upper level plan malviya nagar intersection...
TRANSCRIPT
TABLE TOP
TABLE TOP
3.3 M WIDE FOOTPATH
3.3 M WIDE FOOTPATH
S T
O
P
OUTER RING ROAD
MALVIYA NAGAR
INTERSECTION
DN >>
9.0
0
R.O.W - 45.00
9.0
0
9.0
0
PROPOSED FLYOVER
OUTER RING ROAD
S T O P
S T
O
P
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
BUS STOP
FOOTPATH
FOOTPATH
15.00
FOOTPATH
9.0
0
FOOTPATH
Service Road
Service Road
Service Road
Govt. senior secondary school
PETROL PUMP
PETROL PUMP
BHARAT
FILLING POINT
INDIAN OIL
FILLING POINT
FILLING POINT
FILLING POINT
FILLING POINT
FILLING POINT
PETROL PUMP
FILLING POINT
NALA
10
.5
0
FOOTPATH
MA
HA
RIS
HI D
AY
AN
AN
D M
AR
G
PROPOSED FLYOVER
<< DN
9.0
0
UP >>
FOOTPATH & DRAINFOOTPATH & DRAIN
PANCHSHEEL PARK
METRO STATION
ROW 45.00M (AS PER ZONAL
DEVELOPMENT PLAN ZONE-F)
ROW 45.00M (AS PER ZONAL
DEVELOPMENT PLAN ZONE-F)
PANCHSHIL
ENCLAVE
C
O
M
B
O
D
IA
A
M
A
R
JA
Y
A
N
T
I
DR
AIN
TABLE TOP PEDESTRIAN CROSSING (150 MM ABOVE ROAD LEVEL
CONNECTED TO ROAD WITH RAMP OF SLOPE 1:50)
CH
-5000 m
CH
-6000 m
<<
UP
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
3.00
7.00
3.0
0
7.5
0
10CM SOLID
BARRIER LINE
10CM SOLID
BARRIER LINE
<< UP
CHIRAG DELHI
INTERSECTION
GR
AM
IN/IP
T
AU
TO
TABLE TOP TABLE TOP
3.3 M WIDE FOOTPATH3.3 M WIDE FOOTPATH
FOOTPATH
FIREMEN ACCESSSTAIRCASE - 4
04 05 06 07 08 09 10
U48
U43
U18.1
U40
ROOF OVER ENTRYSTRUCTURE
ENTRYSTRUCTURE
PLINTH
RAMPSLOPE - 1:12
FOOTPATH
U51
S1 S4d
2.60
15.30
6.00
22.14
17.98
22.55
8.00
9.78
5.60
5.60
2.50 0.751.20
2.50
1.90
7.20
5.55
24.44
18.38
7.400 9.450 9.450 12.500 12.000 10.500
F.F.L.
L.P.0.50 m
H.P.0.65 m
X1201
X1201
Y1201 Y1201
31201
41201 21201
1
1201
UP FROM CONC
UP
LIFT 413 PASSENGERS
D3
GR2
D2a
F.F.L. (+222.75 M)
L4
5.00 BOUNDARY WALLAS PER DMRCSTANDARDS
LVL.+0.15M
5.6X5.6 MCUTOUT INFLOOR
R-01
SLOPE1:100
(+222.75 M)
(+222.15 M)
LIFTCANOPY
OPEN TO SKY
RS1
NOMINAL GRADINGTOWARDS DRAIN
NOMINAL GRADINGTOWARDS DRAIN
PLUMBING CUTOUT ATCEILING 1.0X0.7 M
ELECTRICAL
SHAFT FROMUNDERCROFT
LEVEL TO COVER
LEVEL
ES10
CABLE GALLERY 1.5 M(HEIGHT)X4.0 M (WIDTH)
R3
WALL TO BE SHIFTED
Z
1201
Z1201
C2
C1
5.950
1.00
2.00
4.00
7.006.00
0.45
2.50
U45
F.F.L. (+222.75 M)
F.F.L. (+223.05 M)
F.F.L. (+222.75 M)
1.80
4.0
00
22.681
1.247
UP
DN
3.32
7.07
D1
1.50
3.00
D2a
990 LTR.DAY TANK
U76
ES9
11.12
SLOPE
1:8
3.00
0.60
1.00
NOMINAL GRADINGTOWARDS DRAIN
UP
D2a D2a
S4a
R3
R3
R3
R3
R3
MANHOLE
PL03
S4e
SERVICESGALLERY
CUTOUT ATCOVER LEVEL INTECHNICAL GALLERY
S6a
D4b
FHC1.2MX0.75M
5.90
1.00
R6
2.00 D2a
1.50
1.20
0.75
1.00
1.00
ES11
600MM HIGH WALL
PLINTH F.F.L. (+222.75 M)
D4b
D4b D4b
0.50
1.20 CUTOUT FOR AIR COOLEDCHILLER AND COOLING TOWERCABLES 0.5 X 1.2M
R7
C12150Ø RWP TOGROUND LEVEL
CENTER OFINTERMEDIATESUPPORT FOR ESC-1
E
2.80
SLOPE 1:8 SLOPE 1:84.80
1.20
6.20 6.22
GR2
FIRE BRIGADESUCTIONYARD HYDRANTVALVE4 WAY FIRE BRIGADEINLET FOR HYDRANTSYSTEM
RS1
RS1 LVL.+0..15M (+222.15 M) LVL. ± 0.0 M (+222.00 M)
F.F.L. (+222.75 M)
SUNSHADE
2.40
5.86
6.15 5.55
UP FROM CONC
DNST 01
ESC 01
20.25
12.82
YARD HYDRANTVALVE
C4
C5 3.653.95
3.00
3.003.30
6.00
2.50
1.50 2.50 2.00
DG
5.779
B.E. B.E.
N.E.N.E.
WAY TOD.G. SET
H
A
U
Z
K
H
A
S
A
S
IA
D
C
E
N
T
R
E
B
H
E
L
PANCHSHILA
PARK N
ORTH
S
H
E
IK
H
S
A
R
A
I P
H
-I
S
A
V
IT
R
I N
A
G
A
R
C
H
IR
A
G
H
D
E
L
H
I
PANCHSHIL
ENCLAVE
M
I
L
K
H
A
S
I
N
G
H
M
G
.
A
S
IA
D
T
O
W
E
R
COMBODIA
PANCHSHIL
ENCLAVE
J
O
S
I
P
B
R
O
Z
T
I
T
O
M
A
R
G
MASJID MOTH
G
E
E
T
A
N
J
A
L
I
M
G
.
K
H
I
R
K
I
M
A
I
N
R
D
.
