update xplm icp kundentage 2014 · 2019. 11. 19. · charly wachtel, xplm solution zürich, 25....

43
Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Upload: others

Post on 28-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Charly Wachtel, xPLM SolutionZürich, 25. September 2014

Köln, 1. Oktober 2014

Update xPLMICP Kundentage 2014

Page 2: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update xPLMUpdate Portfolio§ MCAD§ Outlook Integration§ ECAD§ Publishing§ Systems Engineering

SIG Tage 2014§ SIG MCAD§ SIG MBSE

xPLM Solution GmbH 2

Agenda

Page 3: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update xPLM

Page 4: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Offices in US and Central Europe

4xPLM Solution GmbH

Page 5: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Employees (FTE)

xPLM Solution GmbH - 5 -

Page 6: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

PROFESSIONAL CONSULTANCYAND IMPLEMENTATION SERVICESFOR PLM

CONSULTING SERVICES FORSYSTEMS ENGINEERING ANDDOCUMENTATION PROCESSES

INTEGRATION AND ADD-ONSOLUTIONS FOR LEADING PLM, MCAD,ECAD, SYSML, ERP, DMU, MS-OFFICEAND DATA EXCHANGE APPLICATIONS

24/7 OPERATIONAL SUPPORT,TRAINING AND ADMINISTRATIONSERVICES FOR PLM

Solution and Service Portfolio

Page 7: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update MCAD PortfolioMultiCAD MCAD Release 4.2

Page 8: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

For Solidworks, SolidEdge, Inventor, AutoCAD, OfficeGeneral§ Technology release to improve Scalability and Stability§ Customizing Framework to integrate project specific

Functionality (Customer Scriptengines, Hookups inIntegration Processes for Save and Viewables)

§ Drawing Ballooning, Configurations and BOM Handling§ Improved Installation

Advantages§ Improved Usability (Direct Load to CAD)§ Improved UI (Hyperlinks)§ Improved Performance

xPLM Solution GmbH 8

Development4.2 MultiCAD MCAD Release

Page 9: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update MCAD PortfolioMultiCAD Batch Queue

Page 10: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

General§ MultiCAD Batchqueue Process for Solidworks, Solidedge, Inventor, AutoCAD§ Multiple Formats are processed in one Batch Job (Performance)

Advantages§ Improved Availability§ Improved Performance§ Improved Error Handling and automated Queue Monitoring and Restart

xPLM Solution GmbH 10

DevelopmentMultiCAD Batch Queue

Page 11: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update MCAD PortfolioWorkspace Management

Page 12: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Business Requirements§ CAD engineers use

workspaces to managetheir local design worksuch as CAD files,projects and properties

§ The local Workspace isused to work online oroffline in CAD with the PLM/ERP system metadata. CAD binary data isprepared locally before it is uploaded to PLM/ERP.

§ Workspace Manager supports on collaboration conflicts§ Data structure and File assignment is similar to the local file system plus

additional information (Access, Release Status, Reservation, Lifecycle)xPLM Solution GmbH 13

Workspace ManagementBusiness Requirements

Page 13: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Functionality in Workspaces§ Workspaces work file based and menus trigger specific local CAD and also

PLM/ERP functions§ File Based Functionality

• Open in CAD Tool, Add to Assembly• Copy/Paste• SaveAs/Local renaming (Offline)

§ PLM/ERP Functionality• Assign/Import/SaveAs to PLM• Access and reservation control (Reserve/Checkout/Lock)• Show/set/promote Status, Show PLM metadata• Synchronize local workspace CAD file content with PLM/ERP• Global Renaming

xPLM Solution GmbH 14

Workspace ManagementFunctionality (Creo)

Page 14: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Workspaces Object Information§ Local file properties similar to windows explorer§ Shows PLM metadata and local workspace collaboration information in

addition

• Import to bring local CAD files under workspace control• Export to maintain collaboration information an an exported package

xPLM Solution GmbH 15

Workspace ManagementEngineers Management Frontend

§ Local file properties § PLM/ERP properties/ andcollaboration Information

Page 15: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Workspaces Functionality§ Create Workspace§ Delete Workspace§ Update Workspace Information on Changes

in CAD and PLM/ERP• Show metadata (PLM/ERP metadata plus

CAD file properties)• Collaboration Management

(Out Of Date flags, Access Rights, Checkout User)§ Synchronize Workspace CAD File binary Data with PLM/ERP

• Upload/Commit to PLM (sync local workspace to PLM)• Download/Update from PLM (get latest changes from PLM)

xPLM Solution GmbH 16

Workspace ManagementEngineers Management Frontend

Page 16: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 18

Workspace FunctionalityMenu Item Action DescriptionOpen PLM/ERP Info PLM Open PLM client with metadata form

Open in CAD CAD Open the selected file in CAD

Add Component CAD Add the selected file into the current assembly in CAD

Save to PLM CAD&PLM Perform a save and upload into the PLM/ERP system (Commit of local changes)

SaveAs CAD&PLM Copy and rename in the local Workspace and pull PLM autonumber

Cut/Copy/Paste/Delete File Local file management to copy between local workspaces

