updated cv nov 26 2015

27
- CURRICULUM VITAE 1. Proposed Position : Procurement Specialist 2. Name of Firm : 3. Name of Staff : Virgilio G. Balandra 4. Date of Birth : August 13, 1947 Nationality: Filipino 5. Education :Master of Business Administration Ateneo de Manila University Graduate School of Business Makati City, Philippines 1989-1991 (Preparation of Thesis, defense, and graduation 1998) Bachelor of Science in Civil Engineering Cebu Institute of Technology (C.I.T.) Cebu City, Philippines 1964 – 1969 Board Exam. Passed : Board Exam for Civil Engineers Board Exam for Master Plumber Honors Received : 8 th Place – Pre-Board Examination for Civil Engineers – (C.I.T.) 12th Place- Board Examination for Master Plumber First Place – PERT/CPM Seminar by AMIEP, Quezon City Home Address : Blk 10, Lot 32, Camella Avenue, Camella Homes Classic, Barangay

Upload: virgilio-balandra

Post on 22-Jan-2017

108 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Updated CV Nov 26 2015

-

CURRICULUM VITAE

1. Proposed Position : Procurement Specialist

2. Name of Firm :

3. Name of Staff : Virgilio G. Balandra

4. Date of Birth : August 13, 1947 Nationality: Filipino 5. Education :Master of Business Administration

Ateneo de Manila University Graduate School of Business Makati City, Philippines 1989-1991 (Preparation of Thesis, defense, and graduation 1998)

Bachelor of Science in Civil Engineering Cebu Institute of Technology (C.I.T.) Cebu City, Philippines 1964 – 1969Board Exam. Passed : Board Exam for Civil Engineers Board Exam for Master Plumber

Honors Received : 8th Place – Pre-Board Examination for Civil Engineers – (C.I.T.) 12th Place- Board Examination for Master Plumber First Place – PERT/CPM Seminar by AMIEP, Quezon CityHome Address : Blk 10, Lot 32, Camella Avenue, Camella Homes Classic, Barangay Don Bosco, Paranaque City. Cell Phone +63906-218-95-83

Email address [email protected] 6. Membership of Professional Associations: Philippine Institute of Civil Engineer (PICE)

7. Other Training : -World Bank Procurement Guidelines Workshop by World Bank Group, Papua New Guinea, April 29-30, 2010 - Secondary Education Development and Improvement Project (SEDIP) Implementation Plan, Basic Management Concept and Principles by: Department of Education (DepED), Manila, Philippines -SEDIP School Mapping Exercise and School Building Prioritization Model conducted by DepED and Pacific Consultants International, Cebu

City, Philippines-Financial Orientation Workshop on Project Completion and Inventory Management by DepEd and PCI on Sept 24-27, 2007, Cagayan de Oro City.-Government Electronic Procurement System (G-EPS) Training, by the Department of Budget and Management, April 2, 2004, Cagayan de Oro.

Page 2: Updated CV Nov 26 2015

-

-Seminar on Housing Development Projects, by PICE, March 10-11, 1995, Makati, Metro Manila-Safety and First Aid Course by PHILSTRESS, Jan 26-Feb. 9, 1977 at Marikina, Metro Manila-Basic Supervisory Development Seminar by PHILSTRESS, Feb. 3- Mar 10, 1981, Marikina, Metro Manila.

-Master Plumber including Plumbing Design through Special Class-- -PERT/CPM by: Association of Management and Industrial Engineers of

the Philippines (AMIEP) Apr 24-May 22, 1976-Quezon City - Industrial Building Technique – conducted by PICE

- National Roads and Bridges Maintenance Programming-DPWY, Cagayan de Oro City.--1972- Contract Management by DPWH, Cagayan de Oro City--1971

8. Countries of Work Experience: Palau, Timor Leste, Mongolia, Papua New Guinea, Vietnam, Saudi Arabia, Kuwait, Malaysia, Philippines

9. Languages : PILIPINO (GOOD) ENGLISH (GOOD)

10. Key Qualification: More than Forty years of experience in various civil engineering works,

portion of which includes procurement activities using WORLD BANK, JBIC, and ADB procurement guidelines (including TIMOR LESTE Procurement guidelines), project scheduling and monitoring and overall project management of infrastructure projects here and abroad. Previously involved in the project monitoring, evaluation, coordination and inspection of United States Agency for International Development (USAID) funded projects under the ECONOMIC SUPPORT FUND SECRETARIAT- a government agency under the Office of the President of the Philippines tasked to implement projects funded from the rental of the U.S. bases through the USAID with projects such as school buildings, roads and highways, slaughter houses, market buildings, etc., including coordination works with the In-House consultants Louis Berger International, Inc. And TCGI Engineers.