B
H
A
V
IS
H
Y
A
N
ID
H
I
E
N
C
L
A
V
E
K
H
E
L
G
A
O
N
M
G
.
SADHANA E
NCLAVE
B
E
G
U
M
P
U
R
B
E
G
U
M
P
U
R
I
M
A
S
J
ID
AMAR
JAYANTI
K
IM
L
IN
G
V
A
R
D
A
A
N
çT
O
M
U
N
IR
K
A
D
R
A
IN
DR
AIN
T
O
S
O
U
T
H
E
X
T
E
N
S
I
O
N
è
çT
O M
AD
AN
GIR
T
O
M
O
O
L
C
H
A
N
D
è
K
A
L
U
S
A
R
A
I
V
IJ
A
Y
M
A
N
D
A
L
E
N
C
L
A
V
E
P
O
L
IC
E
C
O
L
O
N
Y
H
A
U
Z
K
H
A
S
P
A
D
M
IN
I
E
N
C
L
A
V
E
B
H
IM
N
A
G
R
I
D
L
F
H
A
U
Z
K
H
A
S
E
X
T
N
S
A
F
D
A
R
J
A
N
G
D
E
V
E
L
O
P
M
E
N
T
A
R
E
A
A
U
R
O
B
I
N
D
O
M
A
R
G
A
U
R
O
B
IN
D
O
M
A
R
G
T
O
A
I
I
M
S
è
G
R
E
A
T
E
R
K
A
IL
A
S
H
1
K
A
IL
A
S
H
C
O
L
O
N
Y
S
A
N
T
N
A
G
A
R
K
A
L
K
A
J
I
K
A
IL
A
S
H
H
IL
L
DDA FLATS
MASJID MOTH PH 1
M
A
I
N
R
O
A
D
K
A
L
K
A
J
I
H
A
N
S
R
A
J
G
U
P
T
A
M
A
R
G
R
A
J
A
D
H
I
R
S
A
N
M
A
R
A
G
N
E
H
R
U
P
L
A
C
E
I
N
T
E
R
S
E
C
T
I
O
N
MALVIYA NAGAR
INTERSECTION
çT
O R
ING
RO
AD
T
O
M
A
L
V
IY
A
N
A
G
A
R
è
I.I.T.
INTERSECTION
PANCHSHEEL
INTERSECTION
E
X
I
S
T
I
N
G
E
L
E
V
A
T
E
D
D
M
R
C
T
R
A
C
K
C
CH
-4000 m
SERVICE ROAD
FOOTPATH
FOOTPATH
FOOTPATH FOOTPATH
FOOTPATHFOOTPATHFOOTPATHFOOTPATH
FOOTPATHFOOTPATH
IS
H
W
A
R
N
A
G
A
R
G
IR
I N
A
G
A
R
G
U
R
U
R
A
V
I D
A
S
M
A
R
G
C
A
P
T
A
N
G
A
U
R
M
A
R
G
N
H
-
2
çT
O
A
S
H
R
A
M
T
O
O
K
H
L
A
I
N
D
U
S
T
R
I
A
L
E
S
T
A
T
E
P
H
A
S
E
-
I
I
è
M
A
A
N
A
N
D
M
A
I
M
A
R
G
I
N
T
E
R
S
E
C
T
I
O
N
U
D
A
Y
S
H
A
N
K
A
R
M
A
R
G
GREATER KAILASH
ENCLAVE II
G
R
E
A
T
E
R
K
A
IL
A
S
H
II
C
H
IT
T
A
R
A
N
J
A
N
P
A
R
K
T
O
G
.K
.-
II
è
T
O
IIT
G
A
T
E
è
EP
EP
EP
B
O
U
N
D
A
R
Y
W
A
LL
B
O
U
N
D
A
R
Y
W
A
LL
B
O
U
N
D
A
R
Y
W
A
LL
BO
U
N
D
AR
Y W
ALL
B
O
U
N
D
A
R
Y
W
A
L
L
BO
U
N
D
AR
Y W
ALL
B
O
U
N
D
A
R
Y
W
A
L
L
BO
U
N
D
AR
Y W
ALL
F
O
O
T
P
A
T
H
FOOTPATH
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
H
U
T
H
U
T
HUT
HIGH MAST
EP
EP
EP
EP
EP EP
EP
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH HIGH MAST
SHED
BOUNDARY WALL
BOUNDARY W
ALL
BOUNDARY WALL
FOOTPATH
SHED
FO
O
T O
VER
B
R
ID
G
E
F
O
O
T
O
V
E
R
B
R
ID
G
E
P
W
D
O
F
F
IC
E
S
/S
O
P
E
N
P
L
O
T
M
IC
R
O
S
M
A
L
L
A
N
D
M
E
D
IU
M
E
N
T
E
R
P
R
IS
E
S
D
E
V
E
L
O
P
M
E
N
T
I
N
S
T
IT
U
T
E
M
O
D
I
F
L
O
U
R
M
I
L
L
S
P
A
R
K
D
R
. JH
A
M
A
R
G
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
U
N
D
E
R
C
O
N
S
T
.
