$ -$ 555$ Reprogram DDC system 1 ea 100$ 1,200$ 110$ 1,620$ -$ 1,730$ Electrical - misc. 1 ls 200$ 500$ 220$ 675$ -$ 895$ Remote bulb thermostat 2 ea 500$ 200$ 1,100$ 540$ -$ 1,640$
-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
25,592$ Subtotal2,559$ 10% Contingency5,630$ 20% Contractor O&P
-$ 0% Engineering33,800$
REMARKS
Total
Description QTY UNIT UNIT COSTS SUBTOTAL COSTS TOTAL COST
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-9 Lighting Replacement
Page 1 of 3Version 1.2
6/21/201211:47 AM
Applicant Name: Upper Township School District - NJBPU
Facility Name: Upper Township Middle School INSTRUCTIONS
Date: 5/1/2012 Use one line for each fixture type in a room or area.
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
1 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICES 7 F44LL 118 0.83 Wall Switch 7 F44SSILL 96 0.67 Occ Sensor 0.15 2,200 2,200 3392 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE STORAGE 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 2,200 533 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE SECRETARY 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 974 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE MEETING ROOM 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 2905 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE VAULT 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 266 525 Perry Road, Marmora, NJ 08270 1 BOARD SUPERINTENDENT SECRETARY 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 977 525 Perry Road, Marmora, NJ 08270 1 BOARD SUPERINTENDENTS OFFICE 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 2,200 1948 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 2,200 599 525 Perry Road, Marmora, NJ 08270 1 GYM 64 MH250/1 295 18.88 Wall Switch 64 Custom Fixture 11 25 1.60 Occ Sensor 17.28 3,440 3,440 59,443
10 525 Perry Road, Marmora, NJ 08270 1 STAGE 19 H250/1 250 4.75 Wall Switch 19 Custom Fixture 4 200 3.80 Occ Sensor 0.95 2,200 2,200 2,09011 525 Perry Road, Marmora, NJ 08270 1 STAGE CORRIDOR 2 FU2LL 60 0.12 Wall Switch 2 FU2ILL-R 52 0.10 Occ Sensor 0.02 2,200 2,200 3512 525 Perry Road, Marmora, NJ 08270 1 B103 STORAGE 8 F44LL 118 0.94 Wall Switch 8 F44SSILL 96 0.77 Occ Sensor 0.18 2,200 2,200 38713 525 Perry Road, Marmora, NJ 08270 1 B103 TOILET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4814 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 2,200 43615 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 3 FU2LL 60 0.18 Wall Switch 3 FU2ILL-R 52 0.16 Occ Sensor 0.02 2,200 2,200 5316 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 OFFICE 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 2,200 5317 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 2,200 5918 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS 9 F42LL 60 0.54 Wall Switch 9 F42SSILL 48 0.43 Occ Sensor 0.11 2,200 2,200 23819 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 2,200 15820 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS RESTROOM 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4821 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS 9 F42LL 60 0.54 Wall Switch 9 F42SSILL 48 0.43 Occ Sensor 0.11 2,200 2,200 23822 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 2,200 15823 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS RESTROOM 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4824 525 Perry Road, Marmora, NJ 08270 1 GYM OFFICE, BOYS 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9725 525 Perry Road, Marmora, NJ 08270 1 GYM OFFICE, GIRLS 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9726 525 Perry Road, Marmora, NJ 08270 1 KITCHEN 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 2,200 47527 525 Perry Road, Marmora, NJ 08270 1 KITCHEN DISHWASHER 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 2,200 10628 525 Perry Road, Marmora, NJ 08270 1 KITCHEN STORAGE 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 2,200 10629 525 Perry Road, Marmora, NJ 08270 1 CAFETERIA 30 MH250/1 295 8.85 Wall Switch 30 Custom Fixture 4 200 6.00 Occ Sensor 2.85 2,200 2,200 6,27030 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET STORAGE 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 2631 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 2,200 5332 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM SWITCHGEAR 5 F42LL 60 0.30 Wall Switch 5 F42SSILL 48 0.24 Occ Sensor 0.06 2,200 2,200 13233 525 Perry Road, Marmora, NJ 08270 1 RESTROOM 1 CFT28/1 33 0.03 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.00 2,200 2,200 034 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 2635 525 Perry Road, Marmora, NJ 08270 1 INSDUSTRIAL ROOM 54 F42LL 60 3.24 Wall Switch 54 F42SSILL 48 2.59 Occ Sensor 0.65 2,200 2,200 1,42636 525 Perry Road, Marmora, NJ 08270 1 INDUSTRIAL ROOM OFFICE 3 F44LL 118 0.35 Wall Switch 3 F44SSILL 96 0.29 Occ Sensor 0.07 2,200 2,200 14537 525 Perry Road, Marmora, NJ 08270 1 INDUSTRIAL ROOM PAINT ROOM 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 2,200 19438 525 Perry Road, Marmora, NJ 08270 1 ROOM S2 24 F42LL 60 1.44 Wall Switch 24 F42SSILL 48 1.15 Occ Sensor 0.29 2,200 2,200 63439 525 Perry Road, Marmora, NJ 08270 1 ROOM S2 CLOSET 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 2,200 5340 525 Perry Road, Marmora, NJ 08270 1 ROOM S1 24 F42LL 60 1.44 Wall Switch 24 F42SSILL 48 1.15 Occ Sensor 0.29 2,200 2,200 63441 525 Perry Road, Marmora, NJ 08270 1 ROOM S1 CLOSET 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 2,200 10642 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 29043 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM HALLWAY 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 2644 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM MENS TOILET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4845 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM WOMENS TOILET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4846 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM PRINTER 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 29047 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE 7 F44LL 118 0.83 Wall Switch 7 F44SSILL 96 0.67 Occ Sensor 0.15 2,200 2,200 33948 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE TOILET 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 2,200 5349 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE TOILET 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 2,200 1850 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE 8 F44LL 118 0.94 Wall Switch 8 F44SSILL 96 0.77 Occ Sensor 0.18 2,200 2,200 38751 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 2652 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE CLOSET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 2,200 5953 525 Perry Road, Marmora, NJ 08270 1 VICE PRINCIPALS (VP) OFFICE 3 F44LL 118 0.35 Wall Switch 3 F44SSILL 96 0.29 Occ Sensor 0.07 2,200 2,200 14554 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE SERVER 1 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4855 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE SERVER 2 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4856 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE COPIER ROOM 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4857 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 2,200 19458 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 2,200 5959 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE STORAGE 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9760 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 29061 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 2662 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 2663 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 2,200 5964 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4865 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CORRIDOR 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 26
Existing Facilities Program Lighting Form: Performance Based
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-9 Lighting Replacement
Page 2 of 3Version 1.2
6/21/201211:47 AM
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
66 525 Perry Road, Marmora, NJ 08270 1 BRAILLE ROOM 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9767 525 Perry Road, Marmora, NJ 08270 1 ROOM B1 16 F42LL 60 0.96 Wall Switch 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 2,200 42268 525 Perry Road, Marmora, NJ 08270 1 ROOM B2 16 F42LL 60 0.96 Breaker 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 2,200 42269 525 Perry Road, Marmora, NJ 08270 1 ROOM B3 21 F42LL 60 1.26 Wall Switch 21 F42SSILL 48 1.01 Occ Sensor 0.25 2,200 2,200 55470 525 Perry Road, Marmora, NJ 08270 1 ROOM B6 21 F42LL 60 1.26 Wall Switch 21 F42SSILL 48 1.01 Occ Sensor 0.25 2,200 2,200 55471 525 Perry Road, Marmora, NJ 08270 1 ROOM B5 16 F42LL 60 0.96 Wall Switch 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 2,200 42272 525 Perry Road, Marmora, NJ 08270 1 ROOM B4 16 F42LL 60 0.96 Wall Switch 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 2,200 42273 525 Perry Road, Marmora, NJ 08270 1 ROOM B7 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 2,200 47574 525 Perry Road, Marmora, NJ 08270 1 ROOM B7 CLOSET 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9775 525 Perry Road, Marmora, NJ 08270 1 ROOM B8 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 2,200 47576 525 Perry Road, Marmora, NJ 08270 1 ROOM B9 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 2,200 47577 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9778 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 2,200 1879 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9780 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM FOYER 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 2,200 1881 525 Perry Road, Marmora, NJ 08270 1 MEDIA CENTER/LIBRARY 60 F42LL 60 3.60 Wall Switch 60 F42SSILL 48 2.88 Occ Sensor 0.72 2,200 2,200 1,58482 525 Perry Road, Marmora, NJ 08270 1 COMPUTER ROOM L1 20 F42LL 60 1.20 Wall Switch 20 F42SSILL 48 0.96 Occ Sensor 0.24 2,200 2,200 52883 525 Perry Road, Marmora, NJ 08270 1 ROOM L2/L3 25 F42LL 60 1.50 Wall Switch 25 F42SSILL 48 1.20 Occ Sensor 0.30 2,200 2,200 66084 525 Perry Road, Marmora, NJ 08270 1 ROOM A12 16 F44LL 118 1.89 Wall Switch 16 F44SSILL 96 1.54 Occ Sensor 0.35 2,200 2,200 77485 525 Perry Road, Marmora, NJ 08270 1 HOM EC. ROOM (OLD FACULTY ROOM) 14 F44LL 118 1.65 Wall Switch 14 F44SSILL 96 1.34 Occ Sensor 0.31 2,200 2,200 67886 525 Perry Road, Marmora, NJ 08270 1 HOM EC. ROOM (OLD FACULTY ROOM) 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 2,200 1887 525 Perry Road, Marmora, NJ 08270 1 ROOM A15 15 F44LL 118 1.77 Wall Switch 15 F44SSILL 96 1.44 Occ Sensor 0.33 2,200 2,200 72688 525 Perry Road, Marmora, NJ 08270 1 ROM A13 13 F44LL 118 1.53 Wall Switch 13 F44SSILL 96 1.25 Occ Sensor 0.29 2,200 2,200 62989 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 OFFICE 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4890 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4891 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4892 525 Perry Road, Marmora, NJ 08270 1 ROOM A11 13 F44LL 118 1.53 Wall Switch 13 F44SSILL 96 1.25 Occ Sensor 0.29 2,200 2,200 62993 525 Perry Road, Marmora, NJ 08270 1 ROOM A11 CLOSET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 2,200 5994 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM (BY A11) 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 9795 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, A WING 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 2,200 5396 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, A WING 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 4897 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 2698 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, A WING 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 2,200 5399 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, A WING 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 48