To be mobilized by EGIS-EAU of France as Procurement Specialist for their DRIP Project in India starting Nov. 30, 2015 for an initial duration of 4.5 months to prepare Bidding documents and do Procurement Works related to the implementation of their Dam rehabilitation and Improvement projects in the four provinces of India with Office in New Delhi.

Hired by Egis-EAU of France as Procurement Specialist/Valuer for the Koror-Airai Sanitation Project (KASP) from July 31, 2015 up to Sept 18, 2015 (First Input) specifically to prepare Bid Documents for their Four Sanitation Projects in Malakal, Koror, Airai, & Meyuns.

Hired by Woodfields Consultant, Inc. as Procurement Advisor for the Maynilad World Bank funded projects Design and Build of 20 MLD Muntinlupa Sewage Treatment Plant (STP)(ICB No.: MWMP-13-01) and The Proposed Combined Sewerage Interceptor System for Muntinlupa STP (ICB No. WMP-12-04(A)), One month intermittent from Oct 14, 2013 to Aug 31, 2014. Procurement was extended from September 1, 2014 for the final

Page 3: Updated CV Nov 26 2015

-

bid valuation stage for the 20 MLD STP and the Combined Sewerage Interceptor up to end of year 2014.

Hired by PERT CONSULT International, Inc. to be part of the team that conducted a Business Case Study for Selected Public Private Partnership (PPP) road project that will extend the Central Luzon Expressway (CLEX Phase I), to be called the North Luzon Expressway (NLEX East Expressway), that will connect La Mesa Parkway to Cabanatuan city. Four (4) months intermittent project study from Feb to Aug 2013.

Hired by Charles Kendall & Partners for their Infrastructure Fund Project of the National Procurement Commission under the office of the Prime Minister as a Senior Procurement Specialist whose main task is to prepare all the necessary documents needed to procure GOODS, WORKS, and SERVICES for the various projects for the different sectors like Agriculture, Education, Power, Health, etc. funded by the Infrastructure Funds of the government and Road Projects funded by ADB & JICA

Hired by PRIMEX (and seconded to Asian Development Bank) as International Procurement Specialist-Team Leader for ADB Project Study-“NCB Threshold review for the Road Construction Sector of Mongolia”, in order to come up with a recommendation, with the assistance of the three national consultants from Mongolia, whether or not to increase the NCB Threshold of Mongolia from $1 Million to $ 5 Million. Conducted 1 week visit to Mongolia to gather documents and interview all stakeholders

Assigned as International Procurement Specialist of the Special Project Unit (SPU) of the Mineral Resources Authority(MRA) of Papua New Guinea for their Mining Sector Institutional Strengthening Technical Assistance Project 2 (MSISTAP2) funded by the World Bank.

Completed Technical Assistance assignment with KELLOGG BROWN AND ROOT as a Cost Estimator and Contract/Procurement Specialist (International Status) for the feasibility study for National Irrigation Administration’s (NIA) ADB funded project for the Rehabilitation of their Irrigation Operation System Efficiency Improvement project In Davao and Iloilo provinces.

Assigned as Procurement Specialist of the Red River Delta Water Supply and Sanitation Project in Hanoi, Vietnam from- First Input - September 8, 2008 – to Nov. 7, 2008. Second Input- Dec. 2, 2008 – to Dec. 17, 2008. The tasks include procurement activities like preparing Request for Proposals, Preparing Criteria for Evaluation of Proposals of Consultants, Evaluation and Rating of Proposals of Shortlisted Consultants based on the approved Criteria. Preparing Technical Evaluation Report and and Combined Technical and Financial Evaluation Report, providing Technical Assistance to the Central Project Office of the Ministry of Agriculture and Rural Development using WORLD BANK Procurement Guidelines.

Previously assigned, prior to Vietnam job, as head of the Agusan del Sur Procurement group to implement and procure works contractors, oversee, and monitor the SECONDARY EDUCATION DEVELOPMENT and IMPROVEMENT PROJECT (SEDIP), a foreign assisted project of Department of Education (Funded by Japan Bank for International Cooperation –JBIC, and Asian Development Bank) for 15 Social Reform Agenda Provinces like Agusan del Sur, Surigao del Sur, Antique, Negros Oriental, etc., with the primary tasked of Procurement of works, goods and services related to the construction of new school buildings and repair of existing ones to eradicate or at least solve the classroom shortages of the country.