BOUNDARY WALL
MH
LB
MH
MH
MH
MH
MH
MH
MH
B
U
IL
D
IN
G
B
U
IL
D
IN
G
DEVELOPMENT INSTITUTE
MICRO SMALL AND MEDIUM ENTERPROSES
DEVELOPMENT INSTITUTE
MICRO SMALL AND MEDIUM ENTERPROSES
TEMPAL
ROOM
ROOM
SHED
SHED
SHED
ROOM
ROOM
SHED
PLINTH
RA
MP
WE
LLFO
U
N
TA
IN
SHED
BU
ILD
IN
G
BASM
EN
T +2
OFFICE + ROOM
SHED
ELECTRIC
BOX
PLINTH
PLIN
TH
SHIV
PLINT
HS/S
S/S
TEMPAL
S/S
ROOM SHED
DRA
IN
HUT
STAIRCASE AREA
BOUNDARY WALL
BOUNDARY WALL
BOUNDARY WALL
BOUNDARY WALL
BOUNDARY WALL
BOUNDARY WALL
GUARDROOM
ROOM
TANK
WATER
JUNCTIONBOX
MH
WELL
SHED
MH
MH
MH
HIGHMAST
MH
JUNCTION BOX
JUNCTION BOX
JUNCTION BOX
FO
O
TPATH
FO
O
TPATH
F
O
O
T
P
A
T
H
SHUTTER
GATE
G+1ROOM
GATE
G +1
ROOM
ONE
LENTER +
ONE
SHED
SHAD
RO0M STAIR
TOILETS
ROM S/S
RO0MS/S
S/S
ROM S/S
ROOM S G
+ 1
GROUND FLOOR + SHED
GREEN
ARE A
OPEN
AREA
ROAD
TOILETS
ROM S/S
TOILETS
ROM S/S
ROOM S G
+ 1
GROUND FL
OOR + S
HED
S H
E
D
GUARDSHAD
HINDUSTAN COCA COLA
BAVERAGES LIM
ITED
GUARDSHADAREA OPEN
BASMENT + 2 FLOOR
SHOPAREA
SHUTTER
GATE
G+1ROOM
GATE
G +1
ROOM
ONE
LENTER +
ONE
SHED
SHAD
RO0M STAIR
TOILETS
ROM S/S
RO0MS/S
S/S
ROM S/S
ROOM S G
+ 1
GROUND FLOOR + SHED
GREEN
ARE A
OPEN
AREA
ROAD
TOILETS
ROM S/S
TOILETS
ROM S/S
ROOM S G
+ 1
GROUND FL
OOR + S
HED
S H
E
D
GUARDSHAD
HINDUSTAN COCA COLA
BAVERAGES LIM
ITED
GUARDSHADAREA OPEN
BASMENT + 2 FLOOR
SHOPAREA
SHUTTER
GATE
G+1ROOM
GATE
G +1
ROOM
ONE
LENTER +
ONE
SHED
SHAD
RO0M STAIR
TOILETS
ROM S/S
RO0MS/S
S/S
ROM S/S
ROOM S G
+ 1
GROUND FLOOR + SHED
GREEN
ARE A
OPEN
AREA
ROAD
TOILETS
ROM S/S
TOILETS
ROM S/S
ROOM S G
+ 1
GROUND FL
OOR + S
HED
S H
E
D
GUARDSHAD
HINDUSTAN COCA COLA
BAVERAGES LIM
ITED
GUARDSHADAREA OPEN
BASMENT + 2 FLOOR
SHOPAREA
SHUTTER
GATE
G+1ROOM
GATE
G +1
ROOM
ONE
LENTER +
ONE
SHED
SHAD
RO0M STAIR
TOILETS
ROM S/S
RO0MS/S
S/S
ROM S/S
ROOM S G
+ 1
GROUND FLOOR + SHED
GREEN
ARE A
OPEN
AREA
ROAD
TOILETS
ROM S/S
TOILETS
ROM S/S
ROOM S G
+ 1
GROUND FL
OOR + S
HED
S H
E
D
GUARDSHAD
HINDUSTAN COCA COLA
BAVERAGES LIM
ITED
GUARDSHADAREA OPEN
BASMENT + 2 FLOOR
SHOPAREA
SHED
SHED
STORE
STORE
STORE & WORK SHOP
STORE & WORK SHOP
OFFICE BUILDING
MOTER ROOM
OPEN AREA
BASMENT + 2
ST
O
R
E &
W
O
R
K SH
O
P
OPEN AREA
FOOTPATH
RO
OM
SHED
OFFICE
SHED
PLINTH
RA
MP
BUILDING
WE
LL
FOOTPATH
GATE
SHUTTER
G +1
ROOM
G+1ROOM
GATE
ONE
LENTER +
ONE
SHED
SHAD
RO0M STAIR
TOILETS
ROM S/S
RO0M
S/S
S/S
ROM S/S
ROOM S G
+ 1
GROUND FLOOR + SHED
GREEN
ARE A
OPEN
AREA
TOILETS
ROM S/S
ROAD
TOILETS
ROM S/S
ROOM S G
+ 1
GROUND FL
OOR + S
HED
S H
E
D
GUARDSHAD
HINDUSTAN COCA COLA
BAVERAGES LIM
ITED
GUARDSHADAREA OPEN
P
A
R
K
MOTER ROOM
GENARTER
OPEN AREA
ROOM
BASMENT + 2 FLOOR
ROOM
ROOM
ROOMROOM
S/S
STORE
S/S
S/S
OPEN AREA
OPEN AREA
STORE
BASMENT + 2
STORE
TOILET
STORE & W
ORK SHOPST
O
R
E &
W
O
R
K SH
O
PST
OR
E &
W
OR
K SH
OP
W
AL
L
&
SH
ED
S
/S
W
AL
L &
SH
ED
S
/S
STORE & WORK SHOP
OPEN AREA
OPEN AREA STORE & WORK SHOP
WALL & SHED G/ 1
OPEN AREA
STORE & PAINTING WORK SHOP
WALL & SHED G/ 1
STORE & W
ORK SHOP
G
+
3
OFFICE AREA G+1
OFFICE AREA G+1
SHOPAREA
G
+
1
S/S
BUILDING
U/G CHAMBER
ROOM
S
H
O
P
ADD. BOARD
SHO
P
HUT
TOP LVL= 8.877
TOP LVL= 9.614
WOLKING LVL= 9.614
TOP LVL= 9.704
WOLKING LVL= 6.473
WALK WAY ROOF ELV.225.547
WALK WAY ELV.223.361
WALK WAY ROOF ELV.225.886
WALK WAY ELV.223.026
B
O
U
N
D
A
R
Y
W
A
LL
BOUN
DARY
WAL
L
EP
EP
EP
EP EP
FOOTPATH
FOOTPATH HIGH MAST
BOUNDARY WALL
BOUNDARY WALL
BOUNDARY W
ALL
FOOTPATH
SHED
NS
IC
C
OM
PLE
X
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
BOUNDARY WALL
LB
FOOTPATH
BOUNDARY W
ALL
O
K
H
L
A
P
H
-
I
I
I
C
h
:
2
5
4
6
2
.
2
0
5
4
.1
0
0
P
-1
5
P
-0
3
P
-0
4
P
-1
4
P
-1
7
P
-1
6
P
-0
2
P
-1
0
P
-1
1
P
-1
2
P
-1
3
P
-0
8
BOTANICAL GARDEN
JANAKPURI
2
5
9
0
0
PVC25722.500
C
P
-0
7
C
P
-0
6
D
M
R
C
E
L
E
V
A
T
E
D
L
I
N
E
R
6
.0
0
R
6
.0
0
6.60
6.60
0.50
0.50
9.90 9.90
R
6
.
0
0
R
6
.0
0
9.90
0.60
9.90
MUZ 3.15MNMV 2.8M FOOTPATH 3.6M
DEAD ZONE 1.0M
MOTORIZED LANE 20.2M
MEDIAN
ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW
ROW
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW ROW ROW
ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
R15.0
0
R
1
5
.
0
0
R
15.0
0
R
1
5
.0
0
R
1
5
.