100 525 Perry Road, Marmora, NJ 08270 1 ROOM A10 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484101 525 Perry Road, Marmora, NJ 08270 1 ROOM A9 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484102 525 Perry Road, Marmora, NJ 08270 1 ROOM A7 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484103 525 Perry Road, Marmora, NJ 08270 1 ROOM A8 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484104 525 Perry Road, Marmora, NJ 08270 1 ROOM A6 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484105 525 Perry Road, Marmora, NJ 08270 1 ROOM A5 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484106 525 Perry Road, Marmora, NJ 08270 1 ROOM A3 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484107 525 Perry Road, Marmora, NJ 08270 1 ROOM A4 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484108 525 Perry Road, Marmora, NJ 08270 1 ROOM A2 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484109 525 Perry Road, Marmora, NJ 08270 1 ROOM A1 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 2,200 484110 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM (NEW WING) 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 2,200 158111 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY CONFERENCE ROOM A117 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 2,200 194112 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY GUIDANCE A111 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 2,200 194113 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A114 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97114 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A116 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97115 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A115 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97116 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A113 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97117 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A110 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97118 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A108 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97119 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A107 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97120 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A106 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97121 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE 8 F44LL 118 0.94 Wall Switch 8 F44SSILL 96 0.77 Occ Sensor 0.18 2,200 2,200 387122 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE COPIER 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97123 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE TOILET 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 2,200 18124 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE CORRIDOR 9 FU2LL 60 0.54 Wall Switch 9 FU2ILL-R 52 0.47 Occ Sensor 0.07 2,200 2,200 158125 525 Perry Road, Marmora, NJ 08270 1 STORAGE ROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 2,200 106126 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 2,200 106127 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, C WING 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97128 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 2,200 106129 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, C WING 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 2,200 97130 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET, C WING 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 2,200 26131 525 Perry Road, Marmora, NJ 08270 1 ROOM C1 15 F44LL 118 1.77 Wall Switch 15 F44SSILL 96 1.44 Occ Sensor 0.33 2,200 2,200 726132 525 Perry Road, Marmora, NJ 08270 1 ROOM C1 STORAGE 3 F44LL 118 0.35 Wall Switch 3 F44SSILL 96 0.29 Occ Sensor 0.07 2,200 2,200 145133 525 Perry Road, Marmora, NJ 08270 1 STORAGE (BY C1) 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 2,200 48134 525 Perry Road, Marmora, NJ 08270 1 ROOM C2 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 290135 525 Perry Road, Marmora, NJ 08270 1 ROOM C4 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 290136 525 Perry Road, Marmora, NJ 08270 1 ROOM C3 15 F44LL 118 1.77 Wall Switch 15 F44SSILL 96 1.44 Occ Sensor 0.33 2,200 2,200 726137 525 Perry Road, Marmora, NJ 08270 1 ROOM C6 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 290138 525 Perry Road, Marmora, NJ 08270 1 ROOM C8 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 2,200 290
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-9 Lighting Replacement
Page 3 of 3Version 1.2
6/21/201211:47 AM
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
139 525 Perry Road, Marmora, NJ 08270 1 ROOM C10 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 2,200 436140 525 Perry Road, Marmora, NJ 08270 1 ROOM C5 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 2,200 436141 525 Perry Road, Marmora, NJ 08270 1 ROOM C7 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 2,200 436142 525 Perry Road, Marmora, NJ 08270 1 ROOM C12 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 2,200 436143 525 Perry Road, Marmora, NJ 08270 1 ROOM C14 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 2,200 436144 525 Perry Road, Marmora, NJ 08270 1 ROOM C9 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 2,200 436145 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR A 11 F44LL 118 1.30 Wall Switch 11 F44SSILL 96 1.06 Occ Sensor 0.24 2,200 2,200 532146 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR B 12 F44LL 118 1.42 Wall Switch 12 F44SSILL 96 1.15 Occ Sensor 0.26 2,200 2,200 581147 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR C 14 F44LL 118 1.65 Wall Switch 14 F44SSILL 96 1.34 Occ Sensor 0.31 2,200 2,200 678148 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR C 5 F42LL 60 0.30 Wall Switch 5 F42SSILL 48 0.24 Occ Sensor 0.06 2,200 2,200 132149 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR D 10 F42LL 60 0.60 Wall Switch 10 F42SSILL 48 0.48 Occ Sensor 0.12 2,200 2,200 264150 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR E 14 F42LL 60 0.84 Wall Switch 14 F42SSILL 48 0.67 Occ Sensor 0.17 2,200 2,200 370151 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR F&G 12 F44LL 118 1.42 Wall Switch 12 F44SSILL 96 1.15 Occ Sensor 0.26 2,200 2,200 581152 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR F&G 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 2,200 158153 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR H 18 F43LL 93 1.67 Wall Switch 18 F43SSILL 72 1.30 Occ Sensor 0.38 2,200 2,200 832154 525 Perry Road, Marmora, NJ 08270 1 EXIT SIGNS 37 ECF5/2 20 0.74 Wall Switch 37 ELED1.5/2 3 0.11 Occ Sensor 0.63 2,200 2,200 1,384155 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 1 12 HPS250/1 295 3.54 Light Sensor & Timer 12 HPS250/1 295 3.54 Occ Sensor 0.00 4,368 4,368 0156 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 2 1 Custom Fixture 6 210 0.21 Light Sensor & Timer 1 Custom Fixture 6 210 0.21 Light Sensor & Timer 0.00 4,368 4,368 0157 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 3 11 HPS150/1 188 2.07 Light Sensor & Timer 11 HPS150/1 188 2.07 Occ Sensor 0.00 4,368 4,368 0158 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 4 1 MV175/1 205 0.21 Light Sensor & Timer 1 Custom Fixture 6 210 0.21 Occ Sensor -0.01 4,368 4,368 -22159 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 1 1 I60/1 60 0.06 Light Sensor & Timer 1 CFT28/1 33 0.03 Occ Sensor 0.03 4,368 4,368 118160 525 Perry Road, Marmora, NJ 08270 1EXTERIOR: POLE LIGHT 1 (4 BOXES, 1 POLE) 4 MH250/1 295 1.18 Light Sensor & Timer 4 MH250/1 295 1.18 Occ Sensor 0.00 4,368 4,368 0161 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 2 4 I200/1 200 0.80 Light Sensor & Timer 4 CFT55/1-BX 56 0.22 Occ Sensor 0.58 4,368 4,368 2,516162 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 3 3 CFT40/1 46 0.14 Light Sensor & Timer 3 CFT40/1 46 0.14 Light Sensor & Timer 0.00 4,368 4,368 0163 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 4 2 Custom Fixture 5 550 1.10 Light Sensor & Timer 2 MH450/1 508 1.02 Light Sensor & Timer 0.08 4,368 4,368 367164 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 5 7 HPS250/1 295 2.07 Light Sensor & Timer 7 HPS250/1 295 2.07 Occ Sensor 0.00 4,368 4,368 0165 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 2 43 I60/1 60 2.58 Light Sensor & Timer 43 CFT22/1 27 1.16 Occ Sensor 1.42 4,368 4,368 6,198166 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL FIXTURE 5 I100/1 100 0.50 Light Sensor & Timer 5 CFT28/1 33 0.17 Occ Sensor 0.34 4,368 4,368 1,463167 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 3 4 CFT28/1 33 0.13 Light Sensor & Timer 4 CFT28/1 33 0.13 Light Sensor & Timer 0.00 4,368 4,368 0
1,286 Total Pre kW 138.78 Total Post Fixt. 1,286.00 Total Pre kW 97.16 Total kW Saved 41.62 118,261.45Total Annual kWh Saved
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-10 Lighting Control
Page 1 of 3Version 1.2
6/21/201211:47 AM
Applicant Name: Upper Township School District - NJBPU
Facility Name: Upper Township Middle School INSTRUCTIONS
Date: 5/1/2012 Use one line for each fixture type in a room or area.
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