Page 4: Updated CV Nov 26 2015

-

Previously involved in direct supervision of projects here and abroad (Saudi Arabia, Malaysia, Kuwait) such as bridges, flyover, precast, pre-stressed, and post-tensioned projects, pile driving, mass housing projects and sub-division developments, water supply and sewerage system, elevated water tank, water and sewerage treatment plants, and other important projects including the renovation and improvement of Malacanang Presidential Palace building, the official residence of the President of the Philippines.

10. Employment RecordTo be mobilized on November 30, 2015 for an initial input of 4.5 monthsEmplyer: Egis-EAU of France-India projectPosition held: Procurement Specialist

11.-Acts as Procurement Specialist for the DRIP Projects

-Preparation of the Bidding Documents for the following four sub-projects:a. Keralac. Madhya Pradesh,d. Orissa,e. Tamil Nadu

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Dam Rehabilitation and Improvement Project (DRIP)World Bank Funded Project.

Client: Ministry of Water/National Water Resources Council

Project features : Dam Rehabilitation and Improvement Project for the four provinces in India, namely; Kerala, Madhya Pradesh, Orissa, & Tamil Nadu

From : July 31, 2015 – September 18, 2015 (First Input) Second Input (3 weeks) tentative December 2015 Employer : Egis-EAU of francePosition held: Procurement Specialist/Valuer

11.-Acts as Procurement Specialist/Valuer of the Koror-Airai Sanitation Project (KASP) in Palau.

-Preparation of the Bidding Documents for the following sub-projects:a. Sewerage Network 1: Malakalb. Sewerage Network 2: Kororc. WWTP Malakald. WWTP and Sewerage Network Airai- Assist the Team Leader and the Internationa

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Koror-Airai Sanitation Project (KASP) ADB Funded Project.

Client: Palau Public Utilities Corporation (PPUC)

Project features : Design and Build of the Malakal and Airai WWTP, and the rehabilitation and expansion of the Sewerage Network of Malakal and Koror.

Page 5: Updated CV Nov 26 2015

-

expert to prepare and complete bills of quantities and cost estimates.

From : Sep. 1, 2014 – Dec. 31, 2014. Extension of the Procurement Activity for the Evaluation stage of the 20 MLD STP and the Combined Sewage Interceptor systemFrom: Oct. 14, 2013 To – Aug. 31, 2014 Employer: WOODFIELDS CONSULTANT, Inc.

Positions held: PROCUREMENT ADVISOR

11.-Acts as advisor to the team for the following activities:-Evaluation of the Prequalification documents of the applicants for the two above mentioned projects.-Preparation of the Prequalification Evaluation Reports.-Preparation of the Bidding Documents to be issued to the prequalified applicants.-Evaluation of Bids, and-Preparation of the Bid Evaluation Reports.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Design and Build of 20 MLD Muntinlupa Sewage Treatment Plant (ICB No.: MWMP-13-01) and the Proposed Combined Sewerage Interceptor System for Muntinlupa STP (ICB No.:MWMP-12-04(A) World Bank funded projectYear: Oct 14, 2013 to Feb 14, 2014 (1 month intermittent assignment) Client: Maynilad

Project features : Design and Build of the 20 MLD STP which include preparation of process design, mass balance, PID, civil and structural design, hydraulic design, instrumentation design, mechanical and electrical design, pipe laying of ≥ 700mmØ pipes and sewage pipe laying of ≥ 150mmØ

From: Four months intermittent project study from Feb 26, 2013 To – Aug 25, 2013 Employer: PERT CONSULT International, Inc.

Positions held: PROCUREMENT SPECIALIST

11.-Identification of procurement needs-Preparation of procurement plans- Identify PPP Modalities, Risk Assessment, Level of Access to Finance, and Level of GOP Ownership.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Public Private Partnership (PPP) ProjectYear: Feb 26, 2013 to Aug 25, 2013 (4 months intermittent assignment) Client: Department of Public Works and Highways

Project features : Business Case Study to determine the Alignment of the proposed extension of the Central Luzon Expressway (CLEX Phase I), the NLEX East Expressway, that will connect La Mesa Parkway to Cabanatuan city