0
0
R
6.0
0
R
6
.0
0
R
6
.
0
0
R
6
.0
0
6.60
6.60
L
A
N
D
S
C
A
P
E
B
U
F
F
E
R
BU
S STO
P
BU
S STO
P
R
2
2
.5
6
m
R 20.00
N
A
T
I
O
N
A
L
S
M
A
L
L
I
N
D
U
S
T
R
I
E
S
C
O
R
P
O
R
A
T
I
O
N
E
N
D
O
F
U
N
D
E
R
G
R
O
U
N
D
R
A
M
P
/
C
O
N
T
R
A
C
T
E
N
D
B
O
U
N
D
A
R
Y
C
H
:
2
5
2
4
1
.
6
6
(
C
E
N
T
R
E
L
I
N
E
)
X
=
1
8
7
0
0
.
3
0
4
Y
=
-
1
7
1
4
.
5
9
7
R
.O
.W
4
5
.0
0
F
O
O
T
O
V
E
R
B
R
ID
G
E
R.O.W 45.00
U
P
>
>
<
<
U
P
D
N
>
>
<
<
D
N
PETROL PUMP
BHARAT
FILLING POINT
FILLING POINT
FILLING POINT FILLING POINT
FILLING POINT
PETROL PUMP
FILLING POINT
FOOTPATH
CH
-5000 m
CH
-6000 m
C
H
-
3
0
0
0
m
C
H
-
2
0
0
0
m
C
H
-
1
0
0
0
m
JBJB
JBJBJB
JB
JB
JB
JB
JB
JB
JB
JB JB
JB
JBJBJB
JBJBJB
JB
JB JB
JB
JB
JB
JB
JBJB
JBJBJB
JB
JB
JB
JB
JB
JB
JB
JB JB
JB
JBJBJB
JBJBJB
JB
JB JB
JB
JB
JB
JB
G+3
S-9
G+1
S-11
G+2
S-13
G+2
S-15
G+3
S-17
G+3
S-19
G+1
S-21
G+1
S-23
G+3
S-25
B+4
S-27
G+3
S-29
G+1
S-31
G+3
S-33
G+3
S-35
G+1
S-37
G+3
S-39
G+3
S-39 A
B+4
S-41
B+4
S-214
G+1
N-84
G+3
N-86
G+3
N-88
G+3
N-90
G+2
N-92
G+3
N-94
G+1
N-96
G+1
N-98
G+1
N-100
G+1
N-102
G+3
N-104
G+1
N-106
G+3
N-108
B+3
S-212
B+3
S-210
TO
CO
LO
NY
RO
AD
ROAD
SE
RV
ICE
RO
AD
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATHFOOTPATH
FOOTPATH
FOOTPATH
HUTHUT
HUT
GOVT. BOY & GIRLS SECONDARY SCHOOL
MEDIAN
MEDIAN
MEDIAN
MEDIAN
MEDIAN
MEDIAN
MOTHER DAIRY
BUS STOP
LANE LANE
TO
MA
LV
IYA
NA
GA
R
B-30
BLD E3
G+3
H
U
T
GE
NE
RA
L ST
OR
E
SA
FA
L ST
OR
E
SH
OP
MO
TH
ER
DA
IRY
TO
PA
NC
HS
HE
EL C
OLO
NY
SH
OP
PIN
G C
EN
TR
E
S-217
G+3
S-215
G+1 S-221
G+3 S-227
G+2 S-229
G+2
S-231
G+3
S-233
G+3
S-219
G+1
S-287
G+2
S-292
G+1
G+4G+4
S-287
G+2
S-288
G+1
TO
CO
LON
Y R
OA
D
S-343
G+1
S-345
S/S
S-349
S/S
U
/C
G+3
G+3
HDFC BANK
RESIDENCE ASMAL LUXURY
HOTEL G+4
S-339
G+1
S-341
G+3
S-343
G+1
MA
X E
YE
CA
RE
G+2
S-349
S/S
LAN
E
G+3
S-361G+3
S-369A
G+4
S-351,UNDER
TO
CO
LON
Y R
OA
D
CONS.
TOILET
SHOP
TO
DA
YA
LB
AG
H S
WA
MI N
AG
AR
DUSTBIN
SHED
MCD
F
LA
T
G+
3
MCD
F
LA
T
G+
3
S/
S
S/S
HUT
S/S
S/
S
SHED
FO
OT
PA
TH
FOOTPATH
FOOTPATH
SOCIETY
FLATS
G+2
TE
XI S
TA
ND
G+3
D.P BANSAL
BU
ILT
-UP
AR
EA
RESIDENCE
G+1
B-60
G+1
B-59
G+3
B-58
B-4
B-57
S/S
B-56
G+2
B-55
OP
EN
LA
ND
B-5
4G+2
B-53
S/S
B-52
B+4
B-51
B+4
B-50
S/S
B-49
B+4
B-48
B+1
B-47
B+3
B-46
G+2
B-45
G+2
B-44
B+3
B-43
THE HAVEN
G+3
G+1
B-39
G+1
B-38
G+3
B-37
G+3
B-36
B-40
B-42
B+4
B-41
BUILDING
G+3
BUILDING
P
A
R
K
GATE
SERVICE ROAD
GA
TE
GA
TE
GATEGATEGATE
PANCHSHILA FLYOVER
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
FO
OT
PA
TH
FO
OT
PA
TH
FO
O
TP
AT
H
FO
OTP
ATH
SERVICE ROAD
GATE GATE GATE
GATE GATE GATEGATE GATE GATE
GATE
GATE
GATE
GATE GATE GATE GATE
GA
TE
GATE
GATE GATE GATE GATE GATE GATE GATE
GATE
GATE GATE GATE GATE GATEGATE GATE
GA
TE
GA
TE
GATE GATE GATE GATE GATE GATE GATE
GATE
GATE
GATE
GA
TE G
AT
E
GATE GATE GATE GATE GATE
GA
TE
GA
TE
GATE GATE
GA
TE
GA
TE
GATE GATE GATE GATE GATE GATE
GA
TE
GA
TE
GA
TE
GA
TE
GATE
G
A
T
E
GATE
GATE
GATE GATE GATE GATEGATE
GATE GATE GATE GATE GATE GATE GATE GATEGATE
SUB-WAY
J-BOX
J-BOX
J-BOX J-BOX
J-BOX
J
-B
O
X
FO
OT
PA
TH
B
O
R
E
J
-B
O
XF
O
O
T
P
A
T
H
SERVICE ROAD SERVICE ROAD SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
J-BOX
IGL GAS LINE
TO NEHRU PLACE
OUTER RING ROAD
OUTER RING ROAD
GA
TE
GATE
TO
S
IW
ALIK
E
NC
LA
VE
G
A
T
E
DUSTBIN
J-B
HU
T
J-B
OX
GA
TE
ELECTRIC LINE
S O A M I N A G A R
S A D H N A E N C L A V E
JBJB
JBJBJB
JB
JB
JB
JB
JB
JB
JB
JB JB
JB
JBJBJB
JBJBJB
JB
JB JB
JB
JB
JB
JB
G+3
S-9
G+1
S-11
G+2
S-13
G+2
S-15
G+3
S-17
G+3
S-19
G+1
S-21
G+1
S-23
G+3
S-25
B+4
S-27
G+3
S-29
G+1
S-31
G+3
S-33
G+3
S-35
G+1
S-37
G+3
S-39
G+3
S-39 A
B+4
S-41
B+4
S-214
G+1
N-84
G+3
N-86
G+3
N-88
G+3
N-90
G+2
N-92
G+3
N-94
G+1
N-96
G+1
N-98
G+1
N-100
G+1
N-102
G+3
N-104
G+1
N-106
G+3
N-108
B+3
S-212
B+3
S-210
TO
CO
LO
NY
RO
AD
ROAD
SE
RV
ICE
RO
AD