1 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICES 7 F44LL 118 0.83 Wall Switch 7 F44LL 118 0.83 Occ Sensor 0.00 2,200 1,600 4962 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE STORAGE 2 F42LL 60 0.12 Wall Switch 2 F42LL 60 0.12 Occ Sensor 0.00 2,200 1,600 723 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE SECRETARY 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 1424 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE MEETING ROOM 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 4255 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE VAULT 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 366 525 Perry Road, Marmora, NJ 08270 1 BOARD SUPERINTENDENT SECRETARY 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 1427 525 Perry Road, Marmora, NJ 08270 1 BOARD SUPERINTENDENTS OFFICE 4 F44LL 118 0.47 Wall Switch 4 F44LL 118 0.47 Occ Sensor 0.00 2,200 1,600 2838 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 I60/1 60 0.06 Occ Sensor 0.00 2,200 1,600 369 525 Perry Road, Marmora, NJ 08270 1 GYM 64 MH250/1 295 18.88 Wall Switch 64 MH250/1 295 18.88 Occ Sensor 0.00 3,440 3,040 7,552
10 525 Perry Road, Marmora, NJ 08270 1 STAGE 19 H250/1 250 4.75 Wall Switch 19 H250/1 250 4.75 Occ Sensor 0.00 2,200 1,600 2,85011 525 Perry Road, Marmora, NJ 08270 1 STAGE CORRIDOR 2 FU2LL 60 0.12 Wall Switch 2 FU2LL 60 0.12 Occ Sensor 0.00 2,200 1,600 7212 525 Perry Road, Marmora, NJ 08270 1 B103 STORAGE 8 F44LL 118 0.94 Wall Switch 8 F44LL 118 0.94 Occ Sensor 0.00 2,200 1,600 56613 525 Perry Road, Marmora, NJ 08270 1 B103 TOILET 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7114 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 9 F44LL 118 1.06 Wall Switch 9 F44LL 118 1.06 Occ Sensor 0.00 2,200 1,600 63715 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 3 FU2LL 60 0.18 Wall Switch 3 FU2LL 60 0.18 Occ Sensor 0.00 2,200 1,600 10816 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 OFFICE 2 F42LL 60 0.12 Wall Switch 2 F42LL 60 0.12 Occ Sensor 0.00 2,200 1,600 7217 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 TOILET 1 I60/1 60 0.06 Wall Switch 1 I60/1 60 0.06 Occ Sensor 0.00 2,200 1,600 3618 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS 9 F42LL 60 0.54 Wall Switch 9 F42LL 60 0.54 Occ Sensor 0.00 2,200 1,600 32419 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS 6 F42LL 60 0.36 Wall Switch 6 F42LL 60 0.36 Occ Sensor 0.00 2,200 1,600 21620 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS RESTROOM 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7121 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS 9 F42LL 60 0.54 Wall Switch 9 F42LL 60 0.54 Occ Sensor 0.00 2,200 1,600 32422 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS 6 F42LL 60 0.36 Wall Switch 6 F42LL 60 0.36 Occ Sensor 0.00 2,200 1,600 21623 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS RESTROOM 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7124 525 Perry Road, Marmora, NJ 08270 1 GYM OFFICE, BOYS 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14225 525 Perry Road, Marmora, NJ 08270 1 GYM OFFICE, GIRLS 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14226 525 Perry Road, Marmora, NJ 08270 1 KITCHEN 18 F42LL 60 1.08 Wall Switch 18 F42LL 60 1.08 Occ Sensor 0.00 2,200 1,600 64827 525 Perry Road, Marmora, NJ 08270 1 KITCHEN DISHWASHER 4 F42LL 60 0.24 Wall Switch 4 F42LL 60 0.24 Occ Sensor 0.00 2,200 1,600 14428 525 Perry Road, Marmora, NJ 08270 1 KITCHEN STORAGE 4 F42LL 60 0.24 Wall Switch 4 F42LL 60 0.24 Occ Sensor 0.00 2,200 1,600 14429 525 Perry Road, Marmora, NJ 08270 1 CAFETERIA 30 MH250/1 295 8.85 Wall Switch 30 MH250/1 295 8.85 Occ Sensor 0.00 2,200 1,600 5,31030 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET STORAGE 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3631 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM 2 F42LL 60 0.12 Wall Switch 2 F42LL 60 0.12 Occ Sensor 0.00 2,200 1,600 7232 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM SWITCHGEAR 5 F42LL 60 0.30 Wall Switch 5 F42LL 60 0.30 Occ Sensor 0.00 2,200 1,600 18033 525 Perry Road, Marmora, NJ 08270 1 RESTROOM 1 CFT28/1 33 0.03 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.00 2,200 1,600 2034 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3635 525 Perry Road, Marmora, NJ 08270 1 INSDUSTRIAL ROOM 54 F42LL 60 3.24 Wall Switch 54 F42LL 60 3.24 Occ Sensor 0.00 2,200 1,600 1,94436 525 Perry Road, Marmora, NJ 08270 1 INDUSTRIAL ROOM OFFICE 3 F44LL 118 0.35 Wall Switch 3 F44LL 118 0.35 Occ Sensor 0.00 2,200 1,600 21237 525 Perry Road, Marmora, NJ 08270 1 INDUSTRIAL ROOM PAINT ROOM 4 F44LL 118 0.47 Wall Switch 4 F44LL 118 0.47 Occ Sensor 0.00 2,200 1,600 28338 525 Perry Road, Marmora, NJ 08270 1 ROOM S2 24 F42LL 60 1.44 Wall Switch 24 F42LL 60 1.44 Occ Sensor 0.00 2,200 1,600 86439 525 Perry Road, Marmora, NJ 08270 1 ROOM S2 CLOSET 2 F42LL 60 0.12 Wall Switch 2 F42LL 60 0.12 Occ Sensor 0.00 2,200 1,600 7240 525 Perry Road, Marmora, NJ 08270 1 ROOM S1 24 F42LL 60 1.44 Wall Switch 24 F42LL 60 1.44 Occ Sensor 0.00 2,200 1,600 86441 525 Perry Road, Marmora, NJ 08270 1 ROOM S1 CLOSET 4 F42LL 60 0.24 Wall Switch 4 F42LL 60 0.24 Occ Sensor 0.00 2,200 1,600 14442 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 42543 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM HALLWAY 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3644 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM MENS TOILET 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7145 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM WOMENS TOILET 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7146 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM PRINTER 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 42547 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE 7 F44LL 118 0.83 Wall Switch 7 F44LL 118 0.83 Occ Sensor 0.00 2,200 1,600 49648 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE TOILET 2 F42LL 60 0.12 Wall Switch 2 F42LL 60 0.12 Occ Sensor 0.00 2,200 1,600 7249 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE TOILET 1 FU2LL 60 0.06 Wall Switch 1 FU2LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3650 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE 8 F44LL 118 0.94 Wall Switch 8 F44LL 118 0.94 Occ Sensor 0.00 2,200 1,600 56651 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3652 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE CLOSET 1 I60/1 60 0.06 Wall Switch 1 I60/1 60 0.06 Occ Sensor 0.00 2,200 1,600 3653 525 Perry Road, Marmora, NJ 08270 1 VICE PRINCIPALS (VP) OFFICE 3 F44LL 118 0.35 Wall Switch 3 F44LL 118 0.35 Occ Sensor 0.00 2,200 1,600 21254 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE SERVER 1 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7155 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE SERVER 2 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7156 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE COPIER ROOM 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7157 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE 4 F44LL 118 0.47 Wall Switch 4 F44LL 118 0.47 Occ Sensor 0.00 2,200 1,600 28358 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 I60/1 60 0.06 Occ Sensor 0.00 2,200 1,600 3659 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE STORAGE 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14260 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 42561 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3662 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3663 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 I60/1 60 0.06 Occ Sensor 0.00 2,200 1,600 3664 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7165 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CORRIDOR 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 36
Existing Facilities Program Lighting Form: Performance Based
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-10 Lighting Control
Page 2 of 3Version 1.2
6/21/201211:47 AM
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
66 525 Perry Road, Marmora, NJ 08270 1 BRAILLE ROOM 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14267 525 Perry Road, Marmora, NJ 08270 1 ROOM B1 16 F42LL 60 0.96 Wall Switch 16 F42LL 60 0.96 Occ Sensor 0.00 2,200 1,600 57668 525 Perry Road, Marmora, NJ 08270 1 ROOM B2 16 F42LL 60 0.96 Breaker 16 F42LL 60 0.96 Occ Sensor 0.00 2,200 1,600 57669 525 Perry Road, Marmora, NJ 08270 1 ROOM B3 21 F42LL 60 1.26 Wall Switch 21 F42LL 60 1.26 Occ Sensor 0.00 2,200 1,600 75670 525 Perry Road, Marmora, NJ 08270 1 ROOM B6 21 F42LL 60 1.26 Wall Switch 21 F42LL 60 1.26 Occ Sensor 0.00 2,200 1,600 75671 525 Perry Road, Marmora, NJ 08270 1 ROOM B5 16 F42LL 60 0.96 Wall Switch 16 F42LL 60 0.96 Occ Sensor 0.00 2,200 1,600 57672 525 Perry Road, Marmora, NJ 08270 1 ROOM B4 16 F42LL 60 0.96 Wall Switch 16 F42LL 60 0.96 Occ Sensor 0.00 2,200 1,600 57673 525 Perry Road, Marmora, NJ 08270 1 ROOM B7 18 F42LL 60 1.08 Wall Switch 18 F42LL 60 1.08 Occ Sensor 0.00 2,200 1,600 64874 525 Perry Road, Marmora, NJ 08270 1 ROOM B7 CLOSET 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14275 525 Perry Road, Marmora, NJ 08270 1 ROOM B8 18 F42LL 60 1.08 Wall Switch 18 F42LL 60 1.08 Occ Sensor 0.00 2,200 1,600 64876 525 Perry Road, Marmora, NJ 08270 1 ROOM B9 18 F42LL 60 1.08 Wall Switch 18 F42LL 60 1.08 Occ Sensor 0.00 2,200 1,600 64877 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14278 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM 1 FU2LL 60 0.06 Wall Switch 1 FU2LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3679 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14280 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM FOYER 1 FU2LL 60 0.06 Wall Switch 1 FU2LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3681 525 Perry Road, Marmora, NJ 08270 1 MEDIA CENTER/LIBRARY 60 F42LL 60 3.60 Wall Switch 60 F42LL 60 3.60 Occ Sensor 0.00 2,200 1,600 2,16082 525 Perry Road, Marmora, NJ 08270 1 COMPUTER ROOM L1 20 F42LL 60 1.20 Wall Switch 20 F42LL 60 1.20 Occ Sensor 0.00 2,200 1,600 72083 525 Perry Road, Marmora, NJ 08270 1 ROOM L2/L3 25 F42LL 60 1.50 Wall Switch 25 F42LL 60 1.50 Occ Sensor 0.00 2,200 1,600 90084 525 Perry Road, Marmora, NJ 08270 1 ROOM A12 16 F44LL 118 1.89 Wall Switch 16 F44LL 118 1.89 Occ Sensor 0.00 2,200 1,600 1,13385 525 Perry Road, Marmora, NJ 08270 1 HOM EC. ROOM (OLD FACULTY ROOM) 14 F44LL 118 1.65 Wall Switch 14 F44LL 118 1.65 Occ Sensor 0.00 2,200 1,600 99186 525 Perry Road, Marmora, NJ 08270 1 HOM EC. ROOM (OLD FACULTY ROOM) 1 FU2LL 60 0.06 Wall Switch 1 FU2LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3687 525 Perry Road, Marmora, NJ 08270 1 ROOM A15 15 F44LL 118 1.77 Wall Switch 15 F44LL 118 1.77 Occ Sensor 0.00 2,200 1,600 1,06288 525 Perry Road, Marmora, NJ 08270 1 ROM A13 13 F44LL 118 1.53 Wall Switch 13 F44LL 118 1.53 Occ Sensor 0.00 2,200 1,600 92089 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 OFFICE 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7190 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7191 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7192 525 Perry Road, Marmora, NJ 08270 1 ROOM A11 13 F44LL 118 1.53 Wall Switch 13 F44LL 118 1.53 Occ Sensor 0.00 2,200 1,600 92093 525 Perry Road, Marmora, NJ 08270 1 ROOM A11 CLOSET 1 I60/1 60 0.06 Wall Switch 1 I60/1 60 0.06 Occ Sensor 0.00 2,200 1,600 3694 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM (BY A11) 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 14295 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, A WING 2 F42LL 60 0.12 Wall Switch 2 F42LL 60 0.12 Occ Sensor 0.00 2,200 1,600 7296 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, A WING 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 7197 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 3698 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, A WING 2 F42LL 60 0.12 Wall Switch 2 F42LL 60 0.12 Occ Sensor 0.00 2,200 1,600 7299 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, A WING 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 71