Import CAD&PLM Import into the local Workspace and pull PLM autonumbers

Export CAD&PLM Compress the workspace files including collaboration information

Lock/Unlock PLM Lock/Unlock (Reserver/Unreserve) the selected PLM object for the current user

Update/Synchronize CAD&PLM Synchronize the local workspace with the latest content from PLM

Workspace Functional Overview

Page 17: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update MCAD Portfolioe6 Webservice Support, Oracle Fusion

Page 18: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 20

Workspace ManagementMulti CAD and PLM Support

PLM

OracleEDM

OracleFusion

ECI

HTTP/HTTPS

HTTP/HTTPS

Creo Parametric SolidWorksE6 Client

SolidWorks, Inventor,NX, CATIA

Page 19: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Target§ Address Save Performance of integrations

QuickSave details§ Oracle EDM 6.1.3 Webservices are used to implement QuickSave feature§ Improve performance in WAN and LAN environment§ Reduce network traffic for metadata§ Direct communication to PLM server (not over PLM client)§ Leverage DFM§ Support HTTP/HTTPS§ Alternate CEE solution for direct integration over VPN Networks

xPLM Solution GmbH 21

DevelopmentAgile EDM Webservices - QuickSave

Page 20: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update xPLM PortfolioOutlook Integration für Oracle Agile EDM (e6)

Page 21: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

MS-Outlook Integration For Agile EDM (e6)

Confidential ©2005-2013 xPLM Solution

Page 22: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update ECAD PortfolioAvailable Connectors; Out Of the Box Pakages

Page 23: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 26

Available ConnectorsOut Of the Box Packages

Aucotec ELCAD

Aucotec Engineering Base

AutoCAD ecscad

AutoCAD Electrical

EPLAN

Zuken E3 Series

SolidWorks Electrical (planned)

ECAD / Electric

Altium Designer

Cadence Allegro

Cadence OrCAD

Mentor Xpedition - xDX Designer

Mentor Xpedition - xPCB Layout

Mentor PADS PCB

Mentor PADS Schematic

EDA Electronic Out Of The Box PackagesReady to Work§ EDA Project Management

§ Design & PLM Data Management

§ BOM Management

§ Release/Version Management

§ Library Management

Available for Oracle Agile 9On Demand for Oracle EDM (e6)

Page 24: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Update xPLM PortfolioxPLM Publisher for Agile PLM

Page 25: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Publisher for Agile PLM

Manage the content (modules,images) in re-usable topicsControl the publishing workflowwith your Agile PLM workflowContent Assembly and StructureManagement in Agile PLMSupports the content translationand localization processStore your content in an applicationand layout neutral format (XML)Flexible PublishingChannels/ExportProvides the foundation fordocument automation tasks PLM search result

Open XML topicin the XML editor

Object metadatafrom PLMXML preview

xPLM Solution GmbH 28

Page 26: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Systems Engineering

Page 27: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 30

Research and Innovation

Page 28: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 32

PLM-Integrated Models for Specificationand Simulation - Ziel

RequirementsCameo

SimulationSimX

PLMAgile e6

Ziel des Projekts ist die Entwicklung einerMethode und entsprechenderSoftwareapplikation, die eine Prozess- undWerkzeugintegration der Systemspezifikationund -simulation in ein PLM-System ermöglicht.

IP4MBSE – Integration platform for model-basedsystems engineeringVerbindung von Werkzeugen derSystemspezifikation und –Simulation mit einemPLM-System

Spec2Sim – Specification to SimulationErmöglicht automatisierte Überführung vonPartialmodelle der Spezifikation in Partialmodelleder Simulation.

Page 29: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 33

PLM-Integrated Models for Specificationand Simulation – Beispiel I

Abbildung: 16/08/2011 | DC/ETI23 | Hongchao Ji | © Bosch Rexroth AG 2011

Analyse

Erfassung der Kundenanforderungen

Definition und Strukturierung derAbhängigkeiten zwischen denAnforderungen

Einordnung in differenzierteAbstraktionsebenen

Page 30: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 34

PLM-Integrated Models for Specificationand Simulation – Beispiel II

Abbildungen: 16/08/2011 | DC/ETI23 | Hongchao Ji | © Bosch Rexroth AG 2011

Modellierung

Beschreibung der Struktur- undVerhaltensmodell in SysML Diagrammen

Definition der Überprüfungsregelnzwischen Anforderungen undSimulationsmodell

Page 31: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 35

PLM-Integrated Models for Specificationand Simulation – Beispiel III

Abbildungen: 16/08/2011 | DC/ETI23 | Hongchao Ji | © Bosch Rexroth AG 2011

Ausführung

Initiale Simulation

Überprüfen der Resultate an Hand deraufgestellten Regeln

Änderungen am Modell und an Parametern

Nächster Simulationslauf

Überprüfen der Resultate an Hand deraufgestellten Regeln

Page 32: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Systems EngineeringPLM Integration SimulationX