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATHFOOTPATH
FOOTPATH
FOOTPATH
IGL
IGL IGL
IGL
IGLIGL
IGL
IGL
BH
DB
HUTHUT
HUT
GOVT. BOY & GIRLS SECONDARY SCHOOL
EP
EP
EP
ELECTRIC LINE
MEDIAN
MEDIAN
MEDIAN
MEDIAN MEDIAN
MEDIAN
MOTHER DAIRY
LANE LANE
TO
MA
LV
IYA
NA
GA
R
EP EP EPEP
B-30
BLD E3
G+3
H
U
T
GE
NE
RA
L ST
OR
E
SA
FA
L ST
OR
E
SH
OP
MO
TH
ER
DA
IRY
TO
PA
NC
HS
HE
EL C
OLO
NY
SH
OP
PIN
G C
EN
TR
E
S-217
G+3
S-215
G+1 S-221
G+3 S-227
G+2 S-229
G+2
S-231
G+3
S-233
G+3
S-219
G+1
S-287
G+2
S-292
G+1
G+4G+4
S-287
G+2
S-288
G+1
TO
CO
LON
Y R
OA
D
S-343
G+1
S-345
S/S
S-349
S/S
U
/C
G+3
G+3
HDFC BANK
RESIDENCE ASMAL LUXURY
HOTEL G+4
S-339
G+1
S-341
G+3
S-343
G+1
MA
X E
YE
CA
RE
G+2
S-349
S/S
LAN
E
G+3
S-361G+3
S-369A
G+4
S-351,UNDER
TO
CO
LON
Y R
OA
D
CONS.
TOILET
BU
ILD
ING
SHOP
TO
DA
YA
LB
AG
H S
WA
MI N
AG
AR
DUSTBIN
SHED
MCD
F
LA
T
G+
3
MCD
F
LA
T
G+
3
S/
S
S/S
HUT
S/S
S/
S
SHED
FO
OT
PA
TH
FOOTPATH
SOCIETY
FLATS
G+2
TE
XI S
TA
ND
G+3
D.P BANSAL
BU
ILT
-UP
AR
EA
RESIDENCE
G+1
B-60
G+1
B-59
G+3
B-58
B-4
B-57
S/S
B-56
G+2
B-55
OP
EN
LA
ND
B-5
4G+2
B-53
S/S
B-52
B+4
B-51
B+4
B-50
S/S
B-49
B+4
B-48
B+1
B-47
B+3
B-46
G+2
B-45
G+2
B-44
B+3
B-43
THE HAVEN
G+3
G+1
B-39
G+1
B-38
G+3
B-37
G+3
B-36
B-40
B-42
B+4
B-41
BUILDING
G+3
BUILDING
P
A
R
K
EP EP EP EP EP EP EP EP EP EP
EP
EP EP
EP
EP EP
GATE
EP
EPEPEPEPEPEPEPEP
SERVICE ROAD
GA
TE
GA
TE
GATEGATEGATE
PANCHSHILA FLYOVER
EP
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
EP
EP
EP EP EP EPEP
EP
EP
EP
EP
EP
EP EP EP EP EP
EP
EP EP
EP
EP
EP EP EP EP EP
EP
EP
EP
EP
EP
FO
OT
PA
TH
FO
OT
PA
TH
FO
O
TP
AT
H
FO
OTP
ATH
SERVICE ROAD
GATE GATE GATE
GATE GATE GATEGATE GATE GATE
GATE
GATE
GATE
GATE GATE GATE GATE
GA
TE
GATE
GATE GATE GATE GATE GATE GATE GATE GATE
GATE
GATE GATE GATE GATE GATEGATE GATE
GA
TE
GA
TE
GATE GATE GATE GATE GATE GATE GATE
GATE
GATE
GATE
GA
TE G
AT
E
GA
TE
GATE GATE GATE GATE GATE
GA
TE
GA
TE
GATE GATE
GA
TE
GA
TE
GATE GATE GATE GATE GATE GATE
GATE
GA
TE
GA
TE
GA
TE
GA
TE
GATE
G
A
T
E
GATE
GATE
GATE GATE GATE GATEGATE
GATE GATE GATE GATE GATE GATE GATE GATEGATE
SUB-WAY
J-BOX
J-BOX
J-BOX J-BOX
J-BOX
J
-B
O
X
FO
OT
PA
TH
B
O
R
E
J
-B
O
XF
O
O
T
P
A
T
H
SERVICE ROAD SERVICE ROAD SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
J-BOX
SP
SP
SP
IGL
IGL
IGL
IGL
IGL
IGL
IGL
IGL
IGL
IGL
IGL
IGL GAS GAS GAS GAS GAS GAS GAS GAS
IGL GAS LINE
TO NEHRU PLACE
OUTER RING ROAD
GA
TE
GATE
TO
S
IW
ALIK
E
NC
LA
VE
EP
G
A
T
E
DUSTBIN
J-B
HU
T
GA
TE
J-B
OX
S O A M I N A G A R
ELECTRIC LINE
S A D H N A E N C L A V E
GATE
11
.1
2
E
X
IS
T
IN
G
F
L
Y
O
V
E
R
E
X
IS
T
IN
G
F
L
Y
O
V
E
R
O
U
T
E
R
R
IN
G
R
O
A
D
1
.2
9
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-LIN
E
ELE
CT
RIC
LIN
E
ELECTRIC
-L
IN
E
ELECTRIC
-LIN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-LIN
E
ELECTRIC
-L
IN
E
ELECTRIC
-LIN
E
ELECTRIC
-LIN
E
ELECTRIC-LINE
ELECTRIC
-LIN
E
ELECTRIC
-LIN
E
ELECTRIC
-LIN
E
ELECTRIC
-L
IN
E
ELECTRIC
-LIN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
E
L
E
C
T
R
IC
-L
IN
E
ELECTRIC LINE ELECTRIC LINEELECTRIC LINEELECTRIC LINEELECTRIC LINE
IGL
IGL
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GASGAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS
ELECTRIC LINE ELECTRIC LINE
ELE
CT
RIC
LIN
E
E
L
E
C
T
R
IC
L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
ELECTRIC
-L
IN
E
E
L
E
C
T
R
IC
-L
IN
E
DRAIN
DRAIN
ELECTRIC LINE
ELECTRIC LINE
E
P
EP
EPEP
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
EP
EP
EP
EP EP
EP
DRAIN
DRAIN
DRAIN
DRAIN
DRAIN
DRAIN
D
R
A
IN
D
R
A
IN
DR
AIN
D
R
A
IN
DR
AIN
D
R
A
IN
D
R
A
IN
ELECTRIC
-LIN
E
ELECTRIC
-LIN
E
ELECTRIC
-LIN
E
ELECTRIC
-L
IN
E
ELECTRIC-LINE
E
LE
C
T
R
IC
LIN
E
ELECTRIC LINE
EP
34.68
EP EP EP EP EP EP EP EP EP EP EPEP EP
EPEP EPEP
EP EP EP EP
EP EP EP EP EP EP EP EP
EP EP EP EP
EP EP EP
EP
EP
EP EP EP EP EP
EP EP EP EP EP EP EP EP EP EP EP EP EP