Page 6: Updated CV Nov 26 2015

-

From: Mar 23, 2012 To – Dec 20, 2012 Employer: Charles Kendall & Partners

Positions held: INTERNATIONAL SENIOR PROCUREMENT SPECIALIST

11.-Identification of procurement needs-Preparation of procurement plans- Follow up tender bidding documents to make sure these are available for the pre-qualified bidders. -Advertising REOI, Invitation to Pre-Qualify and Bid.-Issue Bid Documents and RFP.-Preparation of Criteria for Techncial Evaluation.-Management of Evaluation.-Technical and Financial Evaluation.-Preparation of Combined Technical and Financial Evaluation Reports.-Evaluation and award recommendation.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: INFRASTRUCTURE FUND ProjectsYear: March 23, 2012 to Dec 20, 2012 Client: National Procurement Commission under the office of the Prime Minister

Project features : Procurement of Goods, Works, and Services for the different projects of the government intended for the different sectors like Agriculture, Health, Education, etc. funded by the Infrastructure Fund including road projects financed by ADB(TIMOR LESTE Road Network Upgrading Project) , and JICA (National Road No. 1 Upgrading Project.).

Positions held: International Senior Procurement Specialist:

Part of a six (6) man Int’l Procurement Team lead by an Austrian as Project Director. With the Team are Austrian, 3 Filipinos, Nigerian and Indian.

Activities performed: Assist the National Procurement Commission (NPC) members in the performance of Procurement Activities for Goods, Works, and Services funded by the government’s Infrastructure Fund (IF). The NPC is in-charge of all Procurement Activities for projects funded by the IF and all government funds exceeding 1 Million U.S. Dollars for the following line ministries; Transport, Petroleum Infrastructure, Solidarity & Social, Health, MDG, IT infrastructure, Electricity, Education, Public Building, Urban and Rural Development, Water & Sanitation, and Agriculture

From: Dec 27, 2010 To – April 26, 2011 Employer: PRIMEX, Manila, Philippines (Seconded to Asian Development Bank)

Positions held: INTERNATIONAL PROCUREMENT SPECIALIST (Team Leader designate)

11.

-Review information of participating bidders and their nationalities, construction completion reports, bill of quantities,

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project:RSC-CO1500 (MON): Reviewing Procurement in Mongolia’s Road Construction Sector (ADB FUNDED PROJECT)Year: December 27, 2010 to April 26, 2011

Page 7: Updated CV Nov 26 2015

-

quoted prices, quality of work delivered, etc.- Planning and conducting interviews with the relevant stakeholders, project employers, the executing agencies (Particularly MRTCUD and MOF), Contractors, and civil society organizations.-Coordinating with the three national consultants, and reviewing the national consultants reports to ensure a consistently high standard.-Analyzing the collected data and preparing the consolidated reports to ADB.-Preparing weekly briefing to ADB.-Conducting necessary mission to the field.

Location: Manila with 1 week visit to Ulaanbaatar, Mongolia (Feb 13-Feb 19, 2011)

Client: Ministry of Finance and Economy

Project features : Project Study to determine whether or not to increase the NCB Threshold of the Road Construction Sector for Mongolia

Positions held: International Procurement Specialist- Team Leader.

Activities performed: To lead the Team ( 3 National Consultants from Mongolia and myself) to conduct a study and develop methodologies and approaches to achieve the objectives and to come up with a study and a recommendation whether or not to increase the NCB Threshold form $1 Million to $5 Million..

From: Feb 17, 2010 To – August 31, 2010Employer: MINERAL RESOURCES AUTHORITY. Port Moresby, Papua New Guinea

Positions held: PROCUREMENT SPECIALIST (International Consultant)

11.1. Managing Procurement - Implement all policies and procedures relating to procurement activities required by the Project.- Ensure that the Bank Procurement Guidelines are followed in all procurement transactions.2, Planning, Record Keeping and Reporting:- Actively participate in the discussion within SPU and with the World Bank Task Team on procurement planning, adequately revise and update the Project Procurement plan for SPU Manager’s consideration. .Prepares correspondences and

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: MSISTAP2 - Mining Sector Institutional Strengthening Technical Assistance Project 2 (WORL BANK FUNDED PROJECT)Year: February 17, 2010 to August 31, 2010 Location: Special Project Unit (SPU), Mineral Resources Authority(MRA), Port Moresby, Papua New Guinea

Client: Government of Papua New Guinea

Project features: Institutional Strengthening of the Mining Sector to Improve development Outcomes from Extractive Industries

Positions held: Procurement Specialist (International)