Page 33: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 37

Systems Engineering

Verbesserung von Entwicklungsprozessen durch die PLM-unterstütze Integration von Simulationswerkzeugen und CAD§ Definition von Konzeptvarianten in einer objektorientierten

Modellierungssprache für die domainspezifische Detailentwicklung mit CAD§ Absicherung von Systemeigenschaften und Produktkonzepten in der frühen

Phase§ Simulationsdatenverwaltung als integraler Bestandteil eines MBSE-Ansatzes§ PLM-gesteuerter Datenaustausch zwischen CAD und

Simulationswerkzeugen

Page 34: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

PLM Integration für SimulationXSimulationX

SimulationX ist ein bewährtes undleistungsfähiges Werkzeug in derIndustrie und Forschung für vielfältigeSimulationsszenarien.Seit mehr als 20 Jahren kommt dieSoftware bei über 700 Kunden inverschiedenen Branchen wie imFahrzeugbau, der Energietechnik, fürHaushaltsgeräte, im Bergbau, bei Ölund Gas, Schienenfahrzeugen,in der Luftfahrt, dem Maschinenbau,der Medizintechnik und im Schiffbauerfolgreich zum Einsatz.

Main Features:

Stationäre Simulation im FrequenzbereichLineare Systemanalyse:Eigenfrequenzen und Schwingformen,ÜbertragungsverhaltenVarianten-Assistent (Parameterstudien)GleichgewichtsberechnungLeistungsanalyseOrdnungsanalyse

Page 35: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

PLM Integration for SimulationXFunction Overview

Basic Functions§ Create Document§ Save Document§ Copy Document§ Load Document§ Create Parameter Set (New Simulation)§ Update Parameter Set (Update Simulation)

Enhanced Functions:§ Compose Simulation Models§ Transmit CAD Parameters and Transformation Matrices§ Generation via MODELICA snippets/templates§ Synchronize Standard Libraries (CADBAS, CADENAS, ..)§ Batch Processing via Automation Interface Visualization of results

Page 36: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Integration ScenariosScreenshots - SimulationX

Parameter

Model

Result

File

Simulation

Page 37: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

vom 28. Oktober – 30. Oktober 2014in Böblingen

MCAD SIG Tage

Page 38: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 45

Agenda MCAD SIG Tage

SIG Tag (1) am 28. Oktober 2014: SolidWorks /Solid Edge/ Inventor/ AutoCAD§ neue Kopplungsarchitektur

• Features, BatchServer• Migration

SIG Tag (2) am 29. Oktober 2014: Pro/E Creo§ Erfahrungsberichte xCSH§ Creo 3.0 Support§ WorkSpace Management§ PLM Einbindung von Simulationsanwendungen am Beispiel von SimulationX

Page 39: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 46

Agenda MCAD SIG Tage

SIG Tag (3) am 30. Oktober 2014: CATIA / NX§ Erfahrungsberichte xCSH§ WorkSpace Management§ Aktueller Stand CATIA V6 Integration§ PLM Einbindung von Simulationsanwendungen am Beispiel von SimulationX

Page 40: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

am 03. Dezember 2014in Viernheim

MBSE SIG Tag

Page 41: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

xPLM Solution GmbH 48

Agenda MBSE SIG Tag

Bericht von MecPro² (BMFT-Projekt)§ Modellbasierter Entwicklungsprozess cybertronischer Produkte und Produktionssysteme

Innovation Management§ Integrationen von Requirements Management Systemen über standardisierte Schnittstellen§ Vorstellung Fusion Innovation Management, Integration in Agile e6§ Automatische Pflichtenhefterstellung und Testspezifikationen via XPLM Publisher

Verbesserung von Entwicklungsprozessen durch die PLM-unterstützeIntegration von Simulationswerkzeugen und CAD§ Definition von Konzeptvarianten in einer objektorientierten Modellierungssprache für die

domainspezifische Detailentwicklung mit CAD§ Absicherung von Systemeigenschaften und Produktkonzepten in der frühen Phase§ Simulationsdatenverwaltung als integraler Bestandteil eines MBSE-Ansatzes§ PLM-gesteuerter Datenaustausch zwischen CAD und Simulationswerkzeugen

Anschließender Workshop

Page 42: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

Anmeldung xPLM SIG Tage

MCAD SIG Tage:28.-30. Oktober 2014in Böblingenhttp://www.xplm.com/sig

MBSE SIG Tag:03. Dezember 2014in Viernheimhttp://www.xplm.com/mbse-sigxPLM Solution GmbH - 49 -

Page 43: Update xPLM ICP Kundentage 2014 · 2019. 11. 19. · Charly Wachtel, xPLM Solution Zürich, 25. September 2014 Köln, 1. Oktober 2014 Update xPLM ICP Kundentage 2014

THANKS A LOT FOR YOUR TIME !

xPLM Solution GmbH

Office Europe: Devrientstr. 5, 01067 Dresden, GERMANYOffice USA: 250 Commercial Street, Worcester, MA 01608, USAEurope: +49 351 82658-0; USA: +1 508 753-7500E-mail: [email protected]; Internet: www.xplm.com