update to ashrae standard 90.1-2016 overview_rev2_all...update to ashrae standard 90.1-2016 m....
TRANSCRIPT
![Page 1: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/1.jpg)
Update to ASHRAE Standard 90.1-2016
M. DENNIS KNIGHT, P.E.Whole Building Systems, LLC
July 19, 2017
1
![Page 2: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/2.jpg)
Topics
Standard 90.1 GoalsMajor Changes in 90.1-2016Energy Savings Impact of Standard 90.1-2016
2
![Page 3: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/3.jpg)
Standard 90.1 Goals
Standard 90.1 Overall GoalANSI consensus standardSave energyTechnically feasible and cost effective
90.1-2016 Specific GoalsEasy to useNew format to move to e-readingImprovement measured by whole building energy performance
3
![Page 4: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/4.jpg)
Summary of Changes
Total of 121 addendaMajor format changes for ease of useNew climate maps aligning with ASHRAE Standard 169New performance-based compliance pathSignificant whole building energy savings
4
![Page 5: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/5.jpg)
New Format
5
2013 2016278 total pages 388 total pages Two-column format Single-column formatNo shading for table rows Alternate shading for table rowsDefined terms normal font Defined terms italicized
![Page 6: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/6.jpg)
New Climate Zone Map
6
Aligns with new ASHRAE Standard 169-2013Reflects global warming trends over the most recent 30 yearsAdds new Climate Zone 0 (extremely hot)Approximately 10% of U.S. counties reassigned to a warmer climate zone
![Page 7: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/7.jpg)
Prescriptive ChangesStandard 90.1 includes two types of compliance paths
Prescriptive path
Proposed Design
Baseline Design
Performance Path
$
$
![Page 8: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/8.jpg)
Envelope
Fenestration90.1-2016 includes a comprehensive update to the fenestration prescriptive requirements
U-factor reduced by as much as 22% in some climate zonesSHGC reduced by as much as 12%
8
![Page 9: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/9.jpg)
Envelope
Walls and DoorsMetal building wall thermal properties better defined to enhance complianceU-factors and air leakage limits for doors are improved
9
![Page 10: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/10.jpg)
Envelope
Building Air LeakageWhole building air leakage testing added as a compliance optionAir barrier design and installation verification required
10
![Page 11: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/11.jpg)
Mechanical
Increased HVAC Equipment Efficiency Requirements
11
Chillers Heat Pumps
Rooftop AC Units Cooling Towers
Dedicated Outdoor Air* Computer Room AC
Variable Refrigerant Flow
* Newly regulated equipment
![Page 12: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/12.jpg)
Mechanical
Replacement equipment now needs to meet many of the requirements formerly for new equipment only. For example:
Various controls requirementsEconomizer requirementsFan efficiencyBoiler turndown
![Page 13: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/13.jpg)
MechanicalHotel/Motel Guest Room Controls
Heating, cooling, & ventilation automatically reduced when unoccupied
Chilled Water Plant MeteringLarge plants required to meter for electricity and efficiency
Economizer Fault Detection and DiagnosticsEnsures that economizers using outdoor air for free cooling are configured and working correctly
![Page 14: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/14.jpg)
Lighting
Reduced Lighting Power Allowance โ Exterior, Interior, Retail Display
Primarily based on improved efficacy of LED lightingExterior lighting power reduced an average of 30%Interior space-by-space reduced an average of 26%Retail display reduced ~25%
![Page 15: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/15.jpg)
Lighting
Exterior lighting and parking garage lighting requirements to reduce power by 50% during unoccupied periods or after business hours
Increased from 30%
15
![Page 16: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/16.jpg)
Lighting
Parking areas with shorter poles (24 ft or less) & > 78WLights automatically reduce by at least 50% as detected by occupancy sensors
16
![Page 17: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/17.jpg)
Lighting