Activities performed: Preparation of Procurement Plans

Page 8: Updated CV Nov 26 2015

-

coordinate with the World Bank regarding its no objection for the proposed contract awards, following the SPU evaluation committee 3. Cooperation with the SPU Accountant:- Cooperate with the SPU accountant for regular preparation of Project - Prepares, together with the Accountant, the estimated budget of the contracts.4. Training and Transfer of Knowledge- Work in close coordination with the SPU Procurement Specialist. -Prepares formal and informal training programs on World Bank procurement processes and reporting requirements for the SPU Procurement Specialist and other SPU - Mentor the SPU Procurement Specialist and other staff

and other Procurement Activities using World Bank Procurement Guidelines for the 5 components of the project namely; 1. Strengthening the Policy and Regulatory Framework for the mining Sector; 2. Strengthening mining sector governance, regulation and sustainable development outcomes; 3. Improving Revenue Collection and audits of the sector; 4. Strengthening the foundation for a conflict free mining sector in Bougainville; 5. Project Management

From: Aug 26, 2009 To Oct 16, 2009 – (52 days Input only for Feasibility Study for NIA’s ADB Project)Employer: KELLOGG BROWN AND ROOT PTY LTD.

Positions held: COST ESTIMATOR and CONTRACT SPECIALIST (International Consultant)

11.In collaboration with other Specialist- Prepares Cost Estimates for proposed Irrigation Rehabilitation Investments.- Prepares detailed procurement plans for Irrigation rehabilitation projects including contract packaging.- Prepares cost estimates for consulting services for proposed investment projects including packaging and procurement plans.- Prepares procurement plans for equipment and other support services for proposed investment projects.-Prepares draft procurement plans as annex for ADB RRP documents.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: PPTA 7141-PHI- Irrigation System Operation Efficiency Improvement Project (ADB FUNDED)Year: Aug 26, 2009 to Oct. 16, 2009 (52 days Input for Feasibility Project Location: NIA Bldg., Quezon City, Philippines

Client: National Irrigation Administration

Project features: Feasibility Studies for the Rehabilitation of Irrigation facilities in Davao Del Norte and Iloilo)

Positions held: Cost Estimator and Contract Specialist (International)Activities performed: Cost Estimating and Preparation of Procurement Plans using ADB Procurement Guidelines

Page 9: Updated CV Nov 26 2015

-

From: Sept 8, 2008 To Nov 7, 2008 – First Input Dec. 2, 2008 To Dec. 17, 2008 – Second Input

Employer: Sinclair Knight Merz (SKM)/Pert Consult InternationalPositions held: Procurement Specialist (International)

11.

- Prepares and updates procurement plans and follow up to obtain approval from the reviewing authorities.- Prepares Terms of Reference and Request for Proposals using WORLD BANK Procurement Guidelines.- Follow up with the reviewing authorities and the World Bank (as necessary) to facilitate approval of procurement documents.- Evaluate bids for consulting proposals by providing guidance to members of the procurement evaluation committees.-Assist the CPO in the review of bid evaluation reports, preparation of Technical Evaluation Reports, and other documents for submission to the WORLD BANK.-All other activities related to procurement of Goods and services including procurement of consultants and Civil Works Contractor.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Red River Delta-Rural Water Supply and Sanitation Project (WORLD BANK -IDA FUNDED)Year: Sept 8, 2008- to Nov. 7, 2008 – First Input Dec. 2, 2008- to Dec. 17, 2008-Second Input

Location: Hanoi, Vietnam

Client: Ministry of Agriculture and Rural Development- Center for Rural Water Supply and Sanitation (MARD-CERWASS)

Main project features: Water Supply and Sanitation Infrastructure.

Positions held: Procurement Specialist (International)

Activities performed: Procurement using WORLD BANK GUIDELINES

From :August 2002 To : July 2008

Employer: Filipinas Dravo Corp./ Pacific Consultants International (PCI) Positions held: Civil Works/Procurement Specialist

11.-Coordinate with the National Project Management Office (NPMO) of the Department of Education (DepED) and PCI, the lead consultant, for the preparation of Bid Documents

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Secondary Education Development and Improvement Project (SEDIP)- JBIC and ADB Funded Project

Page 10: Updated CV Nov 26 2015

-

and Approved Budget for the Contract under Bidding (ABCB)-Schedules Advertisement, Issuance of Bid Documents, Pre-Bid Conference, and Bid Openings.-Schedules and conducts Pre-Construction conferences, and regular periodic meetings. Prepares reports for submission to the head office of the DepED.-Coordinate with the Provincial Governor, Municipal Mayors, Municipal Engineers, BAC members, Education Officials for the conduct of Ground Breaking Ceremonies, and Turn Over ceremonies.-Conduct Equity Generation Activities-Inspects, monitors, & checks all on-going school building constructions.-Coordination and Monitoring of the delivery of School Equipment, Books, and Furnitures.