100 525 Perry Road, Marmora, NJ 08270 1 ROOM A10 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708101 525 Perry Road, Marmora, NJ 08270 1 ROOM A9 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708102 525 Perry Road, Marmora, NJ 08270 1 ROOM A7 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708103 525 Perry Road, Marmora, NJ 08270 1 ROOM A8 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708104 525 Perry Road, Marmora, NJ 08270 1 ROOM A6 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708105 525 Perry Road, Marmora, NJ 08270 1 ROOM A5 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708106 525 Perry Road, Marmora, NJ 08270 1 ROOM A3 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708107 525 Perry Road, Marmora, NJ 08270 1 ROOM A4 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708108 525 Perry Road, Marmora, NJ 08270 1 ROOM A2 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708109 525 Perry Road, Marmora, NJ 08270 1 ROOM A1 10 F44LL 118 1.18 Wall Switch 10 F44LL 118 1.18 Occ Sensor 0.00 2,200 1,600 708110 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM (NEW WING) 6 F42LL 60 0.36 Wall Switch 6 F42LL 60 0.36 Occ Sensor 0.00 2,200 1,600 216111 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY CONFERENCE ROOM A117 4 F44LL 118 0.47 Wall Switch 4 F44LL 118 0.47 Occ Sensor 0.00 2,200 1,600 283112 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY GUIDANCE A111 4 F44LL 118 0.47 Wall Switch 4 F44LL 118 0.47 Occ Sensor 0.00 2,200 1,600 283113 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A114 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142114 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A116 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142115 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A115 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142116 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A113 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142117 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A110 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142118 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A108 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142119 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A107 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142120 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A106 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142121 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE 8 F44LL 118 0.94 Wall Switch 8 F44LL 118 0.94 Occ Sensor 0.00 2,200 1,600 566122 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE COPIER 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142123 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE TOILET 1 FU2LL 60 0.06 Wall Switch 1 FU2LL 60 0.06 Occ Sensor 0.00 2,200 1,600 36124 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE CORRIDOR 9 FU2LL 60 0.54 Wall Switch 9 FU2LL 60 0.54 Occ Sensor 0.00 2,200 1,600 324125 525 Perry Road, Marmora, NJ 08270 1 STORAGE ROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42LL 60 0.24 Occ Sensor 0.00 2,200 1,600 144126 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42LL 60 0.24 Occ Sensor 0.00 2,200 1,600 144127 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, C WING 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142128 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42LL 60 0.24 Occ Sensor 0.00 2,200 1,600 144129 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, C WING 2 F44LL 118 0.24 Wall Switch 2 F44LL 118 0.24 Occ Sensor 0.00 2,200 1,600 142130 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET, C WING 1 F42LL 60 0.06 Wall Switch 1 F42LL 60 0.06 Occ Sensor 0.00 2,200 1,600 36131 525 Perry Road, Marmora, NJ 08270 1 ROOM C1 15 F44LL 118 1.77 Wall Switch 15 F44LL 118 1.77 Occ Sensor 0.00 2,200 1,600 1,062132 525 Perry Road, Marmora, NJ 08270 1 ROOM C1 STORAGE 3 F44LL 118 0.35 Wall Switch 3 F44LL 118 0.35 Occ Sensor 0.00 2,200 1,600 212133 525 Perry Road, Marmora, NJ 08270 1 STORAGE (BY C1) 1 F44LL 118 0.12 Wall Switch 1 F44LL 118 0.12 Occ Sensor 0.00 2,200 1,600 71134 525 Perry Road, Marmora, NJ 08270 1 ROOM C2 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 425135 525 Perry Road, Marmora, NJ 08270 1 ROOM C4 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 425136 525 Perry Road, Marmora, NJ 08270 1 ROOM C3 15 F44LL 118 1.77 Wall Switch 15 F44LL 118 1.77 Occ Sensor 0.00 2,200 1,600 1,062137 525 Perry Road, Marmora, NJ 08270 1 ROOM C6 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 425138 525 Perry Road, Marmora, NJ 08270 1 ROOM C8 6 F44LL 118 0.71 Wall Switch 6 F44LL 118 0.71 Occ Sensor 0.00 2,200 1,600 425
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-10 Lighting Control
Page 3 of 3Version 1.2
6/21/201211:47 AM
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
139 525 Perry Road, Marmora, NJ 08270 1 ROOM C10 9 F44LL 118 1.06 Wall Switch 9 F44LL 118 1.06 Occ Sensor 0.00 2,200 1,600 637140 525 Perry Road, Marmora, NJ 08270 1 ROOM C5 9 F44LL 118 1.06 Wall Switch 9 F44LL 118 1.06 Occ Sensor 0.00 2,200 1,600 637141 525 Perry Road, Marmora, NJ 08270 1 ROOM C7 9 F44LL 118 1.06 Wall Switch 9 F44LL 118 1.06 Occ Sensor 0.00 2,200 1,600 637142 525 Perry Road, Marmora, NJ 08270 1 ROOM C12 9 F44LL 118 1.06 Wall Switch 9 F44LL 118 1.06 Occ Sensor 0.00 2,200 1,600 637143 525 Perry Road, Marmora, NJ 08270 1 ROOM C14 9 F44LL 118 1.06 Wall Switch 9 F44LL 118 1.06 Occ Sensor 0.00 2,200 1,600 637144 525 Perry Road, Marmora, NJ 08270 1 ROOM C9 9 F44LL 118 1.06 Wall Switch 9 F44LL 118 1.06 Occ Sensor 0.00 2,200 1,600 637145 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR A 11 F44LL 118 1.30 Wall Switch 11 F44LL 118 1.30 Occ Sensor 0.00 2,200 1,600 779146 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR B 12 F44LL 118 1.42 Wall Switch 12 F44LL 118 1.42 Occ Sensor 0.00 2,200 1,600 850147 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR C 14 F44LL 118 1.65 Wall Switch 14 F44LL 118 1.65 Occ Sensor 0.00 2,200 1,600 991148 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR C 5 F42LL 60 0.30 Wall Switch 5 F42LL 60 0.30 Occ Sensor 0.00 2,200 1,600 180149 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR D 10 F42LL 60 0.60 Wall Switch 10 F42LL 60 0.60 Occ Sensor 0.00 2,200 1,600 360150 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR E 14 F42LL 60 0.84 Wall Switch 14 F42LL 60 0.84 Occ Sensor 0.00 2,200 1,600 504151 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR F&G 12 F44LL 118 1.42 Wall Switch 12 F44LL 118 1.42 Occ Sensor 0.00 2,200 1,600 850152 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR F&G 6 F42LL 60 0.36 Wall Switch 6 F42LL 60 0.36 Occ Sensor 0.00 2,200 1,600 216153 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR H 18 F43LL 93 1.67 Wall Switch 18 F43LL 93 1.67 Occ Sensor 0.00 2,200 1,600 1,004154 525 Perry Road, Marmora, NJ 08270 1 EXIT SIGNS 37 ECF5/2 20 0.74 Wall Switch 37 ECF5/2 20 0.74 Occ Sensor 0.00 2,200 1,600 444155 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 1 12 HPS250/1 295 3.54 Light Sensor & Timer 12 HPS250/1 295 3.54 Occ Sensor 0.00 4,368 2,184 7,731156 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 2 1 Custom Fixture 6 210 0.21 Light Sensor & Timer 1 Custom Fixture 6 210 0.21 Light Sensor & Timer 0.00 4,368 2,184 459157 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 3 11 HPS150/1 188 2.07 Light Sensor & Timer 11 HPS150/1 188 2.07 Occ Sensor 0.00 4,368 2,184 4,517158 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 4 1 MV175/1 205 0.21 Light Sensor & Timer 1 MV175/1 205 0.21 Occ Sensor 0.00 4,368 2,184 448159 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 1 1 I60/1 60 0.06 Light Sensor & Timer 1 I60/1 60 0.06 Occ Sensor 0.00 4,368 2,184 131160 525 Perry Road, Marmora, NJ 08270 1EXTERIOR: POLE LIGHT 1 (4 BOXES, 1 POLE) 4 MH250/1 295 1.18 Light Sensor & Timer 4 MH250/1 295 1.18 Occ Sensor 0.00 4,368 2,184 2,577161 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 2 4 I200/1 200 0.80 Light Sensor & Timer 4 I200/1 200 0.80 Occ Sensor 0.00 4,368 2,184 1,747162 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 3 3 CFT40/1 46 0.14 Light Sensor & Timer 3 CFT40/1 46 0.14 Light Sensor & Timer 0.00 4,368 2,184 301163 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 4 2 Custom Fixture 5 550 1.10 Light Sensor & Timer 2 Custom Fixture 5 550 1.10 Light Sensor & Timer 0.00 4,368 2,184 2,402164 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 5 7 HPS250/1 295 2.07 Light Sensor & Timer 7 HPS250/1 295 2.07 Occ Sensor 0.00 4,368 2,184 4,510165 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 2 43 I60/1 60 2.58 Light Sensor & Timer 43 I60/1 60 2.58 Occ Sensor 0.00 4,368 2,184 5,635166 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL FIXTURE 5 I100/1 100 0.50 Light Sensor & Timer 5 I100/1 100 0.50 Occ Sensor 0.00 4,368 2,184 1,092167 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 3 4 CFT28/1 33 0.13 Light Sensor & Timer 4 CFT28/1 33 0.13 Light Sensor & Timer 0.00 4,368 2,184 288
1,286 Total Pre kW 138.78 Total Post Fixt. 1,286.00 Total Post kW 138.78 Total kW Saved 102,580.55Total Annual kWh Saved
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-11 Lighting Rep&Control
Page 1 of 3Version 1.2
6/21/201211:47 AM
1,101 14,445
Applicant Name: Upper Township School District - NJBPU
Facility Name: Upper Township Middle School INSTRUCTIONS
Date: 5/1/2012 Use one line for each fixture type in a room or area.
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
1 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICES 7 F44LL 118 0.83 Wall Switch 7 F44SSILL 96 0.67 Occ Sensor 0.15 2,200 1,600 7422 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE STORAGE 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 1,600 1103 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE SECRETARY 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 2124 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE MEETING ROOM 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 6365 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE VAULT 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 556 525 Perry Road, Marmora, NJ 08270 1 BOARD SUPERINTENDENT SECRETARY 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 2127 525 Perry Road, Marmora, NJ 08270 1 BOARD SUPERINTENDENTS OFFICE 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 1,600 4248 525 Perry Road, Marmora, NJ 08270 1 BOARD OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 1,600 799 525 Perry Road, Marmora, NJ 08270 1 GYM 64 MH250/1 295 18.88 Wall Switch 64 Custom Fixture 11 25 1.60 Occ Sensor 17.28 3,440 3,040 60,083
10 525 Perry Road, Marmora, NJ 08270 1 STAGE 19 H250/1 250 4.75 Wall Switch 19 Custom Fixture 4 200 3.80 Occ Sensor 0.95 2,200 1,600 4,37011 525 Perry Road, Marmora, NJ 08270 1 STAGE CORRIDOR 2 FU2LL 60 0.12 Wall Switch 2 FU2ILL-R 52 0.10 Occ Sensor 0.02 2,200 1,600 9812 525 Perry Road, Marmora, NJ 08270 1 B103 STORAGE 8 F44LL 118 0.94 Wall Switch 8 F44SSILL 96 0.77 Occ Sensor 0.18 2,200 1,600 84813 525 Perry Road, Marmora, NJ 08270 1 B103 TOILET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10614 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 1,600 95415 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 3 FU2LL 60 0.18 Wall Switch 3 FU2ILL-R 52 0.16 Occ Sensor 0.02 2,200 1,600 14616 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 OFFICE 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 1,600 11017 525 Perry Road, Marmora, NJ 08270 1 FITNESS ROOM M1 TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 1,600 7918 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS 9 F42LL 60 0.54 Wall Switch 9 F42SSILL 48 0.43 Occ Sensor 0.11 2,200 1,600 49719 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 1,600 33120 525 Perry Road, Marmora, NJ 08270 1 BOYS LOCKERS RESTROOM 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10621 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS 9 F42LL 60 0.54 Wall Switch 9 F42SSILL 48 0.43 Occ Sensor 0.11 2,200 1,600 49722 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 1,600 33123 525 Perry Road, Marmora, NJ 08270 1 GIRLS LOCKERS RESTROOM 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10624 525 Perry Road, Marmora, NJ 08270 1 GYM OFFICE, BOYS 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21225 525 Perry Road, Marmora, NJ 08270 1 GYM OFFICE, GIRLS 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21226 525 Perry Road, Marmora, NJ 08270 1 KITCHEN 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 1,600 99427 525 Perry Road, Marmora, NJ 08270 1 KITCHEN DISHWASHER 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 1,600 22128 525 Perry Road, Marmora, NJ 08270 1 KITCHEN STORAGE 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 1,600 22129 525 Perry Road, Marmora, NJ 08270 1 CAFETERIA 30 MH250/1 295 8.85 Wall Switch 30 Custom Fixture 4 200 6.00 Occ Sensor 2.85 2,200 1,600 9,87030 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET STORAGE 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 5531 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 1,600 11032 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM SWITCHGEAR 5 F42LL 60 0.30 Wall Switch 5 F42SSILL 48 0.24 Occ Sensor 0.06 2,200 1,600 27633 525 Perry Road, Marmora, NJ 08270 1 RESTROOM 1 CFT28/1 33 0.03 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.00 2,200 1,600 2034 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 5535 525 Perry Road, Marmora, NJ 08270 1 INSDUSTRIAL ROOM 54 F42LL 60 3.24 Wall Switch 54 F42SSILL 48 2.59 Occ Sensor 0.65 2,200 1,600 2,98136 525 Perry Road, Marmora, NJ 08270 1 INDUSTRIAL ROOM OFFICE 3 F44LL 118 0.35 Wall Switch 3 F44SSILL 96 0.29 Occ Sensor 0.07 2,200 1,600 31837 525 Perry Road, Marmora, NJ 08270 1 INDUSTRIAL ROOM PAINT ROOM 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 1,600 42438 525 Perry Road, Marmora, NJ 08270 1 ROOM S2 24 F42LL 60 1.44 Wall Switch 24 F42SSILL 48 1.15 Occ Sensor 0.29 2,200 1,600 1,32539 525 Perry Road, Marmora, NJ 08270 1 ROOM S2 CLOSET 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 1,600 11040 525 Perry Road, Marmora, NJ 08270 1 ROOM S1 24 F42LL 60 1.44 Wall Switch 24 F42SSILL 48 1.15 Occ Sensor 0.29 2,200 1,600 1,32541 525 Perry Road, Marmora, NJ 08270 1 ROOM S1 CLOSET 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 1,600 22142 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 63643 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM HALLWAY 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 5544 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM MENS TOILET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10645 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM WOMENS TOILET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10646 525 Perry Road, Marmora, NJ 08270 1 FACULTY ROOM PRINTER 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 63647 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE 7 F44LL 118 0.83 Wall Switch 7 F44SSILL 96 0.67 Occ Sensor 0.15 2,200 1,600 74248 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE TOILET 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 1,600 11049 525 Perry Road, Marmora, NJ 08270 1 NURSES OFFICE TOILET 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 1,600 4950 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE 8 F44LL 118 0.94 Wall Switch 8 F44SSILL 96 0.77 Occ Sensor 0.18 2,200 1,600 84851 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 5552 525 Perry Road, Marmora, NJ 08270 1 MAIN OFFICE CLOSET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 1,600 7953 525 Perry Road, Marmora, NJ 08270 1 VICE PRINCIPALS (VP) OFFICE 3 F44LL 118 0.35 Wall Switch 3 F44SSILL 96 0.29 Occ Sensor 0.07 2,200 1,600 31854 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE SERVER 1 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10655 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE SERVER 2 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10656 525 Perry Road, Marmora, NJ 08270 1 VP OFFICE COPIER ROOM 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10657 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 1,600 42458 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 1,600 7959 525 Perry Road, Marmora, NJ 08270 1 PRINCIPALS OFFICE STORAGE 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21260 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 63661 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 5562 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 5563 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE TOILET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 1,600 7964 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10665 525 Perry Road, Marmora, NJ 08270 1 TRANSPORTATION OFFICE CORRIDOR 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 55
Existing Facilities Program Lighting Form: Performance Based
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-11 Lighting Rep&Control
Page 2 of 3Version 1.2
6/21/201211:47 AM
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
66 525 Perry Road, Marmora, NJ 08270 1 BRAILLE ROOM 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21267 525 Perry Road, Marmora, NJ 08270 1 ROOM B1 16 F42LL 60 0.96 Wall Switch 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 1,600 88368 525 Perry Road, Marmora, NJ 08270 1 ROOM B2 16 F42LL 60 0.96 Breaker 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 1,600 88369 525 Perry Road, Marmora, NJ 08270 1 ROOM B3 21 F42LL 60 1.26 Wall Switch 21 F42SSILL 48 1.01 Occ Sensor 0.25 2,200 1,600 1,15970 525 Perry Road, Marmora, NJ 08270 1 ROOM B6 21 F42LL 60 1.26 Wall Switch 21 F42SSILL 48 1.01 Occ Sensor 0.25 2,200 1,600 1,15971 525 Perry Road, Marmora, NJ 08270 1 ROOM B5 16 F42LL 60 0.96 Wall Switch 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 1,600 88372 525 Perry Road, Marmora, NJ 08270 1 ROOM B4 16 F42LL 60 0.96 Wall Switch 16 F42SSILL 48 0.77 Occ Sensor 0.19 2,200 1,600 88373 525 Perry Road, Marmora, NJ 08270 1 ROOM B7 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 1,600 99474 525 Perry Road, Marmora, NJ 08270 1 ROOM B7 CLOSET 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21275 525 Perry Road, Marmora, NJ 08270 1 ROOM B8 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 1,600 99476 525 Perry Road, Marmora, NJ 08270 1 ROOM B9 18 F42LL 60 1.08 Wall Switch 18 F42SSILL 48 0.86 Occ Sensor 0.22 2,200 1,600 99477 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21278 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 1,600 4979 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21280 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM FOYER 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 1,600 4981 525 Perry Road, Marmora, NJ 08270 1 MEDIA CENTER/LIBRARY 60 F42LL 60 3.60 Wall Switch 60 F42SSILL 48 2.88 Occ Sensor 0.72 2,200 1,600 3,31282 525 Perry Road, Marmora, NJ 08270 1 COMPUTER ROOM L1 20 F42LL 60 1.20 Wall Switch 20 F42SSILL 48 0.96 Occ Sensor 0.24 2,200 1,600 1,10483 525 Perry Road, Marmora, NJ 08270 1 ROOM L2/L3 25 F42LL 60 1.50 Wall Switch 25 F42SSILL 48 1.20 Occ Sensor 0.30 2,200 1,600 1,38084 525 Perry Road, Marmora, NJ 08270 1 ROOM A12 16 F44LL 118 1.89 Wall Switch 16 F44SSILL 96 1.54 Occ Sensor 0.35 2,200 1,600 1,69685 525 Perry Road, Marmora, NJ 08270 1 HOM EC. ROOM (OLD FACULTY ROOM) 14 F44LL 118 1.65 Wall Switch 14 F44SSILL 96 1.34 Occ Sensor 0.31 2,200 1,600 1,48486 525 Perry Road, Marmora, NJ 08270 1 HOM EC. ROOM (OLD FACULTY ROOM) 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 1,600 4987 525 Perry Road, Marmora, NJ 08270 1 ROOM A15 15 F44LL 118 1.77 Wall Switch 15 F44SSILL 96 1.44 Occ Sensor 0.33 2,200 1,600 1,59088 525 Perry Road, Marmora, NJ 08270 1 ROM A13 13 F44LL 118 1.53 Wall Switch 13 F44SSILL 96 1.25 Occ Sensor 0.29 2,200 1,600 1,37889 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 OFFICE 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10690 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10691 525 Perry Road, Marmora, NJ 08270 1 ROOM A13 CLOSET 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10692 525 Perry Road, Marmora, NJ 08270 1 ROOM A11 13 F44LL 118 1.53 Wall Switch 13 F44SSILL 96 1.25 Occ Sensor 0.29 2,200 1,600 1,37893 525 Perry Road, Marmora, NJ 08270 1 ROOM A11 CLOSET 1 I60/1 60 0.06 Wall Switch 1 CFT28/1 33 0.03 Occ Sensor 0.03 2,200 1,600 7994 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM (BY A11) 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 21295 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, A WING 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 1,600 11096 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, A WING 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 10697 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 5598 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, A WING 2 F42LL 60 0.12 Wall Switch 2 F42SSILL 48 0.10 Occ Sensor 0.02 2,200 1,600 11099 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, A WING 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 106
100 525 Perry Road, Marmora, NJ 08270 1 ROOM A10 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060101 525 Perry Road, Marmora, NJ 08270 1 ROOM A9 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060102 525 Perry Road, Marmora, NJ 08270 1 ROOM A7 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060103 525 Perry Road, Marmora, NJ 08270 1 ROOM A8 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060104 525 Perry Road, Marmora, NJ 08270 1 ROOM A6 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060105 525 Perry Road, Marmora, NJ 08270 1 ROOM A5 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060106 525 Perry Road, Marmora, NJ 08270 1 ROOM A3 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060107 525 Perry Road, Marmora, NJ 08270 1 ROOM A4 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060108 525 Perry Road, Marmora, NJ 08270 1 ROOM A2 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060109 525 Perry Road, Marmora, NJ 08270 1 ROOM A1 10 F44LL 118 1.18 Wall Switch 10 F44SSILL 96 0.96 Occ Sensor 0.22 2,200 1,600 1,060110 525 Perry Road, Marmora, NJ 08270 1 MECHANICAL ROOM (NEW WING) 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 1,600 331111 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY CONFERENCE ROOM A117 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 1,600 424112 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY GUIDANCE A111 4 F44LL 118 0.47 Wall Switch 4 F44SSILL 96 0.38 Occ Sensor 0.09 2,200 1,600 424113 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A114 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212114 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A116 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212115 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A115 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212116 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A113 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212117 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A110 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212118 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A108 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212119 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A107 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212120 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY OFFICE A106 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212121 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE 8 F44LL 118 0.94 Wall Switch 8 F44SSILL 96 0.77 Occ Sensor 0.18 2,200 1,600 848122 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE COPIER 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212123 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE TOILET 1 FU2LL 60 0.06 Wall Switch 1 FU2ILL-R 52 0.05 Occ Sensor 0.01 2,200 1,600 49124 525 Perry Road, Marmora, NJ 08270 1 CHILD STUDY MAIN OFFICE CORRIDOR 9 FU2LL 60 0.54 Wall Switch 9 FU2ILL-R 52 0.47 Occ Sensor 0.07 2,200 1,600 439125 525 Perry Road, Marmora, NJ 08270 1 STORAGE ROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 1,600 221126 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 1,600 221127 525 Perry Road, Marmora, NJ 08270 1 BOYS RESTROOM, C WING 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212128 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, C WING 4 F42LL 60 0.24 Wall Switch 4 F42SSILL 48 0.19 Occ Sensor 0.05 2,200 1,600 221129 525 Perry Road, Marmora, NJ 08270 1 GIRLS RESTROOM, C WING 2 F44LL 118 0.24 Wall Switch 2 F44SSILL 96 0.19 Occ Sensor 0.04 2,200 1,600 212130 525 Perry Road, Marmora, NJ 08270 1 CUSTODIAL CLOSET, C WING 1 F42LL 60 0.06 Wall Switch 1 F42SSILL 48 0.05 Occ Sensor 0.01 2,200 1,600 55131 525 Perry Road, Marmora, NJ 08270 1 ROOM C1 15 F44LL 118 1.77 Wall Switch 15 F44SSILL 96 1.44 Occ Sensor 0.33 2,200 1,600 1,590132 525 Perry Road, Marmora, NJ 08270 1 ROOM C1 STORAGE 3 F44LL 118 0.35 Wall Switch 3 F44SSILL 96 0.29 Occ Sensor 0.07 2,200 1,600 318133 525 Perry Road, Marmora, NJ 08270 1 STORAGE (BY C1) 1 F44LL 118 0.12 Wall Switch 1 F44SSILL 96 0.10 Occ Sensor 0.02 2,200 1,600 106134 525 Perry Road, Marmora, NJ 08270 1 ROOM C2 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 636135 525 Perry Road, Marmora, NJ 08270 1 ROOM C4 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 636136 525 Perry Road, Marmora, NJ 08270 1 ROOM C3 15 F44LL 118 1.77 Wall Switch 15 F44SSILL 96 1.44 Occ Sensor 0.33 2,200 1,600 1,590137 525 Perry Road, Marmora, NJ 08270 1 ROOM C6 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 636138 525 Perry Road, Marmora, NJ 08270 1 ROOM C8 6 F44LL 118 0.71 Wall Switch 6 F44SSILL 96 0.58 Occ Sensor 0.13 2,200 1,600 636
File: 01 24145 - Upper Township MS ECMsWorksheet: ECM-11 Lighting Rep&Control
Page 3 of 3Version 1.2
6/21/201211:47 AM
PRE-INSTALLATION POST-INSTALLATION
Line Item Building Floor Area Description
Usage Group ID
Pre Fixt. No. Pre Fixt Code
Pre Watts / Fixt
Pre kW / Space Existing Control
Post Fixt No. Post Fixt Code
Post Watts/ Fixt
Post kW / Space Proposed Control kW Saved
Baseline Annual Hours
Proposed Annual Hours
Annual kWh Saved
Integer line
number
Building Address Floor fixture is
on
Description of location that matches site map Descriptive name for the usage
group
# of existing fixtures
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Pre Watts/Fixt) * (Pre Fixt No.)
