upgrade heat exchangers & replace perimeter heat

6
SHEET INDEX GENERAL 1. G001 TITLE SHEET/LOCATION MAP ARCHITECTURAL 2. A001 BASEMENT PHASING PLAN 3. A002 FIRST FLOOR PHASING PLAN 4. A003 SECOND FLOOR PHASING PLAN 5. A004 THIRD FLOOR PHASING PLAN 6. A005 FIFTH AND SIXTH FLOOR PHASING PLAN 7. A100 BASEMENT WEST FLOOR PLAN 8. A101 BASEMENT EAST FLOOR PLAN 9. A102 FIRST FLOOR WEST FLOOR PLAN 10. A103 FIRST FLOOR EAST FLOOR PLAN 11. A104 SECOND FLOOR WEST FLOOR PLAN 12. A105 SECOND FLOOR EAST FLOOR PLAN 13. A106 THIRD FLOOR WEST FLOOR PLAN 14. A107 THIRD FLOOR EAST FLOOR PLAN 15. A108 FIFTH FLOOR PLAN 16. A109 SIXTH FLOOR PLAN 17. A500 ARCHITECTURAL DETAILS FIRE PROTECTION 18. FP101 PARTIAL BASEMENT AND FIFTH FLOOR FIRE PROTECTION PLANS MECHANICAL 19. M001 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS 20. M002 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS 21. MD099A SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA A 22. MD099B SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA B 23. MD099C SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA C 24. MD100A BASEMENT FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN 25. MD100B BASEMENT FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN 26. MD101A FIRST FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN 27. MD101B FIRST FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN 28. MD102A SECOND FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN 29. MD102B SECOND FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN 30. MD103A THIRD FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN 31. MD103B THIRD FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN 32. MD105A FIFTH FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN 33. MD105B FIFTH FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN 34. MD106 SIXTH FLOOR MECHANICAL STEAM DEMOLITION PLAN 35. MD200C BASEMENT FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C 36. MD203A THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A 37. MD203B THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B 38. MD203D THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA D 39. MD203E THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA E 40. MD205A FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A 41. MD205B FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B 42. MD205C FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C 43. MD206A SIXTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A 44. MP099A SUB-BASEMENT MECHANICAL PIPING PLAN AREA A 45. MP200A BASEMENT FLOOR MECHANICAL PIPING PLAN AREA A 46. MP200B BASEMENT FLOOR MECHANICAL PIPING PLAN AREA B 47. MP200C BASEMENT FLOOR MECHANICAL PIPING PLAN AREA C 48. MP200D BASEMENT FLOOR MECHANICAL PIPING PLAN AREA D 49. MP200E BASEMENT FLOOR MECHANICAL PIPING PLAN AREA E 50. MP200F BASEMENT FLOOR MECHANCIAL PIPING PLAN AREA F 51. MP201A FIRST FLOOR MECHANICAL PIPING PLAN AREA A 52. MP201B FIRST FLOOR MECHANICAL PIPING PLAN AREA B 53. MP201C FIRST FLOOR MECHANICAL PIPING PLAN AREA C 54. MP202A SECOND FLOOR MECHANICAL PIPING PLAN AREA A 55. MP202B SECOND FLOOR MECHANICAL PIPING PLAN AREA B 56. MP203A THIRD FLOOR MECHANICAL PIPING PLAN AREA A 57. MP203B THIRD FLOOR MECHANICAL PIPING PLAN AREA B 58. MP203C THIRD FLOOR MECHANICAL PIPING PLAN AREA C 59. MP203D THIRD FLOOR MECHANICAL PIPING PLAN AREA D 60. MP203E THIRD FLOOR MECHANICAL PIPING PLAN AREA E 61. MP205A FIFTH FLOOR MECHANICAL PIPING PLAN AREA A 62. MP205B FIFTH FLOOR MECHANICAL PIPING PLAN AREA B 63. MP205C FIFTH FLOOR MECHANICAL PIPING PLAN AREA C 64. MP206A SIXTH FLOOR MECHANICAL PIPING PLAN AREA A 65. MP206B SIXTH FLOOR MECHANICAL PIPING PLAN AREA B 66. MP206C SIXTH FLOOR MECHANICAL PIPING PLAN AREA C 67. MH200A PARTIAL BASEMENT MECHANICAL DUCTWORK PLAN DEMO & NEW 68. M501 MECHANICAL DETAILS 69. M502 MECHANICAL DETAILS 70. M503 MECHANICAL DETAILS 71. M601 MECHANICAL SCHEDULES 72. M602 MECHANICAL SCHEDULES 73. M603 MECHANICAL SCHEDULES 74. M701 MECHANICAL CONTROL DIAGRAMS 75. M801 HOT WATER PIPING WEST RISER DIAGRAM 76. M802 HOT WATER PIPING EAST RISER DIAGRAM 77. M803 STEAM DEMOLITION RISER DIAGRAM 78. M804 STEAM DEMOLITION RISER DIAGRAM 79. M805 STEAM DEMOLITION RISER DIAGRAM ELECTRICAL 80. E001 ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS 81. EP100 ELECTRICAL BASEMENT PLAN 82. EP110 ELECTRICAL FIRST FLOOR PLAN 83. EP130 ELECTRICAL THIRD FLOOR WEST PLAN 84. EP160 ELECTRICAL SIXTH FLOOR WEST PLAN Electrical, Mechanical, & Plumbing Engineering MEP Associates, LLC 2720 Arbor Court Eau Claire, WI 54701 715.832.5680 www.mepassocaites.com PREPARED BY: VA PROJECT NUMBER: 585-17-120 OSCAR G. JOHNSON VA MEDICAL CENTER 325 EAST H STREET IRON MOUNTAIN, MI 49801 Director Associate Director Chief of Staff Associate Director for N&PCS Infection Control Nurse Industrial Hygienist Chief of Engineering Chief of Police Patient Safety A.F.G.E. VA MEDICAL CENTER 325 EAST H STREET IRON MOUNTAIN, MI 49801 Safety MEP PROJECT NO.: G29.18.02 Project Number Building Number Drawing Number Project Title Location Issue Date Checked Drawn Drawing Title Approved: VA FORM 08 - 6231 A 3 File Path 6/14/2009 12:39:03 PM CONSTRUCTION DOCUMENTS FULLY SPRINKLERED Office of Construction and Facilities Management U.S. Department of Veterans Affairs B C D E F A B C D E F 2 1 4 5 6 7 8 9 10 Phase ARCHITECT/ENGINEER OF RECORD STAMP CONSULTANT 3 2 1 4 5 6 7 8 9 10 Project Director Revisions: Date: Dwg. of UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT 3/8/19 3/8/19