EP EP
EP EP EP EP EP EP EP EP
EP EP EP EP EP
EP
EP
EP
EP
EP
EP
EP
EP EP
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
EP
EP
EP
EP
EP
EP EP EP EP EP
EP EP EP EP
EP
EP
EP
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
EP
E
P
E
P
EP
EP
EP
EP
EP
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
E
P
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
DRAIN
DRAIN
DRAIN
DRAIN
DRAIN
DRAIN
DRAIN
DRAIN
L-3
c
r
e
a
t
e
r
k
a
i
l
a
s
h
r
o
a
d
c
h
i
t
t
e
r
a
n
j
a
n
p
a
r
k
r
o
a
d
m
a
a
n
a
n
d
m
a
y
e
e
m
a
r
g
l
o
t
u
s
t
e
m
p
l
e
r
o
a
d
n
e
h
ru
p
la
c
e
m
a
rk
e
t ro
a
d
l
a
l
a
l
a
j
p
a
t
r
a
i
r
o
a
d
h
a
n
s
r
a
j
s
e
t
h
m
a
r
g
c
r
p
a
r
k
m
a
i
n
r
o
a
d
c
r
e
a
t
e
r
k
a
i
l
a
s
h
r
a
o
d
e
p
d
p
r
o
a
d
lal bahadur shastri m
arg
lal bahadur shastri m
arg
maharishi dayanand m
arg
s
h
iv
a
lik
ro
a
d
Aug
ust k
arn
ti marg
SR
I KR
ISH
NA
CH
AIT
AN
YA
MA
HA
PR
AB
HU
MA
RG
n
e
h
ru
p
la
c
e
ro
a
d
s
h
y
a
m
s
u
n
d
e
r m
a
lh
o
tra
m
a
rg
h
d
fc
b
a
n
k
trito
n
h
o
s
p
ite
l
h
d
fc
b
a
n
k
fa
b
h
o
te
l b
ro
a
d
w
a
y
p
ia
g
g
io
v
e
h
ic
le
s
p
v
t
g
o
v
e
rn
m
e
n
t g
irl s
c
h
o
o
;
g
o
v
e
rn
m
e
n
t g
irl s
c
h
o
o
;
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
GAS GAS GAS GAS GASGAS
GA
S
GASGAS
GAS GAS GAS GAS GAS GAS
SEW
ER LIN
E
SEW
ER LIN
E
SEW
ER LIN
E
SEW
ER LIN
E
SEW
ER LIN
E
SEW
ER L
IN
E
SEW
ER L
IN
E
SEWER LIN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
SEW
ER LIN
E
SE
WE
R L
INE
SE
WE
R L
INE
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
SEWER LINE
SEWER LINE
SEWER LINE
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER LIN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER LIN
E
W
ATER LIN
E
WATER LINE
WATER LINE
W
A
T
E
R
L
IN
E
W
ATER
L
IN
E
W
A
TE
R
L
IN
E
WATER LINEWATER LINE
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER LIN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
WA
TE
R L
INE
WATER LINE
WATER LINE
WATER LINE
WATER LINE
WATER LINE
W
A
TE
R
LIN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
ATER LIN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
ATER LIN
E
W
ATER LIN
E
W
ATER L
IN
E
W
ATER L
IN
E
WATER LINE
WATER LINE
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
LIN
E
W
A
T
E
R
LIN
E
W
A
T
E
R
LIN
E
W
A
T
E
R
LIN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
EW
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
LIN
E
W
A
T
E
R
L
IN
E
W
A
T
E
R
LIN
E
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
W
A
T
E
R
L
IN
E
W
A
T
E
R
L
IN
E
W
ATER L
IN
E
W
ATER LIN
E
W
ATER LIN
E
W
A
T
E
R
L
IN
E
WATER LIN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER L
IN
E
W
ATER LIN
E
W
ATER L
IN
E
W
ATER L
IN
E
M
TNL
MTNL
M
TNL
M
TNL
M
TNL
M
TNL
M
TNL
M
TNL
M
TNL
MTNL
M
TNL
M
TNL
MTNL
MTNL
M
TNL
M
TNL
MTNL
M
TNL
M
TNL
M
T
N
L
M
T
N
L
M
T
N
L
SEW
ER LIN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
S
E
W
E
R
L
IN
E
M.T.N.L
M.T.N.L
M.T
.M.L
M.T
.M.L
M.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.LM.T.N.L M.T.N.L
M.T.N.L
M.T.N.L
M.T.N.L M.T.N.L
M.T.N.L
M.T
.N.L
M.T
.N.L
2
0
0
M
M
W
A
T
E
R
L
I
N
E
1
0
0
M
M
W
A
T
E
R
L
I
N
E
1
0
0
M
M
W
A
T
E
R
L
I
N
E
1
0
0
M
M
W
A
T
E
R
L
IN
E
2
0
0
M
M
W
A
T
E
R
L
IN
E
9
0
0
M
M
W
A
T
E
R
L
IN
E
1
5
0
M
M
W
A
T
E
R
L
IN
E
2
5
0
M
M
S
E
W
E
R
L
IN
E
2
5
0
M
M
S
E
W
E
R
L
IN
E
4
5
0
M
M
W
A
T
E
R
L
IN
E
4
5
0
M
M
W
A
T
E
R
L
IN
E
4
5
0
M
M
W
A
T
E
R
L
IN
E
4
5
0
M
M
W
A
T
E
R
L
IN
E
S
E
W
E
R
L
I
N
E
1
5
0
M
MM
A
N
4
5
0
M
M
W
A
T
E
R
L
I
N
E
4
5
0
M
M
W
A
T
E
R
L
I
N
E
1
5
0
M
M
W
A
T
E
R
L
I
N
E
600 M
M
W
ATER LINE
4
5
0
M
M
W
A
T
E
R
L
IN
E
3
0
0
M
M
S
E
W
E
R
L
IN
E
1
5
0
M
M
W
A
T
E
R
L
I
N
E
M
A
IN
3
0
0
W
A
T
E
R
L
IN
E
4
5
0
M
M
W
A
T
E
R
L
IN
E
5
0
0
M
M
S
E
W
E
R
L
IN
E
3
0
0
M
M
S
E
W
E
R
L
IN
E
4
5
0
M
M
S
E
W
E
R
L
IN
E
3
0
0
M
M
S
E
W
E
R
L