Year: 2002 to 2008

Location: Agusan del Sur, Philippines

Client: Department of Education

Main project features: Construction of Secondary Education School Buildings for the whole province.

Positions held: Procurement Specialist

Activities performed: Procurement of Contractor and Project Monitoring and Evaluation for Civil Works Package and Coordination and Monitoring of the delivery of School Equipment, Books, and Furnitures

From :Nov 1999 To : July 2002Employer: Engineering & Development Corporation of the Philippines (EDCOP)/SYMOND PHILS.

Positions held: Senior Civil Engineer

11.-Construction Management Services and monitoring of the construction of Transmission and Distribution Networks for Water and Waste Water including elevated Water Tank, Water Treatment Plant, Raw Water Reservoir, Filtration and Treatment Plant, Sewage Treatment Plant and Sewage Pumping Stations, and Deep Well Drilling and upgrading of the existing Water Network and Sewer Distribution System.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: 1. Fort Bonifacio Water Supply and Waste Water Sanitation Project.2. Clark –Vivendi Water Network and Sewer Distribution System

Year: 1999 - 2002

Location: 1. Fort Bonifacio, Taguig, Philippines

2. Clark Economic Zone, Clark Field, Pampanga, Phils.

Client: 1. Fort Bonifacio Development Corporation

2. Clark – Vivendi Water Corporation

Main project features: Water Supply and Sanitation Infrastructure Development.

Positions held: Senior Civil EngineerActivities

Page 11: Updated CV Nov 26 2015

-

performed: Construction Management and Engineering Supervision.

From : March 1997 To : December 1997

Employer: Filipinas Dravo CorporationPositions held: Construction Manager

11.-Set goals and objectives for the project engineers supervising the construction of Row Houses, Single detached and duplex housing units and conducts regular inspection and coordination meeting at site with the contractors.-Organizes and Checks the preparation of estimates, construction schedules and bidding documents for the construction of land development, drainage and sanitary sewer, water and fire protection lines.-Oversees the preparation of documents for the application of the different permits like locational clearance, Dept. of Agrarian land conversion, environmental clearance certificate, development and building permits, water permit, electrical distribution and lighting facilities and other government licenses.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Living Water Sub-divisionYear: 1997

Location: Pililia, Rizal

Client: Filipinas Dravo Land Development Corporatin

Main project features: Land Development and Housing Construction.

Positions held: Construction Manager

Activities performed: Planning, Organizing, Staffing, Leading and Controlling.

From November 1993 To : December 1996

Employer: Borland Development CorporationPositions held: Assistant General Manager

11.-Planning, organizing, staffing, leading and controlling project and office operation for the successful implementation of various sub-division and mass housing projects.-Conducts regular inspection and coordination meeting at the jobsite with the project engineers and construction staff

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: 3 company owned subdivision development and housing project

Year: 1993 to 1996

Location: Novaliches, Quezon City

Client: Borland Development Corp.(company owned)

Page 12: Updated CV Nov 26 2015

-

and with the contractors.-Formulate policies and guidelines to be implemented for the sales, promotion, and advertisement of all housing projects undertaken by the company.-Takes charge of the recruitment and accreditation of real estate brokers, set up objectives, conduct meeting, orientations, and briefing for pricing, commission scheme and incentives for the brokers.-Supervises and controls the preparation of distribution of sales kit, fliers, and other sales materials.

Main project features: Sub-division development and Housing Construction

Positions held: Assistant General Manager

Activities performed: Planning, Leading, Staffing, Controlling.

From : October 1992 To : October 1993

Employer: Fluor Daniel Arabia, Ltd.Positions held: Associate Project Controls Engineer

11.-Coordination and direction of estimating, planning and scheduling, cost engineering functions and resources for the purpose of providing high quality estimates, budgets, cost and schedule analysis and timely, accurate reports for measuring the performance and progress of the project. Prepare weekly progress reports for fabrication of carbon and stainless steel spools.-Conducts field inspection and monitoring of actual accomplishment of the contractor needed in the checking of periodic accomplishments and billing.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Zuluf Am Capacity Increase Project