Dwelling Unit LightingApartments, condos, living space must have at least 75% of permanently installed fixtures with minimum lamp efficacy of 55 lumens/WattLikely requires LED or fluorescent
17
![Page 18: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/18.jpg)
Power
50% of receptacles (wall plugs) in a space must have automatic shutoff control
Private offices, conference rooms, print/copy, breakroom, classroom individual workstationsRequires automatic control (ex: occupancy sensor or time-of-day schedule)Controlled receptacles must be marked and uniformly distributedPlug-in type devices do not comply
18
![Page 19: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/19.jpg)
New Compliance Path90.1-2013 Includes Two Paths for Compliance:
Prescriptive
Proposed Design
Baseline Design
Performance โ Energy Cost Budget (ECB)
EnerSiHAP
EnergyInsightsโข
$
$
![Page 20: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/20.jpg)
90.1-2016 Introduces a Third Path for ComplianceAppendix G, Performance Rating Method โ similar to Energy Cost Budget but more flexibleNot for code compliance (prior to 2016)Used for beyond code programs
LEEDASHRAE Standard 189.1International Green Construction Code (IgCC)EPACT Tax Credits
Provides credit for good design choices typically not recognized in code
Good HVAC systems selectionRight sizing of HVAC systemsOptimized orientation and use of windowsEfficient use of thermal mass
New Compliance Path
20
![Page 21: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/21.jpg)
Appendix G requires a Performance Cost Index (PCI) specific to building type and climate zone
Baseline set ~ 90.1-2004Intent is that the stringency of the baseline doesnโt changePCI target changes with each version of a code Beyond code programs can choose a PCI to meet their needs
New Compliance Path
๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐ ๐ถ๐ถ๐๐๐ถ๐ถ๐ถ๐ถ ๐ผ๐ผ๐๐๐ผ๐ผ๐๐๐ผ๐ผ (๐๐๐ถ๐ถ๐ผ๐ผ) =๐๐๐๐๐๐๐๐๐๐๐ถ๐ถ๐๐๐ผ๐ผ ๐ต๐ต๐ต๐ต๐ต๐ต๐ต๐ต๐ผ๐ผ๐ต๐ต๐๐๐ต๐ต ๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐ต๐ต๐๐๐ถ๐ถ๐๐๐ต๐ต๐ต๐ต๐๐๐๐ ๐ต๐ต๐ต๐ต๐ต๐ต๐ต๐ต๐ผ๐ผ๐ต๐ต๐๐๐ต๐ต ๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐๐ 0.75
0.50
0.25
0
1.0 Baseline90.1-2004
Net Zero
90.1-2016
189.1-2017(estimate)
Future Codes
90.1-2010
![Page 22: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/22.jpg)
Appendix G - Single Ruleset for Many Purposes
New Compliance Path
22
![Page 23: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/23.jpg)
90.1-2016 Introduces a Third Path for ComplianceProvides increased flexibilitySaves time and money dedicated to energy modeling by allowing a single modeling approach to be used for multiple functionsEncourages the creation of tools that automate the simulation process as the market is increasedProvides credit for good design practices that were previously not recognized for code compliance
New Performance Path Summary
23
![Page 24: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/24.jpg)
Model Codes Historic Savings
24
![Page 25: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/25.jpg)
Energy Saving Analysis Method
25
Develop 16 prototype building models using EnergyPlus
Apply to 8 climate zones (17 climate locations)
Generate minimally code-compliant models for 90.1-2004, 2007, 2010, 2013 and 2016 editions
Assign new building construction weighting factor to each bldg in each climate location
Calculate the national weighted energy use intensity and energy cost index
![Page 26: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/26.jpg)
90.1-2016 Energy SavingsPreliminary Results
38.7% 35.7%16.5%
47.2% 37.4% 44.6% 48.6%
29.9% 28.9%
25.1%29.2%
44.4%
11.9%
21.4%
21.5% 20.8%34.1%
0
100
200
300
400
500
600
700
Ener
gy U
se In
tens
ity [k
Btu
/sf]
Prototype Name
Prototype EUI vs. National Weighted Average EUI
90.1-2004
90.1-2016
Prototype EUI National Weighted
Average EUI
26
![Page 27: Update to ASHRAE Standard 90.1-2016 Overview_Rev2_all...Update to ASHRAE Standard 90.1-2016 M. DENNIS KNIGHT, P.E. Whole Building Systems, LLC. July 19, 2017. 1](https://reader031.vdocuments.mx/reader031/viewer/2022030723/5b08f9a17f8b9ac90f8d63c4/html5/thumbnails/27.jpg)
Preliminary Results
National Weighted Average
Site Energy [kBtu / ftยฒ-yr]Energy Cost [$ / ftยฒ-yr] % Energy or Cost Savings
90.1-2004 90.1-2013 90.1-2016 PI 90.1-2013 vs.90.1-2004
90.1-2016 PI vs.90.1-2004
90.1-2016 PI vs.90.1-2013
Whole Building
76.5 54.1 50.43 29.3% 34.1% 6.8%
$1.84 $1.32 $1.21 28.5% 34.2% 8.0%
27