Upload: others

Post on 24-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT

SHEET INDEXGENERAL1. G001 TITLE SHEET/LOCATION MAP

ARCHITECTURAL2. A001 BASEMENT PHASING PLAN3. A002 FIRST FLOOR PHASING PLAN4. A003 SECOND FLOOR PHASING PLAN5. A004 THIRD FLOOR PHASING PLAN6. A005 FIFTH AND SIXTH FLOOR PHASING PLAN7. A100 BASEMENT WEST FLOOR PLAN8. A101 BASEMENT EAST FLOOR PLAN9. A102 FIRST FLOOR WEST FLOOR PLAN10. A103 FIRST FLOOR EAST FLOOR PLAN11. A104 SECOND FLOOR WEST FLOOR PLAN12. A105 SECOND FLOOR EAST FLOOR PLAN13. A106 THIRD FLOOR WEST FLOOR PLAN14. A107 THIRD FLOOR EAST FLOOR PLAN15. A108 FIFTH FLOOR PLAN16. A109 SIXTH FLOOR PLAN17. A500 ARCHITECTURAL DETAILS

FIRE PROTECTION18. FP101 PARTIAL BASEMENT AND FIFTH FLOOR FIRE PROTECTION PLANS

MECHANICAL19. M001 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS20. M002 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS21. MD099A SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA A22. MD099B SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA B23. MD099C SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA C24. MD100A BASEMENT FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN25. MD100B BASEMENT FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN26. MD101A FIRST FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN27. MD101B FIRST FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN28. MD102A SECOND FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN29. MD102B SECOND FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN30. MD103A THIRD FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN31. MD103B THIRD FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN32. MD105A FIFTH FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN33. MD105B FIFTH FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN34. MD106 SIXTH FLOOR MECHANICAL STEAM DEMOLITION PLAN35. MD200C BASEMENT FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C36. MD203A THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A37. MD203B THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B38. MD203D THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA D39. MD203E THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA E40. MD205A FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A41. MD205B FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B42. MD205C FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C43. MD206A SIXTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A44. MP099A SUB-BASEMENT MECHANICAL PIPING PLAN AREA A45. MP200A BASEMENT FLOOR MECHANICAL PIPING PLAN AREA A