Year: 1992-1993

Location: Tanajib, Saudi Arabia

Client: ARAMCO

Main project features: Gas Pipes

Positions held: Associate Project Controls Engineer

Activities performed: Project Monitoring

From : July 1991 To : August 1992

Employer: M. S. Al-Suwaidi

Positions held: Planning Engineer

11.-Prepares construction schedule, planning, scheduling,

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Page 13: Updated CV Nov 26 2015

-

and monitoring of documents for the construction of Polypropylene Plant for IBN ZAHR and Ethylene, Propylene, Butadiene Tanks & Dike Walls for the Arabian Petrochemical Company.-Preparation of Monthly accomplishments for submission to the project consultant, MITSUI ENGINEERING, for their checking and endorsement.-Preparation of Two weeks look ahead for the 2 projects.

Name of assignment or project: 1. Polypropylene Plant2. Ethylene, Propylene, Butadiene Tanks & Dike Walls

Year: 1991 – 1992 =

Location: Jubail, Kingdom of Saudi Arabia

Client: 1. IBN ZAHR 2. Arabian Petrochemical co.

Main project features: Construction of Petrochemical Structures.

Positions held: Planning Engineer

Activities performed: Project Scheduling, Monitoring and Evaluation.

From : July 1990 To : July 1991

Employer: URSI –Trans-Asia (Phils.), Inc.

Positions held: Senior Civil Engineer

11.-Coordinates with the different Resident Engineers for the collection of progress reports to be submitted to the president.-Prepares report and correspondence, checks PERT/CPM schedule and other submittals of the different contractors before submitting them to the DPWH.-Prepares document needed for the submission of bids for new projects.-Monitoring and evaluation of the different IBRD Funded projects of the company.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Bohol-Iloilo-Masbate-Fifth IBRD (World Bank Funded) Highway and Bridge Reconstruction Program

Year: 1990 – 1991

Location: Bohol, Iloilo, & Masbate

Client: 1. Department of Public Highways

Main project features: Construction and Rehabilitation of Roads and Bridges

Positions held: Senior Civil Engineer

Activities performed: Project Scheduling, Monitoring and Evaluation.

From : Jan 1988 To : July 1991

Employer: Economic Support Fund Secretariat

Positions held: Planning Officer

11.-Works hand in hand with the

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Page 14: Updated CV Nov 26 2015

-

In-house consultants (Louis Berger International, Inc. And TCGI Engineers) in the review of Inception Reports, Investment Reports for new projects funded by USAID. Assists in the evaluation and rating of submitted proposals for the pre-qualification and selection of project consultants. Coordinates and monitors various functions of all USAID funded projects from tenders, contracts, payments up to completion and closing of project accounts. Prepares bid documents to be handed out to participating contractors. Coordinates with USAID Engineers for matters related to the implementation of the projects. Conducts inspection trip to assigned package to monitor and check the accomplishments of the different contractors within the assigned package.

Name of assignment or project: Various USAID funded projects

Year: 1988 – 1991

Location: Luzon, Visayas, and Mindanao, Philippines.

Client: USAID and Office of the Philippine President

Main project features: Construction of School Buildings, Markets, Roads, and other Infrastructures

Positions held: Planning Officer

Activities performed: Procurement of Consultants and Contractors, Project Scheduling, Monitoring and Evaluation.

From : April 1986 To : August 1987

Employer: AG & P – Campenon Bernard Kuwait

Positions held: Concrete Work Supervisor

11.-Supervises construction of concrete and asphalt roads, drainage and sewer lines, bridges, and other structures. Supervises, excavation, backfilling, and compaction of trenches for electric, sewer and gas pipes. Supervises installation/fittings of PVC, asbestos and glass reinforced pipes. Supervises waterproofing and installation of protection boards on all PTT manholes.-Supervises the erection and installation of pre-cast, pre-stressed, and post-tensioned concrete girders for bridges and skyways. Coordinates with the Project Consultant FREEMAN FOX all daily activities.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Jahra-Ghazaly Motorway.

Year: 1986 – 1987

Location: Kuwait City

Client: Government of Kuwait

Main project features: Modern State Highways and Bridges.

Positions held: Concrete Work Supervisor

Activities performed: Construction Supervision.

From : November 1983 To : July 1984

Page 15: Updated CV Nov 26 2015

-

Employer: T.A.S.- Ekistics Sdn. Bhd., Kluang, Johore, Malaysi

Positions held: Assistant Project Manager

11.