Pre-installation control device
Number of fixtures after
retrofit
Code from Wattage Table
Watts/Fixt from Wattage
Table
(Post Watts/Fixt) *
(Post Fixt No.)
Post-installation control device
Pre kW/Space -
Post kW/Space
Existing annual hours for the usage
group
Proposed annual hours for the usage
group
(PreFixt #*PreWatts/Fixt * Baseline Hrs) -
(PostFixt#*PostWatts/Fixt * Proposed Hours)
139 525 Perry Road, Marmora, NJ 08270 1 ROOM C10 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 1,600 954140 525 Perry Road, Marmora, NJ 08270 1 ROOM C5 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 1,600 954141 525 Perry Road, Marmora, NJ 08270 1 ROOM C7 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 1,600 954142 525 Perry Road, Marmora, NJ 08270 1 ROOM C12 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 1,600 954143 525 Perry Road, Marmora, NJ 08270 1 ROOM C14 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 1,600 954144 525 Perry Road, Marmora, NJ 08270 1 ROOM C9 9 F44LL 118 1.06 Wall Switch 9 F44SSILL 96 0.86 Occ Sensor 0.20 2,200 1,600 954145 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR A 11 F44LL 118 1.30 Wall Switch 11 F44SSILL 96 1.06 Occ Sensor 0.24 2,200 1,600 1,166146 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR B 12 F44LL 118 1.42 Wall Switch 12 F44SSILL 96 1.15 Occ Sensor 0.26 2,200 1,600 1,272147 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR C 14 F44LL 118 1.65 Wall Switch 14 F44SSILL 96 1.34 Occ Sensor 0.31 2,200 1,600 1,484148 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR C 5 F42LL 60 0.30 Wall Switch 5 F42SSILL 48 0.24 Occ Sensor 0.06 2,200 1,600 276149 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR D 10 F42LL 60 0.60 Wall Switch 10 F42SSILL 48 0.48 Occ Sensor 0.12 2,200 1,600 552150 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR E 14 F42LL 60 0.84 Wall Switch 14 F42SSILL 48 0.67 Occ Sensor 0.17 2,200 1,600 773151 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR F&G 12 F44LL 118 1.42 Wall Switch 12 F44SSILL 96 1.15 Occ Sensor 0.26 2,200 1,600 1,272152 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR F&G 6 F42LL 60 0.36 Wall Switch 6 F42SSILL 48 0.29 Occ Sensor 0.07 2,200 1,600 331153 525 Perry Road, Marmora, NJ 08270 1 CORRIDOR H 18 F43LL 93 1.67 Wall Switch 18 F43SSILL 72 1.30 Occ Sensor 0.38 2,200 1,600 1,609154 525 Perry Road, Marmora, NJ 08270 1 EXIT SIGNS 37 ECF5/2 20 0.74 Wall Switch 37 ELED1.5/2 3 0.11 Occ Sensor 0.63 2,200 1,600 1,450155 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 1 12 HPS250/1 295 3.54 Light Sensor & Timer 12 HPS250/1 295 3.54 Occ Sensor 0.00 4,368 2,184 7,731156 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 2 1 Custom Fixture 6 210 0.21 Light Sensor & Timer 1 Custom Fixture 6 210 0.21 Light Sensor & Timer 0.00 4,368 2,184 459157 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 3 11 HPS150/1 188 2.07 Light Sensor & Timer 11 HPS150/1 188 2.07 Occ Sensor 0.00 4,368 2,184 4,517158 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL PACK 4 1 MV175/1 205 0.21 Light Sensor & Timer 1 Custom Fixture 6 210 0.21 Occ Sensor -0.01 4,368 2,184 437159 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 1 1 I60/1 60 0.06 Light Sensor & Timer 1 CFT28/1 33 0.03 Occ Sensor 0.03 4,368 2,184 190160 525 Perry Road, Marmora, NJ 08270 1EXTERIOR: POLE LIGHT 1 (4 BOXES, 1 POLE) 4 MH250/1 295 1.18 Light Sensor & Timer 4 MH250/1 295 1.18 Occ Sensor 0.00 4,368 2,184 2,577161 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 2 4 I200/1 200 0.80 Light Sensor & Timer 4 CFT55/1-BX 56 0.22 Occ Sensor 0.58 4,368 2,184 3,005162 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 3 3 CFT40/1 46 0.14 Light Sensor & Timer 3 CFT40/1 46 0.14 Light Sensor & Timer 0.00 4,368 2,184 301163 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 4 2 Custom Fixture 5 550 1.10 Light Sensor & Timer 2 MH450/1 508 1.02 Light Sensor & Timer 0.08 4,368 2,184 2,586164 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: POLE LIGHT 5 7 HPS250/1 295 2.07 Light Sensor & Timer 7 HPS250/1 295 2.07 Occ Sensor 0.00 4,368 2,184 4,510165 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 2 43 I60/1 60 2.58 Light Sensor & Timer 43 CFT22/1 27 1.16 Occ Sensor 1.42 4,368 2,184 8,734166 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: WALL FIXTURE 5 I100/1 100 0.50 Light Sensor & Timer 5 CFT28/1 33 0.17 Occ Sensor 0.34 4,368 2,184 1,824167 525 Perry Road, Marmora, NJ 08270 1 EXTERIOR: CANOPY 3 4 CFT28/1 33 0.13 Light Sensor & Timer 4 CFT28/1 33 0.13 Light Sensor & Timer 0.00 4,368 2,184 288
1,286 Total Pre kW 138.78 Total Post Fixt. 1,286.00 Total Pre kW 97.16 Total kW Saved 41.62 195,470.38Total Annual kWh Saved
Upper Township School District - NJBPU
CHA Project #24145Upper Township Middle School
Cost TableQuantity Total Cost
Single fixture retrofitNew electronic ballast installation $42 $42 $0 $84New Super T8 lamp installation $2 $4 $0 $6
$90
Troffer lighting retrofitNew electronic ballast installation $42 $42 $0 $84 1031 $86,600New super T8 lamp installation $24 $8 $0 $32 1031 $33,400
sub-total $116Photo cell installation $98 $53 $0 $150
$150 $120,000
Gym & CafeteriaExisting MH fixture and lamp removal $0 $0 $40 $40 94 $3,800New Induction fixture and lamp installation $550 $8 $0 $558 94 $52,500
sub-total $598Photo cell installation $98 $53 $0 $150
$56,300
Exist Signs ReplacmentExisting Exit Sign fixture and lamp removal $0 $0 $25 $25 37 $900New LED Exit Sign fixture and lamp installation $75 $65 $0 $140 37 $5,200
sub-total $165$6,100
Incandescent lighting retrofitExisting incandescent bulb removal $0 $0 $4 $4 59 $200New compact fluorescent installation $32 $4 $0 $36 59 $2,100
$40
Motion sensor installation $100 $85 $0 $185 250 $46,300
Material Cost ($/fixture)
Labor Cost ($/fixture)
Disposal Cost ($/fixture)
Retrofit Cost ($/fixture)
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
ECM-12: Replace Electric Kitchen Equipment with Natural Gas Equipment
ECM Description Summary
Existing FuelProposed Fuel
Item Value UnitsBaseline Fuel Cost 0.15$ / kWhProposed Fuel Cost 1.00$ / Therm
Kitchen Equipment - Commercial Double Stack Oven 42.0 kW - Commercial Range with Oven 30.0 kW - Commercial Tabletop Kettle 13.1 kW - Commercial Tabletop Steamer 15.0 kW - Total Equipmetn kW 100.1 kWKitchen Annual Operating Hours 1,140 hoursBaseline Equipment Efficiency 100%Baseline Annual Electric Use 114,114 kWhBaseline Annual Electric Cost 16,547$
Proposed Equipment Efficiency 80%Proposed Fuel Use 3,894 ThermsProposed Fuel Cost 3,894$
Annual Savings 12,653$ Natural Gas Equipment Project Cost 44,900$
Simple Payback 3.5 Years*Note to engineer: Link savings back to summary sheet in appropriate column.
A commercial cafeteria kitchen typically contains large equipment such as a double stack oven, a full size range with oven, a food warmer(s), table top kettle cooker(s), etc. This equipment consumes large ammounts of energy, and wiith the cost of electricity versus natural gas, it is worthwhile to consider replacing electric equipment with nagtural gas equipment. The assumption of this calculation is that the operating hours and electrical power consumption of the existing electrical equipment are replaced with newer, more efficient equipment using natural gas. The savings are compared to the cost of new gas kitchen equipment; the connection cost (if any) to the natural gas utility and piping in the building is not included.
