07610-004-29-73-B 1. Power off the machine at the disconnect. 2. Remove the gray display cable from the PLC. 3. Gently insert the memory cartridge into the slot. 4. Power on at the disconnect (do not turn on the machine). 5. Press the “ESC” and “OK” buttons at the same time (the screen might be blank). 6. Use the “-” (minus) key to scroll down to “MEMORY CARD” and press “OK.” UPDATING PLC PROGRAM TO V1.3 AVENGER HT-E 7. Use the “-” (minus) key to scroll down to “RESTORE” and press “OK.” 8. Press “OK” at “restore program from memory card.” 9. Press “OK” at “restoring program complete.” 10. Power off the machine at the disconnect. 11. Power on at the disconnect (do not turn on the machine). 12. Press “OK” to power up the screen. 1 of 2

Upload: others

Post on 10-Feb-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UPDATING PLC PROGRAM TO V1 - Jackson WWSNOTE: this program change increases the drain time to 30 seconds and decreases the cycle start delay to 200 milliseconds. UPDATING PLC PROGRAM

07610-004-29-73-B

1. Power off the machine at the disconnect.2. Remove the gray display cable from the PLC.

3. Gently insert the memory cartridge into the slot.

4. Power on at the disconnect (do not turn on the machine).

5. Press the “ESC” and “OK” buttons at the same time (the screen might be blank).

6. Use the “-” (minus) key to scroll down to “MEMORY CARD” and press “OK.”

UPDATING PLC PROGRAM TO V1.3

AVENGER HT-E

7. Use the “-” (minus) key to scroll down to “RESTORE” and press “OK.”

8. Press “OK” at “restore program from memory card.”

9. Press “OK” at “restoring program complete.”

10. Power off the machine at the disconnect.11. Power on at the disconnect (do not turn on the

machine).12. Press “OK” to power up the screen.

1 of 2

Page 2: UPDATING PLC PROGRAM TO V1 - Jackson WWSNOTE: this program change increases the drain time to 30 seconds and decreases the cycle start delay to 200 milliseconds. UPDATING PLC PROGRAM

07610-004-29-73-B

17. At this point the PLC is updated.18. Power off the machine at the disconnect.19. Remove the memory cartridge and gently insert

the gray display cable.

20. Power on at the disconnect.21. Press the “POWER” button on the machine and

run through fi ll and cycle tests to verify the machine functions properly.

NOTE: this program change increases the drain time to 30 seconds and decreases the cycle start delay to 200 milliseconds.

UPDATING PLC PROGRAM TO V1.3 AVENGER HT-E

13. Verify the screen indicates “VER 1.3.”

14. Press the “B” key to go to “Reset to Factory” screen.

15. Press and hold the “OK” key for 10+ seconds until the screen fl ashes “FACTORY RESET.”

16. Do a quick check: press the “A” key three times and there should be values in the parameters.

2 of 2