- Planning, organizing, staffing, leading and controlling for the construction of 43 government school buildings within Johore State, Malaysia. Coordinates with other department for the scheduling and delivery of precast units and the scheduling of Heavy Equipment. Checks and monitors actual costs against budgetary estimates regularly. Prepares reports for submission to the government consultant BINARUNDING. (Note: Project was rescinded because of political and financial reasons. Our 3 months salary not paid.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Construction of 43 government school buildings in Johore State, Malaysia

Year: 1983 – 1984 =

Location: Johore, Malaysia

Client: Ministry of Education

Main project features: Construction of School buildings

Positions held: Assistant Project Manager

From : January 1981 To : November 1983

Employer: PHILSTRESS

Positions held: General Field Superintendent

11.-Give respective assignments to the field engineers and the office engineer for the smooth and successful implementation of various projects of the company such as school buildings, housing projects, industrial and Commercial buildings, and bridges using pre-cast, pre-stressed, and post-tensioned components.-Checks scheduling of all materials and equipment like crane, trailers, etc. to be used in all the projects.-Cost control, monitoring, and supervision.-Conducts periodic meeting at site with client and government inspectors.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Fabrication, delivery, and Installation of Pre-Cast, Pre-Stressed concrete products.

Year: 1981 – 1983

Location: Marikina, Metro Manila, Philippines

Client: Private and Government Sector

Main project features: Fabrication and Erection of Pre-Cast, Pre-Stressed, Post-Tensioned concrete components

Positions held: General Field Superintendent

From : January 1980 To : December 1980

Employer: SAUDI PRE-CAST AND PRE-FAB CO. (SAPRECO)

Positions held: Planning Engineer

Page 16: Updated CV Nov 26 2015

-

11.-Prepares Bar Chart and Schedule of Activities using Bar Char and PERT/CPM of the company’s project in Jubail, Saudi Arabia/.-Compute forward pass and backward pass of each activities to determine the early finish and late finish respectively of each activities to establish the critical path of the schedule.-Prepares monthly progress billing.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Jubail Ladies Dormitory

Year: Jan 1980 – Dec 1980

Location: Riyadh and Jubail, Kingdom of Saudi Arabia

Client: Government

Main project features: Construction of Ladies Dorm

Positions held: Planning Engineer

From : February 1975 To : December 1979

Employer: PHILSTRESSPositions held: From Office Engineer to Superintendent

11.-Supervision and administration of all projects undertaken by the company, schedules flow of equipment and other resources needed. -Checks and control welding works of all grillage plates, plate connectors and shear keys on all erection works.-Schedules x-ray tests on randomly selected welded connections. -Reviews and checks all fabrication drawings.-Supervision of erection works for integrated concrete structural frames including pile driving.-Supervision of all post-tensioning activities for waffle slabs and girders. Checks if all strands have been stressed to the designed stresses-Prepares estimates for labor, materials, and equipment. Organizes manpower and all resources needed for all projects. Supervises foundation works from pile driving to concreting works and erecting of pre-cast, pre-stressed, post-tensioned components. Prepares PERT/CPM, bar charts and time grid diagram. Prepares operating budget and cost

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Fabrication, delivery, and installation of various projects

Year: 1975 – 1979

Location: Metro Manila, Philippines

Client: Various Government and Private Sector

Main project features: Fabrication, delivery, and construction of Pre-cast, Pre-stressed, post-tensioned components.

Positions held: Office Engineer to Superintendent

Page 17: Updated CV Nov 26 2015

-

analysis.-Checks jobsite casting of structural wall panels

From : December 1969 To : December 1974

Employer: Gingoog City Engineer’s Office

Positions held: Maintenance Section Chief

11.-Prepares Program of Work for the Maintenance of the National Highway.-Schedules and assigns worker to do the different tasks for the Maintenance work.-Conducts Traffic Surveys, Traffic countings, Weighing of different types of vehicle and gathering of other datas needed for the ADB funded Construction of Iligan-Cagayan de Oro-Butuan Road.

12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project: Maintenance of the National Highway and other road networks within Gingoog City, Philippines; And Data gathering for the ADB funded project Iligan-Cagayan de Oro-Butuan Road (1974)

Year: 1969 – 1974

Location: Gingoog City, Misamis Oriental, Philippines

Client: Dept of Public Highways

Main project features: Maintenance of Roads and Bridges and Construction of Iligan-Cagayan de Oro- Butuan Road

Positions held: Engineering Aide and later as Maintenance Section Chief.

13. Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Date: 26/11/2015[Signature of staff member or authorized representative of the staff] Day/Month/Year Full name of authorized representative: