SHEET INDEXGENERAL1. G001 TITLE SHEET/LOCATION MAP
ARCHITECTURAL2. A001 BASEMENT PHASING PLAN3. A002 FIRST FLOOR PHASING PLAN4. A003 SECOND FLOOR PHASING PLAN5. A004 THIRD FLOOR PHASING PLAN6. A005 FIFTH AND SIXTH FLOOR PHASING PLAN7. A100 BASEMENT WEST FLOOR PLAN8. A101 BASEMENT EAST FLOOR PLAN9. A102 FIRST FLOOR WEST FLOOR PLAN10. A103 FIRST FLOOR EAST FLOOR PLAN11. A104 SECOND FLOOR WEST FLOOR PLAN12. A105 SECOND FLOOR EAST FLOOR PLAN13. A106 THIRD FLOOR WEST FLOOR PLAN14. A107 THIRD FLOOR EAST FLOOR PLAN15. A108 FIFTH FLOOR PLAN16. A109 SIXTH FLOOR PLAN17. A500 ARCHITECTURAL DETAILS
FIRE PROTECTION18. FP101 PARTIAL BASEMENT AND FIFTH FLOOR FIRE PROTECTION PLANS
MECHANICAL19. M001 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS20. M002 MECHANICAL NOTES, SYMBOLS, AND ABBREVIATIONS21. MD099A SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA A22. MD099B SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA B23. MD099C SUB-BASEMENT MECHANICAL STEAM DEMOLITION PLAN AREA C24. MD100A BASEMENT FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN25. MD100B BASEMENT FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN26. MD101A FIRST FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN27. MD101B FIRST FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN28. MD102A SECOND FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN29. MD102B SECOND FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN30. MD103A THIRD FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN31. MD103B THIRD FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN32. MD105A FIFTH FLOOR WEST MECHANICAL STEAM DEMOLITION PLAN33. MD105B FIFTH FLOOR EAST MECHANICAL STEAM DEMOLITION PLAN34. MD106 SIXTH FLOOR MECHANICAL STEAM DEMOLITION PLAN35. MD200C BASEMENT FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C36. MD203A THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A37. MD203B THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B38. MD203D THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA D39. MD203E THIRD FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA E40. MD205A FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A41. MD205B FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA B42. MD205C FIFTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA C43. MD206A SIXTH FLOOR MECHANICAL PIPING DEMOLITION PLAN AREA A44. MP099A SUB-BASEMENT MECHANICAL PIPING PLAN AREA A45. MP200A BASEMENT FLOOR MECHANICAL PIPING PLAN AREA A
46. MP200B BASEMENT FLOOR MECHANICAL PIPING PLAN AREA B47. MP200C BASEMENT FLOOR MECHANICAL PIPING PLAN AREA C48. MP200D BASEMENT FLOOR MECHANICAL PIPING PLAN AREA D49. MP200E BASEMENT FLOOR MECHANICAL PIPING PLAN AREA E50. MP200F BASEMENT FLOOR MECHANCIAL PIPING PLAN AREA F51. MP201A FIRST FLOOR MECHANICAL PIPING PLAN AREA A52. MP201B FIRST FLOOR MECHANICAL PIPING PLAN AREA B53. MP201C FIRST FLOOR MECHANICAL PIPING PLAN AREA C54. MP202A SECOND FLOOR MECHANICAL PIPING PLAN AREA A55. MP202B SECOND FLOOR MECHANICAL PIPING PLAN AREA B56. MP203A THIRD FLOOR MECHANICAL PIPING PLAN AREA A57. MP203B THIRD FLOOR MECHANICAL PIPING PLAN AREA B58. MP203C THIRD FLOOR MECHANICAL PIPING PLAN AREA C59. MP203D THIRD FLOOR MECHANICAL PIPING PLAN AREA D60. MP203E THIRD FLOOR MECHANICAL PIPING PLAN AREA E61. MP205A FIFTH FLOOR MECHANICAL PIPING PLAN AREA A62. MP205B FIFTH FLOOR MECHANICAL PIPING PLAN AREA B63. MP205C FIFTH FLOOR MECHANICAL PIPING PLAN AREA C64. MP206A SIXTH FLOOR MECHANICAL PIPING PLAN AREA A65. MP206B SIXTH FLOOR MECHANICAL PIPING PLAN AREA B66. MP206C SIXTH FLOOR MECHANICAL PIPING PLAN AREA C67. MH200A PARTIAL BASEMENT MECHANICAL DUCTWORK PLAN DEMO & NEW68. M501 MECHANICAL DETAILS69. M502 MECHANICAL DETAILS70. M503 MECHANICAL DETAILS71. M601 MECHANICAL SCHEDULES72. M602 MECHANICAL SCHEDULES73. M603 MECHANICAL SCHEDULES74. M701 MECHANICAL CONTROL DIAGRAMS75. M801 HOT WATER PIPING WEST RISER DIAGRAM76. M802 HOT WATER PIPING EAST RISER DIAGRAM77. M803 STEAM DEMOLITION RISER DIAGRAM78. M804 STEAM DEMOLITION RISER DIAGRAM79. M805 STEAM DEMOLITION RISER DIAGRAM
ELECTRICAL80. E001 ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS81. EP100 ELECTRICAL BASEMENT PLAN82. EP110 ELECTRICAL FIRST FLOOR PLAN83. EP130 ELECTRICAL THIRD FLOOR WEST PLAN84. EP160 ELECTRICAL SIXTH FLOOR WEST PLAN
Electrical, Mechanical, & Plumbing EngineeringMEP Associates, LLC2720 Arbor CourtEau Claire, WI 54701715.832.5680www.mepassocaites.com
PREPARED BY:
VA PROJECT NUMBER: 585-17-120OSCAR G. JOHNSON VA MEDICAL CENTER325 EAST H STREETIRON MOUNTAIN, MI 49801
Director
Associate Director
Chief of Staff
Associate Director for N&PCS
Infection Control Nurse
Industrial Hygienist
Chief of Engineering
Chief of Police
Patient Safety
A.F.G.E.
