updated wagdi cm cv
TRANSCRIPT
Wagdi Mounir Wahba---------------------------------------------------------------------------------------------------------------------------------
OBJECTIVE:Seeking for a challenging position in an international organization as
(construction manager)I can utilize and enhance my communication, interpersonal and organizational skills.I am a hard worker and willing to learn.
PERSONAL INFORMATION:Name: Wagdi Mounir Wahba
Date of Birth: Oct 28th, 1974Marital Status: MarriedNationality: Egyptian
Military Service Status: ExemptedAddress:
Cairo:
14 Mohamed amin st., El Ahlam – El waili-cairo, Egypt.
Tel: 002022 4263052 Mob: 00201120818728 ,01200241147
: `E-mail:[email protected]@orascomsa.com
LANGUAGES:Arabic : Mother tongue .
English : Fluent in speaking and writing .Indian : Speaking only .
QUALIFICATIONS:2001
B.SC of civil engineering- public work departmentAin Shams University- Cairo
1994High technical diploma in arch.
GRADUATION PROJECT:
Sanity engineering project(Design of water purification – sewage stations – water collections- waterpurification and water distribution)
PROFFESSIONAL EXPERIENCE: since july 2014 - till now
orascom constructionProject title:golf views-palm hills
Project descriptionproject consist of 180 villas and 25 electrical substation, main distributer,and 13 storm watertankProject manager: palm hills
architectural consultant.AAW
postion. Construction managerresponsible for structure and finishing work of 26 electrical substation,13 storm water tanksand 4 lift station manage site activites in corrdinated with time and cost plan make a proper method of statment, the requried dfc,rfi,material submittal sharing with qc
and technical office departement prepration of subcntractor invoices and make anew aggrement with any new activity review time schadule with pm as planing date and work perority
• since August 2012-may 2014Orascom Saudi construction
Project title:King Abdul Aziz International Airport Development Project (300 million SR)
Project description
Project consists of two tunnels, roads, taxi ways, utilities, bridges & box culvert
Project manager:
Ministry of defense and aviation ksa
Structure consultant
dar al handasa
Position :Construction manager
*responsible of excution of two way RC tunnel. box culvert. storm net work* Daily management of 3 sites staff and multiple subcontractor* Ensuring that all quality control and health and safety requriments in the proper way* Providing independent professional advice and guidance to engineers to aviod any delayof progress due to miss knowledge and arrangment of activities* Planning site activites in detail, setting taregets and accurately forecasting complationdates* Accurately estimate materials, construction and labour costs as well as project time scales* Directing and supervising workers
Since april 2008-till july 2012 .Orascom construction industries-cairo .
Project title :Oman embassy residence building 90 million Egyptian pound .
Project description :project consist of 17 multi stories building
Of high technique of finishing .
Project manager:
project management international ( PMI ) .
architectural consultant.(H&F) G.HOSNY&I.FAHMY .
Position :SR .site engineer
*responsible of 5 floors of multi stories building and , main enterance,and carparking all finishing activities*Evaluate and approved design changes.specifications and drawing relase with T.O*Prepares interim and monthly project reports*Controls expenditures within limitations of contract documents*Responsible for control of work in progress ensure client billings monitors*review and monitors project progress to assure quality and adherence torequirmentsof contract doucments
Since March 2006- till feb. 2008Al Shafar General Contracting L.L.C – Dubai
Project title:Suaq Residence Golden mile Palm Jumeirah 1.2 Miliar Dhs, and JBR
Project description : Project consists of 10 multi stories Building,Each one about 16 floors
Project manager / NakheelConsultant / DSA, LC
PositionProject Engineer
Responsibility Supervision of execution of all structure elements including ( Footing ,
Retaining Wall, Diaphragm wall , Slabs, Columns) Supervision of all types of form works including ( SGB, dokka ,pachal) Systems
and check its stability according to design loads and manufacturerecommendation
Check up all structure and architecture Activities ensure that within qualitystandered and time schedule.
Follow up all IRS and MIR and ensure that approved from consultant. Make a adequate method of statement of each activity before starting and
review it with quality manager before submit it to consultant. Make monthly Progress claims, payment control and verification of works
completeFollow up the material procurement and purchase orders
Since February 2005- February 2006Al Shafar General Contracting L.L.C – Dubai
Project titleJumeirah Beach Residence- Sector (6)461 million Dhs
Project descriptionProject consists of 3 multi stories towers, each
one about 46 floors and podium surroundTower≈ 18000 m2
Project manager / MaceConsultant / Dar Al Hashmi Jv
PositionSR. Site Engineer
Responsibility
Execution , supervision of structural, finishing work in podium with respectto specifications international standard of quality
Following up landscape work ( hard – soft) landscape Execution of post-tension Slabs and inclined slabs, flat slabs and foam
concrete for landscape Coordination between E / M department and QC department for preparation
clearance of (slabs- verticals- foam gnc….etc)
November 2001 –Jan 2005
Consiliated Contractors International Company (ccc)ORASCOM Construction industries (joint venture)
Project titleGolden Pyramids Plaza project 750 million $
Project descriptionProject consists of 14 residential and administration building,3 hotels (Intercontinental – Holiday Inn- Hilton) and bigcommercial center in Middle East
Project managementInt. BechTel CoConsultant: Arch. Cassia –
Strut. Moharam - BakhoumPosition
Site EngineerResponsiblity:
Finishing all items in administration offices in A2 up to punch list stage including ( marble cladding- false ceiling – timber cladding –ceramic cladding – aluminum
curtain walls … etc) Finishing all arch / civil items in commercial center Casting all curbs- side walk – ramps and screed for car park Finishing all travellators, lift lobbies (marble cladding – false ceiling- mirrors –
automatic sliding doors .. etc) Finishing car park floor ( polyurethane paint 69,000 m2 )
July 2000 –Oct 2000Al Salam International Company Hurgada, Egypt
PositionSite Engineer
Responsibility :Finishing and civil workPreparing invoice for sub-contractorsCoordination between owner and company
Preparing and updating project schedule
TrainingJuly 1999 – Oct 1999
Egyptian Co for costal construction, Safaga / Cairo/ EgyptFollowing structural work for extension of diving center
July 1998 – Oct 1998
Kajima, Cairo- metroFollowing the finishing work of electrical substations and service rooms
Certificates :
B.SC OF CIVIL ENGINEERING .AIN SHAMS UNIVERISITY.TECHNICAL DIPLOMA OF ARCH(GERMANY INSTITUTE) .INTERNATIONAL COURCE OF SAFTY (OSHA) .PROJECT MANAGMENT COURSE IN AMRICAN UNIVERISITY IN EGYPT (AUC)EXPERIANCE CERTIFICATES FROM(CCC)COMPANY AND ALSHAFARGEN.CONTRACTING ,DUBAI .DUBAI DRIVING LICENCE AND EGYPT DRIVING LICENCE .
REFERENCE:
- Eng / fekry megaly project director(ORASCOM)Tel:00966550383451
- Eng / Sherif El Narekh Project Manager (ORASCOM)Tel: 00201225008691
- Eng / Hazem Kayalli Project manager (CCC)Tel: 97150 8180594
- Eng / Bishoy Azmy Deputy General Manager (Al Shafar)Tel: 00971505534205