Formula/Comments
Based on equipment nameplat dataBased on equipment nameplat dataBased on equipment nameplat dataBased on equipment nameplat data
6 hours per day x 5 days per week x 38 weeks per year
ApproxmiationBaseline Electric Use x 3,412 BTU/kWh / 100,000 BTU/Therm
Upper Township School District - NJBPUCHA Project #24145 MultipliersUpper Township Middle School Material: 1.10
Labor: 1.35ECM-12: Replace Electric Kitchen Equipment with Natural Gas Equipment - Cost Equipment: 1.10
MAT. LABOR EQUIP. MAT. LABOR EQUIP.-$ -$ -$ -$
Remove Existing Elec. Kitchen Equipment 1 LS 100$ 2,000$ 110$ 2,700$ -$ 2,810$ - Commercial Double Stack Oven 1 EA 6,700$ 100$ 7,370$ 135$ -$ 7,505$ - Commercial Range with Oven 1 EA 4,000$ 100$ 4,400$ 135$ -$ 4,535$ - Commercial Tabletop Kettle 1 EA 3,400$ 250$ 3,740$ 338$ -$ 4,078$ - Commercial Tabletop Steamer 1 EA 4,200$ 250$ 4,620$ 338$ -$ 4,958$ Miscellaneous Electrical 1 LS 250$ 500$ 275$ 675$ -$ 950$ Miscellaneous Natural Gas Piping 1 LS 1,000$ 1,000$ 1,100$ 1,350$ -$ 2,450$ Kitchen Hood Fire Suppression System 1 LS 5,500$ 500$ 6,050$ 675$ -$ 6,725$
-$ -$ -$ -$
34,010$ Subtotal3,401.00$ 10% Contingency7,482.20$ 20% Contractor O&P
-$ 0% Engineering44,900$
REMARKS
Total
Description QTY UNIT UNIT COSTS SUBTOTAL COSTS TOTAL COST
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX D
New Jersey Pay For Performance Incentive Program
Upper Township School District - NJBPUCHA Project #24145Upper Township Middle School
New Jersey Pay For Performance Incentive Program
Note: The following calculation is based on the New Jersey Pay For Performance Incentive Program per April, 2010. Building must have a minimum average electric demand of 200 kW. This minimum is waived for buildings owned by localgovernements or non-profit organizations. Values used in this calculation are for measures with a positive return on investment (ROI) only.
Total Building Area (Square Feet) 94,264 $0.10 $/sqftIs this audit funded by NJ BPU (Y/N) Yes $0.05 $/sqftBoard of Public Utilites (BPU)
kWh ThermsExisting Cost (from utility) $260,028 $0
Existing Usage (from utility) 1,795,200 0Proposed Savings 683,810 -626
Existing Total MMBtusProposed Savings MMBtus
% Energy ReductionProposed Annual Savings
$/kWh $/therm $/kWh $/therm $/kWh $/therm $/kWh $/thermIncentive #2 $0.09 $0.90 $0.005 $0.05 $0.11 $1.25 $0.11 $1.25Incentive #3 $0.09 $0.90 $0.005 $0.05 $0.11 $1.25 $0.11 $1.25
Elec Gas Total
Incentive #1 $0 $0 $4,713Incentive #2 $75,219 -$783 $74,436Incentive #3 $75,219 -$783 $74,436
Total All Incentives $150,438 -$1,565 $153,586
Total Project Cost $486,400
Allowable Incentive
% Incentives #1 of Utility Cost* 1.8% $4,713% Incentives #2 of Project Cost** 15.3% $74,436% Incentives #3 of Project Cost** 15.3% $74,436
Total Eligible Incentives*** w/o Incentives w/ IncentivesProject Cost w/ Incentives 4.7 3.2
* Maximum allowable incentive is 50% of annual utility cost if not funded by NJ BPU, and %25 if it is.** Maximum allowable amount of Incentive #2 is 30% of total project cost.Maximum allowable amount of Incentive #3 is 20% of total project cost.*** Maximum allowable amount of Incentive #1 is $50,000 if not funded by NJ BPU, and $25,000 if it is. Maximum allowable amount of Incentive #2 & #3 is $1 million per gas account and $1 million per electric account
Achieved Incentive
Incentives $
Project Payback (years)$153,586$332,814
Max Incentive
2,27137.1%
$103,000
Min (Savings = 15%) Increase (Savings > 15%)
Incentive #1Audit not funded by NJ BPUAudit is funded by NJ BPU
Annual Utilities
6,127
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX E
Photovoltaic (PV) Rooftop Solar Power Generation
Please send questions and comments regarding PVWATTS to Webmaster
Disclaimer and copyright notice
Return to RReDC home page (http://www.nrel.gov/rredc )
* * *AC Energy
& Cost Savings
01 - Upper Township Middle School Solar PV ECM
Station IdentificationCity: Newark
State: New_Jersey
Latitude: 40.70° N
Longitude: 74.17° W
Elevation: 9 m
PV System SpecificationsDC Rating: 50.0 kW
DC to AC Derate Factor: 0.770
AC Rating: 38.5 kW
Array Type: Fixed Tilt
Array Tilt: 40.7°
Array Azimuth: 180.0°
Energy SpecificationsCost of Electricity: 14.5 ¢/kWh
Results
MonthSolar
Radiation (kWh/m 2/day)
AC Energy (kWh)
Energy Value
($)
1 3.36 4139 600.15
2 4.05 4469 648.00
3 4.58 5422 786.19
4 4.84 5299 768.36
5 5.30 5838 846.51
6 5.33 5506 798.37
7 5.27 5561 806.35
8 5.25 5503 797.94
9 5.06 5338 774.01
10 4.46 5027 728.91
11 3.15 3588 520.26
12 2.87 3460 501.70
Year 4.46 59150 8576.75
About the Hourly Performance Data
Output Hourly Performance Data
*
Saving Text from a Browser
Output Results as Text
Run PVWATTS v.1 for another US location or an International locationRun PVWATTS v.2 (US only)
Page 1 of 1PVWATTS: AC Energy and Cost Savings
6/1/2012http://rredc.nrel.gov/solar/calculators/PVWATTS/version1/US/code/pvwattsv1.cgi
The monthly and yearly energy production are modeled using the PV system parameters you selected and weather data that are typical or representative of long-term averages. For reference, or comparison with local information, the solar radiation values modeled for the PV array are included in the performance results.
Because weather patterns vary from year-to-year, the values in the tables are better indicators of long-term performance than performance for a particular month or year. PV performance is largely proportional to the amount of solar radiation received, which may vary from the long-term average by 30% for monthly values and 10% for yearly values. How the solar radiation might vary for your location may be evaluated by examining the tables in the Solar Radiation Data Manual for Flat-Plate and Concentrating Collectors (http://rredc.nrel.gov/solar/old_data/nsrdb/redbook/).
For these variations and the uncertainties associated with the weather data and the model used to model the PV performance, future months and years may be encountered where the actual PV performance is less than or greater than the values shown in the table. The variations may be as much as 40% for individual months and up to 20% for individual years. Compared to long-term performance over many years, the values in the table are accurate to within 10% to 12%.
If the default overall DC to AC derate factor is used, the energy values in the table will overestimate the actual energy production if nearby buildings, objects, or other PV modules and array structure shade the PV modules; if tracking mechanisms for one- and two-axis tracking systems do not keep the PV arrays at the optimum orientation with respect to the sun's position; if soiling or snow cover related losses exceed 5%; or if the system performance has degraded from new. (PV performance typically degrades 1% per year.) If any of these situations exist, an overall DC to AC derate factor should be used with PVWATTS that was calculated using system specific component derate factors for shading, sun-tracking, soiling, and age.
The PV system size is the nameplate DC power rating. The energy production values in the table are valid only for crystalline silicon PV systems.
The cost savings are determined as the product of the number of kilowatt hours (kWh) and the cost of electricity per kWh. These cost savings occur if the owner uses all the electricity produced by the PV system, or if the owner has a net-metering agreement with the utility. With net-metering, the utility bills the owner for the net electricity consumed. When electricity flows from the utility to the owner, the meter spins forward. When electricity flows from the PV system to the utility, the meter spins backwards.
If net-metering isn’t available and the PV system sends surplus electricity to the utility grid, the utility generally buys the electricity from the owner at a lower price than the owner pays the utility for electricity. In this case, the cost savings shown in the table should be reduced.
Besides the cost savings shown in the table, other benefits of PV systems include greater energy independence and a reduction in fossil fuel usage and air pollution. For commercial customers, additional cost savings may come from reducing demand charges. Homeowners can often include the cost of the PV system in their home mortgage as a way of accommodating the PV system’s initial cost.
To accelerate the use of PV systems, many state and local governments offer financial incentives and programs. Go to http://www.nrel.gov/stateandlocal for more information.
Return to RREDC Home Page ( http://rredc.nrel.gov/ )
Cautions for Interpreting the Results
Please send questions and comments to Webmaster Disclaimer and copyright notice.
Page 1 of 1PVWATTS: Cautions for Interpreting the Results
5/14/2012http://rredc.nrel.gov/solar/calculators/PVWATTS/interp.html
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX F
Solar Thermal Domestic Hot Water Plant
Home
What Can I Do? Electric Choice Home Energy FAQs
LEARN Fact Sheets Lesson Plans
PLAY Calculators NETWORK Organizations Businesses Events Calendar
BROWSE Resources Solar Wind Biomass Geothermal Water Projects TX Energy - Past and Present Financial Help
About Us
About SECO
RARE
Interactive Energy Calculators
Our calculators help you understand energy production and consumption in a whole new way. Use them to develop a personal profile of your own energy use. Carbon Pollution Calculator Electric Power Pollution Calculator PV System Economics Solar Water Heating What's a Watt?
Solar Water Heating Calculator Water heating is a major energy consumer. Although the energy consumed daily is often less than for air conditioning or heating, it is required year round, making it a good application of solar energy. Use this calculator to explore the energy usage of your water heater, and to estimate whether a solar water heater could save you money.
Water Heater Characteristics
Physical Thermal
? Diameter (feet) 3 ? Water Inlet Temperature (Degrees F)
60
? Capacity (gallons) 360 ? Ambient Temperature (Degrees F) 75
? Surface Area (calculated - sq ft)
78.3 ? Hot Water Temperature (Degrees F)
140
? Effective R-value 5 ? Hot Water Usage (Gallons per Day) 1000
Energy Use
27370 ? Heat Delivered in Hot Water (BTU/hr)
1018 ? Heat loss through insulation (BTU/hr)
Gas vs. Electric Water Heating
Gas Electric
0.756 ? Overall Efficiency 0.9449
0.7841 ? Conversion Efficiency 0.98
36200 BTU/hr ? Power Into Water Heater 28970 BTU/hr
Cost
$ 1 /Therm ? Utility Rates $ 0.145 /kWh
$ 3171.120 ? Yearly Water Heating Cost $ 10777.12
Page 1 of 2Interactive Energy Calculators
5/31/2012http://infinitepower.org/calc_water.htm
How Does Solar Compare?