46. MP200B BASEMENT FLOOR MECHANICAL PIPING PLAN AREA B47. MP200C BASEMENT FLOOR MECHANICAL PIPING PLAN AREA C48. MP200D BASEMENT FLOOR MECHANICAL PIPING PLAN AREA D49. MP200E BASEMENT FLOOR MECHANICAL PIPING PLAN AREA E50. MP200F BASEMENT FLOOR MECHANCIAL PIPING PLAN AREA F51. MP201A FIRST FLOOR MECHANICAL PIPING PLAN AREA A52. MP201B FIRST FLOOR MECHANICAL PIPING PLAN AREA B53. MP201C FIRST FLOOR MECHANICAL PIPING PLAN AREA C54. MP202A SECOND FLOOR MECHANICAL PIPING PLAN AREA A55. MP202B SECOND FLOOR MECHANICAL PIPING PLAN AREA B56. MP203A THIRD FLOOR MECHANICAL PIPING PLAN AREA A57. MP203B THIRD FLOOR MECHANICAL PIPING PLAN AREA B58. MP203C THIRD FLOOR MECHANICAL PIPING PLAN AREA C59. MP203D THIRD FLOOR MECHANICAL PIPING PLAN AREA D60. MP203E THIRD FLOOR MECHANICAL PIPING PLAN AREA E61. MP205A FIFTH FLOOR MECHANICAL PIPING PLAN AREA A62. MP205B FIFTH FLOOR MECHANICAL PIPING PLAN AREA B63. MP205C FIFTH FLOOR MECHANICAL PIPING PLAN AREA C64. MP206A SIXTH FLOOR MECHANICAL PIPING PLAN AREA A65. MP206B SIXTH FLOOR MECHANICAL PIPING PLAN AREA B66. MP206C SIXTH FLOOR MECHANICAL PIPING PLAN AREA C67. MH200A PARTIAL BASEMENT MECHANICAL DUCTWORK PLAN DEMO & NEW68. M501 MECHANICAL DETAILS69. M502 MECHANICAL DETAILS70. M503 MECHANICAL DETAILS71. M601 MECHANICAL SCHEDULES72. M602 MECHANICAL SCHEDULES73. M603 MECHANICAL SCHEDULES74. M701 MECHANICAL CONTROL DIAGRAMS75. M801 HOT WATER PIPING WEST RISER DIAGRAM76. M802 HOT WATER PIPING EAST RISER DIAGRAM77. M803 STEAM DEMOLITION RISER DIAGRAM78. M804 STEAM DEMOLITION RISER DIAGRAM79. M805 STEAM DEMOLITION RISER DIAGRAM

ELECTRICAL80. E001 ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS81. EP100 ELECTRICAL BASEMENT PLAN82. EP110 ELECTRICAL FIRST FLOOR PLAN83. EP130 ELECTRICAL THIRD FLOOR WEST PLAN84. EP160 ELECTRICAL SIXTH FLOOR WEST PLAN

Electrical, Mechanical, & Plumbing EngineeringMEP Associates, LLC2720 Arbor CourtEau Claire, WI 54701715.832.5680www.mepassocaites.com

PREPARED BY:

VA PROJECT NUMBER: 585-17-120OSCAR G. JOHNSON VA MEDICAL CENTER325 EAST H STREETIRON MOUNTAIN, MI 49801

Director

Associate Director

Chief of Staff

Associate Director for N&PCS

Infection Control Nurse

Industrial Hygienist

Chief of Engineering

Chief of Police

Patient Safety

A.F.G.E.

VA MEDICAL CENTER325 EAST H STREET

IRON MOUNTAIN, MI 49801Safety

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

3

File P

ath

6/14/2009 12:39:03 P

M

CONSTRUCTIONDOCUMENTS

FULLY SPRINKLERED

Office ofConstructionand FacilitiesManagement

U.S. Department

of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT

3/8/19

3/8/19

Page 2: UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT

1. Not used.

WES

T A1

00

EAST

A10

1

WES

T A1

00

EAST

A10

1

1. Basement floor project area is a Business occupancy per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all

penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet

or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match

existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and

10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.