IN
E
C
A
P
T
A
I
N
G
A
U
R
M
A
R
G
I
N
T
E
R
S
E
C
T
I
O
N
S
A
V
I
T
R
I
C
I
N
E
M
A
I
N
T
E
R
S
E
C
T
I
O
N
TABLE TOP
TABLE TOP
3.3 M WIDE FOOTPATH
3.3 M WIDE FOOTPATH
S T
O
P
OUTER RING ROAD
MALVIYA NAGAR
INTERSECTION
<< UP
R.O.W - 45.00
R.O.W - 45.00
9.0
0
9.0
0
PROPOSED FLYOVER
OUTER RING ROAD
S T O P
S T
O
P
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
EXISTING FLYOVER
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
FOOTPATH
BUS STOP
FOOTPATH
FOOTPATH
15.00
FOOTPATH
LANDSCAPE BUFFER
Service Road
Service Road
Service Road
ROW 45.00
Govt. senior secondary school
PETROL PUMP
PETROL PUMP
BHARAT
FILLING POINT
INDIAN OIL
FILLING POINT
FILLING POINT
FILLING POINT
FILLING POINT
FILLING POINT
PETROL PUMP
FILLING POINT
NALA
10
.5
0
FOOTPATH
DMRC TUNNEL
MA
HA
RIS
HI D
AY
AN
AN
D M
AR
G
32.00
9.0
0
C'
C
FOOTPATH & DRAINFOOTPATH & DRAIN
PANCHSHEEL PARK
METRO STATION
PANCHSHEEL PARK
METRO STATION
ROW 45.00M (AS PER ZONAL
DEVELOPMENT PLAN ZONE-F)
ROW 45.00M (AS PER ZONAL
DEVELOPMENT PLAN ZONE-F)
COMBODIA
PANCHSHIL
ENCLAVE
A
M
A
R
JA
Y
A
N
T
I
DR
AIN
CH
-6000 m
CH
-5000 m
PROPOSED FLYOVER
<< DN
9.0
0
9.0
0
UP >>
DN >>
<<UP
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
SERVICE ROAD
3.00
7.00
3.0
0
7.5
0
10CM SOLID
BARRIER LINE
10CM SOLID
BARRIER LINE
C.P.M. F-2, PWDE.E. F-31, PWD
Craphts Consultant
(I) Pvt. Ltd.
CRASH BARRIER
L
C
PROPOSED SECTION - C - C'
PROPOSED FLYOVER
CRASH BARRIER
MEDIAN 0.50
SLOPE 2.5% SLOPE 2.5%
0.50
PROPOSED FLYOVER
TO I.I.T
è
TO I.I.T
è
TO- MODI MILLè
TO- MODI MILLè
5.80
2.9011.0011.002.805.70
Service Road FootpathCarriageway
FootpathCarriageway
Service Road
Median
Boundary w
all
Boundary w
all
40.20
EXISTING CROSS SECTION- C - C'
1.00
C
L
ROW - 45.00
Surface level Road
1.90 10.50
1.90
9.009.00 10.50
1.90
FootpathSurface level RoadFootpath
ROW - 45.00M
2. STRUCTURAL DESIGNING FOR THE PROPOSED FLYOVER HAS TO BE DONE ININTEGRATION WITH STRUCTURAL ARRANGEMENT OF PANCHSHEEL METRO STATION
1. ALL DIMENSIONS ARE IN METERS UNLESS MENTIONED OTHERWISE.
A P P R O V A L O F U T T I P E C
The 64th meeting of the UTTIPEC working group ll-B was held under the chairmanship of pr.Secretary, PDW on20.06.2017
OBSERVATIONS :
The above objection / suggestion were presented by PWD, GNCTD, in the Working Group-II-B meeting and theobservations are as follows:
i). The flyover at Malviya Nagar intersection has been proposed to provide signal free movement for the traffic movingstraight on Outer Ring Road.Once the proposed flyover is in place the intersection will be signalized to allow the rightturns for the traffic coming from Malviya Nagar side and moving towards Chirag Delhi as well as the traffic turning rightfrom IIT side to Malvya Nagar side alongwith signalized pedestrian crossing. It is also understood that there will besignificant increase in traffic volume (especially the local traffic comprising of feeder services) around this intersectiononc Panchsheel Park Metro station becomes operational. The provision of flyover at this intersection will significantlyreduce the congestion at lower level as the majority of straight moving traffic will be catered by the proposed flyover.
ii). The distance between the Chirag Delhi intersection and Malviya Nagar Intersection is 1186m while the distancebetween Khel Gaon Marg Intersection and Malviya Nagar Intersection is 1085 m meaning thereby that Malviya NagarIntersection is placed almost centrally between these two. It is to be noted that the distance between the toe of existingChirag Delhi flyover and the toe of the proposed flyover would be 540 m whereas the distance between the toe of existingPanchsheel Flyover and proposed flyover at Malviya Nagar would be 485 m meaning thereby the weaving lengths oneither end of proposed flyover will be adequate as per the codal provision.