VA MEDICAL CENTER325 EAST H STREET
IRON MOUNTAIN, MI 49801Safety
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
File P
ath
6/14/2009 12:39:03 P
M
CONSTRUCTIONDOCUMENTS
FULLY SPRINKLERED
Office ofConstructionand FacilitiesManagement
U.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
UPGRADE HEAT EXCHANGERS & REPLACE PERIMETER HEAT
3/8/19
3/8/19
1. Not used.
WES
T A1
00
EAST
A10
1
WES
T A1
00
EAST
A10
1
1. Basement floor project area is a Business occupancy per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all
penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet
or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match
existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.
PHASE 18
PHASE 20
PHASE 19
PHASE 17
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
UNPHASED - THESE SPACES ARE AVAILABLE FOR CONSTRUCTION AT ANY TIMEFROM JUNE THROUGH AUGUST.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.
PHASE 15 - SEE A002 FOR REMAINDER OF PHASE 15 WORK
Keynotes
General Notes
SCALE:
BasementPhasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
File P
ath
6/14/2009 12:39:03 P
M
FULLY SPRINKLERED
Office ofConstructionand FacilitiesManagement
U.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825
1. Not used.
WES
T A1
02
EAST
A10
3
WES
T A1
02
EAST
A10
3
1. First floor project areas are Healthcare, Business and Ambulatory Healthcare occupancies per NFPA 101 -2018.
2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all
penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet
or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match
existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.
PHASE 15
PHASE 16
PHASE 14
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.
Keynotes
General Notes
SCALE:
First FloorPhasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
File P
ath
6/14/2009 12:39:03 P
M
FULLY SPRINKLERED
Office ofConstructionand FacilitiesManagement
U.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825
1. Not used.
WES
T A1
04
EAST
A10
5
WES
T A1
04
EAST
A10
5
1. Second floor project areas are Healthcare and Ambulatory Healthcare occupancies per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all
penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet
or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match
existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.
PHASE 13
PHASE 12
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.
Keynotes
General Notes
SCALE:
Second FloorPhasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
File P
ath
6/14/2009 12:39:03 P
M
FULLY SPRINKLERED
Office ofConstructionand FacilitiesManagement
U.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825
1. Not used.
WES
T A1
06
EAST
A10
7
WES
T A1
06
EAST
A10
7
1. Third floor project area is a Business occupancy per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all
penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet
or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match
existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.
PHASE 5
PHASE 4
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASE 6
PHASE 7
PHASE 8
PHASE 9
PHASE 10
PHASE 11
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.
Keynotes
General Notes
SCALE:
Third FloorPhasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
File P
ath
6/14/2009 12:39:03 P
M
FULLY SPRINKLERED
Office ofConstructionand FacilitiesManagement
U.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825
1. Not used.
1. Fifth and Sixth floor project areas are Business occupancies per NFPA 101 - 2018.2. Light lines indicate existing work to remain, dark lines indicate new work.3. Field verify all dimensions and clearances before beginning construction.4. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all
penetrations.5. Patch all abandoned holes in floors with concrete to match existing construction.6. At all removed piping and conduit fill all holes in partitions indicated to be fire rated with firestopping to meet
or exceed wall rating. Fill all holes in smoke resistive walls or full height partitions to seal opening.7. Remove and reinstall ceiling tile as required to install new piping. Replace any damaged ceiling tile to match
existing.8. All work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30 PM and
10:00 PM.9. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.10.Contractor may propose alternate phasing plan with COR approval.
PHASE 2
PHASE 1
PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEEDAND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.
PHASE 3
UNPHASED - THESE SPACES ARE AVAILABLE FOR CONSTRUCTION AT ANY TIMEFROM JUNE THROUGH AUGUST.
PHASING NOTE
FIFTH FLOOR WORK IS ABOVECEILING WORK FOR SIXTH FLOORONLY. REFER TO SIXTH FLOORPHASING PLAN.
PHASING NOTE
A MAXIMUM OF FOUR ROOMS MAYBE OUT OF USE AT ANY TIME INEACH PHASE. EIGHT ROOMS TOTALMAY BE OUT OF USE AT ANY TIMEUNLESS APPROVED BY THE COR.
PERIMETER HEAT DOES NOT NEEDTO BE OPERATIONAL BUT ALLPRESSURE TESTING, FINISHES ANDCLEANING NEED TO BE COMPLETEDBEFORE TURNING ROOMS BACK TOOWNER.
Keynotes
General Notes
SCALE:
Fifth FloorPhasing Plan
1/16"=1'-0"
N
SCALE:
Sixth FloorPhasing Plan
1/16"=1'-0"
N
MEP PROJECT NO.: G29.18.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
3
File P
ath
6/14/2009 12:39:03 P
M
FULLY SPRINKLERED
Office ofConstructionand FacilitiesManagement
U.S. Department
of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
420 RAIL STREETNEGAUNEE, MI 49866PHONE: 906-475-6616NDW PROJECT NUMBER: 1825