PHASE 18

PHASE 20

PHASE 19

PHASE 17

PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.

UNPHASED - THESE SPACES ARE AVAILABLE FOR CONSTRUCTION AT ANY TIMEFROM JUNE THROUGH AUGUST.

PHASING NOTE

A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.

PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.

PHASE 15 - SEE A002 FOR REMAINDER OF PHASE 15 WORK

Keynotes

General Notes

SCALE:

BasementPhasing Plan

1/16"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

3

File P

ath

6/14/2009 12:39:03 P

M

FULLY SPRINKLERED

Office ofConstructionand FacilitiesManagement

U.S. Department

of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825

AutoCAD SHX Text
TA
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LAUNDRY CHUTE ABOVE
AutoCAD SHX Text
TA
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
TA
AutoCAD SHX Text
HYDRAULIC POWER UNIT
AutoCAD SHX Text
AHU
AutoCAD SHX Text
FD
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
UP
AutoCAD SHX Text
SLOPED CEILING
AutoCAD SHX Text
COILING OH FABRIC DOOR
AutoCAD SHX Text
COIL CABINET
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
TA
AutoCAD SHX Text
TA
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 7
AutoCAD SHX Text
BLAST CHILLER
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
PIPE CHASE
AutoCAD SHX Text
ACCESS
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
ELECTRICAL EQUIPMENT
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
ELECTRIC TRANSFORMERS ON 4" RAISED CONC SLAB
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
D-4
AutoCAD SHX Text
D-5
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
COILING OH DOOR
AutoCAD SHX Text
EXTERIOR PLATFORM
AutoCAD SHX Text
EXTERIOR HEATED SLOPED WALKWAY
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
FE
AutoCAD SHX Text
ROOF OF MECHANICAL ROOM 1400
AutoCAD SHX Text
A001
AutoCAD SHX Text
2
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
BASEMENT PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text
585-17-120
AutoCAD SHX Text
No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
84
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text
10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text
12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text
12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text
3/8/2019
Page 3: UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT

1. Not used.

WES

T A1

02

EAST

A10

3

WES

T A1

02

EAST

A10

3

1. First floor project areas are Healthcare, Business and Ambulatory Healthcare occupancies per NFPA 101 -2018.

2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all

penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet

or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match

existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and

10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.

PHASE 15

PHASE 16

PHASE 14

PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.

PHASING NOTE

A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.

PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.

Keynotes

General Notes

SCALE:

First FloorPhasing Plan

1/16"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

3

File P

ath

6/14/2009 12:39:03 P

M

FULLY SPRINKLERED

Office ofConstructionand FacilitiesManagement

U.S. Department

of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825

AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
FD
AutoCAD SHX Text
6" RAISED ALTAR
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
VOLUNTEER AREA
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
MECH. CHASE
AutoCAD SHX Text
UP
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
TILE
AutoCAD SHX Text
TILE
AutoCAD SHX Text
TILE
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
TUBE STATION
AutoCAD SHX Text
FIREPLACE
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
D-4
AutoCAD SHX Text
D-5
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
A002
AutoCAD SHX Text
3
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
FIRST FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text
585-17-120
AutoCAD SHX Text
No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
84
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text
10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text
12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text
12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text
3/8/2019
Page 4: UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT

1. Not used.

WES

T A1

04

EAST

A10

5

WES

T A1

04

EAST

A10

5

1. Second floor project areas are Healthcare and Ambulatory Healthcare occupancies per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all

penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet

or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match

existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and

10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.

PHASE 13

PHASE 12

PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.

PHASING NOTE

A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.

PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.

Keynotes

General Notes

SCALE:

Second FloorPhasing Plan

1/16"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

3

File P

ath

6/14/2009 12:39:03 P

M

FULLY SPRINKLERED

Office ofConstructionand FacilitiesManagement

U.S. Department

of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825

AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECHICAL ROOM ROOF
AutoCAD SHX Text
DUCT THRU FLR
AutoCAD SHX Text
COOLING UNIT FOR PACS RM.
AutoCAD SHX Text
AHU #4 PHARMACY
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DWV
AutoCAD SHX Text
STM
AutoCAD SHX Text
AHU #15 KITCHEN
AutoCAD SHX Text
ELEC CABINET
AutoCAD SHX Text
AHU #5 SURGERY
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
1st. FLOOR ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
STAIR 8
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
OPEN TO FIRST FLOOR
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
SUB-STERILIZER MECH SPACE
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
FOLDING WALL
AutoCAD SHX Text
FAN COIL 2180
AutoCAD SHX Text
A003
AutoCAD SHX Text
4
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
SECOND FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text
585-17-120
AutoCAD SHX Text
No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
84
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text
10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text
12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text
12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text
3/8/2019
Page 5: UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT

1. Not used.

WES

T A1

06

EAST

A10

7

WES

T A1

06

EAST

A10

7

1. Third floor project area is a Business occupancy per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all

penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet

or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match

existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and

10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.

PHASE 5

PHASE 4

PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.

PHASE 6

PHASE 7

PHASE 8

PHASE 9

PHASE 10

PHASE 11

PHASING NOTE

A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.

PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.

Keynotes

General Notes

SCALE:

Third FloorPhasing Plan

1/16"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

3

File P

ath

6/14/2009 12:39:03 P

M

FULLY SPRINKLERED

Office ofConstructionand FacilitiesManagement

U.S. Department

of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825

AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
RAMP UP 7"
AutoCAD SHX Text
FLOOR UP 7"
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
VINYL TILE
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
MECHANICAL SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
AUDIOLOGY SOUND BOOTH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
K-2005
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH CHASE
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
2ND FLOOR ROOF
AutoCAD SHX Text
A004
AutoCAD SHX Text
5
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
THIRD FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text
585-17-120
AutoCAD SHX Text
No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
84
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text
10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text
12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text
12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text
3/8/2019
Page 6: UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT

1. Not used.

1. Fifth and Sixth floor project areas are Business occupancies per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all

penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet

or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match

existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and

10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.

PHASE 2

PHASE 1

PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.

PHASE 3

UNPHASED - THESE SPACES ARE AVAILABLE FOR CONSTRUCTION AT ANY TIMEFROM JUNE THROUGH AUGUST.

PHASING NOTE

FIFTH FLOOR WORK IS ABOVECEILING WORK FOR SIXTH FLOORONLY. REFER TO SIXTH FLOORPHASING PLAN.

PHASING NOTE

A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.

PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.

Keynotes

General Notes

SCALE:

Fifth FloorPhasing Plan

1/16"=1'-0"

N

SCALE:

Sixth FloorPhasing Plan

1/16"=1'-0"

N

MEP PROJECT NO.: G29.18.02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

3

File P

ath

6/14/2009 12:39:03 P

M

FULLY SPRINKLERED

Office ofConstructionand FacilitiesManagement

U.S. Department

of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date: Dwg. of

420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825

AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
FLOOR RAISED 9"
AutoCAD SHX Text
STEP UP
AutoCAD SHX Text
DUMB WAITER
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 5
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
FIRE EQUIP
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
STEP UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
DUCT INTAKE
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
MECH SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
FE
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
DN
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
FIRE EXTG.
AutoCAD SHX Text
FIRE EXTG.
AutoCAD SHX Text
FIRE EXTG.
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
DN
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
PASSENGER ELEVATOR
AutoCAD SHX Text
SERVICE ELEVATOR
AutoCAD SHX Text
5th FLOOR ROOF
AutoCAD SHX Text
PIPE SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
LDRY CHUT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
5th FLOOR ROOF
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
PIPE CHASE
AutoCAD SHX Text
A005
AutoCAD SHX Text
6
AutoCAD SHX Text
RU
AutoCAD SHX Text
RU
AutoCAD SHX Text
FIFTH AND SIXTH FLOOR PHASING PLAN
AutoCAD SHX Text
UPGRADE HEAT EXCHANGERS AND
AutoCAD SHX Text
REPLACE HEATING DESIGN
AutoCAD SHX Text
585-17-120
AutoCAD SHX Text
No. 1
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
MARCH 8, 2019
AutoCAD SHX Text
84
AutoCAD SHX Text
50%%% REVIEW
AutoCAD SHX Text
10/24/2018
AutoCAD SHX Text
95%%% REVIEW
AutoCAD SHX Text
12/05/2018
AutoCAD SHX Text
100%%% DOCUMENTS
AutoCAD SHX Text
12/21/2018
AutoCAD SHX Text
100%%% BID DOCUMENTS
AutoCAD SHX Text
3/8/2019