iii). The assumption of reduction in width of carriageway from existing 12 m to 9 m on Outer Ring Road as stated inobjection/suggestion is not correct. In fact 9 + 9 m carriageway on flyover would take care of the traffic moving straightacross the intersection on Outer Road as uninterrupted movement. At surface level, 9 m and 10.5 m widths ofcarriageways have been proposed towards southern and northern side of proposed flyover respectively which will takecare of the turning traffic at the intersection.
iv). The entry to / exit from the petrol pumps existing on either side of Oute Ring Road near Malviya Nagar intersectionhas been proposed through the surface level road proposed on either side of flyover and therefore, access to the petrolpumps are not affected with the provision of the flyover.
v). Closure of median at Malviya Nagar intersection after completion of DMRC work around this place would warrantdetour of approximately 2 km (both ways) for both the right turning traffic at Malviya Nagar intersection. This would alsocontinue to load both the carriageways of Outer Ring Road between Panchsheel and Chirag Delhi flyovers, which is notdesirable from the point of view of level of service and high economic cost. Present closure of median is only temporaryfeature to regulate the traffic in view of ongoing DMRC work.
RECOMMENDATION :
Based on the above observation Working Group recommended the proposal for consideration of the Governing Body.
Presented in the 54th UTTIPEC Governing Body meeting, held on 22.06 2017 at underthe chairmanship of the hon'ble Lt. Governor of Delhi.
DECISION OF THE GOVERNING BODY:
The proposal was approved.
NOTE:
MINUTES OF 64th WORKING GROUP II-B MEETING : MINUTES OF 54th GOVERNING BODY MEETING :MINUTES OF 62nd WORKING GROUP II-B MEETING :Minutes of the 62nd meeting of the UTTIPEC Working Group II-B (Retrofitting ofExisting Corridor), held under the Chairmanship of Secretary, PWD, on Wednesday,03.05.2017 at 11.00 AM. in the Conference Room of Secretary, PWD, 5th level, 'B'Wing, Delhi Secretariat, New Delhi.
i). It was observed that between the existing Chirag Delhi and Savitri Cinema flyover(Northern side) near LPG gas godown, there is a reduction of carriageway lanes,which is creating bottleneck leading to severe traffic congestion. It was decidedthat PWD, GNCTD will take up widening in consultation with other Stakeholdersfor smooth flow of traffic.
OBSERVATIONS :
ii). The approved multi modal integration of Greater Kailash and Panchsheel Park metrostations needs may be integrated with this project.
iii). The doubling of Sarai Kale Khan grade separator will be integrated with NHAI'sproposal of NH-24- Ring road 'T'-junction.
iv). PWD, GNCTD in consultation with Delhi Traffic Police will make suitable provisionof traffic signal phasing and signages to ensure optimum utilization of grade separatorsfor smooth flow of traffic which should be submitted to UTTIPEC.
v). PWD, GNCTD to take necessary clearances from the land owning agencies andstakeholders for the proposed widening, wherever required.
vi). Representatives of Delhi Traffic Police (SR) and DMRC agreed with the proposals.
RECOMMENDATION :
Based on the above observations, Working Group recommended the proposal of aboveall four intersection for uploading on UTTIPEC website for community feedback andaccordingly for consideration and approval of Governing Body.
Dy. Director (Plg.)
UTTIPEC
Asstt. Director (Plg.)
UTTIPEC
Sr. Consultant (T)
UTTIPEC
1. Approval of Governing Body is for Transportation and Circulation plan only.
2. This is the conceptual drawing and detailed engineering design, is to be evaluated byRoad Owning Agency.
3. Structural engineering safety/ road geometric features are strictly to be followed bythe implementing agency as per the Bureau of Standards (BIS)/ Indian Road Congress(IRC) and any other statutory codes.
4. UTTIPEC's Street Design Guidelines approved by the Hon'ble L.G. on 25.11.2010 tobe followed by the Executing/ Implementing agencies.
5. Acquisition of land for Implementation of project shall be the, responsibility ofExecuting/ Implementing agencies.
6. The necessary permission for cutting of trees and rainwater harvesting etc. shall beobtained by the executing/ Implementing agencies from concerned deptt. as per theprevailing policy.
7. All required statutory clearances are to be obtained by the executing/ implementingagencies.
8. Drawings for the construction are to be prepared by the Road Owning Agency.
9. Signages and road marking should be as per IRC Code .
10. Road safety audit to be prepared by road owning agency as per the standard guidlines.
UPPER LEVEL PLAN
LOWER LEVEL PLAN
KEY PLANSTUDY STRETCH
PROPOSED CONCEPTUAL TRAFFIC CIRCULATION PLAN( MALVIYA NAGAR INTERSECTION TO PANCHSHEEL FLYOVER)
Prepared On :
30 / 10 /2017
Managing Director
REMARKAS PERDATESL NO
CLIENT:
PROJECT:
THIS DRAWING IS A PROPERTY OF THECRAPHTS CONSULTANTS ( I ) PVT. LTD. ANDMUST NOT BE COPIED OR REPRODUCED IN ANY FORM
Checked By : P. ALAMDRAWN BY
M. Arafat
CRAPHTS
TITLE:
CONSULTANTS:
DRG NO -
CRTS / PWD / ORR / LP / 200-F
SCALE -
1:1000
P . W . D . GOVT. OF DELHI
CRAPHTS CONSULTANTS (I) PVT. LTD.14/3, Mathura Road, Faridabad.
Ph - 91-2278813, 2275948.
INTEGRATED TRANSIT CORRIDOR DEVELOPMENT AND STREET
NETWORK/CONNECTIVITY PLAN FOR THE CORRIDOR (A) ON OUTER RING
ROAD FROM MODI MILL FLYOVER TO IIT GATE AND (B) ON RING ROAD FROM
BHAIRON MARG T JUNCTION TO DND INTERSECTION.
REVISIONS
LEGENDS
Existing Road
Tree
ROW
SYMBOL
DISCRIPTION
DMRC Line (Underground)
Drain
Proposed Road
Foot Path
Green Belt
Builtup Area
Property to be demolished
Existing Median
Existing Flyover
Proposed Flyover
Building Line
Affacted Area
Traffic Circulation
DMRC Line (Elevated)
DMRC Stations
Proposed Ramp
Existing Ramp
Lane Marking
12/05/2017 Recommendation/suggestion of Working group UTTIPEC, DDAR1
R2 Discussion with Dy.Director,UTTIPEC, DDA28/09/2017R2
11/10/2017R3 Discussion with Dy.Director,UTTIPEC, DDA
24/10/2017R4 Discussion with Sr. Consultant,UTTIPEC, DDA