? Solar Water Heater Cost: $ 22900? Percentage Solar:
70
10.31631 years for gas ? Payback Time for Solar System 3.035530years for electric
More information on solar water heating:
Fact sheet - Solar Water Heaters Fact sheet - Solar Water Heaters for Swimming Pools Kids fact sheet - Heat from the Sun
Return to Top of Page
Send comments, questions, and suggestions to website manager.
Window on State Government | Privacy and Security Policy | Accessibility Policy
State Energy Conservation Office (SECO)
Page 2 of 2Interactive Energy Calculators
5/31/2012http://infinitepower.org/calc_water.htm
_____________________________________________________________________________ New Jersey BPU - Energy Audits
APPENDIX G
EPA Portfolio Manager
OMB No. 2060-0347
STATEMENT OF ENERGY PERFORMANCEUpper Township Middle School
Building ID: 2923501 For 12-month Period Ending: January 31, 20121
Date SEP becomes ineligible: N/A Date SEP Generated: June 08, 2012
FacilityUpper Township Middle School525 Perry RoadPetersburg, NJ 08270
Facility OwnerN/A
Primary Contact for this FacilityN/A
Year Built: 1973Gross Floor Area (ft2): 94,264
Energy Performance Rating2 (1-100) 59
Site Energy Use Summary3
Electricity - Grid Purchase(kBtu) 5,124,258 Natural Gas - (kBtu)4 0 Total Energy (kBtu) 5,124,258
Energy Intensity4 Site (kBtu/ft2/yr) 54 Source (kBtu/ft2/yr) 182 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) 726 Electric Distribution Utility Atlantic City Electric Co [Pepco Holdings Inc] National Median Comparison National Median Site EUI 59 National Median Source EUI 197 % Difference from National Median Source EUI -8% Building Type K-12
School
Stamp of Certifying Professional
Based on the conditions observed at thetime of my visit to this building, I certify that
the information contained within thisstatement is accurate.
Meets Industry Standards5 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A
Certifying ProfessionalN/A
Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.
The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.
EPA Form 5900-16
ENERGY STAR®
Data Checklistfor Commercial Buildings
In order for a building to qualify for the ENERGY STAR, a Professional Engineer (PE) or a Registered Architect (RA) must validate the accuracy of the data underlyingthe building's energy performance rating. This checklist is designed to provide an at-a-glance summary of a property's physical and operating characteristics, as well asits total energy consumption, to assist the PE or RA in double-checking the information that the building owner or operator has entered into Portfolio Manager.
Please complete and sign this checklist and include it with the stamped, signed Statement of Energy Performance.NOTE: You must check each box to indicate that each value is correct, OR include a note.
CRITERION VALUE AS ENTERED INPORTFOLIO MANAGER VERIFICATION QUESTIONS NOTES
Building Name Upper Township Middle
School Is this the official building name to be displayed inthe ENERGY STAR Registry of LabeledBuildings?
Type K-12 School Is this an accurate description of the space inquestion?
Location 525 Perry Road,
Petersburg, NJ 08270 Is this address accurate and complete? Correctweather normalization requires an accurate zipcode.
Single Structure Single Facility
Does this SEP represent a single structure? SEPscannot be submitted for multiple-buildingcampuses (with the exception of a hospital, k-12school, hotel and senior care facility) nor can theybe submitted as representing only a portion of abuilding.
School (K-12 School)
CRITERION VALUE AS ENTERED INPORTFOLIO MANAGER VERIFICATION QUESTIONS NOTES
Gross Floor Area 94,264 Sq. Ft.
Does this square footage include all supportingfunctions such as kitchens and break rooms usedby staff, storage areas, administrative areas,elevators, stairwells, atria, vent shafts, etc. Alsonote that existing atriums should only include thebase floor area that it occupies. Interstitial(plenum) space between floors should not beincluded in the total. Finally gross floor area is notthe same as leasable space. Leasable space is asubset of gross floor area.
Open Weekends? No
Is this building normally open at all on theweekends? This includes activities beyond thework conducted by maintenance, cleaning, andsecurity personnel. Weekend activity could includeany time when the space is used for classes,performances or other school or communityactivities. If the building is open on the weekend aspart of the standard schedule during one or moreseasons, the building should select ?yes? for openweekends. The ?yes? response should applywhether the building is open for one or both of theweekend days.
Number of PCs 616 Is this the number of personal computers in theK12 School?
Number of walk-inrefrigeration/freezer
units 2
Is this the total number of commercial walk-in typefreezers and coolers? These units are typicallyfound in storage and receiving areas.
Presence ofcooking facilities Yes
Does this school have a dedicated space in whichfood is prepared and served to students? If theschool has space in which food for students is onlykept warm and/or served to students, or has only agalley that is used by teachers and staff then theanswer is "no".
Percent Cooled 100 % Is this the percentage of the total floor space withinthe facility that is served by mechanical coolingequipment?
Percent Heated 100 % Is this the percentage of the total floor space withinthe facility that is served by mechanical heatingequipment?
Months 12(Optional) Is this school in operation for at least 8 months ofthe year?
Page 1 of 4
High School? No
Is this building a high school (teaching grades 10,11, and/or 12)? If the building teaches to highschool students at all, the user should check 'yes'to 'high school'. For example, if the school teachesto grades K-12 (elementary/middle and highschool), the user should check 'yes' to 'highschool'.
Page 2 of 4
ENERGY STAR®
Data Checklistfor Commercial Buildings
Energy ConsumptionPower Generation Plant or Distribution Utility: Atlantic City Electric Co [Pepco Holdings Inc]
Fuel Type: Electricity
Meter: 0405 5739 9991-E (kWh (thousand Watt-hours))Space(s): Entire Facility
Generation Method: Grid Purchase
Start Date End Date Energy Use (kWh (thousand Watt-hours))
01/01/2012 01/31/2012 142,800.00
12/01/2011 12/31/2011 132,600.00
11/01/2011 11/30/2011 127,500.00
10/01/2011 10/31/2011 106,200.00
09/01/2011 09/30/2011 119,700.00
08/01/2011 08/31/2011 136,200.00
07/01/2011 07/31/2011 120,900.00
06/01/2011 06/30/2011 102,600.00
05/01/2011 05/31/2011 147,000.00
04/01/2011 04/30/2011 112,500.00
03/01/2011 03/31/2011 117,300.00
02/01/2011 02/28/2011 135,300.00
0405 5739 9991-E Consumption (kWh (thousand Watt-hours)) 1,500,600.00
0405 5739 9991-E Consumption (kBtu (thousand Btu)) 5,120,047.20
Meter: 0633 6669 9997-E (kWh (thousand Watt-hours))Space(s): Entire Facility
Generation Method: Grid Purchase
Start Date End Date Energy Use (kWh (thousand Watt-hours))
01/01/2012 01/31/2012 53.00
12/01/2011 12/31/2011 292.00
11/01/2011 11/30/2011 43.00
10/01/2011 10/31/2011 418.00
09/01/2011 09/30/2011 47.00
08/01/2011 08/31/2011 117.00
07/01/2011 07/31/2011 41.00
06/01/2011 06/30/2011 36.00
05/01/2011 05/31/2011 44.00
04/01/2011 04/30/2011 43.00
03/01/2011 03/31/2011 46.00
02/01/2011 02/28/2011 54.00
0633 6669 9997-E Consumption (kWh (thousand Watt-hours)) 1,234.00
Page 3 of 4
0633 6669 9997-E Consumption (kBtu (thousand Btu)) 4,210.41
Total Electricity (Grid Purchase) Consumption (kBtu (thousand Btu)) 5,124,257.61
Is this the total Electricity (Grid Purchase) consumption at this building including allElectricity meters?
Additional FuelsDo the fuel consumption totals shown above represent the total energy use of this building?Please confirm there are no additional fuels (district energy, generator fuel oil) used in this facility.
On-Site Solar and Wind EnergyDo the fuel consumption totals shown above include all on-site solar and/or wind power located atyour facility? Please confirm that no on-site solar or wind installations have been omitted from thislist. All on-site systems must be reported.
Certifying Professional (When applying for the ENERGY STAR, the Certifying Professional must be the same PE or RA that signed and stamped the SEP.)
Name: _____________________________________________ Date: _____________
Signature: ______________________________________ Signature is required when applying for the ENERGY STAR.
Page 4 of 4
FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.
Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.
FacilityUpper Township Middle School525 Perry RoadPetersburg, NJ 08270
Facility OwnerN/A
Primary Contact for this FacilityN/A
General InformationUpper Township Middle School
Gross Floor Area Excluding Parking: (ft2) 94,264 Year Built 1973 For 12-month Evaluation Period Ending Date: January 31, 2012
Facility Space Use SummarySchool
Space Type K-12 School
Gross Floor Area (ft2) 94,264
Open Weekends? No
Number of PCs 616
Number of walk-in refrigeration/freezerunits 2
Presence of cooking facilities Yes
Percent Cooled 100
Percent Heated 100
Months o 12
High School? No
School District o
UpperTownship
School District
Energy Performance ComparisonEvaluation Periods Comparisons
Performance Metrics Current(Ending Date 01/31/2012)
Baseline(Ending Date 07/31/2011) Rating of 75 Target National Median
Energy Performance Rating 59 58 75 N/A 50
Energy Intensity
Site (kBtu/ft2) 54 55 46 N/A 59
Source (kBtu/ft2) 182 183 154 N/A 197
Energy Cost
$/year $ 215,665.74 $ 224,022.66 $ 183,054.03 N/A $ 234,074.29
$/ft2/year $ 2.29 $ 2.38 $ 1.94 N/A $ 2.49
Greenhouse Gas Emissions
MtCO2e/year 726 730 616 N/A 788
kgCO2e/ft2/year 8 8 7 N/A 9
More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Median column presentsenergy performance data your building would have if your building had a median rating of 50. Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.
2012Upper Township Middle School525 Perry RoadPetersburg, NJ 08270
Portfolio Manager Building ID: 2923501
The energy use of this building has been measured and compared to other similar buildings using theEnvironmental Protection Agency’s (EPA’s) Energy Performance Scale of 1–100, with 1 being the least energyefficient and 100 the most energy efficient. For more information, visit energystar.gov/benchmark.
This building’sscore
59
100
Most Efficient
This building uses 182 kBtu per square foot per year.*
*Based on source energy intensity for the 12 month period ending January 2012
Date of certification
Date Generated: 06/08/2012
Statement ofEnergy Performance
1
Least Efficient
50
Median
Buildings with a score of75 or higher may qualifyfor EPA’s ENERGY STAR.
I certify that the information contained within this statement is accurate and in accordance with U.S.Environmental Protection Agency’s measurement standards, found at energystar.gov